building electrification & electric vehicle reach codes · 2019-03-20 · building...

42
Building Electrification & Electric Vehicle Reach Codes Community Charrette 1 March 20 th , 2019 County of Santa Clara 1555 Berger Road | San Jose, CA 95112

Upload: others

Post on 10-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Building Electrification & Electric Vehicle Reach Codes Community Charrette

1

March 20th, 2019County of Santa Clara1555 Berger Road | San Jose, CA 95112

Page 2: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Today’s Objectives

2

• To share information on the development of building electrification and electric vehicle reach codes

• To hear your voice

• To gather important feedback to frame reach code options for future adoption

Page 3: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Agenda

3

• Introductions & Opening Remarks

• What is a Reach Code?

• Statewide Cost-Effectiveness Study & What does it mean?

• Summary of Technologies

• Discussion: Understanding of Impacts

• Next Steps

Page 4: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Introductions and Opening Remarks

4

Blake HerrschaftSenior EngineerDNV GL

John Supp,Account Services Manager, SVCE

Douglas Kot,Head of SectionDNV GL

Avani Goyal, Associate, TRC

Page 5: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Reach Code Background

5

Page 6: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

What is a Reach Code?

6

• California Title 24 Part 6 (the Energy Code) • Updated every 3 years

• California Title 24 Part 11 (CALGreen)• Reach codes exceed Title 24, Part 6

• Must be proven to be cost-effective• Can be prescriptive codes• Can be performance codes

Page 7: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

What is a Reach Code?

7

• Local amendment to state code• Developed through a stakeholder outreach process

• Developers• Architects & Engineers• Environmental Organizations• Community Organizations

• Regulatory Entities• California Energy Commission – reviews and approves

amendments to the energy code• Building Standards Commission – reviews and approves

amendments to building code

Page 8: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

How do Municipalities Adopt a Reach Code?

8

• Municipality internally explores Reach Codes• Potential Reach Code options are defined • Stakeholder and community outreach• Refinement of Reach Code options• Municipalities seeks community support for potential Reach Codes• Municipalities completes the cost-effectiveness study (CEC Reviews)• Municipalities approves through local Commissions and Councils• Reach Code is approved!

Page 9: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Why Adopt a Reach Code?

9

• Construct more cost effective, safer, and healthier buildings• To facilitate greater Electric Vehicle (EV) adoption rates

• 2016 Code has an EV Charger density lower than current local uptake• Prepare to meet future state code requirements, including 2019 Building Standards• 2019 Energy Code addresses all-electric pathway

• Solar Photovoltaic (PV) is required • Heat pump water heater pre-wiring is required• Residential all-electric compliance pathway established (not nonresidential)

• Reduce energy, cost and emissions • Increase convenience, health and safety

Page 10: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Overview of Statewide Reach Code Cost Effectiveness Study

10

Page 11: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Overview of Statewide Reach Code Cost-Effectiveness Studies

11

• Analysis of options to exceed 2019 Energy Code (Title 24, Part 6)

• Cost-effectiveness measured by customer bill impacts as well as tests set by the California Energy Commission

• Required for local ordinance application and approval

• Measures researched for residential and commercial new construction:

• All-electric design

• Energy efficiency (envelope, heating, cooling, lighting, hot water)

• Solar photovoltaics and battery energy storage systems

• Demonstrates that it is possible to cost-effectively improve energy performance

Page 12: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Determining Cost Effectiveness

12

• Energy savings determined through building simulations

• Costs derived from local experts and online resources

• 30-year or 15-year net present value

Energy Savings

$

Costs

$

Time Dependent Valuation

OR

Utility Bill Impacts BENEFIT to COST RATIO (B/C)

Construction

AND

Maintenance

Page 13: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Cost Effectiveness Considerations

13

• Findings presented hereafter are all cost effective

• All-electric compliance pathways are possible for new construction residential and some commercial buildings

• All-electric buildings reduce greenhouse gas emissions and are less-expensive to build

• Many all-electric packages have lower construction costs than mixed-fuel

Mixed Fuel All Electric

Energy Efficiency

Energy Efficiency

+ PV + Battery

Energy Efficiency

Energy Efficiency

+ PV + BatterySingle family $1k $4k -$4k $2k

Medium Office $60k $360k -$50k $250k

Page 14: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Interpreting the Residential Findings - EDR

14

• Energy Design Rating (EDR) is based on Home Energy Rating System (HERS)

• 2006 IECC Standard = 100 EDR

• Zero Net Energy = 0 EDR

• 2019 Title 24 prescriptive home is

~ 40-50 EDR with efficiency only

~ 20 EDR with PV offsetting electricity use of a mixed-fuel home

• Currently a compliance output

• EDR Reduction -> going lower than 2019 Title 24 with cost-effective measures

Page 15: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Residential Findings for Santa Clara County (CZ4)

15

• Analyzed 2430 ft2 single family home and 6960 ft2 8-unit MF building

• Separate compliance pathways for mixed-fuel and all-electric homes

• 2019 Energy Code (Title 24, Part 6) will require ~2.5 kW of PV/dwelling

-3.4

-1.5

-2.5

-1.3

-4-3-2-10

Single Family Multifamily

EDR

Redu

ctio

n

Cost Effective Efficiency-Only EDR Reductions

All-Electric Mixed-Fuel

2.4

9.2

0.1 0.302468

10

Single Family Multifamily

kW o

f PV

Cost Effective PV Size Increases

All-Electric Mixed-Fuel

47%38%

84% 81%

21%

10%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

Single Family Multifamily

% GHG savings

All electric code minimum

All electric efficiency+PV+battery

Mixed fuel efficiency+PV+battery

These values are the maximum threshold for cost effectiveness using the required CEC Methods

Page 16: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Nonresidential Findings for Santa Clara County (CZ4)

16

9%

15%

0%

14%15%

7%

0%2%4%6%8%

10%12%14%16%

Office Retail Hotel

Com

plia

nce

Mar

gin

Cost Effective Efficiency-Only Compliance Margins

All-Electric Mixed-Fuel

19%16%

0%

15%12%

1%0%

5%

10%

15%

20%

Office Retail Hotel

% G

HG S

avin

gs

Nonresidential - GHG Savings(Efficiency-Only )

All-Electric Mixed-Fuel

These values are the maximum threshold for cost effectiveness using the required CEC

Methods

Page 17: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Key Takeaways for Community

17

• All-electric compliance pathways are possible for new construction residential and some commercial buildings

• All-electric buildings reduce greenhouse gas emissions and are less-expensive to build

• Your Cities and County are actively engaged in this process

Page 18: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Discussion Question:

18

What are your hopes and concerns for a Reach Code in your community?

Page 19: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

All Electric Building

Technologies & Policy

Examples

Page 20: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

20

Water Heating49%

Space Heating37%

Cooking7%

Pool Heating4%

Clothes Drying3%

Thermal Energy Use in California Buildings

Water Heating

32%

Space Heating

36%

Cooking23%

Misc9%

Residential Non-Residential

Page 21: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Efficiency of Thermal Technologies

21

0.8

1

3.5

Natural Gas

Electric Resistance

Heat Pump

Page 22: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

All Electric Building Measures

22

Water HeatingSpace Heating Cooking Clothes Drying

Page 23: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

All Electric Building Measures

23

Water HeatingSpace Heating Cooking Clothes Drying

Page 24: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

All Electric Building Measures

24

Water HeatingSpace Heating Cooking Clothes Drying

Page 25: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

All Electric Building Measures

25

Water HeatingSpace Heating Cooking Clothes Drying

Page 26: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

26

1752 1825 1850 1875 1900 1925 1950 1975 2000 2025

1897: Boston’s Electric Subway Opens

1899: Ferdinand Porsche’s Electric Car

1839: Discovery of Photovoltaic Effect

2008: Tesla Roadster

1996: GM EV1 Released

1857: First Heat Pump Built

1824: Carnot Heat Engine Theorized

1892: First Electric Range

1889: Ruud Invents Electric Water Heater

1929: Stiebel Eltron Invents Tankless Electric

2003: Patent for HeatPump Dryer

1954: First PV Panel

1980s: First US Heat Pump Water Heaters

1970s: Westinghouse Induction Range

1933: Frigidaire Demonstrates Induction Stove

1930s: Natural Gas Piped to Homes

1940: First Ground Source HP

1938: Moore Releases Both Electric and Gas Dryers

1852: Kelvin Conceptualizes Heat Pump

1752: Ben Franklin’s Kite Experiment

SolarSpace HeatingWater HeatingCookingClothes DryingElectric Vehicles

Page 27: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Many Homes are All-Electric Today

27

5.7%

7.6%

33.6%

43.0%

5.7%

Electric Heating

Electric Water Heating

Electric Cooking

Electric Dryer

All-Electric Home

Percent of California Homes Electrified by End Use (RASS 2009)

Page 28: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Electric Vehicle (EV) Technologies

and Ordinance Examples

Page 29: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Electric Vehicle Definitions – Charger Types

291. BUILDING CODE ORDINANCES TO SUPPORT ELECTRIC VEHICLE (EV) CHARGING INFRASTRUCTURE FOR NEW CONSTRUCTION & ALTERATIONS (2018)

Level 115-20 Amp, 120v AC (standard household outlet)Driving Distance: 3.3 miles/hourCharging Time: 10-24 hours

Level 2

40+ Amp, 208/240v ACDriving Distance: 25-30 miles/hourCharging Time: 1-10 hours

DC Fast Charge 80-400 Amp, 200-600v DCDriving Distance: 125-400 miles/hourCharging Time: 10 min - 1 hour

Page 30: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Electric Vehicle Definitions – Space Types

301. BUILDING CODE ORDINANCES TO SUPPORT ELECTRIC VEHICLE (EV) CHARGING INFRASTRUCTURE FOR NEW CONSTRUCTION & ALTERATIONS (2018)

EV Capable Raceway (conduit), electrical capacity (breaker space)

EV Ready Raceway (conduit), electrical service capacity, overcurrent protection devices, wire, and suitable termination points such as junction box (i.e. full circuit)

EVSE (electric vehicle supply

equipment)

All the equipment needed to deliver electrical energy from an electricity source to a Plug-in Electric Vehicle (PEV’s) battery

Page 31: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Why Adopt EV Measures into Codes?

31

“Driving Plug-In Electric Vehicle Adoption with Green Building Codes” by Energy Solutions, PG&E, ARB.

EV Ready EV Capable EV Capable

Including this into code now saves building owners significant costs later

Page 32: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Discussion Question:

32

What all-electric technology is most important to you?

Can you see yourself living and driving all-electric?

Page 33: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Understanding Impacts

Page 34: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Building Ordinance Examples

34

Ordinance Type Example Reach Codes

Electric PreferredMarin County and Palo Alto:Mixed-fuel required to be 10-15% more efficient than state code, orAll-electric

Carbon Neutral Vancouver will require all new buildings to be carbon neutral by 2025

Natural Gas Connections

Arcata and Berkeley have proposed ordinances banning natural gas piping- No natural gas appliances installed- Replace existing municipal natural gas equipment with electric

Amsterdam is weaning homes off natural gas by 2050, starting with public housing units “towards a city without natural gas.”

Page 35: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Electric Vehicle Infrastructure Code Examples

35

Building Sector

Baseline (2019 CALGreen

Mandatory)Bay Area Example Reach Codes

Single Family EV Capable space Marin County, San Rafael: EV Ready spacePalo Alto: at least EV Capable (increased amperage compared to CALGreen)

Multi Family EV Capable for 10% of parking spaces

Oakland and San Francisco:10% Level 2 EV Ready; remaining parking spaces EV Capable (including electrical capacity for an addition 50% of spaces with load sharing)Palo Alto and Menlo Park:One Level 2 EV Ready space per dwelling unit, and EVSE installation at some spaces

Non-Residential

EV Capable for 6% of parking spaces

San Francisco:10% Level 2 EV Ready; remaining spaces EV Capable (including electrical capacity for an addition 50% of spaces with load sharing)

Page 36: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Additional Examples

36

Topic Baseline (CALGreen

Mandatory)Example Reach Codes

Renovations and Additions

Not included Marin County – based on renovations to parking spaces and/or electrical roomSan Francisco – based on overall building renovation

Harmonize with state accessibility codes

Not included* Design EV parking spaces to comply with accessibility requirements (slope, barrier-free path of travel, etc.)

*In some cases, design of a single space may be required in multifamily housing.

Page 37: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Reach Code Examples

37

A) Performance• Buildings using natural gas must exceed Energy Code (Title 24, part 6) by X%• Buildings using electricity only must meet or exceed Title 24 by Y%• Buildings over a certain size using…. must exceed Title 24 by Z%• Buildings using XYZ equipment (e.g. packaged rooftop units)…. must exceed Title

24 by Z%

B) Prescriptive• Buildings must include EV charging infrastructure or charger beyond CALGreen

requirements• Buildings must include pre-wiring for electric induction stoves

Page 38: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Discussion Questions on Impacts

38

Which reach codes would you support for your community?

Page 39: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Reach Code Development Timeline

39

Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20 Apr-20 Jun-20

Outreach

Research Existing State and Local Codes

Development of Model Reach Codes

Develop Customized EV Cost-Benefit Analysis

Identify Tools and Processes for Adoption and…

Provide Technical Assistance for Adoption

Provide Technical Assistance for Implementation

Page 40: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Overview of Next Steps

40

Next Steps• We are working with your City to provide adoption and

implementation supportWhat you can do?• Help get the word out about all-electric buildings and

transportation • Attend a citizen commission meeting and provide your opinion• Look for (and attend) the follow-up meeting in late-April or

early-May

Page 41: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Stay Connected

41

www.siliconvalleyreachcodes.org

Page 42: Building Electrification & Electric Vehicle Reach Codes · 2019-03-20 · Building Electrification & Electric Vehicle Reach Codes . Community Charrette. 1. March 20. th, 2019. County

Thank You!

42