building bond referendum - marshall.k12.mn.us€¦ · 401 south saratoga street marshall, mn 56258...
TRANSCRIPT
-
Marshall Public Schools401 South Saratoga StreetMarshall, MN 56258
Our mission is to develop the potential of each learner for success in a changing world.
Building Bond Referendum The Marshall Board of Education is asking voters to consider
approving a $38.81 million building bond referendum on May 10, 2016.
Non-ProfitU.S. Postage
PAIDMarshall, MN
Permit No. 154
School District Resident
To request A presentationContact Scott Monson, Superintendent
507-537-6924 or [email protected]
For More Information
Visitmarshall.k12.mn.us/
referendum2016
scan this code
Quick OverviewThe total referendum cost includes associated project financing and bond costs.
Here are projected construction costs for each site:Park Side: Renovate/add on to current building for PreK-1 = $4.4 million
Middle School: Renovate/add on to current building = $3.8 millionNew Elementary: Build new school for grades 2-4 = $21.4 million
High School: Add on to current building = $8.8 millionWest Side: Propose to sell or re-purpose building
This proposed plan focuses on maintaining our targeted class sizes, improving building safety and security, and addresses both current
and future enrollment needs and projections.
Look inside for more details and see Architect’s drawings!
email [email protected]
mailto:scott.monson@ marshall.k12.mn.ushttp://www.marshall.k12.mn.us /referendum2016http://www.marshall.k12.mn.us /referendum2016mailto:[email protected] mailto:[email protected]
-
Prepared and paid for by Independent School District 413, Marshall Public Schools, 401 South Saratoga Street, Marshall, MN 56258
what Could the schools look like?
• Maintains Innovative Learning Center for K-1 • 9 Kindergarten rooms• 9 First Grade rooms• 7 Early Childhood rooms
• 1 Early Childhood Family Education room • 1 Early Childhood Special Education room
• 27 classrooms• 8 special education classrooms• 2 multi-purpose/tech learning labs• Media/virtual resource centers• 2 music rooms
• Café’nasium• Kitchen/prep areas• Full-size basketball gym’atorium (seats 700)
• Adds 5 classrooms• Adds 2 science labs• Adds team lockers/locker rooms• Expands cafeteria
• Expands agriculture room/lab• Expands woods area • Expands welding area
• Adds 4 classrooms• Adds 2 science labs• Converts early childhood space to art/technology lab
• Converts pool to full-size basketball court/gym• Upgrades to the orchestra room and FACS lab
Park SidePrek - grade 1
New elementarygrades 2-4
middle schoolgrades 5-8
high schoolgrades 9-12
Color KeyOrange = New Construction
Yellow = Renovation
Red = Safe and Secured Entry