D o c. T i tl e Me t hodStat e me nt of Buil di ng W or k TO A- TO YO JO IN TV EN TU R E D o c . N o C M MS– B W - 0 0 1 R e v . No. 0 D a t e  Ju l y , 2 010 C on str u ctionof Port F acilit i esan d B u i l d i n gsf orC ai Mep I n t erna t i on al C on t ain erTe r mi n al CAI MEP INTERNATIONAL CONT AINER TERMINAL METHOD STATEMENT OF BUILDING WORK Page 1

Upload: muhammad-waqas

Post on 07-Jan-2016

112 views

Category:

Documents


10 download

DESCRIPTION

method statement

TRANSCRIPT

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 1/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

CAI MEP INTERNATIONAL CONTAINER TERMINAL

METHOD STATEMENT OF BUILDING WORK

Page 1

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 2/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

TABLE OF CONTENS

1. Purpose Page 3

2. Work Scope Page 3

3. Reference Technical Specification Page 3

4. Reference Drawings Page 5

5. Construction Work Page

5.1 !eneral "low Chart Page

5.2 Construction Proce#ure Page $

5.2.1 Preparation Page $

5.2.2 %arth Work Page $

5.2.3 Piling Work Page &

5.2.4 Reinforce'ent Work Page 1

5.2.5 "or'work Page 1$

5.2. Concrete Work Page 1&

5.2.$ (asonr) Work Page 22

5.2.* Structural Steel + Roofing Work Page 23

5.2.& "inishing Work Page 25

5.2.1, (echanical + %lectrical Work Page 2

5.2.11 Testing -n# Trial Run Page 2*

  . Construction Sche#ule Page 2*

$. rgani/ational Chart Page 2&

*. 0nspection -n# ualit) Control Page 3,

&. Safet) Control Page 3,

1,. %niron'ental Control Page 31

11. 0nspection -n# testing plan 0TP

12. -ppen#i

 

Page 2

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 3/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

1. PURPOSE

This (etho# State'ent is prepare# to ensure that construction of 6uil#ings for the pro7ect shall

co'pl) on plans specifications an# all releant stan#ar# an# co#e re8uire'ents in the

eecution of #ifferent work actiities to 6e perfor'e# in the construction of 6uil#ings an#

other releant structures associate# with the pro7ect in general. 0n a##ition this will sere as a

tool to gui#e all technical personnel an# la)'an eecute proper construction proce#ures

co'plie# with the 8ualit) an# safet) plans for the pro7ect.

2. SCOPE OF WORK

The scope of work coer for the construction of all 9uil#ing an# its utilities:

 ;o. 9uil#ing na'e Store) Structure

1 P(9 9ranch ffice 2 R C Structure

2 Securit) ffice 1 R C Structure

3 peration 9uil#ing 4 R C Structure

4 -'enit) 9lock 2 R C Structure

5 Container "reight Station C"S 1 < ( R C + Steel Structure

(aintenance Shop 1 < ( R C + Steel Structure

$ Container !ate 1 R C + Steel Structure

* Su6station 1 R C Structure

& "uel Station 1 R C + Steel Structure

1, Pu'p Station 1 R C Structure

11 (iscellaneous structures 1 R C + Steel Structure

3. REFERENCE TECHNICAL SPECIFICATION

Page 3

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 4/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

= Refer attach'ent as appen#i > 1 = -pplica6le stan#ar#s an# co#e of practice ?@A(% 00

of the Technical Specifications Part 1B Diision ,4B pp 214=1414

4. REFERENCE DRAWINGS.

Refer attach'ent as appen#i=2= Drawing list for 9uil#ing Structure P-C1=C(=9@D=!;R.

5. CONSTRUCTION WORK.

5.1 GENERAL FLOW CHART

  9uil#ing work is #epicte# 6) the following flow=chart :

 

Page 4

 %arth Work

Piling Work 

 

Preparation

Roofing Work 

(asonr) Work

Reinforce# Concrete Work 

"inishing Work 

 Structural Steel Work 

Testing + Trial Run

Co'pletion

 (etal Cla##ing Work 

( + % Work

?-C Plu'6ing%lectrical

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 5/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

 

5.2 CONSTRUCTION PROCEDUCE

The work proce#ure is #escri6e# as follows:

5.2.1 PREPARATION

Te'porar) )ar# such as stockpile an# fa6rication )ar# for 6uil#ing work shall 6e prepare#

within the site after soil i'proe'ent. @ocation an# plan shall 6e consi#ere# to aoi# traffic

an# congestions #uring 'o6ili/ation of 'aterialsB 'achines an# o6struction to construction

#uring the course of #ifferent actiities in the site.

0t is necessar) to set up a fa6rication )ar# in or#er to carr) out the fa6rication of

Reinforcing 6arsB for' workB steel fra'es an# so on. -n# alsoB those fa6ricate# BcastB

asse'6le# pro#ucts will 6e te'poraril) stocke# at the Stock )ar#. The )ar#s will 6e gra#e#

flat at the #esignate# area an# with a#e8uate #rainage.

Eoint sure) with the %ngineerFs representatie shall 6e carrie# out to esta6lish control

 points an# confir' the coor#inates an# eleation prior to the co''ence'ent of the

construction works.

-fter confir'ing the coor#inates an# eleations of all the 6uil#ing locationB sure) location

for piling an# ecaation shall 6e carrie# out each stage of the works.

5.2.2 EARTH WORK

5.2.2.1 %caation work :

%caation shall 6e #one in a safe an# se8uential 'anner on the 6asis of the prepare# plan

#rawings an# in accor#ance with the instructions 6) the %ngineer.

The ecaation 'etho# is either 'achine or 'anual cutB an# care is to 6e taken not to

#istur6 the soil 6elow the supporting groun#. 0f #eep trenching nee#s shoringB proper lateral

sheeting an# struts shall 6e proi#e# for safet).

During ecaationB #rainage #itch shall 6e proi#e# an# sloping #own to su'p pit to

 preent floo#ing within the work area in case rain occurs. %arth ecaation with slope# roof 

an# surface #rainage to aoi# scouring off part of ecaation pit.

Ansuita6le 'aterial an# waste 'atters shall 6e re'oe# fro' site to the waste )ar# inaccor#ance with the specification re8uire'ents.

Page 5

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 6/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

-fter ecaationB the 6otto' surface of pit shall 6e co'pacte# to not less than &5G of 

'ai'u' #r) #ensit) 6) i6rator) plate co'pactor an# the slope shall 6e tri''e# off to

aoi# collapse of pit wall.

5.2.2.2 9ackfilling work 

-pproe# suita6le 'aterial shoul# 6e use# for 6ackfilling. Co'paction stan#ar# shall 6e

e'plo)e# in the eecution of this work. "ill 'aterials shall 6e #istri6ute# eenl) to the

 6ackfill area to a specifie# thickness of co'paction H 15, '' thick an# co'pacte# 6)

 porta6le co'pactor to a specifie# co'paction factor. Sprinkle water to the earth fill in

co'pliance with the allowa6le 'oisture contents specifie# 6efore start co'paction. %er)

la)er shall 6e teste# for co'paction to assure that this particular work is checke# an#

co'plie# with the goerning specification.

5.2.3 PILING WORK

5.2.3.1 !eneral flow chart :

Page

(o6ili/ation of Piling (achine

Delier) of RC Pile for 9uil#ing structure

@ifting the lower seg'ent RC pile 6)

Crane then 'ount Diesel a''er 

Driing the lower seg'ent RC pile

Confir' the 6earing capacit) 6)

ealuating penetration #uring #riing

@ifting the upper seg'ent RC pilean# splicing

Driing the upper RC pile

"inish

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 7/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

5.2.3.2 Piling Proce#ure :

5.2.3.2 !eneral Piling Proce#ure

1. Pile (aterial

= Pile (aterial :

PC Spun Pile ,,'' #ia.

PC Spun Pile 5,,'' #ia.

RC S8uare Pile 4,,'' 4,,''

Piles will 6e plant fa6ricate# an# transporte# to the site 6) 9arge an# trailer truck. The) will

 6e supporte# 6) 6e##ing ti'6ers place# #irectl) un#er the positions of lifting hoops.

Piles will 6e store# carefull) on flat groun# within the te'porar) )ar#. Piles will 6e stacke#

on top of one another to a 'ai'u' of three la)er.

(aterial #elier) #ocketsB receipts an# inspection shall 6e con#ucte# to eer) pile #elier)

at site. Result of the inspection an# #elier) #ocu'ents shall 6e su6'itte# to the %ngineer.

 

RC PILE TIMBER 

Storage of RC Pile

Page $

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 8/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

 

TRUCK CRANE

TRAILER

RC PILE

Transportation of RC pile

= Piling %8uip'ent :

The following e8uip'ent shall 6e use# for the Piling work.

a''er : Diesel a''er 4.5 > $ tons classB I9%@I I45I9,

9ase (achine : 0T-C0 PD& or e8uialent

Serice Crane : 35 ton classB crane truck 

thers : Se'i=auto'atic wel#ing 'achine ) -cet)lene cutting outfit

2. 

Piling 6) #iesel ha''er : Refer attache# #rawing 6elow

The pile will 6e #rien 6) #iesel ha''er an# #riing shall stop when the 6earing capacit) is

alrea#) reache# an# confir'e#. -ll piles shall 6e #rien to their specifie# 6earing capacit)

an# location co'pl)ing with technical specification an# #esign #rawings.

Page *

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 9/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

CENTER LINE OF PILE

SURVEYER

TRANSIT/PLUMB BOB

PILE DRIVER

SURVEYER

PILE UNDER DRIVING

DIESEL HAMMER

GNIVI

RD

NOIT

CERID

TRANSIT/PLUMB BOB

Pile Driing

a Driing lower seg'ent pile .

Crane will lift up the lower seg'ent pile. -fter lifting B the pile shall 6e hel# along lea#er 

of #iesel ha''er

The pile position shall 6e a#7uste# 6) 'oing the lea#er. The ha''er with the cap is then

'ounte# on the pile top. 9efore starting #riingB the erticalit) an# position of the pile is

carefull) checke# 6) total station an# theo#olite an# a#7uste# as re8uire#.

 6 Driing upper seg'ent pile .

When the lower seg'ent ha# 6een #rien the secon# seg'ent will 6e positione#

concentric to the 6otto' seg'ent hel# up an# aligne# erticall).

Prior to splicing area to 6e 7ointe# 'ust 6e free fro' rustB oilB water an# other foreign

'atter that woul# affect the 8ualit) of the wel#e# 7oints. Splices will 6e 6) 6utt t)pe 7oint

using arc wel#ing. -ll wel#e# 7oints will 6e inspecte# isuall) .

Page &

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 10/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

Driing will 6e stoppe# when 6earing capacit) is alrea#) achiee#B through the applicationof ile)F s for'ula in calculating the 6earing capacit). See PD- Test calculation .

0f it is foun# that the 6earing capacit) is insufficient against #esign after the re6oun#

recor#B the pile will 6e eten#e# an# re=#rien until the 6earing capacit) is attaine#.

Ru H &.*1 %f.(R. (R < e2 .(P

  S<,.5C1<C2<C3 (R < (P

0n which:

Ru : Alti'ate ResistanceB I;

(R : Weight of ra'B Ig

: Drop height of ha''erB ''

%f : %fficienc) of fall of ha''er 

(P : Weight of pile < hel'et B Ig

e : Coefficient of restitution

Page 1,

PILE DRIVER

DIESEL HAMMER

HELMET

LOWER PILE

1) DRIVING OF LOWER PILE 2) CLEANING OF PILE HEAD 3) SPLICING 4) RESUMING OF DRIVING

FO A EAS EQUI ING MO E THAN 1 PILE LENGTH TO OBTAIN DESIGN BEA ING CAPACITY

UPPER PILE

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 11/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

C1 : %lastic #efor'ation of pile B ''

C2 : %lastic #efor'ation of groun# B ''

C3 : %lastic #efor'ation of pile hea# cushion B '' here C3 H 2 ''.

 S : aerage penetrationB in '' per 6low for at least the last 1, 6lows

Ase re6oun# recor#

The result of Pile #riing an# 6earing capacit) shall 6e confir'e# 6) %ngineer. The recor#s

of pile installation shall 6e su6'itte# to the %ngineer.

0n case the pile tip can not reach the #esign leel #ue to unforeseen har# la)erB these 'atter 

will 6e reporte# to %ngineer.0f piles can not 6e #rien to the #esign leel 6ut has alrea#) attaine# the re8uire# 6earingB

the #riing shall 6e stoppe# to aoi# 6uckling or cracking in accor#ance with Specification

an# %ngineer 0nstruction.

Pile hea# treat'ent shall 6e #one after getting the %ngineersF -pproal.

5.2.3.3 Pile Recor#

9efore final setting of the pilesB the re6oun# shall 6e recor#e#.

The pile #riing is #ee'e# co'plete# after confir'ation of the sufficient 6earing capacit)

against #esign. 9earing capacit) for all piles will 6e calculate# with for'ulas .

5.2.3.4 Test Pile = Test pile position refer to figure on page &B pile #riing

9efore pilingB Pile D)na'ic -nal)sis will 6e con#ucte# to confir' the pile capacities an# to

#eci#e the correction factor of ile)Fs for'ula. PD- test proi#es 'ore infor'ationB a6out

Skin resistance #istri6utionB Toe resistanceB si'ulate# static loa#=settle'ent relationshipB

 pile integrit)B stresses in the pile #uring the 6low.

The #etail proce#ure shall 6e su6'itte# in separate #ocu'ent.

5.2.3.5 ualit) Control

a0nspection of pile .

 Pile 'aterial such as concrete B re6ar an# wire stran#s or ten#ons for pre > stress t)pe

shall 6e inspecte# on factor) 6efore fa6rication an# the finishe# pro#uct shall 6e inspecte#

 6efore #elier).

The inspection report shall 6e receie# 6efore arrial of piles on site.

Apon arrial on siteB piles shall 6e inspecte# as to #i'ensionsB 8uantit)B an# ph)sical

con#ition an# reporte# to the %ngineer.

Page 11

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 12/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

 6 0nspection prior to Wel#ing Work.

Prior to the wel#ingB the grooe# face an# its a#7acent areas shall 6e co'pletel) free fro'

oilB paintB oi#es B water an# all other foreign 'aterials.

When two lengths of pile are 7ointe#B the en# plates shall 6ear een in all areasB The

wel#ing 'ust 6e carrie# out accor#ing to the 'anufactureFs instruction an# 'ust 6e

checke# 6efore #riing resu'es.

During #riingB the pile hea# will 6e protecte# 6) hel'et of cast steel or 'il# steel fitte#

closel) aroun# the pile. Packing cushion ti'6erB coering the hea# of pileB will 6e place#

on the pile an# will 6e replace# as often as necessar) to preent #a'age to the piles.

c Driing recor#.

• Progra' an# progress

• The #ate an# ti'e of pile #riing

• Position of the pile nu'6er an# si/e of pile

• T)pe an# si/e of ha''er an# for #rop or single acting ha''er B #etails of release

'echanis' Bthe length of the #rop or strokeB for #iesel ha''er the length of stroke an# the

 6lows per 'inute J for #ou6le acting ha''ers the nu'6er of 6lows per 'inute an# for 

auto'atic h)#raulic #rop ha''ers the recor#e# aerage energ) per 6low #uring an

incre'ent of penetration.

• Deiation fro' tolerance an# the line an# leel shown on the #rawings.

• R.@ of toe of pile with ha''er in place 6efore #riing.

• R.@. of toe of pile on co'pletion of #riing.

• @ength of the co'plete# pile an# leel of splices.

• Driing @og Depth B 6low counts per 2,,'' for whole of penetration B with ti'es of 

interruption of 6reaks in #riing .

• The recor# of te'porar) co'pression for each of the last ten 6lows.

• Doll) an# packing t)pe an# con#ition 6efore an# after #riing.

• DetailsB #ate an# ti'e of an) re=#riing or testing.

5.2.4 REINFORCEMENT WORK

(anufacturer of reinforcing 6ar shall 6e propose# to the %ngineer for accre#itation an#approal. ;o #elieries shall 6e accepte# for use without #ecision 6) the engineer.

Page 12

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 13/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

%er) #elier) of reinforcing 6ar suppl) for constructionB the 8uantit) an# ph)sical

 properties shall 6e checke# 6) the Contractor. The 8ualit) shall 6e confir'e# 6) checking

'ill certificate issue# 6) the 'anufacturer through the co'parison of the la6orator) test

result of speci'en taken fro' the #ifferent kin#s of #ia'eter in the #eliere# pro#uct.

5.2.4.1 (aterial

Roun# 6ar + #efor'e# 6ar shall 6e 21,, Igc'²= Kiel# strength .

5.2.4.2 Reinforce'ent storage 6efore fa6rication

  Reinforce'ent will 6e store# in a warehouse area at site with a#e8uate protection fro'

getting rust)B or protecte# fro' an) ele'ent that woul# affect its 8ualit) con#ition asspecifie#.

  Storing will 6e organi/e# 6) categor)B t)peB gra#e an# #ia'eter. -s a ruleB the en# of 

each 6ar ha# 6een painte# to #ifferentiate the #ifferent gra#es.

 

Reinforcing steel that are re7ecte# hae to 6e store# in a separate place awa) fro' where

it was accepte#B 6efore sen#ing 6ack to the supplier.

5.2.4.3 Reinforce'ent fa6rication process

1. Reinforce'ent fa6rication an# storage.

  Workers will fa6ricate the 6ar accor#ing to the infor'ation 'entione# on the la6elB an#

fa6ricate# 6ars will 6e store# s)ste'aticall) accor#ing to their structural usage per work 

unit 'entione# on their la6el Work AnitB structureB #rawingB categor)B t)peB #ia'eterB

gra#eL.

-ll precautions will 6e taken to aoi# #a'age an# 6en#ing the steel 6ars #uring storageB

loa#ing an# transportation to the site. The 6ars shoul# 6e protecte# fro' the rust 6)

storage on woo#en platfor'B crates or eleate# trestles.

2. 0nstallation at site.

  The reinforce'ent installation will 6e in accor#ance with the #rawingsB the !eneral

Technical SpecificationsB an# the wner re8uire'ents coerB spacer 6locksB

reinforce'ent continuit) an# tolerances.

  9efore an) pouringB all the reinforce'ent shall 6e inspecte# an# accepte# 6) the

%ngineer or the ownerFs representatie.

Page 13

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 14/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

The fore'an on site will correct an) #eiation out of tolerances i''e#iatel) upon notice

 6efore filling the inspection re8uest.

5.2.5 FORMWORK 

5.2.5.1 "or'work Set=Ap :

9lin#ing concrete shall 6e installe# prior to placing for'work.

"or' 'a#e of pl)woo# or steel shall 6e cleane# on all its surfaces in contact with concrete

shall 6e treate# or painte# with oil prior to the installation. 0nstallation shall 6e 'a#e

 precisel) on the lines an# gra#es using stringB spirit leelB sure) instru'ent etc.

 "or's shall 6e kept fir'l) in position 6) putting tie ro#s or eternal support. Tie ro#s

support shall 6e so arrange# an# #istri6ute# an# strong enough to withstan# the pressure

#uring casting concrete.

5.2.5.2 Construction 'etho#

  "oun#ations shall 6e constructe# first an# then colu'ns to the tripo# 6ea' 6otto'

leel. 0n the Workshop 6uil#ingB su6=colu'ns an# su6=6ea's s)ste' on wallB 6ea'

surface for' will 6e #one after the installation of steel fra'ework.

%sta6lish accurate centerline ais an# leel for the la)out of foun#ationsB colu'nsB

 6ea'sB an# floorsB 6efore installing for's.

  "or' shoul# 6e a#e8uatel) supporte# or 6race# to aoi# 'oe'ents or #isplace'ent

#uring casting concrete. 9olt connector or   an) accepta6le pre fa6ricate# support

s)ste' is essential.

 

Check the align'ent of for'work 6) stretching a cor# along e#ges of installe# for's

  "or a##itional supportsB 0ron an# tension ca6le can 6e use# as supports in the

installation of for's of colu'n footings. Check the esta6lish centerline for accurac)

to aoi# #eiations.

Staging an# scaffol#ing support s)ste' is to 6e utili/e# for 6ea's an# sla6 for'sB an#

the) are installe# at the sa'e ti'e. During installation regular checking of lines an#

gra#es shall 6e 'a#e to ensure the eenness an# straightness of sla6s an# 6ea's

#uring construction .

Page 14

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 15/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

   position Steel an# woo# 7oist supports an# 6racings is utili/e# for for's of concrete

structures. Eacks are installe# at top an# 6ase of supports for a#7usting height or  lengthB all 6ases of 

support shoul# 6e proppe# 6) a piece of woo#en 'aterial to preent settle'ent.

  -ll supporting colu'ns an# 6racings shoul# 6e anchore#B hol# an# connect together to

 6eco'e sta6le fra'e s)ste' to secure structures #uring concreting.

5.2.6 CONCRETE WORK 

5.2..1 (aterial

= The class of concrete for each section of the works shall co'pl) with SpecificationB E0S an#

-ST( Stan#ar#s.

PRP%RTK C;CR%T% TKP%

1. Concrete Class D % !

2. -pplication er 2 Stor)

9uil#ings

1 Stor) 9uil#ings @ean

Concrete

3. Ce'ent T)pe=1 PC94, PC94, PC94,

4. Water Ce'ent Ratio ,.4$5 ,.5 .$

5. (ini'u' Ce'ent

Content kg'335, 33, 22,

. (a -ggregate Si/e 1& 1& 3*

$. Concrete C)lin#er 

Strength at 2* #a)s> 

"cF (pa

3,(pa 25(pa 14(pa

Design 'i shall 6e su6'itte# an# approe# 6) the engineer an# trial 'i shall 6e con#ucte# to

confir' the co'pression strength an# satisf) the specification.

0n generalB concrete 'ust 6e caste# within , 'inutes fro' 'iing to placing. The concrete

te'perature shall 6e 6elow 35⁰C as specifie# at the point of pouring. ther 'easures to keep the

concrete te'perature low is to keep the aggregates an# water coolB or arrange earl) 'orning

 pouring to aoi# casting #a)ti'e which has high hu'i#it) con#ition.

5.2..2 Construction 'etho# :

< Concrete Pouring an# Treat'ent re8uire'ents:

= Do not change positionB 6en# shape of reinforce'entB position of for'work an# thickness

of concrete coer.

= Do not use i6rator to #isplace hori/ontall) the concrete 'i

Page 15

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 16/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

  = Concrete shall 6e poure# continuousl) up to finish gra#e or construction 7oints in#icate#

on the #rawing shall 6e followe# when there is a ten#enc) to stop pouring.

= Tre'ie pipe shall 6e utili/e# when pouring concrete 6e)on# 'anual reach or a6oe

groun# to aoi# segregation of the rea#) 'i concrete #uring pouring an# 'ai'u'

falling height 6e 1.5'.

= Ase concrete spacer 6etween for'work an# reinforce'ent to aoi# #isplace'ent of 

reinforce'ent #uring concrete place'ent.

= Concrete shall 6e continuousl) poure# until one co'ponent is finishe# to aoi# col#

 7oints.

= Structural co'ponents such as colu'nB wall which is higher than 1.5' shall 6e proi#e#

with openings at 1.5' 'ai'u' ertical spacing to aoi# concrete fro' segregation

#uring pouring an# to a6i#e 6) the stan#ar# height of pour of 1.5 'eters .

= Ase concrete i6rator to co'pact 'iB i6ration ti'e shall 6e fro' 2, to 3, secon#s. Ase

trowel to leel the concrete surface.

= 0f the concreting is too large in 8uantit) that one ti'e pouring is i'possi6leB the

contractor shall proi#e proper construction 7oints in accor#ance with the specification.

These 7oints shall 6e locate# at places that hae 'ini'u' effect of 'o'ent an# shearB

usuall) locate# at 13 or 23 points of the span of the structure or refer to the

specifications on construction 7oints. 9efore casting the re'aining portion roughene#

surface to ensure 6on#ing with new concrete.

= Concrete shall 6e poure# in la)ers fro' 2,=3,c' then i6rate in accor#ance with the

specifie# ti'e. ;u'6er of i6rator #epen#s on the concreting areaB at least 3 stan#=6)

i6rators in eer) concreting location as 6ack up for conke# out units .

= Concrete for sla6 shall 6e leele# right after pouring. Pre cast concrete pieces for leel

control points shall 6e proi#e# an# re'oe# 6efore caste# concrete gets har#.

Page 1

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 17/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

Concrete Pouring for "oun#ation

Concrete Pouring for Superstructure

< Concrete Curing: 24 hours after Casting.

-ll concrete shall 6e cure# 6) either spra)ing water #irectl) or spra)ing water on a 'at

 place# on the concrete surface.

Water curing 6) sprinkling processB shall 6e repeate# wheneer the water #ries up an#

'aintain the concrete wet for a perio# of $ #a)s.

< Concrete "inishing: Apon re'oing for'worksB concrete surface shall 6e finishe#B

repaire# of an) #efects to ensure eenness an# unifor'it) in color. -ll concrete surfaces

shall 6e free fro' an) irregularities. - waterproofing coat 'a) also 6e applie# to a selecte#

location as specifie#.

5.2..3 Testing an# Check for -cceptance:

Concrete speci'ens for strength test shall 6e o6taine# in eer) 2, '³ 6atch groupB an#

taken at the sa'e ti'e an# place. Test sa'ple stan#ar# #i'ensions are ØH15,'' hH

3,,'' c)lin#er .

5.2.7 MASONRY WORK 

(aterial Sa'ple an# technical #ataFs of hollow 6rick shall 6e su6'itte# to the %ngineer for 

approal.

9ricks 6etween colu'n an# lintel supports shall 6e arrange# in accor#ance with the

Page 1$

P U M P C A R

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 18/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

specification an# #rawings.

The 'ortar co'position is the 'iture of ce'entB san# an# water 6) correct proportion

specifie#. "or olu'e 3 : 5 : 1B for reinforce# 6lock work an# elsewhere. The 'iing an#

knea#ing is to 6e #one 6) 'anual 'iing or a s'all a porta6le 'ier. -#e8uate an#

sufficient application of 'ortar for hori/ontal 7oints shall 6e applie#B an# 6ricks shall 6e

wette# 6efore la)ing. The 'ortar for ertical 7oints shall 6e fille# up 6) trowel #uring 6lock 

la)ing an# the en#s of the 6rick 'ust 6e M6uttere#N to enhance fir' connection. %cess

'ortar that ca'e out on the surface shall 6e scrape out with a trowel. -ll hori/ontal an#

ertical 7oints shall hae full 'ortar coerage. The 'ortar s8uee/e# fro' the 7oints shall 6e

flushe# with the the a#7oining installe# 6ricks. "inish 7oints to face work after 'ortar has 6egun to stiffen 6) s8uare raking. "ollow specifie# stan#ar# for the 'ai'u' la)er of 

 6ricks installation per #a).

5.2.7.1  Work preparation:

-fter re'oing for'work of sla6B floor cleaning shall 6e #one for 'arking.

Sure) group shall re=esta6lish center lineB ink 'arks shall 6e applie# to a re=locate#

'argin lines of 6rick walls on colu'ns an# sla6s.

-#7ust #eiate# anchor 6ars that will connect to 6rick walls .

(o6ili/e 6ricksB ce'entB 'ortarB waterB scaffol#ing to construction area.

5.2.$.2 Construction or#er:

9rick work shall 6e constructe# fro' 6otto' to top processB 'ain walls shall 6e lai#

first followe# 6) partition walls.

9oun#ar) walls shall 6e 6uilt first followe# 6) partition wall.

5.2.$.3 Checking:

Check regularl) the erticalit) an# straightness #uring 6rick la)ing 6) ruler an#

 plu'6. Stretche# cor# to 6oth en#s to ensure 6rick la)ing course are in straight line.

5.2.8 STRUCTURAL STEEL ROOFING WORK 

5.2.*.1 . Structural Steel :

1. (aterial an# Receiing

(anufacturer of steel 'aterials shall 6e propose# to the engineer for approal prior to

 procure'ent an# #elier). -ll steel 'aterials #eliere# to the fa6rication shopB shall 6e

Page 1*

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 19/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

inspecte# an# checke# 6) the recipient. Delier) #ocketsB 'ill certificates B 8uantit) an#

 ph)sical propert) checking of the 'aterial shall 6e perfor'e# 6efore unloa#ing. 0nferior 

an# su6 stan#ar# 'aterials are re7ecte# an# preente# fro' unloa#ing. The 'aterial

technical #ataFs fro' the 'ill certificate shall 6e confir'e# 6) con#ucting la6orator) test

on sa'ple taken fro' the #eliere# 'aterials. Asage of the 'aterial #epen#s on the test

result for the specifie# stress re8uire'ents.

2. Shop "a6rication

Prior to fa6ricationB shop #rawings shall 6e su6'itte# to the engineer for approal.

9en#e# steel 'e'6ers shall confor' to the approe# shop #rawing. 0n or#er to 'aintain

8ualit) an# 'ini'ise the installation an# asse'6l) perio#B painting 'ust 6e #one in thefa6rication )ar#.

3. %rection work 

  Detaile# erection se8uence for each structure approe# 6) the %ngineer shall 6e

ac8uire# prior to erection. (o6ile cranes will 6e use# for the erection. Te'porar)

 6racings shall 6e prepare# 6efore colu'n erection in or#er to 'aintain the erticalit) an#

align'ent. -fter checking proper align'entB fasten these steel 'e'6ers 6) connectors of 

high strength 6olt an# tighten it accor#ing to its specifie# tor8ue 'o'ent re8uire'ent 6)

using tor8ue wrench or special tightening han# tool. Touch up paint will 6e applie# to all

scratche# surfaces to restore its re8uire# teture surfaces.

 

Page 1&

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 20/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

%rection of Steel Structure

4. (etal Roofing an# Cla##ing Work 

The 'aterial for 'etal roofing an# cla##ingB inclu#ing shop #rawing re8uire'ent for this

work shall 6e su6'itte# to %ngineer for approal. The 'aterial shall 6e fa6ricate# 6ase#

on the approe# shop #rawings su6'itte# to the 'anufacturer.

9asic Steps for installation of 'etal roofing an# cla##ing is eplaine# 6elow.

Step 1: %sta6lish the gri#s an# eleations 6ase# on the stan#ar# proce#ure in eecuting

this work ite' or releant accepta6le 'etho# through 'arkings using stretche# string or 

wire along its gri# or eleation.Step 2: "iing 'etal sheets onto purlin an# girt using self=tapping screws.

Step 3: Sealant shall 6e applie# at proper wrappe# portion 6ase# on the 'anufacturerFs

shop #rawing

Step 4: "i flashingsB tri'sB guttersB #own spout pipes an# louers.

5.2.*.2 . Roofing Work :

Roofing 'aterial an# shop #rawing for this t)pe of work shall 6e su6'itte# to the engineer 

for approal.

0nstallation proce#ure shall confor' to 'anufacturerFs pro#uct technical specification on

installation. Precautions against acci#ent shall 6e well consi#ere# for its sensitieness in

eecuting this work.

9efore placing waterproofing 'e'6raneB the surface shall 6e thoroughl) cleane# an#

 pri'er paint shall 6e applie# in #r) con#ition. -ppl) waterproofing 'e'6rane on pri'er 

coate# surfaceB 6) pre heating to a#here fir'l). erlapping portion of waterproofing

'e'6rane shall 6e carefull) 6on#e# with each other to aoi# water leakage.

5.2.*.3 . ccupational ealth -n# Safet) Control for Steel Structure Work.

%er)6o#) who will carr) out the works shall use all the necessar) protectie or safet)

gears an# a6i#e 6) the occupational health an# safet) control plan of the pro7ect to aoi# the

occurrence of acci#ent an# 'ini'i/e the potential cause of  ha/ar#. Working areas shall 6e

 proi#e# with warning #eices signageFs or 6arriers B an# fre8uentl) checke# 6) Safet)

%ngineer #uring work ti'e.

Page 2,

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 21/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

%nsure all ehicles an# e8uip'ent is safe an# full) efficientB guar#e# an# e8uippe# with

safet) #eices an# has 6een su67ecte# to necessar) test.

(ake sure that operatorsB #riers an# atten#ants will onl) concern the'seles on the

e8uip'ent for which the) hae 6een thoroughl) traine#. Check working efficienc) of 

e8uip'ent for its inten#e# purposeB an# its ali# registration an# cali6ration certificates.

Safet) lifelines shall 6e proi#e# to all eleate# work areas to enhance connection point

safet) harness or 6elts use# 6) workersB especiall) to a location where scaffol#ing

i'possi6le. -ll workers working higher than 1.5 'eters 'ust wear a safet) harness or 6elt.

The safet) line 'anufacturerOs reco''en#ations for use shall 6e strictl) followe#.

5.2.! FINISHING WORK 

5.2.&.1 Door + Win#ow works

DoorsB louers an# win#ows shall 6e of the approe# ones an# in co'pliance with the

specification. 0nstallations shall 6e 'a#e in accor#ance with the sche#ule to keep finishing

work in se8uence an# to aoi# lapping of actiities that cause #ela) or #a'age i'pact to

other finishing work. 0nstalle# #oorsB louers an# win#ows shall 6e keep protecte# to aoi#

#a'ages cause# 6) other ongoing finishing works an# other parties.

5.2.&.1 Plastering

The thickness an# 'i proportion of 'ortar for plastering or ren#ering shall 6e in accor#ance

with the specification an# the 'iing an# knea#ing process is to 6e #one 'anuall) or 6)

 porta6le 'ier. Ce'ent shall 6e of the stan#ar# or#inar) Portlan# ce'ent an# san#B source#

out fro' lan# or rier an# shall 6e approe# 6) the %ngineer.

5.2.&.2 Tiling

Tile 'aterial an# shop #rawing for tile la)out or arrange'ent shall 6e su6'itte# to engineer 

for approal. Prior to tile la)ing concrete surface where tile is lai# shall 6e cleane#B free fro'

#ustB oilB grease an# other ele'ents that woul# affect 8ualit) of tile 6e# 'ortar. 9e# 'ortar of 

specifie# 'i proportion 1:3 is place# an# sprea# eenl) with a 'ini'u' thickness of 

1,'' oer the area to 6e tile#. Tiles are then lai# oer the eenl) applie# 6e# 'ortar until it

a#here fir'l) inplace.Tile gaps shall 6e fille# up with grout of approe# t)pe or as specifie#

in the plan. -fter grouting tile# area shall 6e cleane# fro' ecess grout to keep the work 

clean as specifie#.

5.2.&.3 Painting

Page 21

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 22/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

Paint 'aterial shall 6e of the approe# one in accor#ance with specification. Surface

 preparation 6efore painting shall confor' to the 'anufacturerFs instruction to each kin# of 

 paint 'aterial. ;u'6er of coatB #r) fil' thickness shall co'pl) with the approe# paint

sche#ule. Where re8uire#B final coat shall 6e carrie# outB after or al'ost all of the work 

near6) is co'plete# to 'ini'i/e #a'age.

5.2.&.4 Ceiling Work 

The 'aterial for ceiling shall 6e su6'itte# to the engineer for approal. Shop #rawing for 

ceiling la)out an# arrange'ent plan shall 6e approe# 6) the %ngineer. -n# proper 

coor#ination to (% works shall 6e 'a#e to aoi# lapping of works that cause #ela) in

eecuting the work.angers shall 6e installe#B fastene# an# fie# properl) un#er the concrete sla6 or steel

structural 'e'6ers. Then thin gauge an# light steel fra'e is installe# to enhance leel

a#7ust'entsF re8uire#. (+% works a6oe ceiling shall 6e co'plete# 6efore installing the

ceiling fra'e.

 Deflections or #a'age on the T=runner fra'e shall 6e repaire# prior to installation of the

g)psu' 6oar#.

5.2.1" MECHANICAL ELECTRICAL WORK

5.2.1,.1 -ir Con#itioning an# ?entilation Work 

(anufacturer an# %8uip'ent of -ir Con#itioning an# ?entilation s)ste' inclu#ing shop

#rawing plans an# all sche'atic la)outs for these works shall 6e su6'itte# to the %ngineer 

for approal. -ll slots in eterior walls inten#e# for pipe crossing shall 6e 'a#e i'perious.

Shop #rawings of ceilings an# walls shall reflect location of air con#itionerB entilator an#

#uctsB to account for the 6alance #istri6ution of other e8uip'ent. 0nstallation of air 

con#itionerB entilatorB air inlet an# outletB inclu#ing pipesB #ucts an# other relate# fittings

shall confor' as in#icate# in the shop #rawings. %haust pipe#uct shall slope# #ownwar#

fro' insi#e to outsi#e.

5.2.1,.2 Plu'6ing Work 

(aterial an# e8uip'ent for Plu'6ing work an# shop #rawings shall 6e su6'itte# to the

engineer for approal.

%caation an# trenching of soilB preparation of sleees on floorB wall an# 6ea' where there

are necessar) in structures shall 6e well consi#ere#.

9efore 6eing installe#B all pipes shall 6e thoroughl) cleane#B free fro' an) scalesB 6urrsB

rusts an# o6structions.

Page 22

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 23/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

Prefa6ricationB installation an# 7ointing of pipes inclu#ing fittings with a#hesie for P?C

'aterialB inclu#ing alesB strainersB an# flei6le 7oints shall 6e #one carefull).

-#e8uate pipe supportsB hanging steel 6ars an# anchorage shall 6e proi#e#.

Sealing of pipe sleees shall 6e #one properl).

Pressure test for water suppl) pipes an# flushing test for #rainage pipes shall 6e perfor'e#.

9ack=fill an# co'paction of soil for un#ergroun# piping shall 6e #one carefull).

5.2.1,.3 %lectrical Work 

(aterial an# e8uip'ent for %lectrical work an# shop #rawings shall 6e su6'itte# to the

%ngineer for approal.

Preparation for efficient wire or ca6le la)ing such as confir'ation of the eact locationswhere the) are to 6e lai#B cleaning the trenches or #uctsB scraping6rushing insi#e of the

#uct 6ankB pipes or con#uits an# so on shall 6e #one.

-ll ca6le connections shall 6e 'a#e insi#e #istri6ution 6oar#J pull 6o an# outlet 6o etc.

an# the connection shall neer 6e epose# or insi#e of con#uits.

Ca6le align'entB 6in#ingB fiingB wall penetration sealingB ca6le 'arkingB ca6le penetration

into con#uits 6etween ca6le tra)sB #ucts an# Eo6=site 7unction 6oes an# si'ilar shall 6e

'a#e properl).

-#e8uate press=sae couplingB wire connector or press co'6ine ter'inal etc. will 6e use# as

a principle for the connection of wires an#or ca6les.

0n the case of line pipe ecee#ing 3,' for one section or where lea#ing in is #ifficultB pull

 6o shall 6e use#.

"iing 'etho# of #istri6ution 6oar#s etc. shall 6e specifie# on the construction #rawingB an#

shall 6e fie# accor#ingl).

The position of lighting apparatus shall 6e in#icate# on ceiling allotte# sketch in a#anceB

taking 6alance with other facilities apparatus.

"iing height of switch an# socket outlet shall 6e shown on the shop #rawing securing the

approal of the consultant an# shall 6e fie# accor#ingl).

5.2.11 TESTING AND TRIAL RUN

-fter installation of (echanical an# %lectrical e8uip'entB test an# inspection inclu#ing

their recor# reports will 6e #one. Trial operation shall 6e procee#e# to a#7ust an# check the

function of e8uip'ent.

Page 23

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 24/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

6. CONSTRUCTION SCHEDULE :

See -ttach= -ppen#i=3

7. ORGANI#ATIONAL CHART 

Page 24

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 25/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

Page 25

S$%&'()E*+,-*/&*'

M$*$0&-

M-. $*

S,'&

B,,*0 C,&% 

 M-. T,&* M-.*9

A)C

C,&% 

M-. R(

S-+&(

E*0,*&&-

S,'&

E*0,*&&-

 

S:; C*'-$<'-

P-=&<' M$*$0&-

M-. F>?,/$

C*?'-<',*

M$*$0&-

M-. A?$,

TT@

S,'&

E*0,*&&-

S,'&

E*0,*&&-

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 26/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

 

8. INSPECTION UALITY CONTROL

*.1 !eneral

The Contractor shall su6'it the na'e an# appropriate #etails of an) in#epen#ent testing

organi/ation to the engineer for approal 6efore an) construction work for 9uil#ing

co''ence.

*.2 (aterials Testing

(aterials testing is to 6e carrie# out 6efore #elier) of 'aterials into the site an# 8ualit)

certificate shall 6e su6'itte#.

!. SAFETY CONTROL

The pro7ect Safet) Plan is esta6lishe# for the Construction of C-0 (%P 0;T%R;-T0;-@

C;T-0;%R T%R(0;-@ in ?ietna' 6ase# on ccupational ealth an# Safet) an#

Reha6ilitation (anage'ent (anual of TTE?.

The safet) control of works shall 6e 'aintaine# an# ensure its co'pliance through=out the

co'pletion perio# so that works can 6e eecute# s'oothl) without unnecessar) interruption.

0'portance shall 6e place# on the preention of an) acci#ent such as personal in7ur) B

#a'age to structures an# work itself.

0n generalB safet) rules an# regulations stipulate# 6) the goerning authorities of ?ietna' as

well as 6) the client shall 6e o6sere#.

 

1". EN@IRONMENT CONTROL

The Pro7ect %niron'ental (anage'ent Plan %(P a##resses the re8uire'ents for 

%niron'ental (anage'ent B outlining how the scope B as #escri6e# 6) the Con#itions of 

Contract B will 6e i'ple'ente# to achiee the ke) o67ecties for C-0 (%P

0;T%R;-T0;-@ C;T-0;%R T%R(0;-@ PRE%CT B an# has 6een #esigne# to

co'pl) with the intent of S-S 1*,,1 an# 0S 14,,1.

9uilt into this operating s)ste' will 6e C-0 (%P 0;T%R;-T0;-@ C;T-0;%R 

T%R(0;-@ PRE%CT Specification re8uire'ents Bas #efine# in the contract. This

Page 2

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 27/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

%niron'ental (anage'ent Plan will incorporate work 'etho# state'entsB inspectionsB test

 plans B an# check sheets are #eelope# to coer the particular re8uire'ents of this pro7ect.

This Plan is esta6lishe# 6ase# on the %niron'ental (anage'ent (anual of TTE?.

11.A&*,

1.  > -pplica6le Co#es an# Stan#ar#s

2.  > Drawing @ist for 9uil#ing

3. = 9uil#ing Construction Sche#ule4.  > 0nspection an# Test Plan

Page 2$

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 28/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

 

A&*, ; 1

-pplica6le Co#es an# Stan#ar#s

Page 2*

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 29/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

A&*, ; 2

 Drawing @ist for 9uil#ing

Page 2&

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 30/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

A&*, ; 3

9uil#ing Construction Sche#ule

Page 3,

7/17/2019 Building work method statement

http://slidepdf.com/reader/full/building-work-method-statement 31/32

Doc. Title Method Statement of Building Work TOA-TOYO JOINT VENTURE

Doc. No CM – MS – BW - 001 Rev. No. 0 Date  July, 2010

Construction of Port Facilities and Buildings for Cai Mep International Container Terminal

A&*, ; 4

0nspection an# Test Plan

Page 31