business update 26 march 2015 - analyst...scope of work: provision of full pre-front end engineering...

15
SWIBER HOLDINGS LIMITED Business Update 26 March 2015

Upload: others

Post on 17-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

SWIBER HOLDINGS LIMITEDBusiness Update

26 March 2015

Page 2: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

Business momentum has been picking up since the 2nd half of 2014. Three major new contracts since December

Contract Wins MarketsContract Value (US$

m)

Dec 2014 West Africa 710

Feb 2015 India 310

Mar 2015 India 333

Business Update

Page 3: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

Q4 Q1 Q2 Q3 Q4 Q1

20142013 2015

900

800

650 535

1,400

1,800

Mexican Energy Reforms

in Aug 14

Indonesian

Presidential Elections

in July 14

Indian General

Elections in May 14

Post-election upturn in India and energy reforms in Mexico and India continue to benefit Swiber’s order book

Orderbook

Post-Election Upturn & Energy reforms in target markets

Page 4: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

Through strategic geographical expansion, we keep utilization rates high, as our marine and

offshore construction assets can be mobilized to service regions with opposite weather windows

Latin America Africa Asia Pacific

Operational Season:

March to October Operational Season:

October to May Operational Season:

April to September

Africa & South Asia

Maximizing asset utilization across geographies

Page 5: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

Project Wins: WEST AFRICA

Page 6: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

CLIENT : Houston-based Company

TITLE : West Africa Field Development Project

COMPLETION DATE (PHASE 1) : 1Q2015

COMPLETION DATE (PHASE 2) : mid-2017

CONTRACT VALUE : US$ 710 Million

SCOPE OF WORK:

Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End

Engineering Design (FEED) studies and EPCIC of an Offshore Processing Facility,

as well as associated subsea infrastructure developments.

West Africa Project Overview

Page 7: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

Project Wins: INDIA - DAMAN

Page 8: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

CLIENT : Oil & Natural Gas Corporation Ltd (ONGC), India

TITLE : Daman Development Project

COMPLETION DATE (PHASE 1) : 30th April 2016

COMPLETION DATE (PHASE 2) : 30th March 2017

CONTRACT VALUE : US$ 310 Million

India – Daman Project Overview

Page 9: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

Phase 1 – Completion by 30th April 2016

•Platform Installations – 3 Platforms•Bridge Installation – 1 Bridge•Laying of Pipelines – 47 km•Platform Modification works for TCPP & C24P1

Phase 2 – Completion by 30th March 2017

•Platform Installations – 5 Platforms•Laying of Pipelines – 54 km•Platform Modification works

� Laying of approx. 101 km of pipelines of various sizes

� Installation of 8 New Platforms

� Modification of existing Platforms

India – Daman Scope of Work

Page 10: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

India – Daman Project Field Phase 1

Page 11: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

India – Daman Project Field Phase 2

Page 12: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

Project Wins: INDIA – PRP4

Page 13: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

CLIENT : Oil & Natural Gas Corporation Ltd (ONGC), India

TITLE : Pipeline Replacement Project 4

COMPLETION DATE (PHASE 1) : 15th May 2016

COMPLETION DATE (PHASE 2) : 15th May 2017

CONTRACT VALUE : US$ 333 Million

India – PRP4 Project Overview

Page 14: Business Update 26 March 2015 - Analyst...SCOPE OF WORK: Provision of full Pre-Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) studies and EPCIC of

Phase 1 – 15-Oct-2015 till 15-May-2016

•Laying of Rigid Pipelines » 17 Segment – 138.45 KM•Laying of Flexible Pipelines » 5 Segment – 20.05 KM•Topside Modification of Platforms » 37 nos•Redundant riser removal » 48 nos

Phase 2 – 15-Oct-2015 till 15-May-2016

•Laying of Rigid Pipelines » 7 Segment – 50.25 KM•Laying of Flexible Pipelines » 6 Segment – 28.90 KM•Topside Modification of Platforms » 27 nos•Redundant riser removal » 29 nos

� Laying of approx. 237.65 km of subsea pipelines in 35 segments of various sizes including subsea tie-in for Oil and Gas transportation and water injection.

� Topside modifications at 64 nos. platforms.

� Demolition of 77 nos. of redundant risers