building s.p.a.c.e.s. initiative draft esplostproject list · 2016. 10. 4. · s t h d er m s r h...

38
BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOST PROJECT LIST COMMUNITY INPUT SESSIONS OCTOBER 4 18, 2016

Upload: others

Post on 19-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

BUILDING S.P.A.C.E.S. INITIATIVEDRAFT E‐SPLOST PROJECT LISTCOMMUNITY INPUT SESSIONS

OC TOB E R   4 ‐ 1 8 ,   2 0 1 6

Page 2: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

AGENDA

Introductions

Building S.P.A.C.E.S. Initiative Overview

E‐SPLOST Overview

E‐SPLOST Projects and Options

Small Group Discussion

2

Page 3: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

3

INTRODUCE YOURSELF

1. I am a parent  or guardian of a DeKalb student

2. I work for DCSD3. I am both an employee 

and a parent4. I am a student5. I am a community 

member or other

Paren

t  or g

uardi

an 

Emplo

yee o

f DCS

D

Emplo

yee a

nd a 

paren

t

Stude

nt

Comm

unity

 mem

ber o

r othe

r

0% 0% 0%0%0%

Page 4: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

4

INTRODUCE YOURSELF

1. I am an ES stakeholder ONLY.

2. I am a MS stakeholder ONLY.

3. I am a HS stakeholder ONLY.4. I am interested in multiple 

levels (ES, MS, HS).5. None, interested observer.

ES st

akeh

older

MS st

akeh

older

HS st

akeh

older

Multip

le lev

els (E

S, MS

, HS)

Obse

rver

0% 0% 0%0%0%

Page 5: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

5

PLEASE TELL US YOUR HIGH SCHOOL CLUSTER:(IF YOUR CLUSTER IS NOT LISTED, PLEASE WAIT FOR NEXT SLIDES)

1. Cedar Grove HS2. Chamblee HS3. Clarkston HS4. Columbia HS5. Cross Keys HS

Ceda

r Gro

ve HS

Cham

blee H

SCla

rkston

 HSCo

lumbia

 HSCro

ss Ke

ys HS

0% 0% 0%0%0%

Page 6: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

6

PLEASE TELL US YOUR HIGH SCHOOL CLUSTER:(IF YOUR CLUSTER IS NOT LISTED, PLEASE WAIT FOR NEXT SLIDES)

1. Dunwoody HS2. Druid Hills HS3. Lakeside HS4. Lithonia HS5. Miller Grove HS

Dunw

oody

 HSDr

uid Hi

lls HS

Lake

side H

S

Litho

nia HS

Mille

r Grov

e HS

0% 0% 0%0%0%

Page 7: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

7

PLEASE TELL US YOUR HIGH SCHOOL CLUSTER:(IF YOUR CLUSTER IS NOT LISTED, PLEASE WAIT FOR NEXT SLIDES)

1. Martin Luther King Jr. HS

2. McNair HS3. Redan HS4. Southwest DeKalb HS5. Stephenson HS

Marti

n Lut

her K

ing Jr

. HS

McNa

ir HS

Reda

n HS

South

west 

DeKa

lb HS

Steph

enso

n HS

0% 0% 0%0%0%

Page 8: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

8

PLEASE TELL US YOUR HIGH SCHOOL CLUSTER:

1. Stone Mountain HS2. Towers HS3. Tucker HS4. I do not know the HS 

near me.5. I don’t live in DeKalb.

Stone

 Mou

ntain 

HSTo

wers 

HSTu

cker H

S

Don't

 know

 the H

S nea

r me

Don’t

 live i

n DeK

alb

0% 0% 0%0%0%

Page 9: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

AGENDA

Introductions

Building S.P.A.C.E.S. Initiative Overview

E‐SPLOST Overview

E‐SPLOST Projects and Options

Small Group Discussion

9

Page 10: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

BUILDING S.P.A.C.E.S. INITIATIVE OVERVIEWGOALS

To align the E‐SPLOST V capital improvement program and its resources with the District’s core mission and vision. To leverage a data‐driven process and stakeholder engagement to guide the strategic decisions related to the development of the E‐SPLOST V project list. To determine how, where, and why future E‐SPLOST  revenues should be allocated to improve and modernize the District’s buildings and infrastructure.

10

Page 11: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

BUILDING S.P.A.C.E.S. INITIATIVE OVERVIEWDATA COLLECTION AND STAKEHOLDER ENGAGEMENT

11

Gather and analyze data for each school and facility  Facility Condition Assessment Facility Educational Adequacy Assessment  Capacity/Utilization Review

Two rounds of community meetings (October 2015 and October 2016) Secondary School Facility Planning and Feasibility Study (March 2016 – September 2016) Six Public Meetings Fifteen Regional Steering Committee Meetings Three Online Surveys

Informational Meeting: September 27, 2016Online Survey: October 4 – 24, 2016

Page 12: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

AGENDA

Building S.P.A.C.E.S. Initiative Overview

E‐SPLOST Overview

E‐SPLOST Projects and Options

Small Group Discussion

12

Page 13: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

Education ‐ SpecialPurposeLocalOptionSalesTax (E‐SPLOST)

A significant funding source for capital improvements (e.g. new construction, facility improvements, technology upgrades, etc.) which can ONLY be used for educational purposes A one penny sales tax funded by anyone buying goods in the county, regardless of where they liveMust be approved by DeKalb County voters, and has been continuously approved since its inception in 1997 

E-SPLOST OVERVIEWWHAT IS E-SPLOST?

13

Page 14: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

PATHWAY TO 2017-2022 E-SPLOST

14

Secondary School Facility Planning and Feasibility

Study(March – September 2016)

Page 15: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

AGENDA

Building S.P.A.C.E.S. Initiative Overview

E‐SPLOST Overview

E‐SPLOST Projects and Options

Small Group Discussion

15

Page 16: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

2017-2022 E-SPLOST PROJECT CATEGORIES

16

Project Categories: $ millions

1. Safety and Security Improvements $15

2. New Facilities and Additions $230

3. Facility Condition Improvements $100

4. Technology Improvements $65

5. Buses, Vehicles, and Other Capital Equipment $40

Management Support and ProgramContingency

$50

Total $500

Page 17: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

E-SPLOST PROJECTS AND OPTIONS1. SAFETY AND SECURITY IMPROVEMENTS $15 M

Life Safety ($9.8 million): Sprinklers Fire Alarms Emergency lighting

Security ($5.2 million):  Front Entry Vestibules Outdoor security lighting Perimeter Fencing

17

Page 18: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

18

1. SAFETY AND SECURITY - $15M Which of these 2 areas is your highest priority?

1. Life safety items –sprinklers, fire alarms, etc.

2. Security items –vestibules, outdoor lighting, fencing, etc.

Life s

afety 

items

 

Secu

rity i

tems 

0%0%

Page 19: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

19

1. SAFETY AND SECURITY - $15MHIGHEST PRIORITY FOR SAFETY

1. Fire sprinklers in the buildings

2. Fire Alarms3. Emergency lighting4. Other

Fire s

prink

lers

Fire A

larms

Emerg

ency 

lighti

ng

Othe

r

0% 0%0%0%

Page 20: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

20

1. SAFETY AND SECURITY - $15MHIGHEST PRIORITY FOR SECURITY

1. Vestibule to manage front door

2. Fencing3. Outdoor lighting4. Other

Vesti

bule 

Fenc

ingOu

tdoor 

lighti

ng

Othe

r

0% 0%0%0%

Page 21: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

E-SPLOST PROJECTS AND OPTIONS2. NEW FACILITIES AND ADDITIONS - $230M+$25M

Options  2A 2B 2C

Secondary Schools Recommendation $195M $195M $195MTwo new elementary schools to relieve Cross Keys Cluster overcrowding $60M $60M $60MOne new elementary schoolreplacement and other additions $56.6M $28M $0

Land Purchase $5M $0 $0M

E‐SPLOST Category 2 Total $315.6M $283M $255M

E‐SPLOST Category 2 Budget $230M $230M $230MAmount over $230 M $85.6M $53M $25MAmount over $255 M(Assuming $25 M in Ga DOE Reimbursements) $60.6M $28M $0M

21

Page 22: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

22

2. NEW FACILITIES AND ADDITIONS - $230M+ $25M Which option do you prefer?

1. Option 2A: Secondary plan, 3 new ES, other ES additions, new land ‐$315.6M

2. Option 2B: Secondary plan, 3 new ES, no ES additions, no land ‐ $283M

3. Option 2C: Secondary plan, 2 new ES, no ES additions, no land ‐ $255M

Optio

n 2A

Optio

n 2B

Optio

n 2C

0% 0%0%

Page 23: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

23

DCSD has an E-SPLOST budget of $230M for capacity additions and additional $25M in Ga

DOE reimbursements. Should the district:

1. Identify additional revenues above the $255 Million to cover additional capacity costs?

2. Not exceed the $255 Million?

Addit

ional 

reven

ues

Not e

xceed

 

0%0%

Page 24: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

ADDITIONAL REVENUE OPTIONS FOR CATEGORY 2NEW FACILITIES AND ADDITIONS

Possible funding options to support increased costs for capacity additions:

1. Bond backed by property millage2. Strategic sale of surplus property3. Use of District's General Fund Reserves

24

Page 25: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

25

Which of three revenue options would you prefer?

1. Bond backed by property millage

2. Strategic sale of surplus property

3. Use of District's General Fund Reserves

4. I do not support any revenue option; keep costs at or below $255M

Bond

 back

ed by

 prop

erty m

i...

Strate

gic sa

le of 

surp

lus pr

o...

Use o

f Dist

rict's

 Gene

ral Fu

..

I do n

ot su

pport

 any r

even

u...

0% 0%0%0%

Page 26: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

26

If DCSD proposed a bond (backed by property millage) to support new facilities and additions, would YOU support it?

1. Yes2. No3. Not sure

Yes No

Not s

ure

0% 0%0%

Page 27: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

27

If DCSD proposed a bond (backed by property millage) to support new facilities and additions, would the community support it?

1. Yes2. No3. Not sure

Yes No

Not s

ure

0% 0%0%

Page 28: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

E-SPLOST PROJECTS AND OPTIONS3. FACILITY CONDITION IMPROVEMENTS - $100M

Options 3A 3B 3CRenovations for Jolly ES/Chesnut ES (to support additions in Option 2A) $16M $0 $0HS Athletic Fields Upgrades $0 $6M $9.8MES Playground Replacement $1.4M $0 $3MRestroom Fixture Replacement $2.7M $2.7M $4.6MSet‐aside for Potential Lead/Water Remediation $1.8M $2.2M $2.4MADA/Accessibility $3.5M $3.5M $3.5MCapital Renewal Program (major system replacement) $72M $83M $69MSchool bus parking and pavement upgrades $2.6M $2.6M $5.2MParking additions at schools $0 $0 $2.5ME‐SPLOST Category 3 $100M $100M $100M

28

Page 29: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

29

In order to address needed facility condition improvements, I prefer to focus $100 M on:

1. Option 3A (renovations to support ES additions)

2. Option 3B (major focus on capital renewal)

3. Option 3C (focus on specialty needs)

4. Option 3A, 3B, or 3C, but with some budget allocation adjustments

Optio

n 3A

Optio

n 3B 

Optio

n 3C 

Optio

n 3A, 

3B, o

r 3C

0% 0%0%0%

Page 30: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

30

Identify any component of Category 3 you would recommend increasing the budget allocation.

1. Renovations for Jolly ES/Chesnut ES (to support additions in Option 2A) [$0‐$16M]

2. HS athletic field upgrades [$0‐9.8M]

3. ES playground replacements [0‐$3M]

4. Restroom fixture replacement [$2.7M‐$4.6M]

5. Set‐aside for potential Lead/Water Remediation [$1.8M‐$2.4M]

Reno

vatio

ns ES

HS at

hletic

 fields

ES pl

aygro

und 

Restr

oom 

fixtur

e Le

ad/W

ater 

0% 0% 0%0%0%

Page 31: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

31

Identify any component of Category 3 you would recommend increasing the budget allocation.

1. ADA/accessibility issues [$3.5M]

2. Capital renewal program (major system replacement) [$69M‐$83M]

3. School bus parking/pavement [$2.6M‐$5.2M]

4. Parking additions at schools [$0‐$2.5M]

ADA/

acces

sibilit

y

Capit

al ren

ewal 

Schoo

l bus

 parki

ngPa

rking

 addit

ions

0% 0%0%0%

Page 32: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

E-SPLOST PROJECTS AND OPTIONS4. TECHNOLOGY IMPROVEMENTS - $65M

Total

(ERP)Finance/HR System $12M

Computer Refresh $22M

Telecom Upgrade $6M

Safety and Security $10M

Active Boards $10M

Infrastructure $5M

E‐SPLOST Category 4 $65M

32

Page 33: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

E-SPLOST PROJECTS AND OPTIONS5. BUSES/VEHICLES, CAPITAL EQUIPMENT - $40M

Options 5A 5B 5CSchool buses $33.8M $30.8M $25.15MSupport/Service Vehicles (Police, Maintenance, School Nutrition, Warehouse) $1.5M $2.5M $3.5MBand equipment $2M $3M $4MCompactors $0 $0 $1.75MPortable Classrooms $1.5M $2.5M $3MKitchen Equipment $1.2M $1.2M $2.6ME‐SPLOST Category 5 Total $40M $40M $40M

33

Page 34: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

34

In order to address buses/vehicles and capital equipment needs, I prefer to focus the $40 M on:1. Option 5A (focus on major 

school bus purchase)2. Option 5B (blend of 

Options 5A and 5C)3. Option 5C (major focus on 

other [non‐school bus] capital equipment needs)

4. Option 5A, 5B, or 5C, but with some budget allocation adjustments

Optio

n 5A

Optio

n 5B

Optio

n 5C

Optio

n 5A, 

5B, o

r 5C

0% 0%0%0%

Page 35: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

35

Identify any component of Category 5 you would recommend increasing the budget allocation.

1. School buses [$25.15M‐$33.8M]

2. Support/service vehicles [$1.5M‐$3.5M]

3. Band equipment [$2M‐$4M]

4. I don’t recommend any increase.

Schoo

l bus

es 

Supp

ort/s

ervice

 vehic

lesBa

nd eq

uipme

nt 

Don’t

 reco

mmen

d  inc

rease

.

0% 0%0%0%

Page 36: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

36

Identify any component of Category 5 you would you recommend increasing the budget allocation.

1. Trash compactors [$0‐$1.75M]

2. Portable classrooms [$1.5M‐$3M]

3. Kitchen equipment [$1.2M‐$2.6M] 

4. I don’t recommend any increase.

Trash 

comp

actor

sPo

rtable

 classr

ooms

 Kit

chen

 equip

ment

Don’t

 reco

mmen

d  inc

rease

0% 0%0%0%

Page 37: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

AGENDA

Building S.P.A.C.E.S. Initiative Overview E‐SPLOST Overview E‐SPLOST Projects and Options Small Group Discussion Please return your clicker and follow instructions to go to your small group room

37

Page 38: BUILDING S.P.A.C.E.S. INITIATIVE DRAFT ESPLOSTPROJECT LIST · 2016. 10. 4. · s t h d er M S r H ta k l de r M u lt l e le s, M S,) O b 0% 0% 0% 0% 0%. 5 PLEASE TELL US YOUR HIGH

SMALL GROUP

• Please return your clicker.• Purpose – to allow participants to explain thinking 

behind the data• Ground Rules:

• Allow everyone to participate• No right/wrong answers• No judgment on comments

• Time Frame – You have 1 hour for discussion• Please follow your facilitator and go to your small group room

THANKS for being here to share your perspectives and questions.