by fantastic floors end of year horror – the following floor was done between 6-8 december 2006...

25
by Fantastic Floors End of Year Horror End of Year Horror The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what we did …………

Upload: dasia-bebb

Post on 29-Mar-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

by Fantastic Floors

End of Year HorrorEnd of Year Horror – –

The following floor was done between 6-8 December 2006

The floor is beetle ridden and in a bad state this is what we did …………

Page 2: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

WOODSTOCK

• We took on a job on Wednesday 6th December which for some reason I happened to had to manage but never actually went to see initially, to quote on !

• By now you must know we are exhausted the pressure in sleepy holy is on; all of a sudden the sun’s out and the Capetonions comes to live !

• Demand - Demand - Demand – beware the Transvalers are coming and the foreigners are in Cape Town – everybody is cleaning up and this was our worst horror for 2006 !

Page 3: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Beetles

Page 4: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Rats ???

Page 5: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Holes, Cracks & Craters

Page 6: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Serious damage ……wood cracked off – all needed filling

Page 7: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Buckled and warped and very uneven….

Page 8: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

And long & in serious neeeed….

Page 9: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Fixed best possibly ……tongue and groove floors (which has been chipped

and worn away) … Blue pointer rat holes ..

Page 10: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

WOW !!!!– first coat

Page 11: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

BEFORE….. LOUNGE Complete house is in Oregon Pine floors with an inlay of plain pine

repairs (see section between brackets) done previously when client did renovations - Oregon Pine is available for repairs if you need – just

ask next time and we will do it properly !!??

Page 12: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Same room….

Page 13: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

End result after sealer – see normal pine (and colour difference !)

Page 14: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Fill-ups – sanded down – this section is oregon pine in lounge

Page 15: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Second coat….

Page 16: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Kitchen after sanded down 4 times …

Page 17: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Sealed – 3rd time – floor so porous it would need 4, where the norm is 3 !

Page 18: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Starting to seal

Page 19: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

3rd Sealer …..

Page 20: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

4th sealer (which normally should only get 3 coats but floors extremely porous)

Page 21: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

This floor is a horror – uneven – cracked and warped – should actually have been replaced !

Page 22: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Fixed and filled to the best our ability !

Page 23: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

End result – if you had seen this initially you would not believe the final outcome

Page 24: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Done !!

Page 25: By Fantastic Floors End of Year Horror – The following floor was done between 6-8 December 2006 The floor is beetle ridden and in a bad state this is what

Done !!!