Building Prothro Football Practice Fields
Tom CookOregon State University
![Page 2: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/2.jpg)
Cameron, McCarthy, Gilbert, & ScheibeLandscape Architects LLPEugene, OR
Bernhardt Golf ConstructionDarryl Bernhardt, Bob Short & CrewPortland, OR
Greg GorackeOSU Intercollegiate Athletics
Design Group
Contractor
OSU liaison
![Page 3: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/3.jpg)
Design Features
1.Excavate existing field 2.Grade subgrade to 1.5% slope3.Head-head multizoned irrigation, Hunter heads4.Drains 15 ft on center, 8” mains, 4” laterals5.Trenches lined with geotextile fabric6.90-10 sand/organic topmix approx. 12” depth7.Sand grown perennial ryegrass sod8.Fixed goals at south end of field
Scheduled start date April 1, 2003Scheduled finish date July 9, 2003
![Page 4: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/4.jpg)
Staging area set up at east end of existing fields
![Page 5: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/5.jpg)
Stockpiling soil for removal
![Page 6: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/6.jpg)
![Page 7: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/7.jpg)
Irrigation lines trenched 2 ft deep into subgradeso drainlines could be installed above irrigation lines
![Page 8: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/8.jpg)
![Page 9: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/9.jpg)
Main drainline at south end of field
![Page 10: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/10.jpg)
Double walled corrugated pipe
![Page 11: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/11.jpg)
Drain lines trenched to a constant depth
![Page 12: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/12.jpg)
Spreading trench spoils away from trench
![Page 13: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/13.jpg)
Packing down trench spoils after spreading
![Page 14: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/14.jpg)
![Page 15: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/15.jpg)
Connecting 20 ft drain sections prior to installation
![Page 16: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/16.jpg)
Packing bottom of trench prior to drain placement
![Page 17: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/17.jpg)
![Page 18: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/18.jpg)
Unprotected drain 8 yrs after construction
![Page 19: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/19.jpg)
Laying geotextile fabric on trench prior to placing pipes
![Page 20: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/20.jpg)
Backfilling drains with gravel
![Page 21: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/21.jpg)
![Page 22: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/22.jpg)
Connecting laterals to main drain
![Page 23: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/23.jpg)
Herringbone pattern on 15ft centers
![Page 24: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/24.jpg)
Stockpiling sand + organic topmix from Fazio Bros.
![Page 25: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/25.jpg)
![Page 26: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/26.jpg)
![Page 27: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/27.jpg)
![Page 28: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/28.jpg)
![Page 29: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/29.jpg)
Spreading topmix in preparation for final grading
![Page 30: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/30.jpg)
![Page 31: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/31.jpg)
Watering to firm surface for grading
![Page 32: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/32.jpg)
Laser Grading to produce flat surface
![Page 33: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/33.jpg)
Finish grade slope is 1.5% from north to south
Laser beacon
![Page 34: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/34.jpg)
Rootzone depth approximately 12”
![Page 35: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/35.jpg)
Float and roller to smooth for finish grade
![Page 36: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/36.jpg)
Ryegrass from Bos Sod Co. in British Columbia
![Page 37: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/37.jpg)
![Page 38: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/38.jpg)
Cleanup drag just prior to laying sod
![Page 39: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/39.jpg)
Positioning sod to get tight fitting seams
![Page 40: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/40.jpg)
![Page 41: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/41.jpg)
Sodding finished by July 3, 2003
![Page 42: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/42.jpg)
Jess Lewis, Field mgr.
![Page 43: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/43.jpg)
Root depth 3 wks after sodding
![Page 44: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/44.jpg)
Two-a-day practices started about 5 wks after sodding
![Page 45: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/45.jpg)
Turf appearanceafter 2 wksof preseason practice
![Page 46: Building Prothro Football Practice Fields](https://reader033.vdocuments.us/reader033/viewer/2022060109/5552b963b4c905d9508b54c3/html5/thumbnails/46.jpg)
How did it turn out?
1.Fixed goals = conc. wear at south end2.Worn areas lost stability3.Turf recovered well after season started4.Need to rotate drill locations more