B W S S B ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

Upload: juliet-mangin

Post on 15-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

ENVIRONMENT ACTION PLAN (PART -B)

FOR BANGALORE

Presentation on

By

Chief Engineer (CP & WWM)BWSSB

Page 2: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

MAJOR RIVERS IN AND AROUND MAJOR RIVERS IN AND AROUND BANGALOREBANGALORE

TO TAMILNADU AND BAY OF BENGAL

TO TAMILNADU AND BAY OF BENGAL

JOINS RIVER PONNAIYAR

KARNATAKA

BOUNDARY

Page 3: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

DRAINAGE PATTERN OF BANGALOREDRAINAGE PATTERN OF BANGALORE

PONNIAYAR BASINCAUVERY

BASIN RIDGE LINE

Page 4: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

WHAT IS ALL ABOUT –

ENVIRONMENTAL ACTION PLAN (EAP) ?

Page 5: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

WHAT IS EAP ?

AN ACTION PLAN INCLUDING COST AND TIME REQUIRED FOR REHABILITATION OF EXISTING SEWERAGE SYSTEM TO COLLECT, TREAT AND DISPOSE THE TREATED SEWAGE THERE BY ABATING THE RAW SEWAGE FLOW INTO DRAINS AND LAKES etc.

EAP-PART‘A’ : WORKS STARTED WITH NRCP FUNDS

EAP-PART ‘B’ : ADDITIONAL WORKS IDENTIFIED FOR KUIDFC FUNDING

Page 6: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

OBJECTIVE

– STOPPING FLOW OF RAW SEWAGE INTO STORM

WATER DRAINS

– ACHIEVING ZERO DISCHARGE OF RAW SEWAGE

INTO DRAINS

– CONVEYING SEWAGE TO TREATMENT PLANTS

– AND TREATING TO MEET STANDARDS

– IMPROVING ENVIRONMENT

– IMPROVING SOCIO-ECONOMIC STATUS

Page 7: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

EAP-PART ‘A’

• Under EAP-Part ‘A’, totally fourteen works for rehabilitation of major sewers were identified and prioritised based on their condition & urgency in all three major valleys as follows:

1. V-Valley : Ten works

2. Koramangala Valley : Three works

3. Challaghatta Valley : One work

Page 8: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

WORKS UNDER EAP –PART’A’

SANCTIONED FUNDS : Rs. 46.27 Crores

AWARDED COST OF WORKS : Rs. 56.6 Crores

DETAILS OF WORKS

VRISHABAVATHI VALLEY : 10 Works

KORAMANGALA VALLEY : 03 Works

CHALLAGHATTA VALLEY : 01 Works

TOTAL LENGTH OF SEWERS : 22.41 KM

DUE DATE FOR COMPLETION : AUGUST 2004

Page 9: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWERS COVERED UNDER EAP-PART(A)

Page 10: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

• V-Valley

1. Sujatha Theatre – Laying of parallel 1200mm and 1600mm dia trunk sewers2. Guttahalli – Laying of 600mm dia submain 3. Hosakerehalli Bus stand – Laying of 450mm dia submain4. APMC – Laying of 450mm dia submain5. Cauvery nagar – Laying of 450 & 600mm dia submain6. Nandhini Theatre – Laying of 450mm dia submain7. Kamakshipalya – laying of 450mm dia submain8. Laggere – Laying of 450mm dia submain9. Magadi Road Bridge- Laying of parallel 1200mm dia trunk sewer10. SJR College – Laying of 1200mm dia trunk sewer

• Challaghatta 11. RBANMS Junction – Laying of 1200mm, 1600mm and 1800mm dia

trunk sewers- Enhancement of capacity

• Koramangala12. Koramangala Peripheral – Laying of 600mm dia trunk sewer-Enhancement of

Capacity13. Madivala –Laying of 1000 mm &1800 mm dia trunk sewers.14. J.P Nagar 6th Phase- Laying of 600 mm &800 mm dia trunk sewers-

Enhancement of Capacity.

LIST OF SEWERS COVERED UNDER EAP-PART(A)

Page 11: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

WHY SEWAGE IS FLOWING INTO

STORM WATER DRAINS ?

Page 12: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

BECAUSE OF

1. INADEQUATE CARRYING CAPACITY 2. CORRODED & DAMAGED SEWERS3. SEWERS WITH REVERSE / FLAT GRADIENT 4. SEWERS NOT LINKED TO SYSTEM5. SEWERS NOT PROVIDED IN CERTAIN AREAS6. SEWERS DISPLACED DURING FLOODS7. SEWERS CONNECTED TO DRAINS DIRECTLY8. MANHOLES DAMAGED FOR IRRIGATION9. MANHOLES OVERFLOWING DUE TO

BLOCKAGE BY THE SOLID WASTES DUMPED INTO MANHOLES

10. MANHOLES AND SEWERS ENCROACHED

Page 13: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWAGE FLOWS INTO OPEN DRAINS DUE TO

INADEQUATE CARRYING CAPACITY

Page 14: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B Seshadripuram Main Road-Malleshwaram-V Valley

Page 15: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BJakkarayana Kere – Seshadripuram: V-Valley

Page 16: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BEast End Road – Jayanagar :

Koramangala Valley

Page 17: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWAGE FLOWS INTO OPEN DRAINS DUE TO CORRODED

AND DAMAGED SEWERS

Page 18: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

Magadi Road-Cholurplaya-V-Valley

Page 19: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B Clear View in Magadi Road-Cholurplaya-V-Valley

Page 20: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BCorroded Sewer Exposed in MV Garden-Ulsoor

Challaghatta Valley

Page 21: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B Sathyanarayana Swamy Temple Street –Near Ulsoor Lake –Challaghatta Valley

Page 22: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BUlsoor Lake Bund – Challghatta Valley

Nalla Road- Murphy Town

Page 23: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BNear Nalla Road in M.V. Garden-Ulsoor

Challghatta Valley

Page 24: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWAGE FLOWS INTO OPEN DRAINS DUE TO SEWERS LAID IN REVERSE / FLAT

GRADIENT

Page 25: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BNear the Park in Prasanthi Nagar-Pattegerpalya

K & A Valley

Page 26: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BNear PESIT in Desouza Colony – Hosekerehalli

V-Valley

Page 27: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BAt Ranganathapura in KamakshiPalya

K & A Valley

Page 28: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BIn RPC Layout -Rajaji Nagar : V-Valley

Page 29: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWAGE FLOWS INTO OPEN DRAINS DUE TO ABSENCE OF SEWERAGE NETWORK

Page 30: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BNear Pusphagiri Nagar-Hosekere halli

Kathriguppa Valley

Page 31: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWAGE FLOWS INTO OPEN DRAINS DUE TO SEWERS

DISPLACED DURING FLOOD

Page 32: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

Near Infant Jesues Church at Vivek NagarK-Valley

Page 33: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWAGE FLOWS INTO OPEN DRAINS DUE TO LATERALS DIRECTLY CONNECTED TO

DRAINS

Page 34: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BMaruthi Nagar- Tavarakere

Page 35: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BJ.P Nagar 6th Phase –Jaragenahalli

Tavarekere

Page 36: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BNear Krishnappa Garden- Balaji Nagar

Koramangala Valley

Page 37: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BAndhaman Nagar, J.C. Road

Koramanagala Valley

Page 38: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BGazoor Layout -Vinayak Nagar

Tavarekere

Page 39: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BDollars Layout - J.P Nagar

Tavarekere

Page 40: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWAGE FLOWS INTO OPEN DRAINS DUE TO SEWERS

AND MANHOLES DAMAGED TO IRRIGATE THE FIELDS

Page 41: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BDefence land : KoramangalaValley

Page 42: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

Defence land : Koramangala Valley

Page 43: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BCentral Excise Layout-Yeshwanthapur

Hebbal

Page 44: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

Defence Land - Koramangala Valley

Page 45: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWAGE FLOWS INTO OPEN DRAINS DUE TO SEWERSLAID INSIDE THE STORM

WATER DRAINS

Page 46: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

Srinivasanagar : Kathriguppa Valley

Page 47: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BSt.Jhons Church Road-Ulsoor

Challaghatta Valley

Page 48: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BArmstrong Road-Ulsoor

Challaghatta Valley

Page 49: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SEWAGE FLOWS INTO OPEN DRAINS DUE TO SEWERS

AND MANHOLES ENCROACHED

Page 50: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BDollars layout – J.P. NAGAR

Tavarekere

Page 51: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BGiri Nagar : Kathriguppe Valley

Page 52: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B NDRI Compound – Koramangala Valley

Page 53: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BTimber Yard Layout - Sanjay Nagar

V-Valley

Page 54: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

BKrishanamma Garden –Munnireddy Palya

Challaghatta Valley

Page 55: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

IN ADDITION THE SYSTEM SUFFERS DUE TO

• LOW STRENGTH PIPES (NP2 / CI)

• PIPES USED BEYOND LIFE TIME

• NO PROPER BEDDING

• LACK OF CO-ORDINATION IN LINKING OF LOWER DIAMETER SEWERS

• UNEXPECTED DEVLOPMENTS &TRAFFIC LOAD

• ABSENCE OF VENT SHAFTS FOR LONG SEWERS

• DISCHARGE OF INDUSTRIAL WASTE

• ABSENCE OF INTERIOR DETAILS OF SEWERS

AND MANHOLES

Page 56: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

NECESSITY FOR EAP-PART B

TO ACHIEVE THE OVER ALL GOAL OF ZERO

DISCHARGE INTO DRAINS IT IS VERY MUCH

REQUIRED TO CARRY OUT THE WORKS

IDENTIFIED IN ALL MINOR VALLEYS AND FEW

ADDITIONAL WORKS IDENTIFIED THERAFTER

IN MAJOR VALLEYS. THEY ARE TO BE

INTERLINKED WITH THOSE WORKS UNDER

EAP-PART - A

Page 57: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SCOPE OF WORK – EAP (PART B)

• REHABILITATION / REPLACEMENT OF IDENTIFIED SEWERS (450mm to 2000mm dia) & APPERTUNENCES

• RECTIFYING THE DEFECTS IN THE COLLECTION SYSTEM

• LAYING NEW SEWERS WHEREVER NEEDED

• CONDUCTING CC-TV SURVEY TO ASSESS THE CONDITIONS OF MAJOR SEWERS

Page 58: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SUMMARY OF PROPOSAL – EAP (PART B)

• TOTAL LENGTH OF SEWERS : 95 KM

• LENGTH OF GRP SEWERS : 7.8 KM

• DIA OF SEWERS : 450 - 2000 mm

• TOTAL COST : Rs. 100 CRORES

• TIME REQUIRED : TWO YEARS

• NUMBER OF WORKS : 56

• BASIS OF ESTIMATES : BWSSB SR(02-03)

Page 59: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

OVERALL MAP SHOWING WORKS IDENTIFIED UNDER EAP (PART B)

Page 60: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

V - VALLEY

• NUMBER OF WORKS : 12

• LENGTH OF SEWERS : 19 KM

• COST OF WORKS : Rs. 9.16

Crores

Page 61: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

MAP SHOWING IDENTIFIED SEWERS

IN V-VALLEY

Page 62: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

KATHRIGUPPE VALLEY

• NUMBER OF WORKS : 6

• LENGTH OF SEWERS : 10.7 KM

• COST OF WORKS : Rs. 5.25 Crores

Page 63: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

MAP SHOWING IDENTIFIED SEWERS IN KATHRIGUPPE

Page 64: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

KETHMARANAHLLI & ARKAVATHYVALLEY

• NUMBER OF WORKS : 6

• LENGTH OF SEWERS : 13.9 KM

• COST OF WORKS : Rs. 5.7 Crores

Page 65: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

MAP SHOWING IDENTIFIED

SEWERS IN ARKAVATHY

VALLEY

Page 66: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

HEBBAL VALLEY

• NUMBER OF WORKS : 3

• LENGTH OF SEWERS : 6.0 KM

• LENGTH OF GRP SEWERS : 0.5 KM

• COST OF WORKS : Rs. 7.8 Crores

Page 67: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

MAP SHOWING IDENTIFIED SEWERS IN HEBBAL VALLEY

Page 68: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

CHALLAGATTA VALLEY

• NUMBER OF WORKS : 3

• LENGTH OF SEWERS : 6.7 KM

• LENGTH OF GRP SEWERS : 1 KM

• COST OF WORKS : Rs. 9.14 Crores

Page 69: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

KORAMANGALA VALLEY

• NUMBER OF WORKS : 13

• LENGTH OF SEWERS : 30.7 KM

• LENGTH OF GRP : 6.3 KM

• COST OF WORKS : Rs. 44.36Crores

Page 70: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

MAP SHOWING IDENTIFIED SEWERS IN KORAMANGALA AND CHALLAGHATTA

Page 71: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

TAVARAKERE VALLEY

NUMBER OF WORKS : 6

LENGTH OF SEWERS : 7.6 KM

COST OF WORKS : Rs.4.14 Crores

Page 72: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

MAP SHOWING IDENTIFIED SEWERS IN TAVARAKERE

Page 73: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

NECESSITY FOR CC-TV SURVEY

• TO ASSESS THE CONDITION OF MAJOR

SEWERS

• TO CREATE A DATA BASE ON SEWERS AND

MANHOLES FOR LINKING TO GIS

• TO SUPPORT THE REGULAR O&M

• TO ARRIVE AT A REALISTIC SCHEDULE OF

PREVENTIVE MAINTENANCE

Page 74: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

SUMMARY OF COSTS

• REHABILITATION OF SEWERS IN ALL THE VALLEYS : Rs.85.53 Crores

• PROVISIONAL SUMS TOWARDS - FOR CC-TV & CONDITION ASSESSMENT SURVEY : Rs. 10.00 Crores

• Consultancy fee : Rs. 0.87 Crores

• Contingencies : Rs. 3.60Crores

TOTAL : Rs. 100.00 Crores

Page 75: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

PLAN OF ACTION & TARGETS

Step-1: Preparation of DPR (In Progress)

Step-2: Invitation To Tenders, Evaluation and

Award of Contract– within 3 months

Step-3: Completion of Works in 24 Months

Page 76: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

MEASURABLE OUT COMES and SOCIAL BENEFITS

1. About 110 MLD of raw sewage from all the Seven Major and Minor valleys could be brought into the system after completion of this project.

2. About 40,000 population residing in the core area of the City and some portions of the core interfacing with peripheral areas will be directly benefited out of the proposed new sewerage facilities.

3. About 5 lakhs population in the core area of the City will be benefited from the risk of direct exposure to raw sewage flowing in the open drains.

Page 77: BWSSBBWSSB ENVIRONMENT ACTION PLAN (PART -B) FOR BANGALORE Presentation on By Chief Engineer (CP & WWM) BWSSB

B

W

S

S

B

OTHER SOCIO ECONOMICAL BENEFITS

• Zero Discharge of Raw Sewage into Storm Water Drains

• Clean living Environment• Reduction in damaged Assets• Improved water quality in Lakes• Improved Ground Water Quality• Improvement in fish life and aquatic ecology• Improved Aesthetics• Improvement in Public Health & quality of life• Appreciation of property values• Socio-Economic Improvement