building a clean energy future - ironmatrix.com...engineering & certification patents & fab....

28
Building a Clean Energy Future June 2018 | 1

Upload: others

Post on 08-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Building a Clean Energy Future

June 2018 | 1

Page 2: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

-20.0%

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

120.0%

1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018

Energy Growth

Ref: http://www.bp.com/en/global/corporate/energy-economics/statistical-review-of-world-energy.html

Perc

enta

ge S

hare

of E

nerg

y Gr

owth

Page 3: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

| 3

Energy & Construction Integration – the next step

Page 4: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

| 4

A More Profitable Type of Construction

1. Robot FabricationJust nine major partsAll made by robotsFull supply chain control

Page 5: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

| 5

A More Profitable Type of Construction

2. Optimized ConstructionFlat-Packed, shipping container transport.No cranes, earthworks or scaffolding.Built on challenged sites.

Page 6: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

| 6

A More Profitable Type of Construction

3. Free Solar

Replaces cladding and eves with solar at no incremental cost.Stores 50% of a home’s energy in thermal mass.

Page 7: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

| 7

Enabling Technology

Patented Structure

Expandable & ReconfigurableFlat/ Green RoofRemovable & Re-sellable

Page 8: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Two Story Standard Configuration

Custom Configuration

Challenging Site

Solar Ready

Reconfigure/ Resale/ Recycle

Flat Roof

Curtain wall Double Glazing

$1,000/m2

$1,200/m2 $1,250/m2

2017

$900/m2

2019

$700/m2

2021+

| 8

Cost comparison

$1,450/m2

Lower CostLock-up cost, 20-30%lower cost than traditional build.Lower cost fit-out.

*Lock-up Costs

ScaledProduction

RobotFabrication

Page 9: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Iron Matrix - a better home for a lower cost

| 9

… Builders/ Developers More profitable construction

Unlock and lease land

Lower cost fit-out and utilities

| 9

… GovernmentsAdvanced manufacturing

Clean energy uptake

Jobs and remote/ affordablehousing

Better for … CustomersLower cost home

Eliminate bills with clean energy

Residual value

Page 10: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Commercialization Plan (Stage 1)

| 10

Proof of Concept2015-2018

Scaled Production2018-2020

Wider Deployment2020+

PhaseI

PhaseII

PhaseIII

Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II)

Builder, Fabricator Partner/ Acquisition Robot Manufacturing Automated Structural Cert. Online Design & Sales Capital Raise (Ph III)

Other Applications (e.g. Commercial) License Technology International Deployment Full Supply Chain Control Stage II Capital Raise

Page 11: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

($10,000,000)

$0

$10,000,000

$20,000,000

$30,000,000

$40,000,000

$50,000,000

$60,000,000

$70,000,000

1-Jan-19 1-Jan-20 1-Jan-21 1-Jan-22 1-Jan-23

$16m EBITDA by 2023

EBITDA

Remote housing revenue

Suburban housing revenue

Eco-village revenue

Page 12: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

| 12

Investment Milestones

$3.3mil val. (post money)

$650k raise (Seed)

Foundation Investor

$350k 11%

VC (Clean Energy)

$150k 4.5%Gov. Grant(Acc. Com.)

$150k

$200k Prototype Fit-Out

$50k Legal

$100k Salaries (Company)

$300k Robot Development (Advanced Manufacturing)

$400k Builder

Foundation Investor

$250k

VC (CleanEnergy)

$250k

ModularBuilder

$250k

PropertyDeveloper

$250k

$5.6mil val. (post money)

$1mil raise (Series A)

$400k Salaries (Company)

$300k Engineering, Architecture, Interior Design

$200k Legal, Accounting

Eco Village ($1.0 mil working capital)

Contingency ($300k+ Eco Village Profit)

$10-20mil val.

(Series B)

3 months 3-6 months 18-24 months

Page 13: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Intellectual property Au$1.5 million*

Engineering, Patents, Certification, Fabrication Drawings, Web Domain, Trademarks.

| 13

Company Valuation

Tangible assets (prototype) Au$1.3 millionThe land was purchased for $750,000 in 2011. With construction costs of $375,000, we unlocked $175,000 in land value. Capital to be re-deployed after completion.

www.IronMatrix.com

*Value based on 10 year projection of similar build and sales as prototype.

Au$2.8 million valuation No debt

Page 14: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Co-FounderMBA (Entrepreneurship & CleanTech)8 years Consulting

Nina Hitchins Carley Morgan

Automation & ControlBachelor of Electrical EngineeringProject Engineer

Brendan Wessling David SutherlandBranding & MarketingMBAGeneral Manager at Yes Agency

CommunicationsBachelor of CommunicationsCommunity Engagement Officer

| 14

Team

Co-FounderBach. Engineering & Commerce18 Years Energy Industry

David Morgan John JorritsmaConstruction25 Years Residential Construction & Fit-out

Page 17: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

0

2000

4000

6000

8000

10000

12000

14000

16000

1965

1967

1969

1971

1973

1975

1977

1979

1981

1983

1985

1987

1989

1991

1993

1995

1997

1999

2001

2003

2005

2007

2009

2011

2013

2015

2017

Coal Oil GasNuclear Hydro Geo/Bio/OthWind Solar

Historical Energy Growth

Ref: http://www.bp.com/en/global/corporate/energy-economics/statistical-review-of-world-energy.html

Mill

ion

Tone

s of O

il Eq

uiva

lent

Page 18: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

| 18

Zero Cost Energy

$0.01

$0.10

$1.00

$10.00

$100.00

1975 1985 1995 2005 2015 2025

Sol

ar P

anel

Cos

t $/

Wat

t

Solar panels as claddingprovide zero cost energy

Page 19: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Fully Customizable Internals

Flexible FinishesIron Matrix interiors can be fully customized and modularized.

| 19

Page 20: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Future Opportunities

| 20

$

Modularized Fit-out

Financing/ Leased Land

Delivery DronesRobot Assembly

time

Energy Storage, DC Power Sys.

Iron MatrixBuildings

Page 21: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Australia has the;

• Natural Resources

• Solar Energy & Land

• Technical Capabilities and

• Political Support (few manufacturing jobs)

that would allow it to be at the vanguard of this revolution.

Australian Made The 4th Industrial Revolution has begun (robot manufacturing) and Australia is well positioned to take full advantage.

| 21

Australia’s competitive advantage

Page 22: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator
Page 23: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator
Page 24: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator
Page 25: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator
Page 26: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Cost Savings Estimates

Page 27: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

Go-to-market strategy starts with a high margin eco-village

0%

10%

20%

30%

40%

50%

60%

0

500

1,000

1,500

2,000

2,500

3,000

Jul-18 Jul-19 Jul-20 Jul-21 Jul-22

Gross MarginSquare meters built

each month

Eco-Village Remote housing Suburban housing

Page 28: Building a Clean Energy Future - ironmatrix.com...Engineering & Certification Patents & Fab. Drawings Prototype Construction Prototype Fit-out Capital Raise (Ph II) Builder, Fabricator

$0

$20,000

$40,000

$60,000

$80,000

$100,000

Jul-18 Jan-19 Jul-19 Jan-20

Fabrication Automation Capex

Engineering certification

Finite Element Analysis

Prototype fit-out

Insurance

Engineering and design

Legal Advice

Superannuation

Founder salaries

Incidentals

Seed$2.8 pre-money

valuation

Allocation of Seed and Series A investment dollars

Series A$5 pre-money

valuation