by ms. pakawan chufamanee director of mekong affairs division,
DESCRIPTION
by Ms. Pakawan Chufamanee Director of Mekong Affairs Division, Bureau of International Cooperation, Department of Water Resources, Ministry of Natural Resources and Environment, Thailand. - PowerPoint PPT PresentationTRANSCRIPT
by Ms. Pakawan ChufamaneeDirector of Mekong Affairs Division,Bureau of International Cooperation,Department of Water Resources,Ministry of Natural Resources and Environment, Thailand
25 River Basins in ThailandBasin No. Name of River Basins Catchment Area
(sq.km.)01 Salawin 17,92002 Mae Khong 57,42203 Kok 7,89504 Chi 49,47705 Mun 69,70006 Ping 33,89807 Wang 10,79108 Yom 23,61609 Nan 34,33010 Chao Phraya 20,12511 Sakaekrang 5,19112 Pasak 16,29213 Thachin 13,68214 Mae Klong 30,83715 Prachinburi 10,48116 Bang Pakong 7,97817 Tonglesap 4,15018 East Coast 13,83019 Phetchaburi 5,60320 Prachuap Khiri Khan coast 6,74521 South East Coast 26,35322 Ta Pi 12,22523 Songkhla Lake 8,49524 Pattani 3,85325 South West Coast 21,172
MRC Joint Committee
MRC Council
Mekong River Commission Secretariat
National Mekong
Committee
Development Partner
Dialogue PartnerObserver
Linkage Local, National and Regional
Cabinet
National Water Resources
Committee (chair by PM)
Thai National Mekong
Committee (chair by Minister)
River Basin Committees
National Working
Group/Consultation
DG(Secretary)
WG 1 WG 2 WG 3 WG 4TNMC-BDP
Sub-area WG 2T
Sub-area WG
3T
Sub-area WG
5T
Joint Committ
ee
Donor Consultativ
e Group
MRC Secretariat
Council
MRC Summit
Role of River Basin Committee
• Formulation plan that further submitted for river basin investment
• Promoting participation of stakeholders
• Formulation of participatory water allocation system
- The water resources planning are not integrated
- Lacking of information
- Members lack of understanding
- Insufficient expertise and knowledge
- Secretariat offices have work load
- Inadequate public relation
- The implementation of authority is absent
Stakeholder participationRoles & responsibilities
Capacity
Policy and legislation
Data & information
Finance
River Basin Committee Performance
RBCPerforman
ce
Adapted Integrated Water Resources Management to national and river basin;
Guideline on Water Resources Management from the 10th National Economic and Social Development Plan (2007 – 2011)- Watershed forests rehabilitated- Water resources development- Flood prevention- Waste water control and mitigation- Increasing water resources management efficiency
1) IWRM is required mechanism, tools and process2) Capacity building and strengthening of
participants3) Different background and knowledge of RBC
members4) Required strong leader/adviser5) Realistic projects are required present to public
and government organization/local administrations
6) Needs public concern, participation and acceptation
Obstruction of Water Resources Management in Thailand
1) Policy and plan: no unity, plan and practical action
2) Institutional structure: existing institution structure is not different in the past
3) Related to water laws: variety of water laws, lacking of unity
4) Database and knowledge base on water resources management: scattered information in various agencies, variety of information, lacking of linkage and skillful personnel
Mekong-Integrated Water Resources management
14
Environment
Climate Change and Adaptation
Integrated Capacity Building
Information and Knowledge Management
Fis
herie
s
Wat
ersh
ed M
anag
emen
t
Dro
ught
M
anag
emen
t
Tou
rism
Flo
od M
anag
emen
t an
d M
itiga
tion
Nav
igat
ion
Sus
tain
able
H
ydro
pow
er
Basin Development Plan
MRC Integrated Programme/Project
Supporting Regional Cooperation for Sustainable Development ofWater and Related Resources in the Mekong River Basin
Agr
icul
ture
and
Ir
rigat
ion
IWRM-based basin strategy
Development scenarios analysis
(Regional and Sub-area levels)
Promotion Implementation
Project portfolio
(Short list)
Rolling IWRM-based
Basin Development Plan
Knowledge base
Participation
Capacity building
Sub-areas analysisRegional and National sector reviews
Planned project database
(Long list)
Supporting
Stage:1
Stage:2
Stage:3
Stage:4
Stage:5
Stage:6
Evaluation
Monitoring
UpdatingStage:7
Planning Process
16
Pa
k B
en
gL
ua
ng
Pra
ba
ng
Xiy
ab
uri
Pa
k L
ay
Sa
na
kra
mP
ak
Ch
om
Ba
n K
um
Str
ute
ng
Sa
mb
or
La
t S
ua
Go
ng
ou
qia
o
Xia
ow
an
Ma
nw
an
Do
cha
sha
n
Nu
ozh
ad
uJi
ng
ho
ng
MYANMAR
Ga
lan
ba
Me
ng
son
g
Do
nsa
ho
ng
Th
a K
ho
Xiaowan 2010(9,900 MCM)
Manwan1993( 257 MCM)
Dochashan 2003(367 MCM)
Nuozhadu 2015 (12,300 MCM)
Jinghong 2008 (249 MCM)
Proposed 12 MainstreamDams in Lower Mekong Basin
Proposed and existing HydropowerProposed and existing HydropowerProjects in the Mekong MainstreamProjects in the Mekong Mainstream
Mutual Benefit Mechanism and Tools• Procedures/Guidelines• RBC/RBO Network• SEA• TBEIA• Wetland Management• Promotion of IWRM• JRP, training• Pilot sub-basins• Decision Support Framework (DSF)