Question Excerpt1. – eaves over required windows not < _____. minimum over from the side & rear
property linesA.
300 MM
B.
600 MM
C.
1000MM
D.
750MM
2. sum of areas of openings must not exceed _____ % of sum of areas of walls
A.50B.20C.40D.603. Distance of Exits – w/o sprinkler – ____m from exterior exit door, w/ sprinkler will
be ____mA.
45, 50
B.
30, 60
C.
45, 60
4. Width and Height of doors will be not < _____mm in width, not < ______m in height, opening will be 90 degrees and exit way clear width not < 700mm
A.
900,2.1
B.
800, 2.0
C.
900, 2.0
5. If arcaded bldg, no chaflan reqtd notwithstanding the width of public street, <________m
A.12B.13C.14D.156. nonstructural facing brick, concrete, tile, metal, etc. attached at the backing or
structural components for the purpose of ornamentation.A.BrickB.Face
C.StoneD.Veneer7. spacing of rows of seats from back to back – not < ______mm (standard
seating)A.
840
B.
850
C.
860
8. new construction w/c increases the height or area of an existing bldg./structures.A.
Addition
B.
Renovation
C.
Revision
D.Alteration9. inner courts shall be connected to a street or yard, or by a passageway – at least
how many metersA.
1.0
B.
1.1
C.
1.2
D.
1.3
E.
2
10. if only 2 exits required, shall be placed distance apart not < ____ of the perimeter area.
A.
1/3
B.
1/4
C.
1/5
11. Foundations – not < _______ mm below the grade, may encroach ______mm into public sidewalk areas
A.600, 500B.600, 400C.500, 300D.600, 60012. Footings must be at least _______ m below grade along national roads, may project
not >______mm beyond Property line.
A.
2.4, 300
B.
2.4, 400
C.
2.5, 300
D.
2.3, 400
13. a permanent roofed structure above a door attached to and supported by the building and projecting over a wall or sidewalk
A.BalconiesB.AwningsC.
Canopies
14.
A.
400
B.
200
C.
300
D.
500
15. Work done on any damaged/deteriorated portion of bldg.A.AlterationB.
Renovation
C.
Repair
16. Window openings for room must have at least _____% of the floor area with a minimum area of _____ sq.m.
A.20, 1B.10, 2C.10,1D.20,217. Window openings for baths and toilets must have at least ____ of the floor area with
a minimum area of _____ sq.mmA.1/20 , 250B.1/10, 240C.1/20, 240D.1/10, 24018. WHICH IS NOT INCLUDED IN THE EXCEPTION OF BUILDING PERMIT?A.
PRIVATE BUILDING
B.PUBLIC BUILDINGC.INSTITUTIONAL BUILDING
19. WHICH ARE NOT INCLUDED FOR THE REQUIREMENTS FOR BUILDING PERMIT
A.
The use or occupancy of proposed work
B.A description of work to be covered by the permit
C.
Description and ownership of the lot – TCT
D.Estimated cost of proposed workE.TAX DOCUMENTS20. WHAT TYPE OF CONSTRUCTION IS FOR WOOD CONSTRUCTION WITH FIRE
RESISTANT MATERIALS 1 HR FIRE RESISTIVE RATINGA.TYPE IIB.
TYPE III
C.
TYPE IV
D.TYPE I21. WHAT TYPE OF CONSTRUCTION IS FOR WOOD CONSTRUCTIONA.TYPE IIB.
TYPE III
C.TYPE ID.
TYPE IV
22. WHAT TYPE OF CONSTRUCTION IS FOR WOOD AND MASONRY CONSTRUCTION WITH FIRE RESISTANT MATERIALS 1 HR FIRE RESISTIVE RATING
A.TYPE IIB.
TYPE IV
C.
TYPE III
D.TYPE I23. WHAT TYPE OF CONSTRUCTION IS FOR STEEL, IRON CONCRETE
CONSTRUCTION WITH FIRE RESISTANT MATERIALS 1 HR FIRE RESISTIVE RATING
A.TYPE VB.TYPE IIC.
TYPE IV
D.
TYPE III
24. Vertical Clearance of awning (undermost surface of the awning or GL) – not < ______m
A 3
.B.
2.7
C.
2.4
D.
2.8
25. Ventilation or vent shafts – horizontal cross-sectional area not <_____ sq.m per meter height of shaft
A.0.15B.0.10C.0.20D.0.1226. This is where all on site work doneA.
Office
B.ConstructionC.
Plants
27. The width of a stair way if the occupant load of more than 50 shall not be < ____ mA.
1.2
B.
1.1
C.
1
D.
1.5
28. The width of a stair way if the occupant load of less than 50 shall not be < ____ mA.0.90B.
1
C.0.8029. The slope of an exit passage way will have a maximum slope ofA.
1/8
B.1/10C.1/1530. The slope of an exit courts will have a maximum slope ofA.1/10B.
1/8
C.1/1231. The size of room for kitchen must be at leastA.
1.5X2m
B.1.5x3mC.
2x3m
D.1.5x2.1m32. The size of room for human habitation must be at least an area of _____ sq.m. and
______M minimum distanceA.
6,2
B.
7,3
C.
6,3
D.
7,2
33. The size of bathrooms or toilets must be at least an area of _____ sq.m. and ______M minimum distance
A.
1.2, 1.0
B.
1.5, 0.9
C.
1.2, 0.9
34. The RATING IN which a material can withstand fireA.FIRE RESPECTIVE RATINGB.FIRE RESISTIVE RATINGC.
FIRE PROTECTIVE RATING
35. The number of exits for Mezzanin with 185 sq.m area or more than 18m in dimension will be exits
A.
1
B.
2
C.
3
36. The number of exits for Above 1st storey with 10 occupant ____ exitsA.
1
B.
2
C.
3
37. The minimum row space with backrest will be
A.
700
B.
750
C.
850
38. The maximum rise and run of the stairs will beA.200, 200B.200, 250C.200, 300D.250, 25039. The headroom clearance for stair will
beA.2.1mB.2.0mC.2.5m40. THE GENERAL PROVISION OF PD 1096 OR THE NATIONAL BUILDING CODE
OF THE PHILIPPINES ARE!A.Safe constructionB.Adequate environmental
safeguardsC.Maintain building in safe, sanitary and good working
conditionsD.ALL OF THE ABOVE41. THE ENFORCEMENT OF PD1096 ON THEIR RESPECTIVE JURISDICTION IS
THEA.MAYORB.ARCHITECTC.
BUILDING OFFICIAL
D.
CITY ENGINEER
42. The door that will be required if the exit door shall swing to exit travel in hazardous areas w/ 50 or more occupant load
A.SwingB.
Panel
C.Leaf43. The distance between 2 landings in stairs will be a maximum of A.3.0mB.3.6mC.3.5m44. THE BUILDING PERMIT WILL BE NULL OR VOID IF THE
CONSTRUCTION DIDN'T COMMENCE D THE WORK IN A PERIOD OF A.6 MONTHSB.12 MONTHSC.2 YEARSD.3 MONTHS
45. THE BUILDING PERMIT WILL BE NULL OR VOID IF THE CONSTRUCTION HAS BEEN ABANDONED FOR HOW MANY DAYS
A.30B.60C.
120
D.8046. Systematic dismantling of a bldg in whole or
part.A.ReinstallationB.DemolitionC.
Dismantle
47. Stair with a straight run, the landing will be a maximum of _______ m vertical distance
A.
1.5
B.
1.2
C.
1.4
48. Spacing of rows of seats from back to back : rows of 46 seats or more (continental)
A.
450mm
B.
500mm
C.
520mm
D.
550mm
49. Spacing of rows of seats from back to back : rows of 45 seats or less (continental)
A.
450mm
B.
500mm
C.
520mm
D.
550mm
50. Spacing of rows of seats from back to back : rows of 35 seats or less (continental)
A.
450mm
B 500mm
.C.
520mm
D.
500mm
51. Spacing of rows of seats from back to back : rows of 18 seats (continental)A.
500mm
B.
450mm
C.
520mm
D.
550mm
52. Side aisle width will be a minimum ofA.1.0mB.1.1mC.1.2mD.1.3m53. Reviewing Stands, Grandstands, and Bleachers the minimum row spacing of seats
without backrest in open air standA.
600
B.
650
C.
700
54. Public Street or alley <______m in width shall be truncated at the corner “Chaflan”
A.
3.4
B.
3.6
C.
3.5
D.
3.7
55. Private stairways that serve <10 occupants will be a minimum of _____m
A.0.60B.0.80C.0.75D.0.7056. PD 1096 WILL BE ENFORCED BY THE SECRETARY OFA.UAPB.PRC
C.
MUNICIPALITY
D.
PUBLIC WORKS
57. Minimum aisle width if serving only two sideA.
1m
B.1.2mC.1.5mD.
0.90m
58. Minimum aisle width if serving only one sideA.
800
B.
900
C.
700
59. Min height of mezzanine floor in metersA.1.80B.
2.0
C.1.75D.1.8560. Means "installation of components of a
building/structure"A.SecureB.ErectionC.Site work61. Maintenance and Removal of Protective Devices protective fence or canopy shall be removed
____days after protection no longer required. A.30B.15C.2062. Located partly in one (1) fire zone and partly in
another A.HIGH RESTRICTIVE FIRE ZONESB.
MODERATE RESTRICTIVE FIRE ZONES
C.
HIGH RESTRICTIVE FIRE HAZARDS
D.
MODERATE RESTRICTIVE FIRE HAZARDS
63. In winding stairsways, the narrower side of the tread will be __________A.150-250mmB.200-300 mm
C.150-300mm64. IN QUALIFICATION FOR BEING AN BUILDING OFFICIAL, YOU MUST HAVE A
DIVERSIFIED WORKING EXPERIENCE OF AN ARCHITECT OR ENGINEER FOR HOW MANY YEARS?
A.
6
B.
4
C.
5
D.
7
65. IN QUALIFICATION FOR BEING AN BUILDING OFFICIAL, YOU MUST BE A REGISTERED ?
A.ARCHITECTB.
ENGINEER
C.
URBAN PLANNER
D.LANDSCAPE ARCHITECTE.A AND B66. IN QUALIFICATION FOR BEING AN BUILDING OFFICIAL, YOU MUST BE A
MEMBER OF A ACCREDITED ORGANIZATION OF NOT LESS THAN HOW MANY YEARS
A.2 YEARSB.1.5 YEARSC.3 YEARSD.5 YEARS67. HOW MANY SETS OF PLANS AND SPECIFICATION ARE NEEDED FOR THE
REQUIREMENTS OF BUILDING PERMIT?A.
5
B.
4
C.
6
D.
7
68. HOW MANY DAYS IT WILL TAKE FOR THE ISSUANCE OF BUILDING PERMIT?A.12 DAYS UPON PAYMENTB.15 DAYS UPON PAYMENTC.14 DAYS UPON PAYMENTD.30 DAYS UPON PAYMENT69. Handrails in stairs will be _________
MMA.800-900
B.700-900C.
900-1200
70. Groups H, I occupancies w/o seats, line of travel to exit door by an aisle is not > ______ m
A.45B.30C.6071. For Protective Nets/Screen the G.I wire gauge must be ________mm mesh _____
net; canvasA.
16.38 MM / nylon
B.16.37 mm/ steelC.
16.39 mm/ nylon
D.16.38mm/ steel72. for Protection of Pedestrians during Construction or Demolition Fences must
be not < _____m above gradeA.
2.3
B.
2.2
C.
2.4
D.
2.5
73. for Protection of Pedestrians during Construction or Demolition Canopies must _______m above the railway, live load 600 kg per sq.m.
A.
2.5
B.
2.6
C.
2.4
D.
2.3
74. for Protection of Pedestrians during Construction or Demolition the Temporary walkway will be at least _____m wide (during construction
A.
1.2
B.
1.3
C.
1.4
D.
1.5
75. for Protection of Pedestrians during Construction or Demolition the Capable of supporting a uniform live load of ____ kg per sq.m for temporary walk way
A.
600
B.
650
C.
620
D.
630
76. For Pedestrian Protection Railings in street side of the sidewalk must be at least_____m in height
A.
1
B.
2
C.
1.2
D.0.9077. For exit sign illumination the minimum lux equivalent will beA.10.7B.10.6C.10.878. For circular stair that will be used as an exit the minimum width of run will be <
______ mmA.
200
B.
250
C.
300
79. For attics the Access will be not < _____mm sq. or in diameter, min clear headroom of ____mm
A.600, 800B.800, 600C.600, 700D.700, 80080. For 599-999 occupants how many exit
neededA.
1
B.
2
C.
3
81. FIRE PUMPS WILL BE CONNECTED TO STREET MAIN W/ NOT LESS THAN
A.120 MM DIAMETERB.150 MM DIAMETERC.100 MM DIAMETER82. FIRE PUMPS CAPACITY WILL BE NOTE LESS THAN A.
1000 LITERES PER MINUTE
B.
2000 LITERES PER MINUTE
C.
3000 LITERES PER MINUTE
83. FIRE PUMP PRESSURE WILL BE NOT LESS THANA.1.5 KG/ SQ CMB.2 KG/SQ.CMC.1 KG/SQ.CM84. FIRE EXTINGUISHING SYSTEM WILL BE PROVIDED FOR EVERY STOREY ,
BASEMENT OR CELLAR WHICH WILL BE USED ASA.OFFICEB.HABITATIONC.
STORAGE
85. FIRE EXTINGUISHING SYSTEM WILL BE PROVIDED FOR EVERY STOREY , BASEMENT OR CELLAR WITH AN AREA OF
A.
300 SQ.M.
B.
250 SQ.M.
C.
200 SQ.M.
D.
350 SQ.M.
86. FIRE EXTINGUISHING SYSTEM WILL BE PROVIDED FOR EVERY STOREY , BASEMENT OR CELLAR WHICH WILL BE USED AS HABITATION WITH AN OCCUPANT LOAD OF MORE THAN
A.30B.40C.20D.5087. Excavation made on public property - restored immediately to its former conditions
w/in _____ hrsA.48B.
120
C.12D.3688. Door leaf width will be a maximum of
______
A.
2.5
B.
1.2
C.
1.5
D.
1
89. Distance bet sprinklers will be max of _____ center to center
A.1.30B.1.40C.1.20D.1.8090. Construction for canopies for incombustible materials not < ____ hrs fire-
resistiveA.
1
B.
3
C.
2
D.
4
91. Ceiling heights for habitable rooms without artificial ventilation from finish floor to ceiling is
A.2.70B.2.40C.2.1092. Ceiling heights for habitable rooms with artificial ventilation from finish floor to ceiling
1st storey and onwards respectively (1st storey, 2nd storey, 3rd storey onwards) in meters
A.2.7, 2.5, 2.0B.2.7, 2.4, 2.0C.2.7, 2.4,2.193. Areas within which only certain types of buildings are permitted to be constructed
based on their use or occupancy, type of constructionA.
FIRE HAZARDS
B.FIRE ZONESC.FIRE AREAS94. Air space requirements for workshop, factories, and officesA.
3.00 cu.m w/ 1.00 sq.m of floor area per person
B.14.00 cu.m of air space per person
C.12.00 cu.m of air space per person
95. Air space requirements for school rooms will be
A.
3.00 cu.m w/ 1.00 sq.m of floor area per person
B.12.00 cu.m of air space per person
C.14.00 cu.m of air space per person
96. Air Ducts – ______ sq.m w/ at least dimension of 300mm
A.0.25B.0.30C.0.35D.0.4097. a written authorization granted by the BO to an applicant allowing the applicant to
proceed w/ the construction w/ specific project after plans, specs and other pertinent doc….
A.No objection certificateB.
Notice to proceed
C.Building permit98. A movable shelter supported from an exterior wall of a bldg. w/c can be retracted,
folded, collapsed against the face of a supporting bldg.A.
Canopies
B.BalconiesC.Awnings99. . Size & Dimensions of Courts - min. horizontal dimension – not <
________A.1.5 MB.2.5 MC.1.2 MD.2.0 M100. the clearance of Awning to curb line – not <_____mmA.
400
B.
500
C.
200
D.
300
101. secondary bldg. located w/in the same premises the use of incidental to that main bldg.
A.Ancillary buildingB.Extra buildingC.Expanded structure102. physical change made to increase its value & improve its aesthetic quality.A.AlterationB.
Renovation
C.
Addition
103. changes in materials, utilities, partitioning, etc but doesn’t increase the overall area thereof.
A.
Addition
B.
Renovation
C.Alteration104. change in use or occupancyA.AlterationB.
Addition
C.Conversion
105. Area Separation – enclosed attic space of combustible construction shall be divided into horizontal area max of _____ sq.m. area, _____ sq.m. in area for attic with Fire-extinguishing system.
A.250, 750B.750, 250C.300, 750
Back to topRemove Ad
Related QuizzesPass Taxi With Shahzoor- Office Buildings
Building Construction Quiz 1
Building Construction Part 2
Are You Building A Freak Factory?
Is IT A Condo, Plat Or Pud
Building Construction Quiz (Plumbing - Toilet Fixtures)
Related TopicsConstruction
Modernism
Home
House
Featured QuizzesWhich Lord Of The Rings Character Are You?
How Many Babies Will I Have?
What Is Your Personality Type On The Basis Of Your Handwriting?
The Gods And Their Spouses - Norse Mythology Couples Quiz
Am I In Love?