Building a “Site-Visit Free” Energy Audit System using GIS

Zero-Touch Energy Audit

Swami Senior Consultant @ Red Planet Consulting

[email protected] +91-9884183818

What is Energy Audit?

33 kV Substation

33/11 kV Substation

Transformer

M3

M2

M6 M7

M8

M9

M1

M4

M5

33 kV Consumer Meter

33 kV Consumer Meter

LT Consumer

Meters

11 kV Consumer Meter

Outgoing Meter

Incoming Meter

Outgoing Meter

33/11 kV Substation

33 kV Substation

M1

M3

M2

M4

Loss = M1 – (M2 + M3 + M4) 33 kV Consumer

Meter

33 kV Consumer Meter

Outgoing Meter

Incoming Meter

M1

M2 M3 M4

33/11 kV Substation

Transformer

M5

M6

M7

M8

M9

Loss= M5 – (M6 + M7 + M8 + M9)

LT Consumer

Meters

11 kV Consumer Meter

Outgoing Meter

M5

M6 M7 M8 M9

33/11 kV Substation

33 kV Substation

M1

M3

M2

M4

33/11 kV Substation

Transformer

M5

M6

M7

M8

M9

Loss = M1 – (M2 + M3 + M4)

Loss= M5 – (M6 + M7 + M8 + M9)

GIS @ NPCL

• Resurrection of Existing GIS System.

• Make GIS integrall part of Business Process by integrating it with SAP.

• Integration of Planned Scada OMS/DMS with GIS

• Provide GIS Access across the organization (Web Application)

• Field Force Automation for Field Crews.

Project Objectives

EO WEB FME

Electric Office

Mapframe

CIMXML Smallworld Business Integrator

Data Import

SCADA SAP

Field Force Automation

GIS @ NPCL

Evolution of Energy Audit

Make Data your Highest Goal & Build your

Applications around it.

Stage I : Field Survey QC

Stage II : Back-office QC Team MMI

Stage III : Pre-Import QC

Stage IV : Post-Import QC Team RPC

Stage V : Connectivity QC

Stage VI : Field Verification

QC

Team NPCL

Stage VII : Quality Routines System Driven

33/11 kV Substation

33 kV Substation

M1

M3

M2

M4

33/11 kV Substation

Transformer

M5

M6

M7

M8

M9

Loss = M1 – (M2 + M3 + M4)

Loss= M5 – (M6 + M7 + M8 + M9)

Substation O/G Meter

33 kV Consumer Meter

33 kV Consumer Meter

Substation I/C Meter

Substation O/G Meter

Substation PT Meter

Distribution Txr Meter

Distribution Txr Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

Substation O/G Meter

33 kV Consumer Meter

33 kV Consumer Meter

Substation I/C Meter

Substation PT Meter

Substation O/G Meter

Substation O/G Meter

Distribution Txr Meter

Distribution Txr Meter

Distribution Txr Meter

Distribution Txr Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

LT Meter

Boundary Meter Boundary Meter Boundary Meter Boundary Meter

Substation

M1

Substation

M2

M3 M4

M5 M6

M7

Transformer

M1

M5 M3

M6 M7

M4

M2

Substation

M1

Substation

M2

M3 M4

M5 M7

M8

Transformer

M1

M5 M3

M6 M7

M4

M2

Ease of Diagnosis by introducing additional Layers.

Substation Meter

DT Meter

Consumer Meter

Substation Meter

DT Meter

Consumer Meter

Boundary Meter

Division Meter

Substation Level

Feeder Level

DT Level

Substation Level

Feeder Level

DT Level

Division Level

Boundary Level

Nodal Level

Switching Level

Pre-GIS

Post-GIS

$

GOING FORWARD @ NPCL

• Integration with OMS system

• Accountability of Temporary Network Switching

Swami

[email protected]