building a “site visit free” energy audit · pdf filezero-touch energy audit swami...
TRANSCRIPT
Building a “Site-Visit Free” Energy Audit System using GIS
Zero-Touch Energy Audit
Swami Senior Consultant @ Red Planet Consulting
[email protected] +91-9884183818
33 kV Substation
33/11 kV Substation
Transformer
M3
M2
M6 M7
M8
M9
M1
M4
M5
33 kV Consumer Meter
33 kV Consumer Meter
LT Consumer
Meters
11 kV Consumer Meter
Outgoing Meter
Incoming Meter
Outgoing Meter
33/11 kV Substation
33 kV Substation
M1
M3
M2
M4
Loss = M1 – (M2 + M3 + M4) 33 kV Consumer
Meter
33 kV Consumer Meter
Outgoing Meter
Incoming Meter
M1
M2 M3 M4
33/11 kV Substation
Transformer
M5
M6
M7
M8
M9
Loss= M5 – (M6 + M7 + M8 + M9)
LT Consumer
Meters
11 kV Consumer Meter
Outgoing Meter
M5
M6 M7 M8 M9
33/11 kV Substation
33 kV Substation
M1
M3
M2
M4
33/11 kV Substation
Transformer
M5
M6
M7
M8
M9
Loss = M1 – (M2 + M3 + M4)
Loss= M5 – (M6 + M7 + M8 + M9)
• Resurrection of Existing GIS System.
• Make GIS integrall part of Business Process by integrating it with SAP.
• Integration of Planned Scada OMS/DMS with GIS
• Provide GIS Access across the organization (Web Application)
• Field Force Automation for Field Crews.
Project Objectives
EO WEB FME
Electric Office
Mapframe
CIMXML Smallworld Business Integrator
Data Import
SCADA SAP
Field Force Automation
GIS @ NPCL
Stage I : Field Survey QC
Stage II : Back-office QC Team MMI
Stage III : Pre-Import QC
Stage IV : Post-Import QC Team RPC
Stage V : Connectivity QC
Stage VI : Field Verification
QC
Team NPCL
Stage VII : Quality Routines System Driven
33/11 kV Substation
33 kV Substation
M1
M3
M2
M4
33/11 kV Substation
Transformer
M5
M6
M7
M8
M9
Loss = M1 – (M2 + M3 + M4)
Loss= M5 – (M6 + M7 + M8 + M9)
Substation O/G Meter
33 kV Consumer Meter
33 kV Consumer Meter
Substation I/C Meter
Substation O/G Meter
Substation PT Meter
Distribution Txr Meter
Distribution Txr Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
Substation O/G Meter
33 kV Consumer Meter
33 kV Consumer Meter
Substation I/C Meter
Substation PT Meter
Substation O/G Meter
Substation O/G Meter
Distribution Txr Meter
Distribution Txr Meter
Distribution Txr Meter
Distribution Txr Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
LT Meter
Boundary Meter Boundary Meter Boundary Meter Boundary Meter
Substation Level
Feeder Level
DT Level
Substation Level
Feeder Level
DT Level
Division Level
Boundary Level
Nodal Level
Switching Level
Pre-GIS
Post-GIS
$
GOING FORWARD @ NPCL
• Integration with OMS system
• Accountability of Temporary Network Switching