bwm-2011-16 statusinstallation on tankers and technologies
DESCRIPTION
Presentation re BWMP (DNV)TRANSCRIPT
-
Jad Mouawad
2011-06-22
BWM-2011-16
Ballast Water Management Convention
Status, installation on tankers and technologies
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
Agenda
2
Ratification
Application
Entry into force
Status
Hazardous areas
APT, technical freshwater etc.
Installation on tankers
Manufacturers
DNV Services
Technologies
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
Iran, 28th country ratified 6th April 2011
3
Status: 28 of 30 parties & 25.43% of 35% tonnage required for entry into force
Party Local requirements Party & local requirements
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
Application
4
Applies
- Party to the Convention; or
- Sailing in waters of a Party
International BWM Certificate
Exceptions
(Reg. A-3)
Emergency Accidental
Uptakeand
dischargein highseas
Uptakeand
dischargein thesame location
Exemption(Reg. A-4)
Betweenspecifiedports
Five yearsperiod
Based onrisk
analysisaccordingto G7
Does not apply
Ballast freeships
Local trade (flag and operationonly under same party)
Local trade (flag ofparty and operationunder anotherparty only)
Navyships
Permanent ballast water
-
July 5, 2011 5
2011 2012 2013 2014 2016 2018
Ratification Entry into force
Intermediate or Renewal survey
Anniversary date in 2016
12 months
Exchange or Treatment
Treatment
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
Installation of treatment systems schedule Reg. B-3
66
Ballast Water
Capacity
Date of construction of ship
Before 2009 2009 2009 2011 2010 or later 2012 or later
< 1500 m
Ballast water
exchange or treatment
until 2016
Ballast water
treatment only after
2016
Ballast water
exchange or treatment
until 2011
Ballast water
treatment only from
2011
Ballast water
treatment only
1500 5000 m
Ballast water
exchange or treatment
until 2014
Ballast water
treatment only after
2014
Ballast water
exchange or treatment
until 2011
Ballast water
treatment only from
2011
Ballast water
treatment only
> 5000 m
Ballast water
exchange or treatment
until 2016
Ballast water
treatment only after
2016
Ballast water
exchange or treatment
until 2016
Ballast water
treatment only after
2016
Ballast water
treatment only
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
Agenda
7
Ratification
Application
Entry into force
Status
Hazardous areas
APT, technical freshwater, etc.
Installation on tankers
Manufacturers
DNV Services
Technologies
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
8
Main principles Connection between cargo area
and engine room not allowed
Rules pre-2007:
Intrinsically safe only allowed
Treatment systems are not
intrinsically safe
Rules post-2007:
Zones 0, 1, 2 and safe
Certified safe, as many of the
treatment systems
Standards:
IIA, T3 minimum oil tanker
Up to IIC, T6 chemical tankers
Gas carriers:
Not an issue as ballast can be led
to the engine room
88
Installation on tankers
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
9
Aft peak tank (APT)
Water from the cargo area not
allowed to be pumped to the engine
room/APT
Water from the APT to the cargo
area:
Two non-return valves
mounted in series; and
All connections between the
APT and the cargo area must
be led above deck with
penetrations to the pump-room
and APT from the main deck
level.
Penetrations of the engine
room/pump-room bulkhead are not
acceptable.
9
Installation on tankers
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
Installation Approval & Surveys
Approval
(DNV Rules Pt.6 Ch.18)
ExchangeBWM Plan
Sequential
Flow through
Dilution
Sediment management
Sampling
TreatmentControl & Instrumentation
Piping systems
Bypasses
Capacity
Foundation (if necessary)
Surveys
(Reg. E-1)
ExchangeDocumentation
Sampling
Openings for flow through
Treatment Installation
Commissioning
Documentation
No sampling for organisms required by Regulation E-1
10
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
Agenda
11
Ratification
Application
Entry into force
Status
Yard capacity
Installation
BWM Plan
Implementation
Manufacturers
DNV services
Technologies
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
Manufacturers type approval by DNV
12
Manufacturer BWT System Technologies Active
Substances
Stage of
approval
Other
approval
Alfa Laval PureBallast 2.0/2.0
Ex
Advanced Oxidization + filtration Yes Type
Approved
No
OceanSaver OceanSaver Cavitation + electrolysis + saturation
+ filtration
Yes Type
Approved
No
Optimarin Optimarin Ballast
System (OBS)
UV + filtration No Type
Approved
No
Headway Marine
Technology
OceanGuard BWMS Electrocatalysis + filtration +
ultrasound
Yes Final
Approval
CCS (China)
Wilhelmsen Marine
Equipment
Unitor BWMS Cavitation + electrolysis + filtration +
ozonation
Yes Final
Approval
South Africa
Auramarine Crystal Ballast
BWMS
UV + filtration No Ongoing No
Knutsen OAS KBAL Pressure drop + UV No Ongoing No
Trojan UV Wartsila BWT UV + filtration No Ongoing No
MMC MMC BWMS UV + filtration No Ongoing No
Sunrui Company Balclor BWMS Electrolysis + filtration Yes Ongoing CCS (China)
Hyde Marine Hyde Guardian
BWMS
UV + filtration No Submitted LR (UK)
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
Manufacturers approval status by other Administrations
13
Manufacturer BWT System Technologies Active
Substances
Stage of
approval
Approval
body
Techcross Electro-Cleen Electrolysis Yes Type Approved South Korea
NEI Ventury Oxygen
Stripping
Deoxygenation No Type Approved Marshall
Islands
NK Co., Ltd NK-O3 Blue
Ballast
Ozonation Yes Type Approved South Korea
Panasia Glo-En Patrol UV + filtration No Type Approved South Korea
JFE JFE BWMS Chemical injection + filtration Yes Type Approved Japan
Hitachi Hitachi BWMS Filtration + coagulation +
magnetic separation
Yes Type Approved Japan
RWO CleanBallast Filtration + electrolysis +
electrochlorination
Yes Final Approval Germany
HHI EcoBallast UV + filtration Yes Final Approval South Korea
Japanese Association
of Marine Safety
SP Hybrid Cavitation + ozonation Yes Final Approval Japan
Ecochlor Ecochlor BWMS Chemcial injection (ClO2) Yes Final Approval Germany
21st Century
Shipbuilding
ARA BWMS Filtration + high energy
plasma + UV
Yes Final Approval South Korea
Severn Trent De Nora BalPure Filtration + electrolysis Yes Final Approval Germany
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
DNV Services
Type Approval of treatment systems
Approval of BWM Plan
Certificate/Statement of Compliance
BWM-E, BWM-EP & BWM-T notations
Class
Preparation of BWM Plans
Feasiblity study for treatment systems
Risk analysis for exemptionsAdvisory
14
-
Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-06-22
15
Safeguarding life, property
and the environment
www.dnv.com