bula!

27
BULA! WELCOME TO THE DEPARTMENT OF TOWN & COUNTRY PLANNING GIS User Conference 2012 Presentation

Upload: zanna

Post on 15-Feb-2016

68 views

Category:

Documents


0 download

DESCRIPTION

BULA!. WELCOME TO THE DEPARTMENT OF TOWN & COUNTRY PLANNING. GIS User Conference 2012 Presentation. from. TOWN PLANNING. to. VILLAGE PLANNING. Role of the Dept. to the Government of the day. Overall Administration, Planning & Regulating of Land Use in Fiji through the: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BULA!

BULA!WELCOME TO THE

DEPARTMENT OF TOWN & COUNTRY PLANNING

GIS User Conference 2012 Presentation

Page 2: BULA!

TOWN PLANNING

VILLAGE PLANNING

from

to

Page 3: BULA!

Role of the Dept. to the Government of the day

Overall Administration, Planning & Regulating of Land Use in Fiji through the: Town Planning Act cap. 140

“Enabling attractive investment environment with strategic directions for sustainable growth”

Page 4: BULA!

RESPONSIBILITIES• Town Planning Schemes• Zoning & Rezoning

• Master Plans• Subdivision of Lands

• Engineering Land & Building Development

• Policy Advice on Strategic Physical Planning and Land

Use.

Page 5: BULA!

The UGMAP for the Greater Western Region (GWR) is a major outcome of the joint

Government of Fiji (GOF) and Asian Development Bank (ADB) Technical assistance.

This was built on the result of the Urban Policy Action Plan(UPAP)

Page 6: BULA!
Page 7: BULA!

DATA COLLECTED

Page 8: BULA!
Page 9: BULA!
Page 10: BULA!

AREA COVERED

Ba

Sigatoka

Page 11: BULA!

MAPS DERIVED

Page 12: BULA!
Page 13: BULA!

WAY FORWARD• To complete Land Use

Survey from Ba to Rakiraki• Further Consultation with

Stakeholders

Page 14: BULA!

The Department of Town and Country Planning is undertaking the Urban Village Planning Scheme as part of the Urban Policy Action Plan (UPAP) and Urban Growth Management Plan (UGMAP) A UN funded project.

VILLAGE PLANNING

Page 15: BULA!
Page 16: BULA!

NAME, MAIN_LIMIT

NarewaFrequent flooding, poorly drained, high seasonal water table, gilgai, nutrient deficiency

NadrogaSlope, profile shallowness, erosion risk, nutrient deficiency, soil moisture deficit

Sawakasa Frequent flooding, high water table, imperfect drainage Soso High water table, salinity

VatuvonuSevere erosion risk, slope, shallow soil, acid, low available P, seasonal moisture deficits

Melimeli Peat swamp not feasible to develop

WaimaroModerate erosion risk, acid, nutrient deficiencies, clayey, limited rooting volume

NausoriFrequent flooding, permanent high water table, poor internal drainage, acid, nutrient deficiencies

Page 17: BULA!
Page 18: BULA!
Page 19: BULA!
Page 20: BULA!
Page 21: BULA!

WAY FORWARD•Further Consultation with Stakeholders•9 Village to complete for the Pilot Projects.

Page 22: BULA!

The land use survey team comprised of members from both the UGMAP GWC Project Team and the UGMAP Urban Village Project Team. The team members were divided into groups and were each given maps outlining their work schedule/timetable and specific work areas to be covered during the first phase of the survey from Namatakula, Sigatoka to Yalalevu, Ba.

METHODOLOGY

Page 23: BULA!

The research has both an Indirect Imposed and Indirect Emergent Structure Surveys: This method was largely employed in the field when doing the survey; where both Interviews and Questionnaires were used.

Page 24: BULA!

ArcMap Version 10 Arc Catalogue Version 10Vanua ViewMicrosoft Office

SOFTWARE USED

Page 25: BULA!

Aerial PhotographsTown Planning SchemesBase MapsCamerasQuestionnairesPencils & PenMeasuring Wheels

TOOLS

Page 26: BULA!

?

Page 27: BULA!

NI SAMOCE