Building Committee Presentation: JULY 17, 2012 PREFERRED SCHEMATIC STUDY AND REPORT Hanson, MA | Whitman-Hanson Regional School District. Module 3 Preferred Schematic Study and Report CONTENTS. EVALUATION OF EXISTING CONDITIONS FINAL EVALUATION OF ALTERNATIVES - PowerPoint PPT PresentationTRANSCRIPT
Building Committee Presentation: JULY 17, 2012PREFERRED SCHEMATIC STUDY AND REPORT Hanson, MA | Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report
CONTENTS
1. EVALUATION OF EXISTING CONDITIONS
2. FINAL EVALUATION OF ALTERNATIVES
3. SELECT PREFERRED OPTION
4. FINAL SUBMISSION REQUIREMENTS
5. NEXT STEPS MOVING FORWARD
Module 3 Preferred Schematic Study and Report
Evaluation of Existing Conditions
Updates to Original Existing Conditions Report
1. Wetlands
2. Historical
3. Geotechnical
Module 3 Preferred Schematic Study and Report
Evaluation of Existing Conditions
Updates to Original Existing Conditions Report
Module 3 Preferred Schematic Study and Report
Final Evaluation of Alternatives
1. Proposed Space Summaries• Options 4A & 4B: PK-2 New Construction Maquan School
• Options 5: PK-5 Addition/ Renovation to Indian Head School• Options 6A & 6B: PK-5 New Construction Combined Maquan & Indian Head
2. Conceptual Plans- All Options• Option 4A: Site Plan, Floor Plans, & Phasing Plans
• Option 4B: Site Plan, Floor Plans, & Phasing Plans• Option 5: Site Plan, Floor Plans, & Phasing Plans• Option 6A: Site Plan, Floor Plans, & Phasing Plans• Option 6B: Site Plan, Floor Plans, & Phasing Plans
3. Proposed Project Construction Schedule
4. Proposed Total Project Budget and Construction Cost Estimate
Module 3 Preferred Schematic Study and Report
1. Proposed Space Summaries
PK-2New ConstructionMaquan Only
PK-5 Addition/ Renovation to Indian Head
PK-5New ConstructionCombined Maquan & Indian Head
Existing New
Net Floor Area (NFA)
60,033 SF 17,258 SF 69,157 SF 89,558 SF
Gross Floor Area (GFA)
90,050 SF
36,996 SF 100,278 SF
129,859 SF137,274 SF
Maquan PK-2:Enrollment: 395
A new 2-story school building on the Maquan site for Pre-K to grade 2.
Demolition of existing Maquan School.Estimated Construction Costs:Total: $30,515,665
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Option 4A| PK-2, New 2-Story School on Maquan Site – Site Plan
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
New SepticField
Option 4A| PK-2, New 2-Story on Maquan Site – Building Plans
Maquan Elementary SchoolFeasibility Study
Hanson, MA
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
New SepticField
Option 4A| PK-2, New 2-Story School on Maquan Site – Phasing Plan
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
1
NO WORK
PHASE 1: Septic – Early bid package. Temporary tie in of existing septic.
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
New SepticField
Option 4A| PK-2, New 2-Story School on Maquan Site – Phasing Plan
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
1
2NO
WORK
PHASE 1: Septic – Early bid package. Temporary tie in of existing septic.
PHASE 2: Building & Site
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
New SepticField
Option 4A| PK-2, New 2-Story School on Maquan Site – Phasing Plan
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
PHASE 1: Septic – Early bid package. Temporary tie in of existing septic.
1
PHASE 2: Building & Site
2PHASE 3: Demo & Site
3
NO WORK
Option 4B| PK-2, New 2-Story School on Maquan Site – Site Plan
Maquan PK-2:Enrollment: 395
A new 2-story school building on the Maquan site for Pre-K to grade 2.
Demolition of existing Maquan School
Estimated Construction Costs:Total: $31,201,959
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
New SepticField
Option 4B| PK-2, New 2-Story School on Maquan Site – Building Plans
Maquan Elementary SchoolFeasibility Study
Hanson, MA
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
Option 4B| PK-2, New 2-Story School on Maquan Site – Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
New SepticField 1
NO WORK
PHASE 1: Septic – Early bid package.
Option 4B| PK-2, New 2-Story School on Maquan Site – Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
New SepticField
2NO
WORK
PHASE 1: Septic – Early bid package.
PHASE 2: Building & Site
1
Option 4B| PK-2, New 2-Story School on Maquan Site – Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
PHASE 1: Septic – Early bid package.
PHASE 2: Building & Site
2PHASE 3: Demo & Site
3
NO WORK
New SepticField 1
Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Site Plan
Combined PK-5:Enrollment: 800
Demolition of the Indian Headone story wing.
New 2-story additions.
Targeted renovation of the existing 2-story 1951 wing.
Demolition or re-purposing of Maquan School
Estimated Construction Costs:Total: $43, 841, 800
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
New SepticField
Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Building Plans
Maquan Elementary SchoolFeasibility Study
Hanson, MA
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
1
PHASE 1: Addition; Serves as a 2 story swing space for Phase 2
New SepticField
Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
1
2
PHASE 1: Addition; Serves as a 2 story swing space for Phase 2
PHASE 2: Demo & Addition
New SepticField
Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
1
2
3A3B
PHASE 1: Addition; Serves as a 2 story swing space for Phase 2
PHASE 2: Demo & Addition
PHASE 3A & 3B: Summer RenovationsNew
SepticField
Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
PHASE 1: Addition; Serves as a 2 story swing space for Phase 2
1
PHASE 2: Demo & Addition
2 PHASE 3A & 3B: Summer Renovations
3A3B
PHASE 4: Demo & Site
4
New SepticField
Option 6A| New 2-Story School on Indian Head Site – Site Plan
Combined PK-5:Enrollment: 800
A new 2-story building for Pre-K to grade 5 on the Indian Head site.
Demolition or re-purposing of Maquan and Indian Head Schools
Estimated Construction Costs:Total: $42,594,292
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
New Septic Field
Option 6A| New 2-Story School on Indian Head Site – Building Plans
Maquan Elementary SchoolFeasibility Study
Hanson, MA
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
Option 6A| New 2-Story School on Indian Head Site – Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
1
PHASE 1: Building , Septic, & Site
New SepticField
Option 6A| New 2-Story School on Indian Head Site – Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
PHASE 1: Building , Septic, & Site
1
PHASE 2: Demo & Site
2
New SepticField
Option 6B| New 2-Story School on Maquan Site- Site Plan
Combined PK-5:Enrollment: 800
A new 2-story building for Pre-K to grade 5 on the Maquan site.
Demolition of Maquan School and demolition of re-purposing of Indian Head School
Estimated Construction Costs:Total: $43,017,532
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
New SepticField
Option 6B| New 2-Story School on Maquan Site – Building Plans
Maquan Elementary SchoolFeasibility Study
Hanson, MA
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
Option 6B| New 2-Story School on Maquan Site- Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
1
PHASE 1: Septic – Early bid package. Temporary tie in of existing.
New SepticField
Option 6B| New 2-Story School on Maquan Site- Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
2
PHASE 1: Septic – Early bid package. Temporary tie in of existing.
PHASE 2: Building & Site
1New SepticField
Option 6B| New 2-Story School on Maquan Site- Phasing Plan
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options
PHASE 1: Septic – Early bid package. Temporary tie in of existing.
PHASE 2: Building & Site
2PHASE 3: Demo & Site
3 1New SepticField
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Option 4A & 4B| PK-2, New 2-Story School on Maquan Site
Module 3 Preferred Schematic Study and Report Project Construction Schedule
PHASE 2 – 18 MONTHS
Mar
ch 1
4, 2
014
Early
bid p
acka
ge
4 MONTHS
8 WEEKS
June
20, 2
014
Constr
uctio
n sta
rts
Jan
4, 2
015
NEW SEPTICSYSTEM
13 WEEKS
April 2
5, 2
014
Bidding
star
ts
BUILD NEW BUILDING + SITEWORK
DEMO OLD BLDG + SITEWORK
Dec. 2
1, 2
014
Mov
e int
o ne
w bldg
.
May
3, 2
016
Constr
uctio
n co
mple
te
PHASE 1 PHASE 2 PHASE 3
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition
Module 3 Preferred Schematic Study and Report Project Construction Schedule
PHASE 2 – 18 MONTHS
9 WEEKS
8 WEEKS
April 2
0, 2
015
Mov
e int
o so
uth
addit
ion
Augus
t 24,
201
5
BUILD NEW ADDITION (SOUTH)
10 MONTHS
April 2
5, 2
014
Bidding
star
ts
DEMO 1960’S WING + BUILD SEPTIC SYSTEM + NEW
ADDITION (NORTH)
DEMO MAQUAN
Nov. 21
, 201
6
Mov
e int
o no
rth
addit
ion
Ma
rch
20
, 2
01
7C
on
stru
ctio
n c
om
ple
te
PHASE 1 PHASE 2 PHASE 4
4 MONTHS
June
20, 2
014
Constr
uctio
n sta
rts
RENO EXIST. INDIAN HEAD
PHASE 3A
9 WEEKS
June
22,
201
5
Augus
t 24,
201
6
RENO EXIST. INDIAN HEAD
PHASE 3B
June
22,
201
6
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Option 6A| New 2-Story School on Indian Head Site
Module 3 Preferred Schematic Study and Report Project Construction Schedule
PHASE 2 – 6 MONTHS
8 WEEKS
April 2
0, 2
016
Mov
e int
o ne
w buil
ding
NEW SEPTIC SYSTEM + BUILD NEW BUILDING
PHASE 1 - 22 MONTHS
April 2
5, 2
014
Bidding
star
ts
Nov. 21
, 201
6
Constr
uctio
n
com
plete
PHASE 1 PHASE 2
June
20, 2
014
Constr
uctio
n sta
rts
DEMO OLD BLDGS. + SITEWORK
Maquan Elementary SchoolFeasibility Study
Hanson, MA Whitman-Hanson Regional School District
Option 6B| New 2-Story School on Maquan Site
Module 3 Preferred Schematic Study and Report Project Construction Schedule
PHASE 2 – 22 MONTHS
Mar
ch 1
4, 2
014
Early
bid p
acka
ge
6 MONTHS
8 WEEKS
June
20, 2
014
Constr
uctio
n sta
rts
NEW SEPTICSYSTEM
13 WEEKS
April 2
5, 2
014
Bidding
star
ts
DEMO OLD BLDGS. + SITEWORK
April 2
0, 2
016
Mov
e int
o ne
w bldg
.
Nov. 21
, 201
6
Constr
uctio
n co
mple
te
PHASE 1 PHASE 2 PHASE 3
BUILD NEW BUILDING + SITEWORK
Option Construction CostProject Cost
6A New School at Indian Head $42,594,292 $53,242,865or Maquan, PK-5
4A New school at Maquan $30,515,665$38,144,581PK-2
5 Add. Reno. Indian Head $43,841,800$54,802,250(partial demo) PK-5
Module 3 Preferred Schematic Study and Report Proposed Total Project Budget and Construction Cost Estimate
4B New school at Maquan $31,201,959$39,002,449PK-2
6B New School at Indian Head $43,071,532 $53,771,915or Maquan, PK-5
Recommended Option
Module 3 Preferred Schematic Study and Program
Final Submission Requirements
1. Overview
2. Educational Program
3. Space Summary
4. Building Plans
5. LEED/CHPS Scorecard
6. Site Plans
7. Budget
8. Updated Project Schedule
Module 3 Preferred Schematic Study and Report
Next Steps Moving Forward
Target Dates
1. Vote Approval of Submission July 24, 2012
2. Feasibility Submission to MSBA August 6, 2012
3. Board Meeting & Proceed to Schematic Design October 3, 2012
4. Schematic Design Submission to MSBA December 13, 2012
5. Project Scope & Budget Meeting December 28, 2012
6. Hanson Town Meeting May 8, 2013
7. Ballot Vote May 18, 2013
8. Bidding Starts April 25, 2014
9. Construction Complete May 3, 2016 – March 20, 2017