Building Rehabilitation and Fire Safety:The Palace Hotel in Madrid Case Study
Lisa E. VanBuskirk, P.E., LEED® AP
Rolf Jensen & Associates, Inc.
![Page 2: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/2.jpg)
New York Times: February 1, 1998The New-Fashioned Palace Hotel in Madrid
“The Palace Hotel in Madrid, across the street from the Prado Museum and with a roster of clients that includes Ernest Hemingway, Mata Hari, Marlon Brando and Rita Hayworth, not to mention Dali and Stravinsky, has completed the most extensive renovation in its 85-year history.
All 440 rooms in the luxury six-story hotel have been refurbished and outfitted with double-glazed windows and insulation to address an old complaint about street noise. A health club has been added on the top floor.
ITT Sheraton bought the Palace in 1995, and paid $42 million to renovate it. The fourth floor's 75 rooms are now designated nonsmoking, and all rooms have been equipped with digital telephones, individually controlled air-conditioning, fire sprinklers, smoke alarms and television sets that receive 30 channels.
![Page 3: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/3.jpg)
Why the Palace Hotel?
• 1995: RJA contracted to evaluate the Hotel
• Compliance with prevailing Sheraton Fire Standards (SFS). (Now known as Starwood Fire Protection and
Fire Life Safety Design Requirements.)
![Page 4: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/4.jpg)
RJA Assignment• Survey building
– Develop report detailing deficiencies relative to SFS
– Provide potential solutions
• Automatic Sprinkler system design/drawings
• Fire Alarm & Notification system design/drawings
• Egress drawings
![Page 5: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/5.jpg)
Hotel Background
• Constructed in 1912 of generally non-combustible, protected construction
• 7 levels above ground
• Uses include Residential, Assembly, Mercantile, Storage, Business, and Back of House
![Page 6: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/6.jpg)
BuildingLayout
![Page 7: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/7.jpg)
Hotel Background
• Egress System
– Three exit stairs
• Travel distance and stair capacity adequate on guestroom floors when automatic sprinkler protection provided
– Main Entrance must be used as exit to provide sufficient egress capacity
• Egress plans must be updated to reflect this change
![Page 8: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/8.jpg)
Hotel Background
• Existing Fire Protection Systems– Fire Alarm and Detection System
– Portable Extinguishers
– Dry Standpipes
– Fire Hoses
– Shopping Arcade protected by automatic sprinklers
– Halon and CO2 systems in certain Back of House areas
![Page 9: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/9.jpg)
Planned Architectural Changes
• New Junior Suites
• New Executive Suites
• New Standard Guestrooms
• No renovation of Main Floor
![Page 10: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/10.jpg)
Sheraton Fire Standards (SFS) versus
1991 Norma Básica De La Edificación Sobre Condiciones De Protección Contra Incendios En Los Edificios (NBE-CPI)
![Page 11: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/11.jpg)
Sheraton Fire Standards (SFS) versus
1993 Ordenanza de Prevención de Incendios del Ayuntamiento de Madrid (ANM)
![Page 12: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/12.jpg)
RJA Survey Findings
• Existing fire protection systems were in working order
• Major findings
– Fire Suppression Capability
– Fire Detection & Notification
– Means of Egress
• Minor maintenance issues also identified
![Page 13: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/13.jpg)
Survey Findings - Automatic Sprinklers
• SFS required AS protection throughout
• Shopping arcade was only area with AS
• RJA determined methodology for retrofit of automatic sprinklers in all areas
![Page 14: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/14.jpg)
Survey Findings - Automatic Sprinklers
• Rotunda floor presented greatest installation challenge due to ornate ceiling
• Interstitial space recommended for routing of piping
• Estimated cost: $890,000 (40, 450 m2 at $22/m2) (1996 US dollars)
![Page 15: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/15.jpg)
Guestroom Sprinkler Example
![Page 16: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/16.jpg)
Survey Findings - Fire Pump Assembly
• Existing electric motor-driven pump lacked capacity to supply projected automatic sprinkler demand
• Existing pump not listed for fire protection service
![Page 17: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/17.jpg)
Survey Findings - Fire Pump Assembly
• Recommended installation of new fire pump assembly
• UL/FM listed diesel fire pump (at time, no comparable Spanish standard)
• Capacity of 750 gpm/2840 lpm
• Estimated cost: $65,000 (1996 US dollars)
![Page 18: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/18.jpg)
Survey Findings - Water Supply• Add Two Fire Hydrants
– SFS requires fire hydrants to supply water to responding fire department personnel.
– City of Madrid would install fire hydrants for a fixed fee.
– Estimated cost: $12,000 (1996 US dollars)
![Page 19: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/19.jpg)
Survey Findings: Addition of Fire Hydrants
![Page 20: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/20.jpg)
Survey Findings – Special Extinguishing Systems
• Remove Halon System
– SFS does not prohibit gaseous fire protection systems, but maintenance costs projected to increase
– Automatic sprinklers installed as substitute in boiler room, electrical substation, computer room and pastry room.
– Estimated cost: $4,000 (1996 US dollars)
![Page 21: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/21.jpg)
Survey Findings – Special Extinguishing Systems
• Remove Kitchen Hood CO2 Suppression System
– SFS did not recognize CO2 for kitchen hood protection
– Listed water spray nozzles connected to the new AS provided for kitchen hood protection
– Estimated cost: $3,000 (1996 US dollars)
![Page 22: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/22.jpg)
Survey Findings - Fire Detection & Notification System
• Existing Fire Alarm (FA) system installed 1987
• Half of guest room floors lacked smoke detection capability
• Class B wiring installed in plastic conduit
• Notification in common areas only by horns
• FACP located in vulnerable location
![Page 23: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/23.jpg)
Survey Findings - Fire Detection & Notification System
• RJA recommended complete replacement of fire alarm system
• Comprehensive smoke detection capability
• Manual fire alarm signaling
• 70 dBA notification in guestrooms
• One-way emergency voice communication
• Two-way fire fighter’s telephone system
• Estimated cost: $360,000 (1996 US dollars)
![Page 24: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/24.jpg)
Smoke Detection Placement
![Page 25: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/25.jpg)
Smoke Detection Placement
![Page 26: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/26.jpg)
Smoke Detection Placement
![Page 27: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/27.jpg)
Smoke Detection Placement
![Page 28: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/28.jpg)
Beam Smoke Detection
![Page 29: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/29.jpg)
Survey Findings - Means of Egress• Enclose Two Open Stairs
– Main and Service Stairs on the five guest room floors open to guest corridors
– SFS required separation to prevent vertical fire spread
– Recommended enclosure of stairs with 2-hour fire resistant construction
– Main Stair to include architectural features and incorporate tempered glass and sprinkler protection as providing equivalent fire resistance
– Estimated cost: $60,000 (1996 US dollars)
![Page 30: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/30.jpg)
Stairway EnclosureExample
![Page 31: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/31.jpg)
Survey Findings - Means of Egress
• Retrofit Existing Corridor Doors with Self Closing Mechanisms
– SFS required openings in corridor walls to be 20 minute fire resistance rated assemblies or 4.45 cm thick, solid bonded wood door doors with self closing and latching devices.
– Existing corridor doors provided an equivalent fire protection rating, but were not self closing and latching.
![Page 32: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/32.jpg)
Survey Findings - Means of Egress
• Retrofit Existing Corridor Doors with Self Closing Mechanisms
– Provide self closing devices on all corridor doors.
– Estimated cost: $50,000 (1996 US dollars)
![Page 33: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/33.jpg)
Survey Findings - Means of Egress• Retrofit Existing Shaft Doors with Self-Closing
Mechanisms
– Guest room floor utility shafts were 1-hour fire resistance rated units.
– SFS required shafts to have 2-hour fire resistance rating.
– Recommended making all openings self-closing.
– Estimated cost: $27,000 (1996 US dollars)
![Page 34: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/34.jpg)
Survey Findings - Means of Egress• Replace Exit Signage
– Existing exit signage was small and confusing.
– SFS required exit signs to be self luminous or electroluminescent
– Recommended replacing all signage with self-luminous signs, listed per Spanish regulations
– Estimated cost: $12,500 (1996 US dollars)
![Page 35: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/35.jpg)
Survey Findings - Means of Egress• Separate Two Stairs
• Two stairs are open to hazardous areas
– Stair on Calle De Medinacelli open to luggage storage room
– Stair on Calle de Cervantes open to the kitchen.
– Recommended separate both stairs from hazardous areas
– Estimated cost: $12,000 (1996 US dollars)
![Page 36: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/36.jpg)
Separation of Stairs
![Page 37: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/37.jpg)
Survey Findings - Means of Egress
• Add Emergency Lighting to Unlite Exterior Stair
• Estimated cost: $3,000 (1996 US dollars)
![Page 38: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/38.jpg)
Total Estimated Cost of Fire/Safety Renovations
~$1.6 million(1996 US dollars)
![Page 39: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/39.jpg)
• Fire & Life Safety upgrades driven by new owner’s
brand standard
• SFS requirements typically exceeded national & municipal requirements
• Historical or unique architectural features may require unusual equipment locations and routing
Example: Main Floor ceiling could have made AS/FA installation difficult. Interstitial space was used for piping and electrical conduit.
Summary
![Page 40: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/40.jpg)
15 Years Later…
Would we recommend the same solutions?
• Other NFPA Standards
• Performance Based Design Applications
• Fire Modeling
• Egress Models
![Page 41: Building Rehabilitation and Fire Safety: The Palace Hotel ... · •RJA recommended complete replacement of fire alarm system •Comprehensive smoke detection capability •Manual](https://reader036.vdocuments.us/reader036/viewer/2022071105/5fdef118222d6925e63cf408/html5/thumbnails/41.jpg)
Thank You
Lisa E. VanBuskirk, P.E., LEED® AP
Rolf Jensen & Associates
Ezelsveldlaan 85
2611 RV Delft
Netherlands
US Cell Phone: +01 202 436 4273
NL Cell Phone: +31 (0) 61 559 1830
www.rjainc.com