building marking system
DESCRIPTION
BUILDING MARKING SYSTEM. STRUCTURE / HAZARDS EVALUATION MARKING. Building Marking Systems. Structure Hazards Evaluation Form. MAP. TEAM NAME:. TX-TF1 SEARCH #1. DATE/TIME OF QUAKE:. SUN 23FEB92 110 HRS. N. CHURCH. GOOD MARKET. FIRST STREET. P.S. #1 SCHOOL K-6. A STREET. B STREET. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/1.jpg)
BUILDING MARKING SYSTEMBUILDING MARKING SYSTEM
STRUCTURE / HAZARDS EVALUATION MARKING
![Page 2: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/2.jpg)
Structure Hazards Evaluation Form
Building Marking Systems
![Page 3: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/3.jpg)
FIRST STREET
A S
TR
EE
T
P.S. #1SCHOOL K-6
GOODMARKET
CHURCH
MAP TEAM NAME: DATE/TIME OF QUAKE:TX-TF1 SEARCH #1 SUN 23FEB92 110 HRS
N
B S
TR
EE
T
![Page 4: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/4.jpg)
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Structure and Hazmat spec make a 2’ x 2’ box on building adjacent to accessible entry.
• Done after doing hazards assessment and filling out structure / hazards evaluation.
• Box is spray painted with using international orange (in TF cache)
![Page 5: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/5.jpg)
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Structure relatively safe for SAR ops. There is little chance of further collapse. – Victims could be trapped by contents– Victim could be unconscious
![Page 6: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/6.jpg)
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Structure is significantly damaged. Some areas may be relatively safe, but others may need shoring, bracing, removal, and/or monitoring of hazards– Building could be completely pancaked
![Page 7: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/7.jpg)
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Structure is NOT SAFE for rescue ops and may be subject to sudden collapse. Remote search ops may proceed at significant risk. If rescue ops are undertaken, safe haven areas, & rapid evacuation routes (with structural monitoring) should be created.
![Page 8: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/8.jpg)
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Arrow next to Marking Box indicates the direction of Safest Entry to Structure
![Page 9: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/9.jpg)
HM
Building Marking Systems
STRUCTURE / HAZARDS MARK
• HM indicates hazardous material condition in or adjacent to structure. SAR Ops normally will not be allowed until condition is better defined or eliminated.
![Page 10: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/10.jpg)
STRUCTURE / HAZARDS MARK - SUMMARY
15JUN92
HM NATURAL GAS
OR-1
No entry until gas is turned off. When it’s mitigated, should line out the HM
mark and record new date and TF
Building Marking Systems
![Page 11: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/11.jpg)
SEARCH ASSESSMENT MARKING
BUILDING MARKING SYSTEMBUILDING MARKING SYSTEM
![Page 12: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/12.jpg)
First slash madewhen entering
Crossing slash made as TF exits
15JUL921400 HR
RATS
3 DEAD
OR-1
2’x2’ X neareach entry
Building Marking Systems
SEARCH ASSESSMENT MARK
![Page 13: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/13.jpg)
VICTIM LOCATION MARKING
BUILDING MARKING SYSTEMBUILDING MARKING SYSTEM
![Page 14: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/14.jpg)
CA6
CONFIRMEDLIVE VICTIM
REMOVED VICTIM
CONFIRMEDDEAD VICTIM
POTENTIALVICTIM CA
6
CA6
CA6
VICTIM LOCATION MARKING
Building Marking Systems
![Page 15: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/15.jpg)
USAR Marking System
INTERNATIONAL SEARCH AND RESCUE ADVISORYGROUP
![Page 16: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/16.jpg)
VICTIM LOCATION MARKING
Go or No Go (G/N)
Team
Time/Date of Start
Time/Date of End
HAZARD INFORMATION
# LIVE VICTIMS REMOVED
# DEAD REMOVED
PERSONS UNACCOUNTED FOR LOCATION OF OTHER
VICTIMS
![Page 17: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/17.jpg)
Note: A circle is drawn around the above box once thebuilding/structure has been completely searched.
Go
UKSAR 1
17/2/04 0830
17/2/04 1147
3 0
4
2 D
Open Shaft: Quad E
![Page 18: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/18.jpg)
Potential VictimNumber and status unknown
V
![Page 19: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/19.jpg)
CONFIRMED VICTIM LOCATIONArrow denotes confirmation
L or D denotes number of each
VL 2
![Page 20: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/20.jpg)
ONLY DEAD BELOW !Arrow denotes confirmation
D denotes number of each
VD2
![Page 21: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/21.jpg)
VICTIMS (all) ExtricatedCircle indicates that all located victims have been extricated
(including dead).
VL 2
D 1
![Page 22: BUILDING MARKING SYSTEM](https://reader036.vdocuments.us/reader036/viewer/2022081513/56813bc2550346895da4ed4d/html5/thumbnails/22.jpg)