BUILDING MATERIALBUILDING MATERIAL
PALESTINE UNIVERSITY PALESTINE UNIVERSITY
chapter No.#7 chapter No.#7
Mechanical WorksMechanical Works
Dr. Ali Ibrahim Tayeh Dr. Ali Ibrahim Tayeh
MECHANICAL WORKS MECHANICAL WORKS General General
Mechanical works must hve high control in Mechanical works must hve high control in order to prevent any damage.order to prevent any damage.
Because its problem appear after some times.Because its problem appear after some times.
MECHANICAL WORKS MECHANICAL WORKS considerations considerations
We should take in our considerations Bath room accessories distribution
Accessories (such as grab bars, paper towel
dispenser, seat cover dispenser, toilet tissue
dispenser, soap dispenser, hand dryer, etc.) should
not be appered by doors.
Bath room accessories distribution depend on
accessories dimensions Structural factors
pipes must be taken in consecration when we
design structural element for buildings as drop
beams.
MECHANICAL WORKS MECHANICAL WORKS considerationsconsiderations
water pipes must be prevented to locate near
to footings or in the middle of buildings.Collector boxes
Collector boxes must be located in a suitable
place enable the human move with more
friability in order to be easier maintenance
and easier insulation.
MECHANICAL WORKS MECHANICAL WORKS considerationsconsiderations
Fresh water and waste water pipes must check it after installed it .
It is preferred to control any supplier by water switch.
To prevent leakage losses or to make high control and easy maintenance.
It is preferred to use a good kind of switch to prevent water leakage and brokenness.
MECHANICAL WORKS MECHANICAL WORKS ValvesValves
All valves shall be installed so that they are accessible for inspection and maintenance,
and are fully operable. Air vents shall be located at highest points in
the lines. No joints shall be made within walls, floors
or ceiling thickness, or in inaccessible positions.
Drain valves shall be provided at the bottom of every riser and on the outlet side of branch
isolating valves, and at all low undeniable points.
MECHANICAL WORKS MECHANICAL WORKS TestingTesting
The domestic hot and cold water service pipe
work shall be tested with potable water to a
pressure of 1 1/2 times the working head and
maintained for two hours without further
application of pressure, and without visible
leakage or drop in indicated pressure.
In the event of the failure of any test the
defect shall be located and repaired, and the
test repeated.
MECHANICAL WORKS MECHANICAL WORKS TestingTesting
All pipe work shall be hydraulically tested as soon as is practicable after installation and
before completion of shaft walls, access panels, suspended ceilings and application of
insulation. The pipe work shall be inspected and hydraulically tested to not less than 1 1/2 times the working pressure whichever is
greater. The test shall be maintained for 2 hours without further application of pressure
and without visible leakage or drop in indicated pressure.
MECHANICAL WORKS MECHANICAL WORKS Pipe SleevesPipe Sleeves
Where pipes pass through floors or walls, compatible pipe sleeves shall be supplied. Unless
otherwise stated pipe sleeves shall be sized to provide 15 mm clearance around the pipe to be installed or,
where the pipe is to be thermally insulated or otherwise covered, 15 mm clearance around the surface covering in order that the sleeve may be
packed and sealed with mineral or glass wool sealed at both ends with water and fire retardant mastic.
Particular attention should be given to necessary fire-stop approval materials.
MECHANICAL WORKS MECHANICAL WORKS Pipe SleevesPipe Sleeves
Sleeves shall be of the same material as the piping and shall be cut to the correct required length at
site with due allowance for the thickness of plaster and/or other finishes.
Water protecting pipe sleeves through floors shall be supplied and fixed in the following locations:
in floors provided with a waterproof membrane
in plant rooms in kitchen areas
MECHANICAL WORKS MECHANICAL WORKS Drainage SystemDrainage System
This system shall be installed to collect the foul drainage from sanitary and waste water items and
convey this effluent to the external authority sewers. Also this system shall cover the storm
water (rain water) drainage . . Drainage water can be grouped to three group:
Clean water Rain water
waste water
MECHANICAL WORKS MECHANICAL WORKS Drainage SystemDrainage System
Drainage water coming to its manholes by gravity Drainage water coming to its manholes by gravity generally generally
Some times we used pumps in order to getting Some times we used pumps in order to getting water to manholes ,in this case the reason to use water to manholes ,in this case the reason to use
pump is:pump is: Difference of level Difference of level
This happen if the This happen if the lowest level of pipes is lower than the lowest level of pipes is lower than the
bottom level of manholes, so we use bottom level of manholes, so we use pump to come over this problem and pump to come over this problem and
getting the water out.getting the water out.
MECHANICAL WORKS MECHANICAL WORKS Drainage SystemDrainage System
Huge quantities Huge quantities
Some times huge quantities of water cause Some times huge quantities of water cause discharge problem , so we use pump to discharge problem , so we use pump to come over this problem and getting the come over this problem and getting the
water out.water out.
MECHANICAL WORKS MECHANICAL WORKS EVAPORATORSEVAPORATORS
Material
The shell and tube plates shall be of steel and the The shell and tube plates shall be of steel and the
water boxes/end covers of steel or cast iron. water boxes/end covers of steel or cast iron.
Water-box end covers shall be removable. Tubes Water-box end covers shall be removable. Tubes
shall be copper, aluminum brass or cupro-nickel. shall be copper, aluminum brass or cupro-nickel.
Supports of suitable materials shall be installed Supports of suitable materials shall be installed
to prevent tube vibrationto prevent tube vibration
Tests
Refrigerant and water spaces shall be pressure Refrigerant and water spaces shall be pressure
tested at the manufacturers works in accordance tested at the manufacturers works in accordance
with this specification.with this specification.
MECHANICAL WORKS MECHANICAL WORKS Roof isolationRoof isolation
Roof isolation To check roof isolation we must close all
sewage or rain water pipe opening then pump a big water quantities to special datum and
observe the change of water level with respect to datum level
Piping requiring to be thermally insulated or otherwise covered shall be so fixed as to
permit the application of the covering around the full circumference and also leave
adequate space between covered pipes.
MECHANICAL WORKS MECHANICAL WORKS ELEVATORELEVATOR
ELEVATORThere are General spas faction should be taken in our
consideration in order to get more safe elevators as: Driving system.
Capacity (LOAD). Power supply.
Motor capacity. Stops and saftey.
Travel Rate speed.
Door systems. Door size. Car Size.
Hoist way Size.
MECHANICAL WORKSMECHANICAL WORKS
ENDEND