building variety statement · building variety statement the “c” buildings at bridge park are...
TRANSCRIPT
BUILDING VARIETY STATEMENT
The “C” buildings at Bridge Park are bound by Riverside Drive to the west, Bridge Park Avenue to thesouth, Mooney Street to the east and Tuller Ridge Drive to the north. This first phase of a mixed usedevelopment is comprised two blocks, both adjacent to Longshore Street along the north south axis,and includes an office building (C2), two mixed use buildings (C1 and C3) and a parking garage withresidential “liners” on two facades (C4/C5). This development is designed to address the VisionPrinciples for the development of the Bridge Street Corridor districts, by providing an interesting,walkable setting for urban lifestyles that places value on human scale and a diversity of experiences.
Each building has a unique character which is expressed through a variety of material finishes anddetails, particularly at the pedestrian street level. Balconies are used extensively throughout, andwindows are maximized at select corners to enhance connections to the outside environment.Pedestrian bridges connect the garage to the residential buildings, and are intended for residents’ useonly. The bridges are open to the outside, so as to create a feeling of connectivity with the streetenvironment, and detailed mostly in steel. Their design emphasizes lightness and simplicity, and createsanother layer of recognition for the community of Bridge Park.
Building C1, a mix of residential and retail, has a traditional arrangement of base, middle and top, eachexpressed with stone and storefront glazing, brick, and a combination of composite metal panels andfiber cement. In some cases brick is carried down to street level or metal panels used more extensivelyat corners to create distinct moments. This building has a roof terrace at the second story whichincorporates green elements and overlooks the park and river along Riverside Drive, and downtownDublin beyond.
Building C2 is an office building with street level retail. A tower element at the southwest corner,grounded by an outdoor dining patio that engages the sidewalk, provides a recognizable gatewayelement, further enhancing the sense of arrival and place making. Glazing is used mostly along theground story, alternating with a stacked bond, accent color brick, and a corbelled brick pattern at thebase of the tower. The upper stories are clad in a combination of brick, fiber cement and glazing. Theaccent color brick is used as trim that accents the large scale brick openings. Balconies at the upperstories along the west façade provide casual meeting spaces and great views to the west.
Building C3 is a combination of retail and commercial uses at the first and second levels, and residentialabove. This building is mostly clad in two colors of brick to create an alternating pattern. A corbelledbrick pattern at the base adds another level of detail. Balconies with perforated metal guardrails andfiber cement clad corner elements punctuate this composition. Generous areas of glazing line the firstand second stories, while a corbelled pattern of brick at the base gives texture and definition at thepedestrian level. The horizontal façade division created with a brick soldier course is playful to the eyeand alternates between the first and second stories. A rooftop amenity deck gives residents additionalchoices for great views and outdoor social space.
Building C4/C5 has two distinct functions as a garage and a residential building. The two are woventogether by the use of two colors of brick and elements such as perforated metal panels, which are used
at balconies, and also as visual highlights that provide screening along the garage facades. Extensiveglazing with fiber cement are used at the two corners of the garage. The main pedestrian entry point tothe garage is though the southwest corner. Transparency is maximized at this location, to create amemorable visual cue for way finding. Fiber cement is used at select locations along the residentialfacades, to create visually lighter elements at the top stories and at balconies. The utility brick baseheight varies along the residential façades, and continues along the base of the garage elevations. Astacked brick bond is used at the residential entry as a pattern accent, which is also used on the garageelevations between bays. Planters along the west side of the garage provide elements of green andsoften the experience of the building at the pedestrian level.
The two buildings on each block are separated by open spaces meant for a variety of pedestrian usesand experiences. These open spaces incorporate generous green space along with specialty paving,casual seating opportunities, outdoor dining and other flexible event spaces, creating a real sense ofplace and providing interesting and pleasant connections between streets. Bio retention areas andimpervious paving aid with site stormwater management, and are incorporated seamlessly into thefabric of these spaces.
BUILDING C1 (MIXED USE BUILDING) – WAIVER SUMMARY
Vertical Increments Required: Requirement exceeded where indicated on elevation sheets. In bothcases this occurs only above the fifth story windows. There are two reasons for this departure. The firstis aesthetic, as the two middle bays in question work better proportionally with the wider bay spacing,and create a more balanced facade. This also creates a more varied aesthetic when looking at theoverall street elevations. The second reason is that the elevator is directly behind the north façadeparapet, and the desire is to not call attention to that element.
Permitted Primary Materials: Secondary materials exceed requirement (34%). Composite metalpanels and fiber cement are used along with brick, stone and glass, to add visual interest and materialcontrast to the building. They are also used to incorporate a visually lighter ‘top’ to the building, toemphasize the visual proportions of base, middle and top, as well as to provide a comfortable streetscale.
BUILDING C2 (CORRIDOR BUILDING) – WAIVER SUMMARY
Permitted Primary Materials: Secondary materials exceed requirements (23%). Fiber cement panelsare introduced in this building as a design element, to add visual interest to the façade and provide amaterial/texture counterpoint to the brick and glass.
BUILDING C3 (CORRIDOR BUILDING) – WAIVER SUMMARY
Vertical Increments Required: Requirement exceeded where indicated on north and south elevations.This occurs only at parapets above level 5 windows, once on each elevation. This is primarily a designdecision, in order to maintain an “overall” bay width that has good proportions relative to the overallelevation. Required vertical increments are maintained at ground level and up to the top of thewindows at level 5.
Horizontal Façade Divisions Required: Horizontal façade divisions vary between top of ground storyand top of second story. As this building is mostly brick, this allowed for a more playful, interesting andvaried pedestrian experience of the building. A “corduroy pattern” (corbelling every other course) alsoadds to the visual interest at the building base.
BUILDING C4 (CORRIDOR BUILDING/ PARKING STRUCTURE) – WAIVER SUMMARY
Ground Story Street Façade Transparency: 48% does not meet requirement. Maximum transparency(glazing) is provided at lobbies and public entry points. The total transparency % at the ground story islow because this building does not have a retail component (instead there are residential units onground floor of two sides of building), and because of the substantial grade change along the Northelevation.
Blank Wall Limitations: South elevation does not meet requirement at ground story. Blank wallexceeds 15’ of length at first story on South and North façades where indicated. At the south elevation,this is due to the service area at that location. At the North façade it is mainly due to the substantialgrade change along this elevation. The bottom of the second floor slab is too close to the adjacentsloping grade to be able to open up the area below the slab, without this portion of the façade lookingmessy and fragmented.
Number of Street Façade Entrances Required: Requirement not met because there is no retailcomponent in this building (residential units on ground floor of two sides of building). Residential unitprivacy is maintained at the street level.
Vertical Increments Required: Requirement exceeded only at parking entry/exit on East façade. Baywidth is required for traffic flow for two entries and one exit (3) 9’ lanes w/ (2) 3’ islands.
Horizontal Façade Divisions: Horizontal façade divisions vary between top of ground story and top ofsecond story. This is a design element, which allowed for a more playful, interesting and variedpedestrian experience of the building.
Permitted Primary Materials: Secondary materials exceed requirement (28%). Fiber cement panelsare used along with brick and glass, to add visual interest and material contrast to the building. They arealso used to incorporate a “lighter” top to the building in select locations, to emphasize the visualproportions of base, middle and top, as well as to provide a comfortable street scale. Exterior materialsat the garage facades are mostly brick, glass and fiber cement panels. Perforated metal panels areadded to this mix to create elements of partial transparency that punctuate the rhythm of the structuralbays and create interest along these elevations. The panel heights vary every other bay, creating analternating pattern.
CBS QA/QC PROGRAM OUTLINE February, 10th 2015
CBS incorporates an in house Quality Assurance - Quality Control program to formalize and add consistency to our quality assurance process and provide for CBS project management and field personnel a reference and best practices guide to use on every project. This QA – QC program is project specific, and all project materials and applications specific to Bridge Park are incorporated into the program. Pre-Installation QA-QC Conferences conducted prior to installation will formally set accountability expectations for each trade contractor in regard to safety, schedule, manpower, and quality. The Quality Assurance section will include a listing of the project specific items that when executed, will result in the successful completion of the contract requirements while in the process assuring a quality end product. The Quality Control section will include a checklist of materials and processes that require verification by the project superintendent that our requirements are met. In addition to our in-house QA/QC measures, the Project will incorporate an accredited third party consultant to monitor and verify that the exterior envelope systems installations are in accordance to the manufactures recommendations, and fully test for compliance. These observations and testing will include;
Building Envelope Consulting (Pre-Construction)
• Review Project specifications and construction drawings. • Submit a written report identifying any areas of concern related to weather ability,
thermal continuity, products, and performance as designed. • Review of construction sequencing and schedule.
Building Envelope Consulting (Construction Phase)
• Attend building enclosure skin components on-site pre-construction meetings • Submit reports noting adherence to specifications and standards.. • Review the construction and detailing of exterior wall mock-ups per building type. • Develop a site specific daily field inspection checklist. • Perform on site/ in-field daily inspections throughout the installation of building
enclosure systems. • Inspect roofing sub straight conditions, surface preparation, and membrane
application. • Conduct final inspections and punch list.
Building Envelope Consulting (Performance Testing)
• Water penetration testing • Water spray testing • Sealant adhesion testing • Infra-red thermograph of building envelope components, and roofing • Create a report delineating any vapor transfer locations, moisture infiltration, thermo
graphic images with photographs of construction details. • Finalize project commissioning with warranties and close out documentation
All testing and field reports will be available anytime for review by the project team including the Owner, the Architect, project consultants, and The City of Dublin. With this two part system in place, we are confident that all products and materials installed on the Bridge Park project will meet or exceed manufactures recommendations, ensuring that Bridge Park will perform and look as good in years to come as it does at completion. Morgan Rogers Project Executive Continental Building Systems
Columbus Office: Pittsburgh Office: Cleveland Office: 150 East Broad Street 395 E. Waterfront Drive 23240 Chagrin Blvd, Ste 400 Columbus, Ohio 43215 Homestead, PA 15120 Beachwood, Ohio 44122 (614) 221-1818 (412) 464-8933 (216) 454-2500
Wee
kday
&W
eeke
ndPa
rkin
gDe
man
dSt
udy
Park
&Se
lfCa
ptur
e10
%+/
,not
fact
ored
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
12/2
/201
4
Brid
gePa
rkEa
stBl
ock
A&B
Com
bine
dM
axM
in6
a.m
.7
a.m
.8
a.m
.9
a.m
.10
a.m
.11
a.m
.no
on1
p.m
.2
p.m
3p.
m.
4p.
m.
5p.
m.
6p.
m.
7p.
m.
8p.
m.
9p.
m.
10p.
m.
11p.
m.
mid
nigh
tTo
talP
arki
ngDe
man
d48
660
195
21,
059
1,18
91,
275
1,31
31,
325
1,35
61,
225
1,18
91,
233
1,12
91,
056
988
994
799
705
546
Tota
lPar
king
Prov
ided
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
3N
etSu
rplu
s(De
ficit)
737
622
271
164
34(5
2)(9
0)(1
02)
(133
)(2
)34
(10)
9416
723
522
942
451
867
773
7(1
33)
%of
Surp
lus(
Defic
it)15
2%10
4%29
%15
%3%
4%7%
8%10
%0%
3%1%
8%16
%24
%23
%53
%74
%12
4%
6a.
m.
7a.
m.
8a.
m.
9a.
m.
10a.
m.
11a.
m.
noon
1p.
m.
2p.
m3
p.m
.4
p.m
.5
p.m
.6
p.m
.7
p.m
.8
p.m
.9
p.m
.10
p.m
.11
p.m
.m
idni
ght
Tota
lPar
king
Dem
and
474
516
787
1,02
31,
075
1,16
81,
258
1,26
71,
241
1,18
31,
165
1,23
21,
342
1,35
61,
322
1,16
31,
010
861
661
Tota
lPar
king
Prov
ided
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
31,
223
1,22
3N
etSu
rplu
s(De
ficit)
749
707
436
200
148
55(3
5)(4
4)(1
8)40
58(9
)(1
19)
(133
)(9
9)60
213
362
562
749
(133
)%
ofSu
rplu
s(De
ficit)
158%
137%
55%
20%
14%
5%3%
4%1%
3%5%
1%9%
10%
7%5%
21%
42%
85%
6a.
m.
7a.
m.
8a.
m.
9a.
m.
10a.
m.
11a.
m.
noon
1p.
m.
2p.
m3
p.m
.4
p.m
.5
p.m
.6
p.m
.7
p.m
.8
p.m
.9
p.m
.10
p.m
.11
p.m
.m
idni
ght
Tota
lPar
king
Dem
and
552
674
963
971
1,24
21,
459
1,61
61,
632
1,61
81,
340
1,30
81,
513
1,63
21,
633
1,47
71,
469
1,22
01,
022
685
Tota
lPar
king
Prov
ided
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
9N
etSu
rplu
s(De
ficit)
1,29
71,
175
886
878
607
390
233
217
231
509
541
336
217
216
372
380
629
827
1,16
41,
297
216
%of
Surp
lus(
Defic
it)23
5%17
4%92
%90
%49
%27
%14
%13
%14
%38
%41
%22
%13
%13
%25
%26
%52
%81
%17
0%
6a.
m.
7a.
m.
8a.
m.
9a.
m.
10a.
m.
11a.
m.
noon
1p.
m.
2p.
m3
p.m
.4
p.m
.5
p.m
.6
p.m
.7
p.m
.8
p.m
.9
p.m
.10
p.m
.11
p.m
.m
idni
ght
Tota
lPar
king
Dem
and
538
586
642
734
871
1,07
71,
295
1,32
11,
247
1,12
11,
087
1,23
51,
485
1,51
61,
416
1,27
41,
191
1,08
681
1To
talP
arki
ngPr
ovid
ed1,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
1,84
91,
849
Net
Surp
lus(
Defic
it)1,
311
1,26
31,
207
1,11
597
877
255
452
860
272
876
261
436
433
343
357
565
876
31,
038
1,31
133
3%
ofSu
rplu
s(De
ficit)
244%
215%
188%
152%
112%
72%
43%
40%
48%
65%
70%
50%
25%
22%
31%
45%
55%
70%
128%
WEE
KDAY
CALC
ULA
TIO
NS
WEE
KEN
DCA
LCU
LATI
ON
S
WEE
KDAY
CALC
ULA
TIO
NS
WEE
KEN
DCA
LCU
LATI
ON
S
Brid
gePa
rkEa
stBl
ock
B&C
Com
bine
d
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kB
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
12/2
/201
4
Tota
lPar
king
Prov
ided
898
852
Stru
ctur
ed46
Stre
et
Use
rsRe
tail
(<40
0,00
0sf
)Em
ploy
ees
0.70
per1
ksfx
24.6
3ks
f=17
spac
es0.
8pe
runi
tx24
.63
ksf=
20sp
aces
Visit
ors
2.90
per1
ksfx
24.6
3ks
f=71
spac
es3.
2pe
runi
tx24
.63
ksf=
79sp
aces
Subt
otal
89sp
aces
99sp
aces
Fine
orCa
sual
Dini
ngEm
ploy
ees
2.50
peru
nitx
19.2
0ks
f=48
spac
es2.
50pe
runi
tx19
.20
ksf=
48sp
aces
Visit
ors
10.0
0pe
runi
tx19
.20
ksf=
192
spac
es10
.00
peru
nitx
19.2
0ks
f=19
2sp
aces
Subt
otal
240
spac
es24
0sp
aces
Qui
ckCa
sual
Dini
ngEm
ploy
ees
2.50
peru
nitx
19.2
0ks
f=48
spac
es2.
50pe
runi
tx19
.20
ksf=
48sp
aces
Visit
ors
7.50
peru
nitx
19.2
0ks
f=14
4sp
aces
7.50
peru
nitx
19.2
0ks
f=14
4sp
aces
Subt
otal
192
spac
es19
2sp
aces
Resi
dent
ial
Tena
nts
1.23
peru
nitx
249
units
=30
6sp
aces
1.23
peru
nitx
249
units
=30
6sp
aces
Visit
ors
0.15
peru
nitx
249
units
=37
spac
es0.
15pe
runi
tx24
9un
its=
37sp
aces
Subt
otal
343
spac
es34
3sp
aces
Offi
ce(<
50,0
00sf
)Em
ploy
ees
3.50
peru
nitx
46.3
7ks
f=16
2sp
aces
0.35
peru
nitx
46.3
7ks
f=16
spac
esVi
sitor
s0.
30pe
runi
tx46
.37
ksf=
14sp
aces
0.03
peru
nitx
46.3
7ks
f=1
spac
esSu
btot
al17
6sp
aces
18sp
aces
Tota
l1,
040
Tota
l89
1Su
rplu
s(De
ficit)
(142
)Su
rplu
s(De
ficit)
7
Resi
dent
ialU
nitM
ixU
nits
Park
s#
Stud
io23
1.00
231
Bedo
om12
31.
0012
32
Bedr
oom
931.
5014
03
Bedr
oom
102.
0020
249
306
PerU
nit
1.23
PerB
edro
om0.
84
PEAK
PARK
ING
DEM
ANDS
BYU
SEPR
IOR
TOAD
JUST
ING
FOR
TIM
EO
FDA
Yw
eekd
ayw
eeke
nd
Wee
kday
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kB
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
12/2
/201
4
Tota
lPar
king
Dem
and
327
358
458
418
536
634
711
718
704
583
578
729
803
824
756
736
636
543
387
Tota
lPar
king
Prov
ided
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
Net
Surp
lus(
Defic
it)57
154
044
048
036
226
418
718
019
431
532
016
995
7414
216
226
235
551
1%
ofSu
rplu
s(De
ficit)
174%
151%
96%
115%
68%
42%
26%
25%
28%
54%
55%
23%
12%
9%19
%22
%41
%65
%13
2%
Use
rs6
a.m
.7
a.m
.8
a.m
.9
a.m
.10
a.m
.11
a.m
.no
on1
p.m
.2
p.m
3p.
m.
4p.
m.
5p.
m.
6p.
m.
7p.
m.
8p.
m.
9p.
m.
10p.
m.
11p.
m.
mid
nigh
tRe
tail
(<40
0,00
0sf)
Empl
oyee
s10
%15
%40
%75
%85
%95
%10
0%10
0%10
0%10
0%10
0%95
%95
%95
%90
%75
%40
%15
%0%
23
713
1516
1717
1717
1716
1616
1613
73
0Vi
sitor
s1%
5%15
%35
%65
%85
%95
%10
0%95
%90
%90
%95
%95
%95
%80
%50
%30
%10
%0%
14
1125
4661
6871
6864
6468
6868
5736
217
0Su
btot
al2
618
3861
7785
8985
8282
8484
8473
4928
100
Fine
orCa
sual
Dini
ngEm
ploy
ees
0%20
%50
%75
%90
%90
%90
%90
%90
%75
%75
%10
0%10
0%10
0%10
0%10
0%10
0%85
%35
%0
1024
3643
4343
4343
3636
4848
4848
4848
4117
Visit
ors
0%0%
0%0%
15%
40%
75%
75%
65%
40%
50%
75%
95%
100%
100%
100%
95%
75%
25%
00
00
2977
144
144
125
7796
144
182
192
192
192
182
144
48Su
btot
al0
1024
3672
120
187
187
168
113
132
192
230
240
240
240
230
185
65Q
uick
Casu
alDi
ning
Empl
oyee
s15
%20
%30
%40
%75
%10
0%10
0%10
0%95
%70
%60
%70
%90
%90
%60
%40
%30
%20
%20
%7
1014
1936
4848
4846
3429
3443
4329
1914
1010
Visit
ors
5%10
%20
%30
%55
%85
%10
0%10
0%90
%60
%55
%60
%85
%80
%50
%30
%20
%10
%5%
714
2943
7912
214
414
413
086
7986
122
115
7243
2914
7Su
btot
al14
2443
6211
517
019
219
217
512
010
812
016
615
810
162
4324
17Re
side
ntia
lTe
nant
s10
0%87
%79
%37
%34
%30
%30
%30
%30
%31
%33
%77
%85
%94
%96
%98
%99
%10
0%10
0%30
626
624
111
210
490
9290
9293
101
235
260
287
293
299
302
306
306
Visit
ors
0%10
%20
%20
%20
%20
%20
%20
%20
%20
%20
%40
%60
%10
0%10
0%10
0%80
%50
%0%
04
77
77
77
77
715
2237
3737
3019
0Su
btot
al30
627
024
911
911
198
9998
9910
110
825
028
232
533
133
733
232
430
6O
ffice
(<50
,000
sf)
Empl
oyee
s3%
30%
75%
95%
100%
100%
90%
90%
100%
100%
90%
50%
25%
10%
7%30
%1%
0%0%
549
122
154
162
162
146
146
162
162
146
8141
1611
492
00
Visit
ors
0%1%
20%
60%
100%
45%
15%
45%
100%
45%
15%
10%
5%2%
1%0%
0%0%
0%0
03
814
62
614
62
11
00
00
00
Subt
otal
549
125
163
176
169
148
152
176
169
148
8341
1712
492
00
WEE
KDAY
CALC
ULA
TIO
NS
Wee
kend
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kB
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
12/2
/201
4
Tota
lPar
king
Dem
and
323
342
360
399
457
547
647
660
631
578
565
637
751
770
728
665
623
570
442
Tota
lPar
king
Prov
ided
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
898
Net
Surp
lus(
Defic
it)57
555
653
849
944
135
125
123
826
732
033
326
114
712
817
023
327
532
845
6%
ofSu
rplu
s(De
ficit)
178%
163%
149%
125%
97%
64%
39%
36%
42%
55%
59%
41%
20%
17%
23%
35%
44%
57%
103%
Use
rs6
a.m
.7
a.m
.8
a.m
.9
a.m
.10
a.m
.11
a.m
.no
on1
p.m
.2
p.m
3p.
m.
4p.
m.
5p.
m.
6p.
m.
7p.
m.
8p.
m.
9p.
m.
10p.
m.
11p.
m.
mid
nigh
tRe
tail
(<40
0,00
0sf)
Empl
oyee
s10
%15
%40
%75
%85
%95
%10
0%10
0%10
0%10
0%10
0%95
%95
%95
%90
%75
%40
%15
%0%
23
815
1719
2020
2020
2019
1919
1815
83
0Vi
sitor
s1%
5%10
%30
%50
%65
%80
%90
%10
0%10
0%95
%90
%80
%75
%65
%50
%35
%15
%0%
14
824
3951
6371
7979
7571
6359
5139
2812
0Su
btot
al3
716
3856
7083
9199
9995
9082
7869
5435
150
Fine
orCa
sual
Dini
ngEm
ploy
ees
0%20
%30
%60
%75
%75
%75
%75
%75
%75
%75
%10
0%10
0%10
0%10
0%10
0%10
0%85
%50
%0
1014
2936
3636
3636
3636
4848
4848
4848
4124
Visit
ors
0%0%
0%0%
0%15
%50
%55
%45
%45
%45
%60
%90
%95
%10
0%90
%90
%90
%50
%0
00
00
2996
106
8686
8611
517
318
219
217
317
317
396
Subt
otal
010
1429
3665
132
142
122
122
122
163
221
230
240
221
221
214
120
Qui
ckCa
sual
Dini
ngEm
ploy
ees
15%
20%
30%
40%
75%
100%
100%
100%
95%
70%
60%
70%
90%
90%
60%
40%
30%
20%
20%
710
1419
3648
4848
4634
2934
4343
2919
1410
10Vi
sitor
s5%
10%
20%
30%
55%
85%
100%
100%
90%
60%
55%
60%
85%
80%
50%
30%
20%
10%
5%7
1429
4379
122
144
144
130
8679
8612
211
572
4329
147
Subt
otal
1424
4362
115
170
192
192
175
120
108
120
166
158
101
6243
2417
Resi
dent
ial
Tena
nts
100%
95%
88%
81%
74%
71%
71%
70%
71%
73%
75%
81%
85%
87%
92%
95%
96%
98%
100%
306
290
269
247
226
217
217
214
217
223
229
247
260
266
281
290
293
299
306
Visit
ors
0%20
%20
%20
%20
%20
%20
%20
%20
%20
%20
%40
%60
%10
0%10
0%10
0%80
%50
%0%
07
77
77
77
77
715
2237
3737
3019
0Su
btot
al30
629
827
625
523
422
422
422
122
423
023
726
228
230
331
832
832
331
830
6O
ffice
(<50
,000
sf)
Empl
oyee
s0%
20%
60%
80%
90%
100%
90%
80%
60%
40%
20%
10%
5%0%
0%0%
0%0%
0%0
310
1315
1615
1310
63
21
00
00
00
Visit
ors
0%20
%60
%80
%90
%10
0%90
%80
%60
%40
%20
%10
%5%
0%0%
0%0%
0%0%
00
11
11
11
11
00
00
00
00
0Su
btot
al0
411
1416
1816
1411
74
21
00
00
00
WEE
KEN
DCA
LCU
LATI
ON
S
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kC
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
12/2
/201
4
Tota
lPar
king
Prov
ided
951
888
Stru
ctur
ed63
Stre
et
Use
rsRe
tail
(<40
0,00
0sf
)Em
ploy
ees
0.70
per1
ksfx
18.4
6ks
f=13
spac
es0.
8pe
runi
tx18
.456
ksf=
15sp
aces
Visit
ors
2.90
per1
ksfx
18.4
6ks
f=54
spac
es3.
2pe
runi
tx18
.456
ksf=
59sp
aces
Subt
otal
66sp
aces
74sp
aces
Fine
orCa
sual
Dini
ngEm
ploy
ees
2.50
peru
nitx
24.4
1ks
f=61
spac
es2.
50pe
runi
tx24
.414
ksf=
61sp
aces
Visit
ors
10.0
0pe
runi
tx24
.41
ksf=
244
spac
es10
.00
peru
nitx
24.4
14ks
f=24
4sp
aces
Subt
otal
305
spac
es30
5sp
aces
Qui
ckCa
sual
Dini
ngEm
ploy
ees
2.50
peru
nitx
24.4
1ks
f=61
spac
es2.
50pe
runi
tx24
.414
ksf=
61sp
aces
Visit
ors
7.50
peru
nitx
24.4
1ks
f=18
3sp
aces
7.50
peru
nitx
24.4
14ks
f=18
3sp
aces
Subt
otal
244
spac
es24
4sp
aces
Resi
dent
ial
Tena
nts
1.22
peru
nitx
160.
00un
its=
195
spac
es1.
22pe
runi
tx16
0un
its=
195
spac
esVi
sitor
s0.
15pe
runi
tx16
0.00
units
=24
spac
es0.
15pe
runi
tx16
0un
its=
24sp
aces
Subt
otal
219
spac
es21
9sp
aces
Offi
ce(<
50,0
00sf
)Em
ploy
ees
3.50
peru
nitx
92.3
72ks
f=32
3sp
aces
0.35
peru
nitx
92.3
72ks
f=32
spac
esVi
sitor
s0.
30pe
runi
tx92
.372
ksf=
28sp
aces
0.03
peru
nitx
92.3
72ks
f=3
spac
esSu
btot
al35
1sp
aces
35sp
aces
Tota
l1,
185
Tota
l87
7Su
rplu
s(De
ficit)
(234
)Su
rplu
s(De
ficit)
74
Resi
dent
ialU
nitM
ixU
nits
Park
s#
Stud
io12
1.00
12.0
01
Bedo
om86
1.00
86.0
02
Bedr
oom
551.
5082
.50
3Be
droo
m7
2.00
14.0
016
019
5Pe
rUni
t1.
22Pe
rBed
room
0.85
PEAK
PARK
ING
DEM
ANDS
BYU
SEPR
IOR
TOAD
JUST
ING
FOR
TIM
EO
FDA
Yw
eekd
ayw
eeke
nd
Wee
kday
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kC
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
12/2
/201
4
Tota
lPar
king
Dem
and
224
316
505
553
706
825
904
914
914
757
730
784
829
809
721
733
584
479
298
Tota
lPar
king
Prov
ided
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
Net
Surp
lus(
Defic
it)72
763
544
639
824
512
647
3737
194
221
167
122
142
230
218
367
472
653
%of
Surp
lus(
Defic
it)32
4%20
1%88
%72
%35
%15
%5%
4%4%
26%
30%
21%
15%
17%
32%
30%
63%
98%
219%
Use
rs6
a.m
.7
a.m
.8
a.m
.9
a.m
.10
a.m
.11
a.m
.no
on1
p.m
.2
p.m
3p.
m.
4p.
m.
5p.
m.
6p.
m.
7p.
m.
8p.
m.
9p.
m.
10p.
m.
11p.
m.
mid
nigh
tRe
tail
(<40
0,00
0sf)
Empl
oyee
s10
%15
%40
%75
%85
%95
%10
0%10
0%10
0%10
0%10
0%95
%95
%95
%90
%75
%40
%15
%0%
12
510
1112
1313
1313
1312
1212
1210
52
0Vi
sitor
s1%
5%15
%35
%65
%85
%95
%10
0%95
%90
%90
%95
%95
%95
%80
%50
%30
%10
%0%
13
819
3545
5154
5148
4851
5151
4327
165
0Su
btot
al2
513
2846
5864
6664
6161
6363
6354
3621
70
Fine
orCa
sual
Dini
ngEm
ploy
ees
0%20
%50
%75
%90
%90
%90
%90
%90
%75
%75
%10
0%10
0%10
0%10
0%10
0%10
0%85
%35
%0
1231
4655
5555
5555
4646
6161
6161
6161
5221
Visit
ors
0%0%
0%0%
15%
40%
75%
75%
65%
40%
50%
75%
95%
100%
100%
100%
95%
75%
25%
00
00
3798
183
183
159
9812
218
323
224
424
424
423
218
361
Subt
otal
012
3146
9215
323
823
821
414
316
824
429
330
530
530
529
323
582
Qui
ckCa
sual
Dini
ngEm
ploy
ees
15%
20%
30%
40%
75%
100%
100%
100%
95%
70%
60%
70%
90%
90%
60%
40%
30%
20%
20%
912
1824
4661
6161
5843
3743
5555
3724
1812
12Vi
sitor
s5%
10%
20%
30%
55%
85%
100%
100%
90%
60%
55%
60%
85%
80%
50%
30%
20%
10%
5%9
1837
5510
115
618
318
316
511
010
111
015
614
692
5537
189
Subt
otal
1831
5579
146
217
244
244
223
153
137
153
211
201
128
7955
3121
Resi
dent
ial
Tena
nts
100%
87%
79%
37%
34%
30%
30%
30%
30%
31%
33%
77%
85%
94%
96%
98%
99%
100%
100%
195
169
154
7166
5758
5758
5964
150
165
183
187
191
193
195
195
Visit
ors
0%10
%20
%20
%20
%20
%20
%20
%20
%20
%20
%40
%60
%10
0%10
0%10
0%80
%50
%0%
02
55
55
55
55
510
1424
2424
1912
0Su
btot
al19
517
215
876
7162
6362
6364
6915
918
020
721
121
521
220
719
5O
ffice
(<50
,000
sf)
Empl
oyee
s3%
30%
75%
95%
100%
100%
90%
90%
100%
100%
90%
50%
25%
10%
7%30
%1%
0%0%
1097
242
307
323
323
291
291
323
323
291
162
8132
2397
30
0Vi
sitor
s0%
1%20
%60
%10
0%45
%15
%45
%10
0%45
%15
%10
%5%
2%1%
0%0%
0%0%
00
617
2812
412
2812
43
11
00
00
0Su
btot
al10
9724
832
435
133
629
530
335
133
629
516
482
3323
973
00
WEE
KDAY
CALC
ULA
TIO
NS
Wee
kend
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kC
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
12/2
/201
4
Tota
lPar
king
Dem
and
215
244
282
335
415
529
648
661
616
543
522
598
734
746
688
609
568
516
368
Tota
lPar
king
Prov
ided
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
951
Net
Surp
lus(
Defic
it)73
670
766
961
653
642
230
329
033
540
842
935
321
720
526
334
238
343
558
3%
ofSu
rplu
s(De
ficit)
343%
289%
237%
184%
129%
80%
47%
44%
54%
75%
82%
59%
30%
27%
38%
56%
67%
84%
158%
Use
rs6
a.m
.7
a.m
.8
a.m
.9
a.m
.10
a.m
.11
a.m
.no
on1
p.m
.2
p.m
3p.
m.
4p.
m.
5p.
m.
6p.
m.
7p.
m.
8p.
m.
9p.
m.
10p.
m.
11p.
m.
mid
nigh
tRe
tail
(<40
0,00
0sf)
Empl
oyee
s10
%15
%40
%75
%85
%95
%10
0%10
0%10
0%10
0%10
0%95
%95
%95
%90
%75
%40
%15
%0%
12
611
1314
1515
1515
1514
1414
1311
62
0Vi
sitor
s1%
5%10
%30
%50
%65
%80
%90
%10
0%10
0%95
%90
%80
%75
%65
%50
%35
%15
%0%
13
618
3038
4753
5959
5653
4744
3830
219
0Su
btot
al2
512
2942
5262
6874
7471
6761
5852
4127
110
Fine
orCa
sual
Dini
ngEm
ploy
ees
0%20
%30
%60
%75
%75
%75
%75
%75
%75
%75
%10
0%10
0%10
0%10
0%10
0%10
0%85
%50
%0
1218
3746
4646
4646
4646
6161
6161
6161
5231
Visit
ors
0%0%
0%0%
0%15
%50
%55
%45
%45
%45
%60
%90
%95
%10
0%90
%90
%90
%50
%0
00
00
3712
213
411
011
011
014
622
023
224
422
022
022
012
2Su
btot
al0
1218
3746
8216
818
015
615
615
620
828
129
330
528
128
127
215
3Q
uick
Casu
alDi
ning
Empl
oyee
s15
%20
%30
%40
%75
%10
0%10
0%10
0%95
%70
%60
%70
%90
%90
%60
%40
%30
%20
%20
%9
1218
2446
6161
6158
4337
4355
5537
2418
1212
Visit
ors
5%10
%20
%30
%55
%85
%10
0%10
0%90
%60
%55
%60
%85
%80
%50
%30
%20
%10
%5%
918
3755
101
156
183
183
165
110
101
110
156
146
9255
3718
9Su
btot
al18
3155
7914
621
724
424
422
315
313
715
321
120
112
879
5531
21Re
side
ntia
lTe
nant
s10
0%95
%88
%81
%74
%71
%71
%70
%71
%73
%75
%81
%85
%87
%92
%95
%96
%98
%10
0%19
518
517
115
814
413
813
813
613
814
214
615
816
516
917
918
518
719
119
5Vi
sitor
s0%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
40%
60%
100%
100%
100%
80%
50%
0%0
55
55
55
55
55
1014
2424
2419
120
Subt
otal
195
190
176
162
149
143
143
141
143
147
151
167
180
193
203
209
206
203
195
Offi
ce(<
50,0
00sf
)Em
ploy
ees
0%20
%60
%80
%90
%10
0%90
%80
%60
%40
%20
%10
%5%
0%0%
0%0%
0%0%
06
1926
2932
2926
1913
63
20
00
00
0Vi
sitor
s0%
20%
60%
80%
90%
100%
90%
80%
60%
40%
20%
10%
5%0%
0%0%
0%0%
0%0
12
22
32
22
11
00
00
00
00
Subt
otal
07
2128
3235
3228
2114
74
20
00
00
0
WEE
KEN
DCA
LCU
LATI
ON
S
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kA
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
10/9
/201
4
Tota
lPar
king
Prov
ided
325
Stru
ctur
ed
Use
rsHo
tel
Empl
oyee
s0.
25pe
runi
tx15
6.00
room
39sp
aces
0.18
peru
nitx
156
ksf=
28sp
aces
Visit
ors
1.00
peru
nitx
156.
00ro
om15
6sp
aces
1.00
peru
nitx
156
ksf=
156
spac
esSu
btot
al19
5sp
aces
184
spac
esHo
telC
onve
ntio
nCe
nter
(>50
sf/g
uest
room
)Em
ploy
ees
1.00
peru
nitx
20.7
6ks
f=21
spac
es2.
00pe
runi
tx20
.756
ksf=
42sp
aces
Visit
ors
10.0
0pe
runi
tx20
.76
ksf=
208
spac
es20
.00
peru
nitx
20.7
56ks
f=41
5sp
aces
Subt
otal
228
spac
es45
7sp
aces
Offi
ce(>
50,0
00sf
)Em
ploy
ees
3.00
peru
nitx
85.0
0ks
f=25
5sp
aces
0.30
peru
nitx
85ks
f=26
spac
esVi
sitor
s0.
25pe
runi
tx85
.00
ksf=
21sp
aces
0.02
peru
nitx
85ks
f=2
spac
esSu
btot
al27
6sp
aces
27sp
aces
Med
ical
/Den
talO
ffice
Empl
oyee
s1.
5pe
runi
tx0
ksf=
0sp
aces
1.50
peru
nitx
0ks
f=0
spac
esVi
sitor
s3
peru
nitx
0ks
f=0
spac
es3.
00pe
runi
tx0
ksf=
0sp
aces
Subt
otal
0sp
aces
0sp
aces
Tota
l70
0To
tal
668
Surp
lus(
Defic
it)(3
75)
Surp
lus(
Defic
it)(3
43)
wee
kday
wee
kend
PEAK
PARK
ING
DEM
ANDS
BYU
SEPR
IOR
TOAD
JUST
ING
FOR
TIM
EO
FDA
Y
Wee
kday
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kA
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
10/9
/201
4
Tota
lPar
king
Dem
and
159
243
493
641
653
641
601
608
653
641
611
504
325
233
233
257
163
162
159
Tota
lPar
king
Prov
ided
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
Net
Surp
lus(
Defic
it)16
682
(168
)(3
16)
(328
)(3
16)
(276
)(2
83)
(328
)(3
16)
(286
)(1
79)
(0)
9292
6816
216
316
6%
ofSu
rplu
s(De
ficit)
105%
34%
34%
49%
50%
49%
46%
47%
50%
49%
47%
35%
0%40
%40
%26
%10
0%10
1%10
4%
Use
rs6
a.m
.7
a.m
.8
a.m
.9
a.m
.10
a.m
.11
a.m
.no
on1
p.m
.2
p.m
3p.
m.
4p.
m.
5p.
m.
6p.
m.
7p.
m.
8p.
m.
9p.
m.
10p.
m.
11p.
m.
mid
nigh
tHo
tel
Empl
oyee
s5%
30%
90%
90%
100%
100%
100%
100%
100%
100%
90%
70%
40%
20%
20%
20%
20%
10%
5%2
1235
3539
3939
3939
3935
2716
88
88
42
Visit
ors
95%
95%
90%
80%
70%
70%
65%
65%
70%
70%
75%
80%
85%
85%
90%
95%
95%
100%
100%
148
148
140
125
109
109
101
101
109
109
117
125
133
133
140
148
148
156
156
Subt
otal
150
160
176
160
148
148
140
140
148
148
152
152
148
140
148
156
156
160
158
Hote
lCon
vent
ion
Cent
erEm
ploy
ees
5%30
%90
%90
%10
0%10
0%10
0%10
0%10
0%10
0%90
%70
%40
%20
%20
%20
%20
%10
%5%
16
1919
2121
2121
2121
1915
84
44
42
1Vi
sitor
s0%
0%50
%10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%50
%30
%30
%10
%0%
0%0%
00
104
208
208
208
208
208
208
208
208
208
104
6262
210
00
Subt
otal
16
122
226
228
228
228
228
228
228
226
222
112
6666
254
21
Offi
ce(>
50,0
00sf
)Em
ploy
ees
3%30
%75
%95
%10
0%10
0%90
%90
%10
0%10
0%90
%50
%25
%10
%7%
30%
1%0%
0%8
7719
124
225
525
523
023
025
525
523
012
864
2618
773
00
Visit
ors
0%1%
20%
60%
100%
45%
15%
45%
100%
45%
15%
10%
5%2%
1%0%
0%0%
0%0
04
1321
103
1021
103
21
00
00
00
Subt
otal
877
196
255
276
265
233
239
276
265
233
130
6526
1877
30
0M
edic
al/D
enta
lOffi
ceEm
ploy
ees
0%0%
60%
100%
100%
100%
100%
100%
100%
100%
100%
100%
67%
30%
15%
0%0%
0%0%
00
00
00
00
00
00
00
00
00
0Vi
sitor
s0%
0%90
%90
%10
0%10
0%30
%90
%10
0%10
0%90
%80
%67
%30
%15
%0%
0%0%
0%0
00
00
00
00
00
00
00
00
00
Subt
otal
00
00
00
00
00
00
00
00
00
0
WEE
KDAY
CALC
ULA
TIO
NS
Wee
kend
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kA
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
10/9
/201
4
Tota
lPar
king
Dem
and
152
175
427
624
618
621
611
608
610
605
600
595
591
586
594
498
387
291
218
Tota
lPar
king
Prov
ided
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
Net
Surp
lus(
Defic
it)17
315
0(1
02)
(299
)(2
93)
(296
)(2
86)
(283
)(2
85)
(280
)(2
75)
(270
)(2
66)
(261
)(2
69)
(173
)(6
2)34
107
%of
Surp
lus(
Defic
it)11
4%86
%24
%48
%47
%48
%47
%47
%47
%46
%46
%45
%45
%45
%45
%35
%16
%12
%49
%
Use
rs6
a.m
.7
a.m
.8
a.m
.9
a.m
.10
a.m
.11
a.m
.no
on1
p.m
.2
p.m
3p.
m.
4p.
m.
5p.
m.
6p.
m.
7p.
m.
8p.
m.
9p.
m.
10p.
m.
11p.
m.
mid
nigh
tHo
tel
Empl
oyee
s5%
30%
90%
90%
100%
100%
100%
100%
100%
100%
90%
75%
60%
55%
55%
55%
45%
45%
30%
18
2525
2828
2828
2828
2521
1715
1515
1313
8Vi
sitor
s95
%95
%90
%80
%70
%70
%65
%65
%70
%70
%75
%80
%85
%85
%90
%95
%95
%10
0%10
0%14
814
814
012
510
910
910
110
110
910
911
712
513
313
314
014
814
815
615
6Su
btot
al15
015
716
615
013
713
712
912
913
713
714
214
614
914
815
616
416
116
916
4Ho
telC
onve
ntio
nCe
nter
Empl
oyee
s5%
30%
90%
90%
100%
100%
100%
100%
100%
100%
90%
75%
60%
55%
55%
55%
45%
45%
30%
212
3737
4242
4242
4242
3731
2523
2323
1919
12Vi
sitor
s0%
0%50
%10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%75
%50
%25
%10
%0
020
841
541
541
541
541
541
541
541
541
541
541
541
531
120
810
442
Subt
otal
212
245
452
457
457
457
457
457
457
452
446
440
438
438
334
226
122
54O
ffice
(>50
,000
sf)
Empl
oyee
s0%
20%
60%
80%
90%
100%
90%
80%
60%
40%
20%
10%
5%0%
0%0%
0%0%
0%0
515
2023
2623
2015
105
31
00
00
00
Visit
ors
0%20
%60
%80
%90
%10
0%90
%80
%60
%40
%20
%10
%5%
0%0%
0%0%
0%0%
00
11
22
21
11
00
00
00
00
0Su
btot
al0
516
2224
2724
2216
115
31
00
00
00
Med
ical
/Den
talO
ffice
Empl
oyee
s0%
0%60
%10
0%10
0%10
0%10
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0
00
00
00
00
00
00
00
00
00
Visit
ors
0%0%
90%
90%
100%
100%
30%
0%0%
0%0%
0%0%
0%0%
0%0%
0%0%
00
00
00
00
00
00
00
00
00
0Su
btot
al0
00
00
00
00
00
00
00
00
00
WEE
KEN
DCA
LCU
LATI
ON
S
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kG
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
10/9
/201
4
Tota
lPar
king
Prov
ided
360
Stru
ctur
ed36
Stre
et
Use
rsRe
tail
(<40
0,00
0sf
)Em
ploy
ees
0.70
per1
ksfx
1.92
ksf=
1sp
aces
0.8
peru
nitx
1.91
9ks
f=2
spac
esVi
sitor
s2.
90pe
r1ks
fx1.
92ks
f=6
spac
es3.
2pe
runi
tx1.
919
ksf=
6sp
aces
Subt
otal
7sp
aces
8sp
aces
Fine
orCa
sual
Dini
ngEm
ploy
ees
2.75
peru
nitx
9.48
ksf=
26sp
aces
3.00
peru
nitx
9.48
ksf=
28sp
aces
Visit
ors
15.2
5pe
runi
tx9.
48ks
f=14
5sp
aces
17.0
0pe
runi
tx9.
48ks
f=16
1sp
aces
Subt
otal
171
spac
es19
0sp
aces
Qui
ckCa
sual
Dini
ngEm
ploy
ees
2.25
peru
nitx
0.00
ksf=
0sp
aces
2.00
peru
nitx
0ks
f=0
spac
esVi
sitor
s12
.75
peru
nitx
0.00
ksf=
0sp
aces
12.0
0pe
runi
tx0
ksf=
0sp
aces
Subt
otal
0sp
aces
0sp
aces
Resi
dent
ial
Tena
nts
1.20
peru
nitx
106.
00un
its=
128
spac
es1.
20pe
runi
tx10
6un
its=
128
spac
esVi
sitor
s0.
15pe
runi
tx10
6.00
units
=16
spac
es0.
15pe
runi
tx10
6un
its=
16sp
aces
Subt
otal
143
spac
es14
3sp
aces
Tota
l32
1To
tal
341
Surp
lus(
Defic
it)(2
85)
Surp
lus(
Defic
it)(3
05)
Resi
dent
ialU
nitM
ixU
nits
Park
s#
Stud
io4
1.00
4.00
1Be
doom
661.
0066
.00
2Be
droo
m29
1.50
43.5
03
Bedr
oom
72.
0014
.00
106
127.
50Pe
rUni
t1.
20Pe
rBed
room
0.86
PEAK
PARK
ING
DEM
ANDS
BYU
SEPR
IOR
TOAD
JUST
ING
FOR
TIM
EO
FDA
Yw
eekd
ayw
eeke
nd
Wee
kday
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kG
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
10/9
/201
4
Tota
lPar
king
Dem
and
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!To
talP
arki
ngPr
ovid
ed36
3636
3636
3636
3636
3636
3636
3636
3636
3636
Net
Surp
lus(
Defic
it)#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
%of
Surp
lus(
Defic
it)#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
Use
rs6
a.m
.7
a.m
.8
a.m
.9
a.m
.10
a.m
.11
a.m
.no
on1
p.m
.2
p.m
3p.
m.
4p.
m.
5p.
m.
6p.
m.
7p.
m.
8p.
m.
9p.
m.
10p.
m.
11p.
m.
mid
nigh
tCo
mm
unity
Shop
ping
Cent
er(<
500,
000s
f)#R
EF!
10%
15%
40%
75%
85%
95%
100%
100%
100%
100%
100%
95%
95%
95%
90%
75%
40%
15%
0%0
01
11
11
11
11
11
11
11
00
#REF
!1%
5%15
%35
%65
%85
%95
%10
0%95
%90
%90
%95
%95
%95
%80
%50
%30
%10
%0%
00
12
45
56
55
55
55
43
21
0#R
EF!
00
13
56
77
76
67
77
64
21
0
Fine
orCa
sual
Dini
ngEm
ploy
ees
0%20
%50
%75
%90
%90
%90
%90
%90
%75
%75
%10
0%10
0%10
0%10
0%10
0%10
0%85
%35
%0
513
2023
2323
2323
2020
2626
2626
2626
229
Visit
ors
0%0%
0%0%
15%
40%
75%
75%
65%
40%
50%
75%
95%
100%
100%
100%
95%
75%
25%
00
00
2258
108
108
9458
7210
813
714
514
514
513
710
836
Subt
otal
05
1320
4581
132
132
117
7792
134
163
171
171
171
163
131
45
Qui
ckCa
sual
Dini
ngEm
ploy
ees
15%
20%
30%
40%
75%
100%
100%
100%
95%
70%
60%
70%
90%
90%
60%
40%
30%
20%
20%
00
00
00
00
00
00
00
00
00
0Vi
sitor
s5%
10%
20%
30%
55%
85%
100%
100%
90%
60%
55%
60%
85%
80%
50%
30%
20%
10%
5%0
00
00
00
00
00
00
00
00
00
Subt
otal
00
00
00
00
00
00
00
00
00
0
Resi
dent
ial
Tena
nts
100%
87%
79%
73%
68%
59%
60%
59%
60%
61%
66%
77%
85%
94%
96%
98%
99%
100%
100%
128
111
101
9387
7577
7577
7884
9810
812
012
212
512
612
812
8Vi
sitor
s0%
10%
20%
20%
20%
20%
20%
20%
20%
20%
20%
40%
60%
100%
100%
100%
80%
50%
0%0
23
33
33
33
33
610
1616
1613
80
Subt
otal
128
113
104
9690
7880
7880
8187
105
118
136
138
141
139
135
128
WEE
KDAY
CALC
ULA
TIO
NS
Wee
kend
Park
ing
Dem
and
Stud
yBr
idge
Park
East
Bloc
kG
PerU
rban
Land
Inst
itute
'sSh
ared
Park
ing,
Seco
ndEd
iton
10/9
/201
4
Tota
lPar
king
Dem
and
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!To
talP
arki
ngPr
ovid
ed36
3636
3636
3636
3636
3636
3636
3636
3636
3636
Net
Surp
lus(
Defic
it)#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
%of
Surp
lus(
Defic
it)#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
#REF
!#R
EF!
Use
rs6
a.m
.7
a.m
.8
a.m
.9
a.m
.10
a.m
.11
a.m
.no
on1
p.m
.2
p.m
3p.
m.
4p.
m.
5p.
m.
6p.
m.
7p.
m.
8p.
m.
9p.
m.
10p.
m.
11p.
m.
mid
nigh
tCo
mm
unity
Shop
ping
Cent
er(<
500,
000s
f)#R
EF!
10%
15%
40%
75%
85%
95%
100%
100%
100%
100%
100%
95%
95%
95%
90%
75%
40%
15%
0%0
01
11
12
22
22
11
11
11
00
#REF
!1%
5%10
%30
%50
%65
%80
%90
%10
0%10
0%95
%90
%80
%75
%65
%50
%35
%15
%0%
00
12
34
56
66
66
55
43
21
0#R
EF!
01
13
45
67
88
77
66
54
31
0
Fine
orCa
sual
Dini
ngEm
ploy
ees
0%20
%30
%60
%75
%75
%75
%75
%75
%75
%75
%10
0%10
0%10
0%10
0%10
0%10
0%85
%50
%0
69
1721
2121
2121
2121
2828
2828
2828
2414
Visit
ors
0%0%
0%0%
0%15
%50
%55
%45
%45
%45
%60
%90
%95
%10
0%90
%90
%90
%50
%0
00
00
2481
8973
7373
9714
515
316
114
514
514
581
Subt
otal
06
917
2146
102
110
9494
9412
517
318
219
017
317
316
995
Qui
ckCa
sual
Dini
ngEm
ploy
ees
15%
20%
30%
40%
75%
100%
100%
100%
95%
70%
60%
70%
90%
90%
60%
40%
30%
20%
20%
00
00
00
00
00
00
00
00
00
0Vi
sitor
s5%
10%
20%
30%
55%
85%
100%
100%
90%
60%
55%
60%
85%
80%
50%
30%
20%
10%
5%0
00
00
00
00
00
00
00
00
00
Subt
otal
00
00
00
00
00
00
00
00
00
0
Resi
dent
ial
Tena
nts
100%
95%
88%
81%
74%
71%
71%
70%
71%
73%
75%
81%
85%
87%
92%
95%
96%
98%
100%
128
121
112
103
9491
9189
9193
9610
310
811
111
712
112
212
512
8Vi
sitor
s0%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
40%
60%
100%
100%
100%
80%
50%
0%0
33
33
33
33
33
610
1616
1613
80
Subt
otal
128
124
115
106
9894
9492
9496
9911
011
812
713
313
713
513
312
8
WEE
KEN
DCA
LCU
LATI
ON
S
CB DA
1110
98
65
43
21
713
A.5
12
B.5
C.45
RAMPUP1'-0"(5.3%) RAMPUP1'-0"(5.3%)
RAMP
UP
TO LE
VEL 2
(6.2%
)
180'-0"
272'-
4"
(14) STALLS @ 9'-0" = 126'-0" 8'-0" 8'-0"
42'-2
"(2
0) S
TALL
S @
9'-0
" = 1
80'-0
"23
'-2"
18'-0
"9'-
0"1'-
0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
2'-6"9'-0"5'-0"9'-0"9'-0"5'-0"9'-0"9'-0"3'-8"(4) STALLS @ 9'-0" = 36'-0"
1'-6 1
/2"8'-
11"
11'-0
"4'-
8"9'-
0"3'-
0"9'-0"
2'-1"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0" 1'-0"
19'-0"
6'-0 3
/4"
9'-0"
9'-0"
5'-0"
9'-0"
9'-0"
5'-0"
9'-0"
9'-0"
5'-0"
9'-0"
9'-0"
9'-0"
9'-0"
(7) S
TALL
S @
9'-0
" = 63
'-0"
5'-2 1
/4"(2
4) S
TALL
S @
9'-0
" = 21
6'-0"
1'-11
"
(10)
STA
LLS
@ 9'
-0" =
90'-0
"
COPY
RIGH
T ©
THIS
DOC
UMEN
T IS
THE
PRO
DUCT
AND
EXC
LUSI
VE P
ROPE
RTY
OF S
CHAE
FER.
NEI
THER
THE
DOC
UMEN
T NO
R TH
EIN
FORM
ATIO
N IT
CON
TAIN
S MA
Y BE
COP
IED
OR U
SED
FOR
ANY
OTHE
R TH
AN T
HE S
PECI
FIC
PURP
OSE
FOR
WHI
CH IT
WAS
PREP
ARED
, WIT
HOUT
THE
WRI
TTEN
CON
SENT
OF
SCHA
EFER
Scha
efer P
rojec
t Num
ber:
PRO
J #
DR
AWN
BY
DAT
E
ISSU
ED W
ITH
SHEE
T R
EVIS
ED
SKET
CH
NU
MBE
R
Phon
e:(6
14) 3
35-2
020
Fax:
(614
) 850
-919
1
Phon
e:(6
14) 4
61-4
664
Fax:
(614
) 280
-888
1w
ww
.moo
dyno
lan.
com
300
Spru
ce S
treet
Sui
te 3
00C
olum
bus,
Ohi
o 4
3215
1423
.06
2015
04-2
1-15
ST1
1414
5
BRID
GE
PAR
K - B
LDG
C4/
C5
CR
AWFO
RD
HO
YIN
G d
evel
opm
ent
6640
LO
NG
SHO
RE
ST.
DU
BLIN
, OH
4301
7
DAS
PARK
ING
SCHE
DULE
LEVE
LTY
PETO
TAL
C5_C
4 LEV
EL 1
REF
ADA
- 9'-0
" x 18
' + S
IGNP
OST
14C5
_C4 L
EVEL
1 RE
FAD
A VA
N - 9
'-0" x
18' +
SIG
NPOS
T4
C5_C
4 LEV
EL 1
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 1
REF
STD
- 9'-0
" x 18
'11
213
2C5
_C4 L
EVEL
2 RE
FEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5_C
4 LEV
EL 2
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 2
REF
STD
- 9'-0
" x 18
'13
814
2C5
LEVE
L 3 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 3
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 3
REF
STD
- 9'-0
" x 18
'14
214
6C5
LEVE
L 4 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 4
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 4
REF
STD
- 9'-0
" x 18
'13
614
0C5
LEVE
L 5 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 5
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 5
REF
STD
- 9'-0
" x 18
'15
816
2C5
LEVE
L 6 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 6
REF
NON-
STD
- 9'-0
" x 16
'1
C5 LE
VEL 6
REF
STD
- 9'-0
" x 18
'14
414
7Gr
and t
otal: 8
69
STR
UC
TUR
AL
EN
GIN
EE
RS
scha
efer
800.
542.
3302
-inc.
com
1/32
" = 1'
-0"
LEVE
L 1 P
ARKI
NG LA
YOUT
CB DA
1110
98
65
43
21
713
A.5
12
B.5
C.45
RAMP
DOW
N TO
LEVE
L 1 (6
.2%)
RAMP
UP
TO LE
VEL 3
(6.0%
)
9'-0" 3'-0" 9'-0" 3'-0" 9'-0" 8'-11" (10) STALLS @ 9'-0" = 90'-0" 8'-0" 8'-0"
1'-0"
18'-0
"23
'-2"
(20)
STA
LLS
@ 9'
-0" =
180
'-0"
23'-2
"18
'-0"
9'-0"
3'-9 1
/4"
(24)
STA
LLS
@ 9'
-0" =
216
'-0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
(4) STALLS @ 9'-0" = 36'-0"
2'-0"
1'-2"(6) STALLS @ 9'-0" = 54'-0"
17'-0
"(1
8) S
TALL
S @
9'-0
" = 1
62'-0
"23
'-2"
1'-0"18'-0"22'-0"18'-0"1'-0"
18'-1
"(1
8) S
TALL
S @
9'-0
" = 16
2'-0"
180'-0"
272'-
4"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
19'-8
"
1'-0"
OPEN
FOR
SPEE
D RA
MP
COPY
RIGH
T ©
THIS
DOC
UMEN
T IS
THE
PRO
DUCT
AND
EXC
LUSI
VE P
ROPE
RTY
OF S
CHAE
FER.
NEI
THER
THE
DOC
UMEN
T NO
R TH
EIN
FORM
ATIO
N IT
CON
TAIN
S MA
Y BE
COP
IED
OR U
SED
FOR
ANY
OTHE
R TH
AN T
HE S
PECI
FIC
PURP
OSE
FOR
WHI
CH IT
WAS
PREP
ARED
, WIT
HOUT
THE
WRI
TTEN
CON
SENT
OF
SCHA
EFER
Scha
efer P
rojec
t Num
ber:
PRO
J #
DR
AWN
BY
DAT
E
ISSU
ED W
ITH
SHEE
T R
EVIS
ED
SKET
CH
NU
MBE
R
Phon
e:(6
14) 3
35-2
020
Fax:
(614
) 850
-919
1
Phon
e:(6
14) 4
61-4
664
Fax:
(614
) 280
-888
1w
ww
.moo
dyno
lan.
com
300
Spru
ce S
treet
Sui
te 3
00C
olum
bus,
Ohi
o 4
3215
1423
.06
2015
04-2
1-15
ST2
1414
5
BRID
GE
PAR
K - B
LDG
C4/
C5
CR
AWFO
RD
HO
YIN
G d
evel
opm
ent
6640
LO
NG
SHO
RE
ST.
DU
BLIN
, OH
4301
7
DAS
PARK
ING
SCHE
DULE
LEVE
LTY
PETO
TAL
C5_C
4 LEV
EL 1
REF
ADA
- 9'-0
" x 18
' + S
IGNP
OST
14C5
_C4 L
EVEL
1 RE
FAD
A VA
N - 9
'-0" x
18' +
SIG
NPOS
T4
C5_C
4 LEV
EL 1
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 1
REF
STD
- 9'-0
" x 18
'11
213
2C5
_C4 L
EVEL
2 RE
FEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5_C
4 LEV
EL 2
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 2
REF
STD
- 9'-0
" x 18
'13
814
2C5
LEVE
L 3 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 3
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 3
REF
STD
- 9'-0
" x 18
'14
214
6C5
LEVE
L 4 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 4
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 4
REF
STD
- 9'-0
" x 18
'13
614
0C5
LEVE
L 5 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 5
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 5
REF
STD
- 9'-0
" x 18
'15
816
2C5
LEVE
L 6 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 6
REF
NON-
STD
- 9'-0
" x 16
'1
C5 LE
VEL 6
REF
STD
- 9'-0
" x 18
'14
414
7Gr
and t
otal: 8
69
STR
UC
TUR
AL
EN
GIN
EE
RS
scha
efer
800.
542.
3302
-inc.
com
1/32
" = 1'
-0"
LEVE
L 2 P
ARKI
NG LA
YOUT
CB DA
1110
98
65
43
21
713
A.5
12
B.5
C.45
RAMP
DOW
N TO
LEVE
L 2 (6
.0%)
RAMP
UP
TO LE
VEL 4
(6.0%
)
180'-0"
272'-
4"
1'-9 1
/4"(2
2) S
TALL
S @
9'-0
" = 19
8'-0"
23'-4
"
8'-0"8'-0"(14) STALLS @ 9'-0" = 126'-0"
1'-0"
18'-0
"23
'-2"
(20)
STA
LLS
@ 9'
-0" =
180'-
0"23
'-2"
18'-0
"9'-
0"
3'-9 1
/4"
(24)
STA
LLS
@ 9'
-0" =
216'-
0"29
'-1"
1'-0"
2'-6" (4) STALLS @ 9'-0" = 36'-0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
19'-0" 22'-0" 19'-0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
1'-0"
OPEN
FOR
SPEE
D RA
MP
COPY
RIGH
T ©
THIS
DOC
UMEN
T IS
THE
PRO
DUCT
AND
EXC
LUSI
VE P
ROPE
RTY
OF S
CHAE
FER.
NEI
THER
THE
DOC
UMEN
T NO
R TH
EIN
FORM
ATIO
N IT
CON
TAIN
S MA
Y BE
COP
IED
OR U
SED
FOR
ANY
OTHE
R TH
AN T
HE S
PECI
FIC
PURP
OSE
FOR
WHI
CH IT
WAS
PREP
ARED
, WIT
HOUT
THE
WRI
TTEN
CON
SENT
OF
SCHA
EFER
Scha
efer P
rojec
t Num
ber:
PRO
J #
DR
AWN
BY
DAT
E
ISSU
ED W
ITH
SHEE
T R
EVIS
ED
SKET
CH
NU
MBE
R
Phon
e:(6
14) 3
35-2
020
Fax:
(614
) 850
-919
1
Phon
e:(6
14) 4
61-4
664
Fax:
(614
) 280
-888
1w
ww
.moo
dyno
lan.
com
300
Spru
ce S
treet
Sui
te 3
00C
olum
bus,
Ohi
o 4
3215
1423
.06
2015
04-2
1-15
ST3
1414
5
BRID
GE
PAR
K - B
LDG
C4/
C5
CR
AWFO
RD
HO
YIN
G d
evel
opm
ent
6640
LO
NG
SHO
RE
ST.
DU
BLIN
, OH
4301
7
DAS
PARK
ING
SCHE
DULE
LEVE
LTY
PETO
TAL
C5_C
4 LEV
EL 1
REF
ADA
- 9'-0
" x 18
' + S
IGNP
OST
14C5
_C4 L
EVEL
1 RE
FAD
A VA
N - 9
'-0" x
18' +
SIG
NPOS
T4
C5_C
4 LEV
EL 1
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 1
REF
STD
- 9'-0
" x 18
'11
213
2C5
_C4 L
EVEL
2 RE
FEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5_C
4 LEV
EL 2
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 2
REF
STD
- 9'-0
" x 18
'13
814
2C5
LEVE
L 3 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 3
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 3
REF
STD
- 9'-0
" x 18
'14
214
6C5
LEVE
L 4 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 4
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 4
REF
STD
- 9'-0
" x 18
'13
614
0C5
LEVE
L 5 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 5
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 5
REF
STD
- 9'-0
" x 18
'15
816
2C5
LEVE
L 6 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 6
REF
NON-
STD
- 9'-0
" x 16
'1
C5 LE
VEL 6
REF
STD
- 9'-0
" x 18
'14
414
7Gr
and t
otal: 8
69
STR
UC
TUR
AL
EN
GIN
EE
RS
scha
efer
800.
542.
3302
-inc.
com
1/32
" = 1'
-0"
LEVE
L 3 P
ARKI
NG LA
YOUT
CB DA
1110
98
65
43
21
713
12
C.45
RAMP
UP
TO LE
VEL 5
(6.0%
)
RAMP
DOW
N TO
LEVE
L 3 (6
.0%)
180'-0"
272'-
4"
1'-9 1
/4"
(22)
STA
LLS
@ 9'
-0" =
198'-
0"23
'-4"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
(14) STALLS @ 9'-0" = 126'-0" 8'-0" 8'-0"
1'-0"
18'-0
"23
'-2"
(19)
STA
LLS
@ 9'
-0" =
171'-
0"33
'-5"
1'-0"
23'-2
"18
'-0"
9'-0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
1'-2"
(17)
STA
LLS
@ 9'
-0" =
153'-
0"
1'-7"
1'-0"
9'-0"
9'-0"
8 1/4"
1'-6"(4) STALLS @ 9'-0" = 36'-0"
1'-0"
OPEN
FOR
SPEE
D RA
MP
CBA
1313
A.5
1212
B.5
RAMP DOWN TO LVL 2 (16%)
RAMP DOWN 10" (8%)
RAMP UP TO LVL 4 (16%)
RAMP UP 10" (8%)
FOB
1'-3"
24'-6
"FO
B4"
10'-3
"3'-
0"10
'-3" 20'-0" 8'-8" 11'-0"
11'-0" 122'-11" 10'-5"
RAMP UP 12" (3.5%)
COPY
RIGH
T ©
THIS
DOC
UMEN
T IS
THE
PRO
DUCT
AND
EXC
LUSI
VE P
ROPE
RTY
OF S
CHAE
FER.
NEI
THER
THE
DOC
UMEN
T NO
R TH
EIN
FORM
ATIO
N IT
CON
TAIN
S MA
Y BE
COP
IED
OR U
SED
FOR
ANY
OTHE
R TH
AN T
HE S
PECI
FIC
PURP
OSE
FOR
WHI
CH IT
WAS
PREP
ARED
, WIT
HOUT
THE
WRI
TTEN
CON
SENT
OF
SCHA
EFER
Scha
efer P
rojec
t Num
ber:
PRO
J #
DR
AWN
BY
DAT
E
ISSU
ED W
ITH
SHEE
T R
EVIS
ED
SKET
CH
NU
MBE
R
Phon
e:(6
14) 3
35-2
020
Fax:
(614
) 850
-919
1
Phon
e:(6
14) 4
61-4
664
Fax:
(614
) 280
-888
1w
ww
.moo
dyno
lan.
com
300
Spru
ce S
treet
Sui
te 3
00C
olum
bus,
Ohi
o 4
3215
1423
.06
2015
04-2
1-15
ST4
1414
5
BRID
GE
PAR
K - B
LDG
C4/
C5
CR
AWFO
RD
HO
YIN
G d
evel
opm
ent
6640
LO
NG
SHO
RE
ST.
DU
BLIN
, OH
4301
7
DAS
PARK
ING
SCHE
DULE
LEVE
LTY
PETO
TAL
C5_C
4 LEV
EL 1
REF
ADA
- 9'-0
" x 18
' + S
IGNP
OST
14C5
_C4 L
EVEL
1 RE
FAD
A VA
N - 9
'-0" x
18' +
SIG
NPOS
T4
C5_C
4 LEV
EL 1
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 1
REF
STD
- 9'-0
" x 18
'11
213
2C5
_C4 L
EVEL
2 RE
FEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5_C
4 LEV
EL 2
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 2
REF
STD
- 9'-0
" x 18
'13
814
2C5
LEVE
L 3 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 3
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 3
REF
STD
- 9'-0
" x 18
'14
214
6C5
LEVE
L 4 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 4
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 4
REF
STD
- 9'-0
" x 18
'13
614
0C5
LEVE
L 5 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 5
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 5
REF
STD
- 9'-0
" x 18
'15
816
2C5
LEVE
L 6 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 6
REF
NON-
STD
- 9'-0
" x 16
'1
C5 LE
VEL 6
REF
STD
- 9'-0
" x 18
'14
414
7Gr
and t
otal: 8
69
STR
UC
TUR
AL
EN
GIN
EE
RS
scha
efer
800.
542.
3302
-inc.
com
1/32
" = 1'
-0"
LEVE
L 4 P
ARKI
NG LA
YOUT
1/32
" = 1'
-0"
SPEE
D RA
MP P
LAN
CB DA
1110
98
65
43
21
713
12
C.45
RAMP
UP
TO LE
VEL 6
(6.0%
)
RAMP
DOW
N TO
LEVE
L 4 (6
.0%)
180'-0"
272'-
4"
1'-9 1
/4"(2
2) S
TALL
S @
9'-0
" = 19
8'-0"
23'-4
"
(14) STALLS @ 9'-0" = 126'-0" 8'-0" 8'-0"
1'-0"
18'-0
"23
'-2"
(21)
STA
LLS
@ 9'
-0" =
189'-
0"22
'-2"
18'-0
"1'-
0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
1'-0" 18'-0" 22'-0" 18'-0" 1'-0"
3'-9 1
/4"
(25)
STA
LLS
@ 9'
-0" =
225'-
0"20
'-1"
10'-0
"22
'-2"
18'-0
"1'-
0"
19'-11" (15) STALLS @ 9'-0" = 135'-0" 6'-1"
1'-0"
COPY
RIGH
T ©
THIS
DOC
UMEN
T IS
THE
PRO
DUCT
AND
EXC
LUSI
VE P
ROPE
RTY
OF S
CHAE
FER.
NEI
THER
THE
DOC
UMEN
T NO
R TH
EIN
FORM
ATIO
N IT
CON
TAIN
S MA
Y BE
COP
IED
OR U
SED
FOR
ANY
OTHE
R TH
AN T
HE S
PECI
FIC
PURP
OSE
FOR
WHI
CH IT
WAS
PREP
ARED
, WIT
HOUT
THE
WRI
TTEN
CON
SENT
OF
SCHA
EFER
Scha
efer P
rojec
t Num
ber:
PRO
J #
DR
AWN
BY
DAT
E
ISSU
ED W
ITH
SHEE
T R
EVIS
ED
SKET
CH
NU
MBE
R
Phon
e:(6
14) 3
35-2
020
Fax:
(614
) 850
-919
1
Phon
e:(6
14) 4
61-4
664
Fax:
(614
) 280
-888
1w
ww
.moo
dyno
lan.
com
300
Spru
ce S
treet
Sui
te 3
00C
olum
bus,
Ohi
o 4
3215
1423
.06
2015
04-2
1-15
ST5
1414
5
BRID
GE
PAR
K - B
LDG
C4/
C5
CR
AWFO
RD
HO
YIN
G d
evel
opm
ent
6640
LO
NG
SHO
RE
ST.
DU
BLIN
, OH
4301
7
DAS
PARK
ING
SCHE
DULE
LEVE
LTY
PETO
TAL
C5_C
4 LEV
EL 1
REF
ADA
- 9'-0
" x 18
' + S
IGNP
OST
14C5
_C4 L
EVEL
1 RE
FAD
A VA
N - 9
'-0" x
18' +
SIG
NPOS
T4
C5_C
4 LEV
EL 1
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 1
REF
STD
- 9'-0
" x 18
'11
213
2C5
_C4 L
EVEL
2 RE
FEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5_C
4 LEV
EL 2
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 2
REF
STD
- 9'-0
" x 18
'13
814
2C5
LEVE
L 3 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 3
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 3
REF
STD
- 9'-0
" x 18
'14
214
6C5
LEVE
L 4 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 4
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 4
REF
STD
- 9'-0
" x 18
'13
614
0C5
LEVE
L 5 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 5
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 5
REF
STD
- 9'-0
" x 18
'15
816
2C5
LEVE
L 6 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 6
REF
NON-
STD
- 9'-0
" x 16
'1
C5 LE
VEL 6
REF
STD
- 9'-0
" x 18
'14
414
7Gr
and t
otal: 8
69
STR
UC
TUR
AL
EN
GIN
EE
RS
scha
efer
800.
542.
3302
-inc.
com
1/32
" = 1'
-0"
LEVE
L 5 P
ARKI
NG LA
YOUT
CB DA
1110
98
65
43
21
713
12
C.45
RAMP
DOW
N TO
LEVE
L 5 (6
.0%)
OPEN
180'-0"
272'-
4"
1'-9 1
/4"(2
2) S
TALL
S @
9'-0
" = 19
8'-0"
(15) STALLS @ 9'-0" = 135'-0"
3'-0" (6) STALLS @ 9'-0" = 54'-0" 3'-0"
1'-0" 18'-0" 22'-0" 18'-0"
1'-0" 1'-0"
18'-0" 22'-0" 18'-0"
1'-0" 1'-0"
18'-0" 22'-0" 18'-0" 1'-0"
(11)
STA
LLS
@ 9'
-0" =
99'-0
"
1'-0"
18'-0
"23
'-2"
(21)
STA
LLS
@ 9'
-0" =
189'-
0"22
'-2"
18'-0
"1'-
0"
3'-9 1
/4"
(25)
STA
LLS
@ 9'
-0" =
225'-
0"20
'-1"
19'-0"6'-1"(15) STALLS @ 9'-0" = 135'-0"19'-11"
2'-1"
18'-0
"5'-
6"
1'-0"
COPY
RIGH
T ©
THIS
DOC
UMEN
T IS
THE
PRO
DUCT
AND
EXC
LUSI
VE P
ROPE
RTY
OF S
CHAE
FER.
NEI
THER
THE
DOC
UMEN
T NO
R TH
EIN
FORM
ATIO
N IT
CON
TAIN
S MA
Y BE
COP
IED
OR U
SED
FOR
ANY
OTHE
R TH
AN T
HE S
PECI
FIC
PURP
OSE
FOR
WHI
CH IT
WAS
PREP
ARED
, WIT
HOUT
THE
WRI
TTEN
CON
SENT
OF
SCHA
EFER
Scha
efer P
rojec
t Num
ber:
PRO
J #
DR
AWN
BY
DAT
E
ISSU
ED W
ITH
SHEE
T R
EVIS
ED
SKET
CH
NU
MBE
R
Phon
e:(6
14) 3
35-2
020
Fax:
(614
) 850
-919
1
Phon
e:(6
14) 4
61-4
664
Fax:
(614
) 280
-888
1w
ww
.moo
dyno
lan.
com
300
Spru
ce S
treet
Sui
te 3
00C
olum
bus,
Ohi
o 4
3215
1423
.06
2015
04-2
1-15
ST6
1414
5
BRID
GE
PAR
K - B
LDG
C4/
C5
CR
AWFO
RD
HO
YIN
G d
evel
opm
ent
6640
LO
NG
SHO
RE
ST.
DU
BLIN
, OH
4301
7
DAS
PARK
ING
SCHE
DULE
LEVE
LTY
PETO
TAL
C5_C
4 LEV
EL 1
REF
ADA
- 9'-0
" x 18
' + S
IGNP
OST
14C5
_C4 L
EVEL
1 RE
FAD
A VA
N - 9
'-0" x
18' +
SIG
NPOS
T4
C5_C
4 LEV
EL 1
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 1
REF
STD
- 9'-0
" x 18
'11
213
2C5
_C4 L
EVEL
2 RE
FEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5_C
4 LEV
EL 2
REF
NON-
STD
- 8'-0
" x 16
'2
C5_C
4 LEV
EL 2
REF
STD
- 9'-0
" x 18
'13
814
2C5
LEVE
L 3 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 3
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 3
REF
STD
- 9'-0
" x 18
'14
214
6C5
LEVE
L 4 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 4
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 4
REF
STD
- 9'-0
" x 18
'13
614
0C5
LEVE
L 5 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 5
REF
NON-
STD
- 8'-0
" x 16
'2
C5 LE
VEL 5
REF
STD
- 9'-0
" x 18
'15
816
2C5
LEVE
L 6 R
EFEV
- 9'-
0" x
18' +
SIG
NPOS
T2
C5 LE
VEL 6
REF
NON-
STD
- 9'-0
" x 16
'1
C5 LE
VEL 6
REF
STD
- 9'-0
" x 18
'14
414
7Gr
and t
otal: 8
69
STR
UC
TUR
AL
EN
GIN
EE
RS
scha
efer
800.
542.
3302
-inc.
com
1/32
" = 1'
-0"
LEVE
L 6 P
ARKI
NG LA
YOUT
LONG
SHOR
E ST
REET
PUB
LIC E
NTRA
NCE:
(1) E
NTRA
NCE
+ (2)
EXI
T LA
NES
PARK
ING
RAMP
(TYP
ICAL
)
TULL
ER R
IDGE
DRI
VE P
UBLIC
ENT
RANC
E:(1
) ENT
RANC
E + (
2) E
XITS
MOON
EY S
T TE
NANT
ENT
RANC
E:(1
) ENT
RANC
E + (
1) E
XIT
LANE
SPEE
D RA
MP:
LEVE
L 2 U
P TO
LEVE
L 4
ELEC
TRIC
VEH
ICLE
CHA
RGIN
GST
ATIO
N SI
GNAG
E (T
YPIC
AL W
HERE
SHOW
N AT
LEVE
LS 2
AND
UP)
ADA
STAL
L SIG
NAGE
(TYP
ICAL
WHE
RE S
HOW
NAT
LEVE
L 1)
COPY
RIGH
T ©
THIS
DOC
UMEN
T IS
THE
PRO
DUCT
AND
EXC
LUSI
VE P
ROPE
RTY
OF S
CHAE
FER.
NEI
THER
THE
DOC
UMEN
T NO
R TH
EIN
FORM
ATIO
N IT
CON
TAIN
S MA
Y BE
COP
IED
OR U
SED
FOR
ANY
OTHE
R TH
AN T
HE S
PECI
FIC
PURP
OSE
FOR
WHI
CH IT
WAS
PREP
ARED
, WIT
HOUT
THE
WRI
TTEN
CON
SENT
OF
SCHA
EFER
Scha
efer P
rojec
t Num
ber:
PRO
J #
DR
AWN
BY
DAT
E
ISSU
ED W
ITH
SHEE
T R
EVIS
ED
SKET
CH
NU
MBE
R
Phon
e:(6
14) 3
35-2
020
Fax:
(614
) 850
-919
1
Phon
e:(6
14) 4
61-4
664
Fax:
(614
) 280
-888
1w
ww
.moo
dyno
lan.
com
300
Spru
ce S
treet
Sui
te 3
00C
olum
bus,
Ohi
o 4
3215
1423
.06
2015
04-2
1-15
ST7
1414
5
BRID
GE
PAR
K - B
LDG
C4/
C5
CR
AWFO
RD
HO
YIN
G d
evel
opm
ent
6640
LO
NG
SHO
RE
ST.
DU
BLIN
, OH
4301
7
DAS
PARK
ING
CIRC
ULAT
ION
DIAG
RAM
STR
UC
TUR
AL
EN
GIN
EE
RS
scha
efer
800.
542.
3302
-inc.
com