builders bulletin - ccba · modernization existing kitchen in building m1 and restrooms in building...

40
JULY 09, 2018 We Build Futures ~ Communities ~ Confidence ~ We Build Your Business Bidding This Week... Builders Bulletin CLEAN USED BRICK - PAVERS CARMEL STONE GRANITE ROCKS FIREWOOD TIMBERS CYPRESS ADOBE BLOCKS FIXTURES APPLIANCES CABINETS BARN WOOD NEW & USED LUMBER METAL GATES CONSTRUCTION & BUILDING SUPPLIES ROOF TILES We’re Not The Best Because We’re the Oldest… We’re The Oldest Because We’re the Best!” Overhead Door Company of Salinas 733 Sanborn Place Salinas, CA 93901 Salinas (831) 422-3667 Monterey (831) 375-3667 Fax (831) 422-1061 Santa Cruz (831) 662-3122 Lic. #529655 Overhead Door Company of Santa Clara Valley 1266 Lawrence Station Road Sunnyvale, CA 94089 Tel (408) 734-8010 Fax (408) 734-3728 Lic. #215098 7/9/18 Salinas Fence Repainting At New Republic Elementary School 3:00 PM 7/10/18 Seaside Central Coast High School Kitchen/Restroom Modernization - Bid 2 2:00 PM 7/10/18 Boulder Creek County Service Area No. 51 Hopkins Gulch - Asphalt Overlay And Installation Of A Swale On West Side Of The Roadway 2:15 PM 7/10/18 Marina 2018 Citywide Street Repair 2:00 PM 7/10/18 Cupertino 2018/19 Reconstruction Of Curbs, Gutters & Sidewalks 2:00 PM 7/10/18 Salinas Landscape Services For The Monte Bella Maintenance District 2:00 PM 7/10/18 Salinas Landscape Services For North/East Maintenance District 2:00 PM 7/10/18 Salinas Landscape Services For Mira Monte, Airport And Woodside Maintenance District 2:00 PM 7/10/18 Salinas Landscape Services For Harden Ranch Maintenance District 2:00 PM 7/10/18 Watsonville Rfq/P - Pajaro Valley High School Athletic Field Project 2:30 PM 7/10/18 Santa Cruz Rfq For Great Meadow Bike Path Phase Ii 3:00 PM 7/11/18 Boulder Creek Fall Creek Fish Ladder Debris Removal 2:00 PM 7/11/18 Capitola 2018 Slurry Seal 3:00 PM 7/11/18 Santa Clara Pruneridge Avenue & Cronin Drive Traffic Signal Installation Project 3:00 PM 7/11/18 Sunnyvale Sewer Siphon Cleaning & Inspection 2018 3:00 PM 7/11/18 Santa Clara Remodel Two Story Residential Home- Bill Wilson Center 4:00 PM 7/12/18 Mountain View Demolition And Abatement For Construction Of New District Office - Mountain View Whisman School District 2:00 PM 7/12/18 Santa Cruz Newell Creek Dam Spillway Bridge Replacement 3:00 PM 7/12/18 * Santa Cruz Cedar Street Rehabilitation 2:00 PM 7/12/18 Saratoga Dyer House Sitework Improvements Sanborn Park 12:00 PM 7/12/18 Gonzales Johnson Canyon Landfill Concrete Pad Installation 2:00 PM 7/12/18 San Jose 8776 Parking Fiber Network 3:00 PM 7/12/18 Soquel Service Area 3 To 4 Intertie 2:00 PM 7/12/18 Watsonville Davis Carey Ave Sanitary Sewer Replacement 3:00 PM 7/12/18 San Jose 8867-Sanitary Sewer Condition Assessment Fy 2018-2019 Package 1 3:00 PM 7/12/18 Hollister Fema - Lovers Lane Road Reconstruction 2:00 PM 7/12/18 Milpitas Street Resurfacing Project 2018, Phase Ii 2:00 PM 7/12/18 Grover Beach Rfp For Professional Design Engineering Services 3:00 PM 7/12/18 Santa Cruz County Rfp - Vegetation Maintenance Services On The Pajaro River 2:00 PM 7/12/18 Santa Cruz Santa Cruz Extra Space Self Storage 12:00 PM 7/12/18 * Mountain View Building 25 Restoration Ames Flight Research Center 4:00 PM 7/13/18 Watsonville Pinto Lake Bike Pump Track 2:30 PM 7/13/18 * San Luis Obispo Rfp For Construction Management & Inspection Services For Wrrf Project 2:00 PM 7/13/18 Palo Alto 2515 El Camino Real Bid Request - Division 1-33 (Request For Sub Bids) 2:00 PM

Upload: others

Post on 09-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

JULY 09, 2018

We Build Futures ~ Communities ~ Confidence ~ We Build Your Business

Bidding This Week...

Builders Bulletin

CLEAN USED BRICK - PAVERS CARMEL STONE GRANITE ROCKS

FIREWOOD TIMBERS CYPRESS

ADOBE BLOCKS

FIXTURES APPLIANCES

CABINETS

BARN WOOD NEW & USED

LUMBER METAL GATES

CONSTRUCTION & BUILDING

SUPPLIES ROOF TILES

“We’re Not The Best Because We’re the Oldest…

We’re The Oldest Because We’re the Best!”

Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901

Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122

Lic. #529655

Overhead Door Company of Santa Clara Valley 1266 Lawrence Station Road • Sunnyvale, CA 94089

Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098

Bid Time Project Name Location Bid Date

7/9/18 Salinas Fence Repainting At New Republic Elementary School 3:00 PM

7/10/18 Seaside Central Coast High School Kitchen/Restroom Modernization - Bid 2 2:00 PM

7/10/18 Boulder Creek County Service Area No. 51 Hopkins Gulch - Asphalt Overlay And Installation Of A Swale On West Side Of The Roadway

2:15 PM

7/10/18 Marina 2018 Citywide Street Repair 2:00 PM

7/10/18 Cupertino 2018/19 Reconstruction Of Curbs, Gutters & Sidewalks 2:00 PM

7/10/18 Salinas Landscape Services For The Monte Bella Maintenance District 2:00 PM

7/10/18 Salinas Landscape Services For North/East Maintenance District 2:00 PM

7/10/18 Salinas Landscape Services For Mira Monte, Airport And Woodside Maintenance District

2:00 PM

7/10/18 Salinas Landscape Services For Harden Ranch Maintenance District 2:00 PM

7/10/18 Watsonville Rfq/P - Pajaro Valley High School Athletic Field Project 2:30 PM

7/10/18 Santa Cruz Rfq For Great Meadow Bike Path Phase Ii 3:00 PM

7/11/18 Boulder Creek Fall Creek Fish Ladder Debris Removal 2:00 PM

7/11/18 Capitola 2018 Slurry Seal 3:00 PM

7/11/18 Santa Clara Pruneridge Avenue & Cronin Drive Traffic Signal Installation Project 3:00 PM

7/11/18 Sunnyvale Sewer Siphon Cleaning & Inspection 2018 3:00 PM

7/11/18 Santa Clara Remodel Two Story Residential Home- Bill Wilson Center 4:00 PM

7/12/18 Mountain View Demolition And Abatement For Construction Of New District Office - Mountain View Whisman School District

2:00 PM NEW

7/12/18 Santa Cruz Newell Creek Dam Spillway Bridge Replacement 3:00 PM

7/12/18 * Santa Cruz Cedar Street Rehabilitation 2:00 PM

7/12/18 Saratoga Dyer House Sitework Improvements Sanborn Park 12:00 PM

7/12/18 Gonzales Johnson Canyon Landfill Concrete Pad Installation 2:00 PM NEW

7/12/18 San Jose 8776 Parking Fiber Network 3:00 PM

7/12/18 Soquel Service Area 3 To 4 Intertie 2:00 PM

7/12/18 Watsonville Davis Carey Ave Sanitary Sewer Replacement 3:00 PM

7/12/18 San Jose 8867-Sanitary Sewer Condition Assessment Fy 2018-2019 Package 1 3:00 PM

7/12/18 Hollister Fema - Lovers Lane Road Reconstruction 2:00 PM

7/12/18 Milpitas Street Resurfacing Project 2018, Phase Ii 2:00 PM

7/12/18 Grover Beach Rfp For Professional Design Engineering Services 3:00 PM

7/12/18 Santa Cruz County Rfp - Vegetation Maintenance Services On The Pajaro River 2:00 PM

7/12/18 Santa Cruz Santa Cruz Extra Space Self Storage 12:00 PM

7/12/18 * Mountain View Building 25 Restoration Ames Flight Research Center 4:00 PM

7/13/18 Watsonville Pinto Lake Bike Pump Track 2:30 PM

7/13/18 * San Luis Obispo Rfp For Construction Management & Inspection Services For Wrrf Project

2:00 PM

7/13/18 Palo Alto 2515 El Camino Real Bid Request - Division 1-33 (Request For Sub Bids)

2:00 PM

Page 1 of 1

Page 2: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Central Coast Builders Association

242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 (831) 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 (831) 883-3933 Monterey

(831) 758-6203 Fax

[email protected]

Board of Directors

President: Clifford Fasnacht, Dougherty Pump & Drill Brian Kenny, Hayward Lumber

Vice President: Kevin McIntosh, Blach Constuction Miguel Bustos, MIG Electric

Secretary/Treasurer: Anka Hepper, WM. B Saleh Painting Kate Rueter, AON Risk Services

Past President: Kristine O’Dell, Absolute HR Gabriel Torres, CCRB/CHISPA

Oscar Blancas, Blancas Construction

CCBA STAFFChristie Cromeenes

Executive Director

Merary Rodriguez FInance Coordinator Shelly Verba Office Planroom Manager

Rikki Montejano Public Relations Coordinator

DisclaimerAll information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of

all facts. We assume no responsibility for errors and/or omissions.All information included is for the intended recipient only, we ask that

you do not share this information

Page 3: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

July 25, 2018

ONLY 20 SPOTS AVAILABLE 

Page 4: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Mon

day,

Aug

ust 2

0, 2

018

1:00

PM

- 4:

00 P

M

Employers have a legal obligation to establish an effective injury and illness prevention program to promote health and safety in the workplace. Complying with safe and healthful work practices, includes first aid kits easily accessible to each work area, and training of at least one employee on each shift currently qualified to render first aid. Contractors are required, by law, to have an employee certified in CPR/First Aid on each job site. Sessions have limited space so register early. This course is designed to provide skills in CPR, First Aid & Automated External Defibrillation (AED). Students will learn adult CPR, rescue breathing and choke saving. Upon successful completion, students will receive the American Red Cross CPR & First Aid Certificate. Both CPR & First Aid Certificates are valid for 2 Years.

CPR & First Aid Training American Red Cross Certified

Cost: $70 members $85 non-members

Bi-Lingual Instructor: PEDRO ALFARO Mr. Alfaro has a Bachelor of Science degree in Nutrition and has been a Health Educator for over 20 years. He volunteered for the Los Angeles American Red Cross Chapter for CPR/First Aid for over 3 years. He was with the Monterey County Health Department for 12 years.

Attendees:_______________________________________________________________________________________________ Company:___________________________________________________Contact:_____________________________________ Email_______________________________________________________Phone:______________________________________

Paying by: □ □ Check: □ Total:__________________________ Card Card #_________________________________________________________Expiration Date________________________

Class will be held at 242 E. ROMIE LANE, SALINAS

PLEASE MAIL, FAX OR EMAIL FORM TO: Central Coast Builders Association

242 E. Romie Lane Salinas, Ca 93901

Phone 831-758-1624 Fax 831-758-6203 Email: [email protected]

***fee will be applied for a “no show” ONLY 15 SPOTS AVAILABLE! RESERVE YOUR SPOT NOW!

Certified CPR/First Aid Training Sponsored by the Central Coast Builders Association

Page 5: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To Bid

Deadline for submission of materials for our Bulletin is end of day Wednesday each week.

Weekly Projects Bidding 7/5/2018

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.

Name Bid Date Time Contract # EstimateLocationOPR#

Monterey County

Bidders:

Plan Issuer:

Salinas

Sand-blast, prepare, and re-paint decorative fencing at New Republic Elementary School.

PREVAILING WAGE

Questions: Diane MillerEmail: [email protected]

18-01732

0

3:00 PM7/9/18

Addenda:FENCE REPAINTING AT NEW REPUBLIC ELEMENTARY SCHOOL

Bid No. NR7-2018-9, BidPackage 7-2018-9

Santa Rita Union School District 831-443-7227

General Contractor Office: 916-549-6259Jpb Designs, Inc.

Bidders:

Plan Issuer:

Seaside

Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. siteimprovements, structural alterations, roofing replacement over the multi-purpose buildings kitchen. Reconfiguration of the interiorpartitions, mechanical, electrical and low-voltage improvements. Kitchen is a teaching facility.

PREVAILING WAGE

MAND 6/19 @ 3pm- site

18-01614

6

2:00 PM7/10/18

Addenda:CENTRAL COAST HIGH SCHOOL KITCHEN/RESTROOM MODERNIZATION - BID 2

Prebid Conf:

Monterey Peninsula Unified School District 831-645-1200 831-649-4175

General Contractor Fax: 831-372-5584Office: 831-372-5580Avila Construction

General Contractor Fax: 831-717-4315Office: 831-656-1600Dmc Commercial Inc.

General Contractor Fax: 530-229-0070Office: 530-229-0001Seward L. Schreder Construction Inc.

HVAC Contractor Fax: 408-920-6174Office: 408-920-6170Performance Air Service, Inc

Bidders:

Plan Issuer:

Marina

The scope of the work for this project includes full width crack sealing, chip sealing and associated roadway repair work including spotrepairs of failed areas within the existing pavement section, the removal and reinstallation of striping and pavement markings, and allrelated work specified in these Specifications. The project limits encompass various streets in the City of Marina and are detailed inthese Specifications.

PREVAILING WAGE

Project Contact: Edna GomezEmail: [email protected]

18-01687

1

2:00 PM7/10/18

Addenda:2018 CITYWIDE STREET REPAIR

APR1801

City of Marina - Engineering 831-884-1212 831-384-0425

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction-Sf Bay Area Branch

Page 6: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Salinas

The project shall involve the furnishing of all labor, material, equipment, and incidentals to perform the landscape maintenance inaccordance with the plans and special provisions.

Project Contact: Hilda Garcia - [email protected]

18-01740

0

2:00 PM7/10/18

Addenda:LANDSCAPE SERVICES FOR THE MONTE BELLA MAINTENANCE DISTRICT

City of Salinas - DPW 831-758-7241 831-754-0756

Plan Issuer:

Salinas

The project shall involve the furnishing of all labor, material, equipment, and incidentals to perform the landscape maintenance inaccordance with the plans and special provisions.

Project Contact: Hilda Garcia - [email protected]

18-01741

0

2:00 PM7/10/18

Addenda:LANDSCAPE SERVICES FOR NORTH/EAST MAINTENANCE DISTRICT

City of Salinas - DPW 831-758-7241 831-754-0756

Plan Issuer:

Salinas

The project shall involve the furnishing of all labor, material, equipment, and incidentals to perform the landscape maintenance in theLandscape and Lighting District in accordance with the Plans and these Special Provisions.

Project Contact: Hilda Garcia - [email protected]

18-01742

0

2:00 PM7/10/18

Addenda:LANDSCAPE SERVICES FOR MIRA MONTE, AIRPORT AND WOODSIDE MAINTENANCE DISTRICT

City of Salinas - DPW 831-758-7241 831-754-0756

Plan Issuer:

Salinas

The project shall involve the furnishing of all labor, material, equipment, and incidentals to perform the landscape maintenance inaccordance with the plans and special provisions.

Project Contact: Hilda Garcia - [email protected]

18-01743

0

2:00 PM7/10/18

Addenda:LANDSCAPE SERVICES FOR HARDEN RANCH MAINTENANCE DISTRICT

City of Salinas - DPW 831-758-7241 831-754-0756

Plan Issuer:

Gonzales

Construct a new 3000 square foot concrete pad at our Johnson Canyon Landfill in Gonzales, CA. The work includes site preparation,forming, rebar installation, and concrete installation and finish work.

PREVAILING WAGE

18-01861

0

2:00 PM7/12/18

Addenda:JOHNSON CANYON LANDFILL CONCRETE PAD INSTALLATION

Salinas Valley Solid Waste Authority 831-775-3000 831-755-1322

NEW

Plan Issuer:

Del Rey Oaks

Project consists of: Temporary Traffic Control; Existing Facilities; Earthwork; Landscape; Dust Palliative; Roadway Excavation;Finishing Roadway; Aggregate Base; Asphalt Concrete.

PREVAILING WAGE

Questions: Sherman Low @ 831-624-2110

18-01836

0

3:00 PM7/17/18

Addenda:STREET REHABILITATION - CARLTON DRIVE OVERLAY

Neill Engineers Corp 831-624-2110 831-624-3693

NEW

Page 7: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Seaside $160,000

A. Other Work. The Work described in these Hazardous Materials Abatement Specifications (“HazMat Specifications”) is in addition toany other future planned work such as renovation.B. Work included - Base Bid: The Abatement Contractor shall be knowledgeable of the conditions for the project, and is responsible forverifying the quantities and locations of all the work to be performed as outlined in this document, as indicated on the architecturalcontract drawings and as directed by the Owner's Representatives. Failure to do so shall not relieve the Abatement Contractor of hisobligation to provide all materials and labor necessary to carry out the provisions of the Contract. The Abatement Contractor shallfurnish all labor, materials, services, permits, insurance (specifically covering the handling and transportation of lead-containing paint(LCP), lead-containing materials, and equipment which is specified, shown, or reasonably implied for the following abatementactivities.

PREVAILING WAGE

Questions: Tom Millman at [email protected]

MAND 7/5 @ 2:30pm- site

18-01782

1

2:00 PM7/19/18

Addenda:SEASIDE CHILDREN’S CENTER - ABATEMENT

Prebid Conf:

Monterey Peninsula Unified School District 831-645-1200 831-649-4175

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Plan Issuer:

Monterey

*** BID DOCS WILL BE UPLOADED ONCE AVAILABLE ***

PREVAILING WAGE

Questions: Tom Millman at [email protected]

MAND 7/10 @ 10am- site

18-01769

0

3:00 PM7/24/18

Addenda:ENROUTE - MONTE VISTA ELEMENTARY SCHOOL - PORTABLES

Prebid Conf:

Monterey Peninsula Unified School District 831-645-1200 831-649-4175

Plan Issuer:

Marina

Marina Coast Water District is seeking bids for application of protective coatings and paints to the interior surfaces of a 2 MG steelpotable storage tank, disinfection of interior surfaces, including surface preparation and other work necessary to accomplish theapproved end result of a totally protected and usable tank and structure.

PREVAILING WAGE

Project Contact: Jaron Hollida @ 831-883-5930

MAND 7/10 @ 10am- 2840 4th Avenue, Marina

18-01758

0

2:00 PM7/31/18

Addenda:RESERVOIR #2 TANK COATING

MW-0238

Prebid Conf:

Marina Coast Water District 831-384-6131

Plan Issuer:

Seaside

THE SCOPE OF THIS PROJECT CONSISTS OF EXTERIOR PAINTING OF ALL EXISTING BUILDINGS ON THE SCHOOL SITE.PAINTING SHALL INCLUDE ALL NECESSARY PREPARATION, PRIMING AND PAINTING. ALL EXISTING EXTERIOR SURFACESTHAT ARE PAINTED AT COMMENCEMENT OF THE PROJECT SHALL BE NEWLY PAINTED.

PREVAILING WAGE

Questions: Tom Millman at [email protected]

MAND 7/17 @ 3pm- site

18-01783

0

3:00 PM7/31/18

Addenda:SEASIDE CHILDREN’S CENTER EXTERIOR PAINT

Prebid Conf:

Monterey Peninsula Unified School District 831-645-1200 831-649-4175

Page 8: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Salinas

Improvements include site work, demolition of the existing start-finish bridge and approaches, construction of the new start-finishbridge, approach ramp and stairs, electrical improvements, accommodations for signage and TV monitors.

PREVAILING WAGE

Project Contact: Dave PrattEmail: [email protected]

MAND 7/10 @ 10am- site

18-01759

0

2:00 PM8/2/18

Addenda:LAGUNA SECA START-FINISH BRIDGE

8406

Prebid Conf:

County of Monterey 831-755-4800 831-755-4958

General Contractor Fax: 831-422-1882Office: 831-422-8213Dilbeck & Sons

General Contractor Fax: 831-717-4315Office: 831-656-1600Dmc Commercial Inc.

General Contractor Fax: 805-548-1995Office: 831-869-8100Jacob Construction & Design

Sub-Contractor/SpecialtyContractor

Fax: 408-275-6225Office: 408-292-6353Alumawall Inc

Plan Issuer:

Carmel-by-the-Sea

City of Carmel-by-the-Sea is soliciting bids from qualified Contractors to perform all aspects of urban forestry. The work, in general,consists of maintenance of trees within the public right-of-way, as well as trees on City properties, that are scheduled for standard,priority, and emergency maintenance services. Tree maintenance work may include, but is not limited to, tree planting, staking,watering, pruning, or removal and stump grinding. The selected firms must be available to respond to the City’s emergency treeissues. The City intends to select multiple qualified firms to carry out these on-call services.

Questions: Mike BransonEmail: [email protected]

7/10 @ 10am- Vista Lobos Community Rm, in the parking lot on the corner of Torres Str and 3rd Ave

18-01733

0

2:00 PM8/8/18

Addenda:ON-CALL TREE MAINTENANCE SERVICES

18-19-001

Prebid Conf:

City of Carmel-by-the-Sea 831-620-2010 831-624-2004

Bidders:

Plan Issuer:

Monterey

In general, the work consists of, but is not limited to, reconstruction of seven intersections, construction of drainage improvements,striping and signage, and traffic signal and street lighting work. This work shall include, but not be limited to, demolition of existingpavement and curb, gutter, and sidewalk, construction of catch basins, installation of storm drain pipe, manholes,construction of curb and gutter, sidewalk, HMA and PCC paving, HMA overlay, striping and signage, and traffic signal and streetlighting improvements.

Project Contact: Regina TrinqueEmail: [email protected]

7/10 @ 3pm- 601 Wave St, Suite 100, Monterey

18-01706

0

2:00 PM8/14/18

Addenda:CITYWIDE SIGNALIZED INTERSECTION ADA UPGRADES, PHASE 2

Prebid Conf:

City of Monterey 831-646-3997 831-646-5686

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

San Benito County

Bidders:

Plan Issuer:

Hollister

The project includes, but is not limited to reconstruct 0.27 Miles of Lovers Lane Road including compacting and placement ofsubgrade, aggregate base, and AC pavement.

Questions: [email protected]

18-01643

0

2:00 PM7/12/18

Addenda:FEMA - LOVERS LANE ROAD RECONSTRUCTION

PWB-1804

County of San Benito 831-636-4170 831-636-4176

General Contractor Fax: 831-449-0700Office: 831-449-4273Don Chapin Co

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Page 9: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Hollister

The City of Hollister is seeking Statement of Qualifications from qualified architectural firms to provide professional planning/consultingservices for the design and construction of the Water Reclamation Recreation Facility. The City of Hollister shall execute a contractwith the selected consultant. All parties competing for the work are advised that the work may be accomplished over the course ofseveral fiscal years. All parties are advised that some of the services may not be required and that the sponsor reserves the right toinitiate additional procurement action for any of the services not included in the initial procurement. These services will include, but arenot necessarily limited to: environmental analyses, conceptual layouts, grant applications, grant management, construction support.The projects may be funded by grants from the State of California. Therefore; the selected firm will be expected to assist the City ofHollister in the development of a contract and scope of services that will be acceptable to the state.

RFP/RFQ Contact: Mike ChamblessTel:(831) 636-4365

18-01858

0

4:00 PM9/12/18

Addenda:RFQ - WATER RECLAMATION RECREATION FACILITY DESIGN AND CONSTRUCTION SUPPORT

City of Hollister 831-636-4365 831-636-4366

NEW

San Luis Obispo County

Plan Issuer:

Grover Beach

The City of Grover Beach is accepting Proposals for Professional Design Engineering Services from individuals or firms specifically forthe following upcoming design, bidding, and construction project:MEASURE K-14 STREET REPAIR AND REHABILITATION PROGRAMDESIGN, BIDDING, AND CONSTRUCTION PHASE SERVICES (CIP) 2295-8

Contact: Greg Ray @ 805-473-4530

18-01755

0

3:00 PM7/12/18

Addenda:RFP FOR PROFESSIONAL DESIGN ENGINEERING SERVICES

CIP 2295-8

City of Grover Beach [email protected] 805-473-4520 805-489-9657

Bidders:

Plan Issuer:

San Luis Obispo

The City of San Luis Obispo (City) is seeking proposals from qualified firms interested in providing Construction Management andInspection Services for the Water Resource Recovery Facility (WRRF) project as described in this Request for Proposal (RFP). TheConstruction Management Team (CM Team) shall assist in the advertisement, award, and administration of the construction contractfor the project.

6/6 @ 10am- 25 Prado Road, San Luis Obispo

18-01454

3

2:00 PM7/13/18

Addenda:RFP FOR CONSTRUCTION MANAGEMENT & INSPECTION SERVICES FOR WRRF PROJECT

91363CM

Prebid Conf:

City of San Luis Obispo 805-781-7200 805-781-7198

Equipment Fax: 661-587-8674Office: 661-809-6838Houchin Equipment Rentals

Plan Issuer:

Cambria

The Project includes installation of a pre-purchased influent screen to the top of the WWTP’s existing grit removal tank; installation ofan elevated worker support platform; hand railings; catwalks; raw sewage piping and valves; and, electrical conduits, and conductorsfor associated power and controls. The completed project shall result in a fully-functional and automated facility for screening rawwastewater being pumped by the WWTP’s influent pumps.

Questions: [email protected] & [email protected]

18-01815

0

3:00 PM7/18/18

Addenda:WASTEWATER TREATMENT PLAN INFLUENT SCREEN INSTALLATION

01-2018

Cambria Community Services District [email protected] 805-927-6223 805-927-5584

Page 10: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Atascadero $1,150,000 $1,300,000

Pavement rehabilitation, including grind and overlay, full depth replacement, cape seal, Type II slurry. Includes minor drainageimprovement of roadways.

PREVAILING WAGE

Project Contact: [email protected] or [email protected]

18-01685

0

3:00 PM7/19/18

Addenda:MEASURE F14 PAVEMENT MANAGEMENT PROGRAM 2018 REHABILITATION

C2017R02 to

City of Atascadero [email protected] 805-470-3180 805-470-3181

Sub-Contractor/SpecialtyContractor

Fax: 916-714-9868Office: 775-355-5271Intermountain Slurry Seal Inc.

Plan Issuer:

Grover Beach

Seeking bids on all trades to build a single family residence on a flat lot.

Questions: Scott PaceEmail: [email protected]

18-01735

0

12:00 PM7/20/18

Addenda:PUTICH RESIDENCE

Scott Pace [email protected] 805-801-5806

Plan Issuer:

Arroyo Grande

The San Luis Obispo County Flood Control and Water Conservation District (District) is seeking a bid for the vegetation thinning of theleveed lower 3 miles of the Arroyo Grande Creek and Los Berros Diversion Channels in the area of Flood Control Zone 1/1A (seeExhibit B). The vegetation thinning will include willow trimming, other tree trimming, invasive plant species removal, and debrisremoval and disposal. The purpose of this Invitation to Bid (Bid) is to provide qualified vendors with sufficient information concerningthe services desired by the District for the vegetation thinning.

Bid Contact: Missy Viles(805) [email protected]

7/11 @ 10:30am- 22nd Street Bridge in Oceano

18-01754

0

3:00 PM7/20/18

Addenda:ARROYO GRANDE CREEK AND LOS BERROS DIVERSION CHANNELS VEGETATION THINNING

3834

Prebid Conf:

County of San Luis Obispo [email protected] 805-781-5216

Bidders:

Plan Issuer:

Morro Bay $5,000,000

Bid Package 2 will include the entire project, less the following trades bid out on Bid Package 1:Demolition, Site Utilities, Earthwork, pursuant to the following Spec Sections:1. 023000 – Subsurface Investigation2. 024119 – Selective Demolition3. Division 31 – Earthwork4. Division 33 – UtilitiesThe Subcontractors working on Bid Package 1 will be required to coordinate with Bid Package 2 Construction, which is anticipated tostart in September 2018.Bid Package 2 will include Construction of the Building, all Site Concrete/AC Paving and Site Appurtenances, All Electrical andIrrigation/Landscaping work.

Questions: [email protected]

7/10 @ 11am- site walk through

18-01702

2

2:00 PM7/24/18

Addenda:BID PACKAGE 2 - STUDENT SUPPORT CENTER

Prebid Conf:

Acme Construction Co Inc [email protected] 209-523-2674 209-523-0213

Electrical Contractor Fax: 805-925-5639Office: 805-922-7777Santa Maria Electric, Inc.

Equipment Fax: 559-651-1379Office: 559-651-1336Haulaway Storage Container

Page 11: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo

California Polytechnic State University, San Luis Obispo (Cal Poly) is requesting proposals from qualified contractors to provide andinstall a minimum of 250 Electronic Package Lockers.The Electronic package lockers will be placed in the new student housing facility on the Cal Poly Campus in San Luis Obispo CA.Future locations may be implemented,Cal Poly is also requesting pricing for a lease option.

PREVAILING WAGE

Bid Contact: Jeanette Paolucci(805) [email protected]

18-01828

1

3:00 PM7/24/18

Addenda:RFP - ELECTRONIC PACKAGE LOCKERS FOR UNIVERSITY HOUSING MAIL ROOM

JP2000015650

Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566

NEW

Bidders:

Plan Issuer:

San Luis Obispo $1,877,000

In general, the project consists of the installation of a new waterline and abandoning of the existing. The project also consists ofremoving and replacing existing corrugated metal pipe (CMP) storm drain, removing and replacing existing catch basins and curb rampimprovements.

PREVAILING WAGE

Project Manager: Hai Nguyen at 805-781-7108

18-01821

0

2:00 PM7/26/18

Addenda:WATERLINE REPLACEMENT VARIOUS LOCATIONS

91436

City of San Luis Obispo 805-781-7200 805-781-7198

NEW

General Contractor Fax: 805-543-1722Office: 805-543-1706Specialty Construction

San Luis Obispo $675,000

The Contractor shall provide all labor, including travel, per diem, parts, materials, supplies, transportation, equipment, tools and everyother item of expense necessary to perform scheduled maintenance, repair, emergency repair and source testing services to includeinspections, calibrations, mechanical and electrical repairs, adjustments with tuning and instrument components associated with theoperation of the boilers specified herein for the California Department of Corrections and Rehabilitation (CDCR), California Men’sColony (CMC) located at Highway 1, San Luis Obispo, Ca.

PREVAILING WAGE

Project Contact: Brandon A SchwabEmail: [email protected]

18-01826

0

10:00 AM7/27/18

Addenda:BOILER INSPECTION, CALIBRATIONS, MAINTENANCE, REPAIRS AND SOURCE TESTING

C5608081-D

NEW

Bidders:

Plan Issuer:

Paso Robles $6,300,000

The work shall include but is not limited to, trenching for pipelines to install sewer, water, reclaimed water, backfill and compaction, andtrench restoration all as shown on the plans and/or as specified herein.

PREVAILING WAGE

18-01777

0

2:00 PM8/9/18

Addenda:PASO ROBLES MUNICIPAL AIRPORT PIPELINES

17-19A

City of Paso Robles 805-237-3861 805-237-3904

Electrical Contractor Fax: 805-925-5639Office: 805-922-7777Santa Maria Electric, Inc.

General Contractor Fax: 661-396-2589Office: 661-397-2121Hps Mechanical

Supplier Fax: 661-393-2288Office: 661-393-2288Core & Main

Supplier Fax: 661-322-2333Office: 661-396-3230Ferguson Waterworks

Supplier Fax: 000-000-0000Office: 661-834-1162R & B Company

Page 12: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Santa Clara County

Bidders:

Plan Issuer:

Cupertino

Remove and replace concrete curbs, gutters, and sidewalks at various locations throughout the City. Work also includes installation ofADA ramps, upgrading existing ADA ramps, and removal/replacement of driveway approaches ..

18-01657

0

2:00 PM7/10/18

Addenda:2018/19 RECONSTRUCTION OF CURBS, GUTTERS & SIDEWALKS

City of Cupertino 408-777-3354 408-777-3333

General Contractor Fax: 924-245-1244Office: 925-245-1300Vanguard Construction Inc.

Bidders:

Plan Issuer:

Sunnyvale

Cleaning and CCTV inspection of twenty (20) sanitary sewer siphon barrels at fourteen (14) sites.

Project Contact: Lisa Vo 408-730-7608Email: [email protected]

6/25 at 11AM (650 W. Olive Ave, Sunnyvale)

18-01616

1

3:00 PM7/11/18

Addenda:SEWER SIPHON CLEANING & INSPECTION 2018

F18-295

Prebid Conf:

City of Sunnyvale DPW 408-730-7403

General Contractor Fax: 916-520-6966Office: 916-442-5400Nor Cal Pipelines

General Contractor Fax: 408-262-1870Office: 408-262-1418Preston Pipelines Inc.

General Contractor Fax: 408-377-0069Office: 408-377-2793Sanco Pipelines

Sub-Contractor/SpecialtyContractor

Fax: 916-405-4180Office: 916-230-0370Stormwater Specialists, Inc.

Bidders:

Plan Issuer:

Santa Clara

Residential remodel to include kitchen, bathrooms and flooring.

Project Contact: Ivis PenaEmail: [email protected]

MAND 6/26 or 6/27 at 1PM

18-01658

0

4:00 PM7/11/18

Addenda:REMODEL TWO STORY RESIDENTIAL HOME- BILL WILSON CENTER

Prebid Conf:

Bill Wilson Center [email protected] 408-243-0222 408-246-5752

HVAC Contractor Fax: 408-920-6174Office: 408-920-6170Performance Air Service, Inc

Bidders:

Plan Issuer:

Santa Clara

Installation of a new traffic signal at Pruneridge Avenue and Cronin Drive intersection, including pedestrian and ADA pathwayimprovements such as ADA curb ramps, installation of traffic signal interconnect facilities, and traffic signing and striping.

Project Contact: Pratyush Bhatia 408-615-3026Email: [email protected]

None (strongly encouraged to visit the site prior to submitting a bid)

18-01704

1

3:00 PM7/11/18

Addenda:PRUNERIDGE AVENUE & CRONIN DRIVE TRAFFIC SIGNAL INSTALLATION PROJECT

CE 17-18-06

Prebid Conf:

City of Santa Clara - DPW 408-615-3000 408-985-7936

General Contractor Fax: 510-792-1728Office: 510-792-1727Redgwick Construction Company

Bidders:

Plan Issuer:

Mountain View

This project is for ARC Building 025 which is a two story reinforced concrete building with 7,453 square feet gross for the ground floor,5,429 square feet gross for the second floor and a basement of approximately 8,000 square feet gross. It is located within the historicalShenandoah Plaza of Moffett Field next to NASA/Ames Research Center and north of the City of Mountain View, CA.

PREVAILING WAGES apply. Contract duration = 600 calendar days

5/22 at 10AM

18-01453

3

4:00 PM7/12/18

Addenda:BUILDING 25 RESTORATION AMES FLIGHT RESEARCH CENTER

Prebid Conf:

Herman Construction Group, Inc. 619-964-9274 000-000-0000

Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric And Engineering

Page 13: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Electrical Contractor Fax: 831-636-9860Office: 831-636-9854Lm Sanchez Electric, Inc.

General Contractor Fax: 000-000-0000Office: 619-964-9274Herman Construction Group, Inc.

General Contractor Fax: 925-609-8357Office: 925-609-8356Ironwood Commercial Builders, Inc.

General Contractor Fax: 209-249-5301Office: 209-982-9900Patriot Construction

General Contractor Fax: 559-747-7101Office: 559-747-7100Souza Construction

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Supplier Fax: 209-547-0554Office: 209-547-1937Armor Fire Extinguisher Company

Plan Issuer:

Saratoga $220,000

Demolition, clearing, grubbing, pruning, removal of trees, shrubs and debris, temporary fencing, and other work necessary to preparethe site for construction of improvements, earthwork, grading, electrical meter, circuit breaker box and conduit work, sanitary drainagework, potable water line work, back flow prevention unit and line work, gas lineand propane tank work, telephone and internet connection work, concrete work, asphalt concrete work, parking striping improvementsand slgnage, traffic control. wheel stops. handicap accessible ramps, railings and signage, storm water protection, porch decking andaccess restoration, building stone facade repair. and miscellaneous appurtenant facilities.

Project Contact: Tom McLauchlan 408-355-2208

Hard copies also available for review at Santa Clara Builders Exchange

7/2 at 10AM (Dyer House)

18-01595

0

12:00 PM7/12/18

Addenda:DYER HOUSE SITEWORK IMPROVEMENTS SANBORN PARK

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

Bidders:

Plan Issuer:

Milpitas

Street resurfacing.

Project Contact: Michael Silveira

18-01648

2

2:00 PM7/12/18

Addenda:STREET RESURFACING PROJECT 2018, PHASE II

4284, 4287 & 4291

City of Milpitas - DPW 408-586-3300

General Contractor Fax: 408-327-7090Office: 408-327-7013Granite Construction

General Contractor Fax: 408-727-0366Office: 408-727-5700Joseph J. Albanese

General Contractor Fax: 925-957-9292Office: 925-957-9200Mck Services, Inc.

General Contractor Fax: 650-966-1946Office: 650-966-1926O'Grady Paving Inc.

Bidders:

Plan Issuer:

San Jose $919,775

Clean and assess the existing sanitary sewer system in the several areas.

Project Contact: Ricardo Rubio-Benitez 408-793-4104

18-01731

0

3:00 PM7/12/18

Addenda:8867-SANITARY SEWER CONDITION ASSESSMENT FY 2018-2019 PACKAGE 1

8867

City of San Jose - DPW 408-535-8300

Sub-Contractor/SpecialtyContractor

Fax: 916-405-4180Office: 916-230-0370Stormwater Specialists, Inc.

Plan Issuer:

San Jose $143,500

Conduits, and pullboxes as required. It also includes installation of sidewalk, curb and gutter, protection of existing utilities andappurtenances conduits as required, circuitry bonding and grounding, excavating, backfilling, driveway restoration, sidewalkrestoration, landscaping restoration, grade restoration, clearing, grubbing, removal of all existing curb and gutter, sidewalk and existingroadway pavement (both PCC an AC) and obstructions,saw cutting, traffic control, modifying and restoring irrigation systems.

Project Contact: Alisa Rappleye 408-793-4130

18-01734

1

3:00 PM7/12/18

Addenda:8776 PARKING FIBER NETWORK

8776

City of San Jose - DPW 408-535-8300

Page 14: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Mountain View

Related grading, paving, alterations and additions to existing parking lot, site utilities, installation of Fire Alarm System and other lowvoltage systems interior to Modular Building, various electrical power and low voltage installations on the site, and electrical and lowvoltage connections at the Modular Building for the Demolition and Abatement for Construction of New District Office.

MAND 7/6 at 10AM

18-01839

0

2:00 PM7/12/18

Addenda:DEMOLITION AND ABATEMENT FOR CONSTRUCTION OF NEW DISTRICT OFFICE - MOUNTAIN VIEWWHISMAN SCHOOL DISTRICT

Prebid Conf:

Greystone West Company 707-933-0624 707-996-8390

NEW

Sub-Contractor/SpecialtyContractor

Fax: 916-405-4180Office: 916-230-0370Stormwater Specialists, Inc.

Plan Issuer:

Palo Alto

Nibbi Brothers has been selected as the NEGOTIATED GENERAL CONTRACTOR.

New construction for a mixed-used building with three levels of Type VA above grade consisting of retail space, office space, and 13residential condominiums. There will be square feet and will comply with Palo Alto’s Green Building ordinance and Cal Greenrequirements.

Project Contact for Questions: Kristin MedwickEmail: [email protected]

18-01776

0

2:00 PM7/13/18

Addenda:2515 EL CAMINO REAL BID REQUEST - DIVISION 1-33 (REQUEST FOR SUB BIDS)

Nibbi Brothers 415-863-1820 415-241-2951

Plan Issuer:

Santa Clara $500,000

Abatement of Asbestos, Lead and PCB throughout 1980's built main building and Central Utilities plant.

Project Contact Questions Email: [email protected]

MAND 7/6 at 1PM

18-01756

0

11:00 AM7/16/18

Addenda:MAIN BUILDING AND CENTRAL PLANT ABATEMENT MISSION COLLEGE

BID# CA02-1819

Prebid Conf:

West Valley - Mission College Dist 408-741-2504

Bidders:

Plan Issuer:

Morgan Hill $2,800,000

Construction of an addition to the existing Library building, remodeling portions of the existing library and construction of site work toaccommodate the new addition at the entrance and parking area.

Questions: Yat Cho at (408) 310-4641, or by email at: [email protected]

MAND 5/30 @ 10AM & 6/13 @ 10AM (meet at Development Svcs Ctr, 17575 Peak Ave, Morgan Hill)

18-01500

5

2:30 PM7/17/18

Addenda:LIBRARY EXPANSION PROJECT

Prebid Conf:

City of Morgan Hill [email protected] 408-310-4672

Asphalt /Road / Bridge / HeavyHighway Contractor

Fax: 510-328-3231Office: 510-328-3230Forticon, Inc.

Casework / Millwork Contractor Fax: 805-544-9229Office: 805-544-2758Salem Cabinetry, Inc.

Communications/TechnologyContractor

Office: 408-375-1554Enos Communications

Electrical Contractor Fax: 831-630-1391Office: 831-630-9496Delgado Electric

Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric And Engineering

Electrical Contractor Office: 831-524-8507Mig Electric

Electrical Contractor Fax: 408-559-3594Office: 408-210-3741Sanpri Electric

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric And Engineering

General Contractor Fax: 000-000-0000Office: 408-422-6807101 Builders

General Contractor Fax: 831-372-5584Office: 831-372-5580Avila Construction

General Contractor Fax: 408-370-2422Office: 408-370-2322Dpr Construction

General Contractor Fax: 000-000-0000Office: 831-566-8753Er Comstruction

General Contractor Fax: 408-846-5660Office: 408-846-5550Kent Construction

General Contractor Fax: 510-579-7382Office: 510-579-7382S&H Construction Inc.

Page 15: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 530-229-0070Office: 530-229-0001Seward L. Schreder Construction Inc.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Plumbing & Piping Contractor Fax: 855-758-6268Office: 408-710-8653Michael Venosta Plumbing

Plumbing & Piping Contractor Office: 408-842-4004Michael Venosta Plumbing

Roofing Contractor Fax: 000-000-0000Office: 408-225-1705Builders Exchange Temp Accts

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Bidders:

Plan Issuer:

Cupertino $500,000

Addition of sidewalk, curb, and gutter where gaps currently exist as well as drainage improvements and planting strips where possible.

18-01655

0

2:00 PM7/17/18

Addenda:MCCLELLAN ROAD SIDEWALK IMPROVEMENTS - PHASE 2

2015-19

City of Cupertino 408-777-3354 408-777-3333

General Contractor Fax: 510-792-1728Office: 510-792-1727Redgwick Construction Company

Plan Issuer:

Palo Alto

Provide professional services for preparation of an addendum to the Environmental Impact Report for the City of Palo Alto RecycledWater Project & multiple associated technical reports for the proposed construction of a 1-2 MGD Advanced Water Purification Facilityproject.

Project Contact For Questions: Saira CardozaEmail: [email protected]

None

18-01807

0

3:00 PM7/17/18

Addenda:RFP FOR PROFESSIONAL SERVICES EIR ADDENDUM FOR 1-2 MGD AWPF

171516

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Plan Issuer:

Cupertino

Remove and replace asphalt to minimum depth of 4 inches, adjust utilities and monument well covers, install asphalt dike, and replacetraffic signal loops and traffic striping.

None

18-01845

0

2:00 PM7/17/18

Addenda:2018 MINOR ASPHALT REPAIRS PROJECT

2018-103

Prebid Conf:

City of Cupertino 408-777-3354 408-777-3333

NEW

Bidders:

Plan Issuer:

Cupertino $375,000

This Project includes removing two existing light poles and concrete bases, remove one solar Ticket Vending Machine and surplus tothe De Anza Corporation Yard, asphalt removal, site grading, new ADA curb ramp, re-paving, and all new striping at the existingParking Lot D at DeAnza College. Project also includes new drilled footings and rebar for light pole bases, new concrete light polebases, all conduits and connections to existing electrical supply, new light poles and heads, and new conduits/connections/installationof a new Ticket Vending Machine to replace the one removed solar Ticket Machine. Ticket Machine to be Ventek, “Venstation” withcellular, coin, bill and card capabilities.

Questions: Annette Perez at (650) 949-6163, or by email at: [email protected]

6/27 @ 10AM

18-01696

0

2:00 PM7/18/18

Addenda:MODERNIZATION PARKING LOT D AT DE ANZA COLLEGE

1801

Prebid Conf:

Foothill-De Anza College 650-949-6163

General Contractor Fax: 925-862-0905Office: 408-442-4286Tri-Valley Excavating

Sub-Contractor/SpecialtyContractor

Fax: 831-763-1409Office: 831-763-1811Superior Hydroseeding

Page 16: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Los Gatos

Demolition and removal of two existing group picnic shelters, construction of two new prefabricated metal group picnic shelters, newsand volleyball court, water, electric service and paving.

Project Contact: Mark Frederick 408-355-2210

Hard copies also available for review at Santa Clara Builders Exchange

Non-Mandatory 7/10 at 10AM (Blossom Hill parking lot-past entrance kiosk)

18-01714

0

2:00 PM7/19/18

Addenda:CREEKSIDE & MEADOWBROOK GROUP AREA REHABILITATION - VASONA PARK

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

Manufacturer Fax: 408-291-8888Office: 408-799-8888Universal Precast Concrete, Inc

Plan Issuer:

Sunnyvale $1,834,333

Interior and exterior renovation to portions of an existing occupied warehouse building to accommodate a new year around shelterfacility and to provide site improvements to meet accessibility code requirements.

Project Contact: Tony Martino 408-210-8948Email: [email protected]

MAND 7/9 at 1PM

18-01723

0

2:00 PM7/19/18

Addenda:WINTER SHELTER EXPANSION

263-CP17007/ITB-FAF-FY18-0237

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Plan Issuer:

San Jose

Perform an upgrade to the audiovisual systems at City Hall.

Project Contact: Theresa Porter 408-535-7048Email: [email protected]

MAND 6/29 at 10AM (Outside in front of Rotunda)

18-01736

0

3:00 PM7/19/18

Addenda:CITY HALL COMMITTEE ROOMS AUDIO VISUAL UPGRADE, WING 218

RFQ PUR148

Prebid Conf:

City of San Jose - DPW 408-535-8300

Plan Issuer:

Palo Alto

Provide relay doors upgrades.

Project Contact For Questions: Kelson Lau 650-566-4573

Hard copies also available for review at Santa Clara Builders Exchange.

7/9 at 10AM (1007 Elwell Court, Palo Alto- Site visit to Maybell Electric Substation will follow)

18-01805

0

3:00 PM7/19/18

Addenda:RFQ MAYBELL RELAY DOORS UPGRADE

172589

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Plan Issuer:

San Jose $2,156,300

Demolishing an existing six (6) story office building and the connecting bridges on Levels 1 thru 5.

Project Contact For Questions: Tie Feng 408-993-4626Email: [email protected]

7/10 at 1:30PM

18-01809

0

2:00 PM7/19/18

Addenda:OLD CITY HALL ANNEX BUILDING DEMOLITION

263-CP18012

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Plan Issuer:

San Jose $162,800

Demolition, clearing and grubbing, remove and replace protective surfacing, remove and replace play equipment panels.

Project Contact: Katy Martin

18-01813

0

3:00 PM7/19/18

Addenda:8117-BRIGADOON PARK PLAYGROUND RENOVATION - REBID

8117

City of San Jose - DPW 408-535-8300

Page 17: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

Provide landscape management, maintenance and irrigation services.

Project Contact For Questions :Theresa Porter 408-535-7048Email: [email protected]

18-01814

1

3:00 PM7/20/18

Addenda:RFP LANDSCAPE MANAGEMENT, MAINTENANCE AND IRRIGATION SERVICES

RFP 17-18-22

City of San Jose - DPW 408-535-8300

Bidders:

Plan Issuer:

Palo Alto

Remove and replace approximately 62,000 SY of asphalt concrete pavement, lighting, striping, tie-downs.

Project Contact: James WadleighEmail: [email protected]

MAND 6/26 at 10AM (Palo Alto Airport Terminal)

18-01676

2

3:00 PM7/24/18

Addenda:APRON RECONSTRUCTION PHASE II

171727

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

General Contractor Fax: 415-366-2883Office: 415-660-7519Build Group, Inc.

General Contractor Fax: 925-803-4263Office: 925-829-9220Desilva Gates Construction

General Contractor Fax: 707-585-1601Office: 707-585-1221Ghilotti Construction Company, Inc.

General Contractor Fax: 408-327-7090Office: 408-327-7013Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 650-952-6851Office: 650-952-7333Interstate Grading & Paving

General Contractor Fax: 650-966-1946Office: 650-966-1926O'Grady Paving Inc.

General Contractor Fax: 510-671-1000Office: 510-671-0000Proven Management

General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction

Plan Issuer:

Palo Alto

Sewer lateral video inspection and cleaning services on an as-needed basis.

Project Contact For Questions: Silvia SantosEmail: [email protected]

7/17 at 2PM (1007 Elwell Court, Palo Alto)

18-01808

0

3:00 PM7/24/18

Addenda:3- YEAR SEWER LATERAL VIDEO INSPECTION AND CLEANING SERVICES

171890

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Bidders:

Plan Issuer:

Cupertino

Crack sealing and micro-surfacing various residential roads.

18-01846

0

2:00 PM7/24/18

Addenda:2018 PAVEMENT MAINTENANCE PHASE 2

2019-102

City of Cupertino 408-777-3354 408-777-3333

NEW

General Contractor Fax: 916-714-9868Office: 775-355-5271Intermountain Slurry Seal Inc.

Plan Issuer:

Cupertino

Remove existing acoustical panels, provide new acoustical panels and associated work.

7/12 at 11:45AM

18-01847

0

2:00 PM7/24/18

Addenda:SENIOR CENTER REPAIRS ACOUSTICAL

2018-07

Prebid Conf:

City of Cupertino 408-777-3354 408-777-3333

NEW

Page 18: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Palo Alto

Upgrade existing mechanical and electrical systems at the Municipal Service Center Buildings A, B, and C.

Project Contact: Matt RaschkeEmail: [email protected]

6/12 at 9AM (Bldg C)

18-01519

4

3:00 PM7/25/18

Addenda:MSC MECHANICAL & ELECTRICAL IMPROVEMENTS

171912

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

General Contractor Fax: 510-351-8315Office: 510-351-7578American Air Conditioning Co.

General Contractor Fax: 415-366-2883Office: 415-660-7519Build Group, Inc.

General Contractor Fax: 408-286-1288Office: 408-594-1566Strawn Construction, Inc

HVAC Contractor Fax: 408-920-6174Office: 408-920-6170Performance Air Service, Inc

Plan Issuer:

Los Altos

On-call repairs to the City’s sanitary sewer system on an as needed basis.

Project Contact: Aida Fairman

None

18-01721

0

2:00 PM7/26/18

Addenda:ON-CALL SANITARY SEWER SPOT REPAIRS & CCTV INSPECTION SERVICES

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

Plan Issuer:

Milpitas $450,000 $500,000

Reconstruction of a park trail and a portion of an access road with a combine surface area of approximately 64,000 sq. ft. of asphaltconcrete (A.C.) pavement. The two project sites, Elm Trail (4,000 ft. long by 8 ft. wide) and Minnis Ranch Road (2,900 ft. long by 12 ft.wide), are both located within Ed R. Levin County Park.

Project Contact: Ubaldo Perez 408-355-2231

Hard copies also available for review at Santa Clara Builders Exchange

7/12 at 10AM

18-01739

0

2:00 PM7/26/18

Addenda:ELM TRAIL & MINNIS RANCH ROAD RECONSTRUCTION - ED LEVIN PARK

to

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

Plan Issuer:

San Jose

Upgrade two (2) Dover passenger elevators at the City of San José Police Communications Building,

Project Contact: Theresa Porter 408-535-7048Email: [email protected]

MAND 7/10 at 10AM (201 W. Mission St., San Jose)

18-01738

1

3:00 PM7/27/18

Addenda:RFB TWO DOVER PASSENGER ELEVATORS UPGRADE

RFB 17-18-43R

Prebid Conf:

City of San Jose - DPW 408-535-8300

Plan Issuer:

Saratoga

Welch Hurst House Weatherization System removal and replacement.

Project Contact: Leslie Harper 408-993-4624Email: [email protected]

Hard copies also available for review at Santa Clara Builders Exchange

7/17 at 9AM

18-01812

0

3:00 PM7/27/18

Addenda:WEATHERIZATION SYSTEM (SHRINK-WRAP) AT WELCH-HURST HOUSE SANBORN SKYLINE COUNTYPARK

ITB-FAF-FY18-0244

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Page 19: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Martin

Provide Construction Project Management Services for the new South County Animal Services Center building.

Project Contact For Questions: Kim Huynh

18-01851

0

3:00 PM7/30/18

Addenda:RFSOQ TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES

RFS-FAF-FY19-0001

County of Santa Clara Facilities & Fleet 408-993-4600

NEW

Plan Issuer:

Los Altos

Design and engineering services for Police Station HVAC upgrades.

Project Contact: Theresa Yee

Hard copies also available for review at Santa Clara Builders Exchange

7/11 at 10AM (Lobby)

18-01720

0

12:00 PM7/31/18

Addenda:RFP FOR DESIGN & ENGINEERING SERVICES FOR POLICE STATION HVAC UPGRADES

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

Plan Issuer:

Los Altos

Design and engineering services for Police Station HVAC upgrades.

Project Contact: Theresa Yee

Hard copies also available for review at Santa Clara Builders Exchange

7/11 at 10M (Lobby)

18-01722

0

3:00 PM7/31/18

Addenda:RFP FOR DESIGN & ENGINEERING SERVICES FOR POLICE STATION EOC & RESTROOMS

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

Plan Issuer:

Santa Clara County

Install communication tower.

Project Contact: Leslie Harper 408-993-4748Email: [email protected]

Hard copies also available for review at Santa Clara Builders Exchange

7/18 at 9AM (Frazier Peak on Mission Ridge Road (Lat: 37-28-31.5 N Long: 121-51-39.5 W)

18-01811

0

3:00 PM7/31/18

Addenda:RFQ FRAZIER PEAK COMMUNICATION TOWER INSTALLATION

RFQ-FAF-FY18-0258

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Plan Issuer:

Santa Clara

Carney Construction is NEGOTIATED CONTRACTOR

Two new community rooms with restrooms. Partition designed for possible future eatery.Starting from foundation- all trades.

Project Contact For Questions. John PhanEmail: [email protected]

18-01843

0

12:00 PM7/31/18

Addenda:PAVILION AT LAWRENCE STATION (REQUEST FOR SUB-BIDS)

Carney Construction 650-917-9414 650-917-9414

NEW

Plan Issuer:

San Jose $6,400,000

Provide design-build services for HVAC Controls of the City Hall Buildings complex and replacement of all 544 VAVs.

Project Contact: Daniel Phan 408-535-8412Email: [email protected]

MAND 7/17 at 9:30AM (Lobby)

18-01863

0

3:00 PM8/2/18

Addenda:8379-CITY HALL BUILDING HVAC

8379

Prebid Conf:

City of San Jose - DPW 408-535-8300

NEW

Page 20: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Milpitas

Perform construction management services.

Project Contact For Questions: Kelly NgEmail: [email protected]

18-01797

1

3:00 PM8/3/18

Addenda:RFQ - REQUEST FOR STATEMENT OF QUALIFICATION AND PROPOSALS FOR CONSTRUCTIONMANAGEMENT SERVICES- MILPITAS UNIFIED SCHOOL DISTRICT

Milpitas Unified School District 408-635-2600

Plan Issuer:

Milpitas

Perform planning and program services and architectural design services.

Project Contact For Questions: Kelly NgEmail: [email protected]

18-01798

1

3:00 PM8/3/18

Addenda:RFQ- REQUEST FOR STATEMENT OF QUALIFICATIONS AND PROPOSALS FOR ARCHITECTURALSERVICES - MILPITAS UNIFIED SCHOOL DISTRICT

Milpitas Unified School District 408-635-2600

Plan Issuer:

San Jose

Perform architectural services for the San Jose Evergreen Community College District, including San Jose City College, EvergreenValley College, and other District facilities.

18-01852

0

2:00 PM8/7/18

Addenda:RFQ (REQUEST FOR PRE-QUALIFICATION) FOR ARCHITECTURAL SERVICES- SAN JOSEEVERGREEN COMMUNITY COLLEGE DISTRICT

RFPQ X2016.0002

San Jose Evergreen Community College District, Cindy Giesing 408-270-6487

NEW

Plan Issuer:

Santa Clara County

Provide development of design criteria, preliminary and final design, engineering management, engineering reviews, qualitymanagement, design integration,system integration, project controls, technical coordination with stakeholders, utilities coordination,value engineering, and development of technical documents for inclusion in the procurement documents.

Project Contact For Questions: Ephraim CadaingEmail: [email protected]

7/13 at 10AM (3331 North First Street, Building A, Auditorium San Jose)

18-01854

0

5:00 PM8/13/18

Addenda:RFP BART SILICON VALLEY PHASE II EXTENSION PROJECT GENERAL ENGINEERING CONSULTING(GEC) SERVICES - SCVTA

RFP S18088

Prebid Conf:

SCVTA -Santa Clara Valley Transportation Authority 408-321-7189

NEW

Plan Issuer:

Morgan Hill

Provide sewer cleaning, inspection, and condition assessment services for City’s Joint Sewer Trunk Pipeline.

Project Contact: Inga Alomzo 408-310-4182Email: [email protected]

Hard copies also available for review at Santa Clara Builders Exchange

18-01865

0

3:00 PM8/14/18

Addenda:RFP JOINT TRUNK PIPELINE INSPECTION AND CONDITION ASSESSMENT

City of Morgan Hill, DPW 408-778-6480

NEW

Plan Issuer:

San Jose $29,400,000

Improvements to blower systems, related systems and appurtenances, and other work at the site.

Project Contact: Kapil Verma 408-635-4045Email: [email protected]

7/11 at 1PM

18-01862

1

3:00 PM8/16/18

Addenda:8073-BLOWER IMPROVEMENTS PROJECT

8073

Prebid Conf:

City Of San Jose, DPW 408-535-8300

NEW

Page 21: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Clara County $14,000,000

THE WORK• SCC Elmwood Jail ADA Improvements - Phase 2 - Permit Number TBD• New construction of suicide watch cells at Elmwood Correctional Facility Building - M1, M5, and W4 - Permit Number 65246.• SCC Main Jail North Barrier Removal - Phase 2 - Permit Number TBD• New construction of suicide watch cells at Main Jail North Floors 6 and 8 - Permit Number 65245. Please refer to specifications forcomplete scope of work.

Project Contact: Joyce Fan 408-993-4614Email: [email protected]

MAND Mandatory 7/18 @ 9AM (945 Thompson St., Milpitas) Non-Mandatory 8/9 @ 9AAM

18-01613

2

2:00 PM8/23/18

Addenda:MAIN JAIL NORTH & ELMWOOD CORRECTIONAL FACILITY

263-CP16020, 263-CP16029, 263-CP17030

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

HVAC Contractor Fax: 408-920-6174Office: 408-920-6170Performance Air Service, Inc

Santa Cruz County

Bidders:

Plan Issuer:

Watsonville

Pajaro Valley Unified School District (“District”) is seeking proposals from qualified persons, firms, partnerships, corporations,associations, or professional organizations to provide constructability review, value engineering, master scheduling, cost estimating,budgeting, and construction services for the development and construction for the Pajaro Valley High School Athletic Field Project(“Project”), in accordance with the lease-leaseback structure set forth in Education Code section 17406 et seq.

Questions: John TischlerEmail: [email protected]

MAND 6/12 @ 10am- site

18-01499

5

2:30 PM7/10/18

Addenda:RFQ/P - PAJARO VALLEY HIGH SCHOOL ATHLETIC FIELD PROJECT

Prebid Conf:

Pajaro Valley Unified School District 831-786-2100 831-728-0136

General Contractor Fax: 916-441-6138Office: 916-441-6870Otto Construction

Boulder Creek $21,150

**NO PLANS OR SPEC**THIS IS A SMALL PROJECT ALL INFORMATION BELOW

Project: CSA No. 51 – Asphalt Overlay Project and Swale on the west side of the roadway.Location: 755 Hopkins Gulch as marked in the field with white paint for 3200 Sq.Ft.Contact: Elsa Aguilar (831) 454-2160

Asphalt Overlay Project:1.Excavate swale area, totaling 600 square feet, down nine (9) inches below new proposed finished grade. Place six (6) inches ofclass two base rock on swale area and compact.2. Excavate 200 linear feet by 16 linear feet width of roadway, pitched to allow drainage to swale. Place 6 inches of class two baserock over this road section and compact.3. Grind to conform and pave area totaling 3200 square feet, overlay of the road section with three (3) inch of ½ inch type A asphaltconcrete (AC) hot mix, (finish height after final roll), grind to conform to existing pavement at either end. Asphalt concrete shall berolled and compact in accordance with Caltrans specifications.4.Dirt debris from the excavation to be place on site, as directed by CSA representative.

Project Contact: ELSA AGUILAREmail: [email protected]

18-01682

0

2:15 PM7/10/18

Addenda:COUNTY SERVICE AREA NO. 51 HOPKINS GULCH - ASPHALT OVERLAY AND INSTALLATION OF ASWALE ON WEST SIDE OF THE ROADWAY

Page 22: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz $861,000

The University of California Santa Cruz (UCSC) requests a written response to this Request for Qualifications (RFQ) for considerationin selecting a qualified civil engineering team to provide design and construction administration services for the following project:8500-033 Great Meadow Bike Path Improvements - Phase II

Questions: Zachary Teske @ (831) [email protected]

18-01766

0

3:00 PM7/10/18

Addenda:RFQ FOR GREAT MEADOW BIKE PATH PHASE II

8500-033

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

Bidders:

Plan Issuer:

Capitola $240,000

This project involves Type II Slurry Seal, thermoplastic striping and pavement markings, traffic control and construction area signage;and other incidental and appurtenant work necessary for the proper construction of the contemplated improvement, as indicated on theproject plans.

Project Contact: Steve JesbergEmail: [email protected]

18-01737

1

3:00 PM7/11/18

Addenda:2018 SLURRY SEAL

City of Capitola 831-475-7300 831-479-8879

General Contractor Fax: 916-714-9868Office: 775-355-5271Intermountain Slurry Seal Inc.

Bidders:

Plan Issuer:

Boulder Creek

The Project aims to maintain fish passage conditions through removal of approximately 185 yd3 of debris, silt, sediment, cobbles, andboulders (Debris) from the Fall Creek Fish Ladder and surrounding creek area.

Project Contact: Holly MorrisonEmail: [email protected]

18-01749

0

2:00 PM7/11/18

Addenda:FALL CREEK FISH LADDER DEBRIS REMOVAL

San Lorenzo Valley Water District 831-338-2153 831-338-7986

General Contractor Fax: 999-999-9999Office: 650-815-8418Green Zone Construction

Bidders:

Plan Issuer:

Santa Cruz $1,500,000 $1,800,000

The work to be done consists of the rehabilitation/reconstruction of Cedar Street in the City of Santa Cruz from Church Street at thenorth end to Laurel Street on the south. This work includes storm drain improvements, sanitary sewer improvements, roadwayexcavation, HMA pavement, PCC pavement, ADA ramps, and roadway striping indicated in the plans. This project will also include allother work not mentioned above that is required by the plans, City Standard Specifications, State Standard Specifications and thespecial provisions to be performed, placed, constructed or installed.

Project Contact: Ricardo ValdesEmail: [email protected]

18-01498

4

2:00 PM7/12/18

Addenda:CEDAR STREET REHABILITATION

c400809 to

City of Santa Cruz 831-420-5160 831-420-5161

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Page 23: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Cruz

Construction of a new multi story Self Storage Facility including retaining walls, shoring, and caissons.

Questions: John RopeEmail: [email protected]

18-01641

0

12:00 PM7/12/18

Addenda:SANTA CRUZ EXTRA SPACE SELF STORAGE

Monarch Construction 949-477-6150 949-477-6159

General Contractor Office: 000-000-0000!!!There May Be Other Gc's Bidding ThisProject That We Are Unaware Of

General Contractor Fax: 949-477-6159Office: 949-477-6150Monarch Construction

HVAC Contractor Fax: 408-920-6174Office: 408-920-6170Performance Air Service, Inc

Supplier Fax: 209-547-0554Office: 209-547-1937Armor Fire Extinguisher Company

Plan Issuer:

Santa Cruz County

The Santa Cruz County Flood Control and Water Conservation District – Zone 7 (District) is requesting proposals from qualifiedcontractors (contractor) to maintain, trim, and reduce vegetation in the Pajaro River system.

18-01678

0

2:00 PM7/12/18

Addenda:RFP - VEGETATION MAINTENANCE SERVICES ON THE PAJARO RIVER

County of Santa Cruz 831-454-2160 831-454-2385

Plan Issuer:

Soquel $780,000

This project is to install approximately 1,900 linear feet (LF) of 12-inch PVC pipe to convey water from the District’s Service Area 3 toService Area 4. The pipeline will span from the southeastern end of Sumner Avenue to the southwestern end of Camino Al Mar, goingacross farmland. Approximately 1,225 LF of this pipeline will be installed using an open trench method with an approximate width of26 inches and depth of 52 inches and will be located entirely within a 10-foot (ft) wide easement across three parcels (dirt roadadjacent to farmland), as well as in public right of way. Approximately 675 LF of pipeline will be installed using directional drilling to pullpipe underneath a Eucalyptus grove. The project includes a Pressure Regulating Station that will be placed in an underground vault inSumner Avenue. Other project components include an above ground utility box, and a 12 ft tall pole mounted radio antenna forcontrolling the PRV station remotely. The proposed pipeline and appurtenances will be constructed in accordance with the District’sDesign and Construction Specifications.

Questions: Brice DahlmeierEmail: [email protected]

7/2 @ 2pm- 5180 Soquel Dr

18-01690

0

2:00 PM7/12/18

Addenda:SERVICE AREA 3 TO 4 INTERTIE

CWO 14-012

Prebid Conf:

Soquel Creek Water District [email protected] 831-475-8500 831-475-4291

Bidders:

Plan Issuer:

Watsonville $130,000

The project consists of performing the following, including, but not limited to: sawcutting, replacing of 367 linear feet of 6” sewer pipewith 8-inch diameter PVC sewer pipe and reconstruct paving to restore roadway.

Project Contact: Tai ChauEmail: [email protected]

18-01719

0

3:00 PM7/12/18

Addenda:DAVIS CAREY AVE SANITARY SEWER REPLACEMENT

SS-18-02 QB

City of Watsonville 831-768-3115 831-763-4065

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Page 24: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Cruz $500,000

The Spillway Bridge, located at the end of Newell Creek Rd in Ben Lomond (https://goo.gl/maps/e99Ta5UsGFy or search Newell 23-002 Dam), must be replaced. Equipment in excess of the design capacity of the existing spillway bridge, including Cal Fire equipment,needs to be brought across the bridge on a regular basis. The replacement bridge is designed to meet current HL93 and permit loads.The existing spillway bridge needs to be demolished before the replacement bridge can be put in its place. The new bridge is designedusing Caltrans standards.

Project Contact: Leah VanDerMaatenEmail: [email protected]

MAND 7/6 @ 10am- Newell Creek Rd gate (at the entrance to the Ben Lomond Transfer Station)

18-01779

1

3:00 PM7/12/18

Addenda:NEWELL CREEK DAM SPILLWAY BRIDGE REPLACEMENT

Prebid Conf:

City of Santa Cruz 831-420-5160 831-420-5161

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 925-449-6999Mission City Rebar Inc.

Sub-Contractor/SpecialtyContractor

Fax: 707-789-9542Office: 707-778-8316Pacific Coast Drilling Co., Inc.

Plan Issuer:

Watsonville $79,000

This project is for licensed contractors with a Specialty Contractor C12-Earthwork and Paving license to prepare site for futureconstruction of a new 10,000 sq. ft. bike pump track at Pinto Lake County Park. Site preparation to include grading, installation ofconcrete ADA ramp and walkway, access staircase and railing, installation of storm drain catch basins, piping and flow spreader andpossible installation of a 150 foot domestic water supply line and drinking fountain. The Contractor shall complete all or any designatedportions of the work called for under the contract in all parts and requirements within 35 calendar days (except as modified in thetechnical specifications). The County of Santa Cruz and its Board of Supervisors reserves the right to reject any or all bids received asthe public good may require.

Project Contact: [email protected]

MAND 6/27 @ 10am- site

18-01619

1

2:30 PM7/13/18

Addenda:PINTO LAKE BIKE PUMP TRACK

17C1-015

Prebid Conf:

County of Santa Cruz 831-454-2160 831-454-2385

Bidders:

Santa Cruz $400,000 $600,000

Structurally stabilize the existing Cow Barn to include replacement of deteriorated framing, flooring and siding members, leveling thestructure, adding bracing and repainting.

Project Contact: Merrilee Byrnes 916/445-8843Email: [email protected]

MAND 6/27 @ 10am- site

18-01649

1

2:00 PM7/17/18

Addenda:WILDER RANCH STATE PARK - COW BARN STRUCTURAL STABILIZATION

C18E0007 to

Prebid Conf:

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

General Contractor Fax: 415-358-5769Office: 415-756-0945Alex Kushner General Contractor

General Contractor Fax: 831-459-9279Office: 831-459-9270Cen-Con, Inc

General Contractor Fax: 831-466-9597Office: 831-426-0743Crw Industries

General Contractor Fax: 805-548-1995Office: 831-869-8100Jacob Construction & Design

General Contractor Fax: 831-423-3024Office: 831-423-3140Schultz Construction

General Contractor Fax: 831-484-0708Office: 831-320-2316Treeline Construction

Sub-Contractor/SpecialtyContractor

Fax: 000-000-0000Office: 831-566-8753Er Comstruction

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 925-449-6999Mission City Rebar Inc.

Page 25: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz $400,000

Improvements to standby power systems by modifying existing equipment connections. Providing, installing, commissioning of (1) dualfuel (natural gas and propane) emergency generator, liquid propane storage tank, panels, circuit breakers, conduits, cables, controlwiring, mechanical piping and fencing for complete operating and functional systems.

PREVAILING WAGE

Questions: Nathan WeinerEmail: [email protected]

MAND 7/5 @ 2pm- Physical Planning, Development & Operations Conference Rm #151H, Barn G

18-01767

0

2:30 PM7/18/18

Addenda:SCIENCE LIBRARY STANDBY POWER PROJECT

10080

Prebid Conf:

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

Bidders:

Plan Issuer:

Santa Cruz $3,140,700

The project consists in general of constructing a 1.3 mile, 12-16 foot wide HMA-paved multi-use trail with a prefabricated pedestrianbridge. Work includes demolition, clearing and grubbing, earthwork, soil testing for hazardous waste, tree removal, manufacture andinstallation of prefabricated pedestrian bridge, concrete bridge abutments, concrete sidewalks, storm drainage, retaining wall, drivewayapproaches, driveway conforms, curbs, gutters, curb ramps, roadway and parking lot lighting, intersection reconfiguration, pedestrianactivated beacon systems, trash enclosure reconstruction and relocation of utilities, plastic curb system, signs and striping. All otherwork not mentioned above that is required by the plans, City Standard Specifications, State Standard Specifications and the specialprovisions shall be performed, placed, constructed or installed.

Project Contact: Nathan NguyenEmail: [email protected]

18-01726

1

2:00 PM7/19/18

Addenda:RAIL TRAIL SEGMENT 7 - PHASE I

c401413

City of Santa Cruz 831-420-5160 831-420-5161

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Manufacturer Fax: 408-291-8888Office: 408-799-8888Universal Precast Concrete, Inc

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 925-449-6999Mission City Rebar Inc.

Sub-Contractor/SpecialtyContractor

Fax: 707-789-9542Office: 707-778-8316Pacific Coast Drilling Co., Inc.

Plan Issuer:

Boulder Creek

Removal and reinstallation of solar panels, removal and disposal of existing roofing, clean and paint inside of gutters, installation ofnew flashing and vents if needed, priming and painting fascia boards if needed, and site clean-up.

PREVAILING WAGE

18-01674

0

12:00 PM7/23/18

Addenda:RFP - FIRE STATION AND FUEL SHED ROOF REPLACEMENT

Boulder Creek Fire District 831-338-7222 831-338-7226

Bidders:

Plan Issuer:

Santa Cruz $3,000,000 $3,500,000

The work to be done consists, in general, of street beautification and utility undergrounding on Riverside Avenue from 3rd Street toBeach Street. Specific work items include, but are not limited to, removal of asphalt concrete and Portland cement concrete,construction of joint trenches for the undergrounding of cable TV, telephone and electrical utilities, installation of curb, gutter, sidewalk,decorative concrete, pervious concrete, median islands, storm drain improvements, sanitary sewer laterals, domestic water line, hotmix asphalt concrete, landscaping, signing, striping, furnishing and installing decorative street lights and trees.

Project Contact: Ricardo ValdesEmail: [email protected]

7/17 @ 10:30am- On Site at Riverside Ave and Third St

18-01725

0

2:00 PM7/24/18

Addenda:RIVERSIDE AVENUE UTILITY UNDERGROUNDING AND STREETSCAPE

c401208 to

Prebid Conf:

City of Santa Cruz 831-420-5160 831-420-5161

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Page 26: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Cruz

This project involves the construction of steel pile and timber lagging retaining wall requiring earth excavation and backfill, wall underdrain system, gabion end closures, drainage facilities, asphalt pavement replacement, metal beam guard railing, asphalt dike, erosioncontrol and revegetation.

Project Contact: Tim BaileyEmail: [email protected]

18-01835

0

2:00 PM7/24/18

Addenda:GLENWOOD DRIVE PM 0.35 STORM DAMAGE REPAIR

County of Santa Cruz 831-454-2160 831-454-2385

NEW

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 925-449-6999Mission City Rebar Inc.

Sub-Contractor/SpecialtyContractor

Fax: 707-789-9542Office: 707-778-8316Pacific Coast Drilling Co., Inc.

Plan Issuer:

Santa Cruz $200,000

This project is for licensed contractors with a Type C33, Painting and Decorating license to prep and paint the exterior surfaces of the1080 Emeline Avenue building in Santa Cruz.

PREVAILING WAGE

Questions: Scott Moats at 831-454-5497

MAND 7/11 @ 10am- site

18-01763

0

2:30 PM7/25/18

Addenda:1080 EMELINE EXTERIOR PAINT

17C1-011

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

Plan Issuer:

Santa Cruz $275,000

The work to be done consists in general of rehabilitating the existing sanitary sewer and storm drain pipes with cured-in-place-pipe, asshown on the plans.

Project Contact: David GlucsEmail: [email protected]

18-01859

0

2:00 PM7/25/18

Addenda:2018 CITYWIDE SEWER STORM DRAIN LINING

City of Santa Cruz 831-420-5160 831-420-5161

NEW

Bidders:

Plan Issuer:

Santa Cruz $400,000

This project is for licensed contractors with a Type C4-Boiler, hot water heating and steam fitting license and/or C36-Plumbingcontractor license to replace the existing boilers, piping, electrical and controls with new.

PREVAILING WAGE

Questions: Anthony Loero at 831-454-4606

MAND 7/11 @ 10am- site

18-01764

0

2:30 PM7/26/18

Addenda:1020 EMELINE BOILER REPLACEMENT

17C1-003

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

Equipment Fax: 510-786-3716Office: 916-850-9611Bay City Boiler & Engineering Co., Inc

Projects Out To Bid

Page 27: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Felton $7,660,000

This project involves the construction of a new library building to be located at 6121 Gushee Street in Felton, California. Project toinclude the construction of an 8,990 square foot one-story building, parking lot and associated site work, engineered advanced septicsystem, utilities, drainage improvements, curb, gutter and sidewalk, landscaping, and restoration plantings.

Project Contact: DAMON ADLAOEmail: [email protected]

7/11 @ 1:30pm- site

18-01791

1

2:00 PM7/26/18

Addenda:FELTON LIBRARY PROJECT

Prebid Conf:

County of Santa Cruz 831-454-2160 831-454-2385

Communications/TechnologyContractor

Office: 408-375-1554Enos Communications

Sub-Contractor/SpecialtyContractor

Office: 831-566-8753Er Construction

Projects Out To Bid

Page 28: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

G R A N I T E R O C K C O N S T R U C T I O N D I V I S I O N

CO

NS

TR

UC

TI

ON

D

IV

IS

IO

N

ALL OF YOUR CONSTRUCTION NEEDS - FROM DRIVEWAYS TO FREEWAYS • Asphalt and Concrete Driveways

• Parking Lots

• Site Work

• Seal Coating and Striping

• Underground Utilities (Water, Sewer, Storm Drain)

• Chip Sealing

• Culverts and Walls

• Golf Cart Path Work

• Concrete Curb and Gutters

• Concrete Flatwork

• Asphalt Grinding

• Subdivision Site Work Development

• Structures

General Engineering Contractor - LIC#22 • For an estimate call 831.768.2789 • Fax 831.768.2701

Page 29: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

School’s out for summer, but the lessons never end for contractors. New law, changes in interpretation and important deadlines require an ongoing ‘learning curve.’ Here’s an expert tutorial and a reminder to turn those ‘papers’ in on time! I am frequently reminded from readers that Public Works Contractors are a big portion of my readers. So here is a reminder from the CSLB for some of my loyal followers: “Public works contractors who are registered with the Department of Industrial Relations (DIR) for the current fiscal year ending June 30 are urged to renew their registration for the next fiscal year using DIR’s online public works contractor registration system. Registered contractors who fail to renew by July 1 but continue working on public works projects will be subject to late fees and potential penalties. The annual registration fee is $400. Contractors not currently registered must wait until the fiscal year begins on July 1 to register for the 2018/2019 fiscal year. Contractors must be registered with DIR before bidding, being awarded, or performing work on public works projects in California. The Labor Commissioner can assess penalties to public works contractors of up to $10,000, in addition to the registration fee, for failure to register. Awarding agencies are also subject to penalties of $100 a day, up to a maximum of $10,000, for hiring an unregistered contractor to perform work on a public works project. A contractor that hires an unregistered subcontractor is also subject to penalties of up to $10,000. Small Project Exemption

Contractors who work exclusively on small projects are not required to register as public works contractors, or file electronic certified payroll reports for those projects. The small project exemption is applied based on the amount of the entire project, not a contractor’s subcontracted amount of the project. Small project exemptions apply for all public works projects that do not exceed: $25,000 for new construction, alteration, installation, demolition or repair $15,000 for maintenance On projects that qualify for the small project exemption, contractors are still required to pay prevailing wages, maintain certified payroll records on a continuous basis, and provide those records to the Labor Commissioner’s Office upon request. DIR has extensive information regarding public works requirements on its public works website, including instructions for contractors on how to renew their public works registration.” As a reminder for Home Owners and Project Owners, the CSLB has a new website feature to help consumers find a licensed contractor. It’s labeled “Find My Licensed Contractor”. Consumers can find all contractors, sorted by classification, in their area. Super convenient! Class dismissed. While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.

Page 30: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

City Building PermitsSalinas

Permit No. B17-0167 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B17-0180 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B17-0369 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B17-0513 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B17-0635 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B18-0163 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B18-0175 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B18-0235 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B18-0252 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B18-0286 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B18-0304 Permit Amount $Owner(s)

CityBuilder Property Address Permit TypePermit No. B18-0305 Permit Amount $Owner(s)

CityBuilder Property Address Permit Type

Page 31: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Bid ResultsCity: HOLLISTERDate: 06/06

Project: BELLA VISTA STORM DRAIN IMPRO.

RTC CONSTRUCTION MANAGEMENT $135,389.00

City: CORRALITOSDate: 06/07Project: REDWOOD RD OVER BROWNS CREEK TRIBUTARY

JOSEPH J ALBANESE $2,092,229.00 GRANITE ROCK CO $2,250,973.00 GORDON N. BALL $3,016,167.00

City: MONTEREYDate: 06/12Project: CITYWIDE ADA RAMPS & STREET RECONSTRUCTION

MPE $1,475,505.00 DOD $1,525,944.00 GRANITEROCK $1,589,287.50 City: SANTA MARGARITA Date: 06/14

Project: CROSSWALK IMPORVMENTS

SOUZA $89,357.50 R. BURKE CORP $122,139.00

City: TEMPLETONDate: 06/14Project: 2016 ASPHALT OVERLAY

PAPICH CONSTRUCTION $1,596,000.00 SOUZA $1,604,056.90 CALPORT CONSTRUCTION $1,691,927.90

Page 32: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Mechanic’s Liens

Notice of Completion

Release of LienNONE THIS WEEK

Date: 06/25 CREDITOR: SANTOS TILE WORKS DEBTOR: STARTWOOD RETAIL AMOUNT: 9,800.00

Date: 06/29 GRANTOR: ROGGE RD SALINAS INC GRANTEE: BLUE MT CO9NSTRUCTION CITY: SALINASDate: 06/29 GRANTOR: BMC EG COURTYARD GRANTEE: SAME CITY: EAST GARRISONDate: 06/29 GRANTOR: BMC EG BUNGALOW GRANTEE: SAME CITY: SALINASDate: 06/29 GRANTOR: BMC EG TOWNS GRANTEE: SAME CITY: EAST GARRISONDate: 06/29 GRANTOR: BMC EG VILLAGE GRANTEE: SAME CITY: EAST GARRISONDate: 06/29 GRANTOR: ROGGE RD GRANTEE: BLUE MT CONSTRUCTION CITY: SALINASDate: 06/29 GRANTOR: SOLEDAD 93 GRANTEE: SAME CITY: SOLEDADDate: 06/29 GRANTOR: BMC EG TOWNS GRANTEE: SAME CITY: EAST GARRISONDate: 06/28 GRANTOR: WC MARINA GRANTEE: SAME CITY: MARINADate: 06/28 GRANTOR: CITY OF MONTEREY GRANTEE: THE DON CHAPIN CO CITY: SALINASDate: 06/28 GRANTOR: NINO HOMES AT ARBOLEDA INC GRANTEE: NINO DEVELOPMENT CITY: KING CITYDate: 06/28 GRANTOR: WC MARINA GRANTEE: SAME CITY: MARINADate: 06/27 GRANTOR: MONTEREY CO. WATER RESOURCES GRANTEE: THE DON CHAPIN CO CITY: MONTEREYDate: 06/27 GRANTOR: MONTEREY CO WATER RESOURCES GRANTEE: THE DON CHAPIN CO CITY: MONTEREYDate: 06/27 GRANTOR: BMC EG GROVE GRANTEE: SAME CITY: EAST GARRISONDate: 06/26 GRANTOR: SOLEDAD 93 GRANTEE: SAME CITY: SOLEDADDate: 06/26 GRANTOR: THE TRUSTEES OF CALI STATE UNIV. GRANTEE: CENTRAL ELETRIC CITY: SEASIDEDate: 06/26 GRANTOR: THE TRUSTEES CALI STATE UNIV GRANTEE: JENSCO INC CITY: SEASIDE

Page 33: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

What's In It For You:How the homesphereprogram works:

bundle and earn more

[email protected] | (650) 793-8432CONTACT Lorri Lasley to enroll

CONNECT Choose from 80+ Preferred Partner brands across 23 product categories to earn rebates. Continue to purchase products locally.

TRACK Your local HomeSphere expert will help you efficiently track your closings by community, lot and block.

COLLECT HomeSphere bundles your rebate incentives together across all products and brands in a single check.

It’s Easy to Get Started! Set a 10-minute meeting with your local HomeSphere Expert who will walk you through:1. Your Builder Profile & Latest Closed Homes2. Your Enrollment Form3. Your W-9 Form

•Get access to Single-Familyand Multi-Family Rebates

•Bundle all your rebates intoone monthly check

•Continue to increase yourrebate check through HomeSphere’s network ofbuilding product manufacturers

Your cash back can grow. Tap in to HomeSphere's network of 80 manufacturers and brands to increase your rebate check, including:

Over 80+ Partners offer builder incentives exclusively through HomeSphere's national rebate program. Start collecting rebates on building essentials today!

Earn cash back on each productyou install

Page 34: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

www.inspiredexpos.com

dream • plan • build

why exhibit at inspired expos?CONNECT with 3,000 to 5,000

qualified clients in 2 days.

INCREASE brand recognition.

ACQUIRE leads and set appointments.

EDUCATE the community on your services.

Reserve Your Space TODAY805.772.4600 • 831.222.0772

MONTEREY EXPOSFall: Oct. 14 & 15, 2017 | Spring: April 21 & 22, 2018

Monterey Home & Garden Expo at the Monterey Fairgrounds

93%are building or

remodeling

14%are home & garden

professionals

7%are purchasing

a home

Page 35: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural
Page 36: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Employer Sponsored Options Products you can get through your employer. Enrolling is easy! Your company receives a single, consolidated bill and participating employees have the convenience of payment through payroll deductions. Both Group and Voluntary options are available.

Medical – All CA Carriers & Covered CA MetLife Dental – Group and Voluntary VSP Group Vision Anthem Blue View Voluntary Vision Landmark Chiropractic & Acupuncture MetLife Term Life - Group and Voluntary CADR+ Telemedicine - 24/7 Doctors on Call LifeLock Identity Theft Protection

Colonial Life Optional Benefits Accident Insurance Critical Illness Insurance Short Term Disability Insurance Hospital Confinement Insurance Whole Life with LTC Rider

LegalShield Pre-Paid Legal Services Legal Shield Identity Theft Shield

Build a Better Benefits Package!

Through the California Builders Exchanges (CBX), the Central Coast Builders Association now offers a highly competitive benefits program to our member firms and their employees.

Want More Information?

Go to www.cbxbenefits.com

Or contact our local Benefits Consultant!

Tina Nelson Q&A Insurance Marketing, CA Lic. 0B17048 Cecy Insurance Services, CA Lic. 0802215 (831) 477-1730 [email protected]

Individual Options Valuable products, services and discounts that your employees can get directly from one of our contracted providers because you are a member of the Association.

Health Insurance for Individuals and Families Nationwide Pet Insurance LifeLock Identity Theft Protection MetLife Home & Auto Insurance Working Advantage Employee Perks Program LegalShield Pre-Paid Legal Services LegalShield Identity Theft Shield

Great Voluntary Benefits!

No Minimum Participation Low Rates Consolidated Billing Guarantee Issue Options

Page 37: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

CONSTRUCTION ESTIMATING

Material quantity takeoffs for residential/commercial. Foundation,excavation, forms, reinforcing, concrete. Rough and finish carpentry. Lumber lists. Experienced.

Contact email: [email protected]

A&R Corporation, Inc is seeking a Project Manager, Project En-gineer and Superintendents to staff a mul-tifamily apartment project located in Paso Robles. Please send resumes to Neil Mil-

ler at the following email address, [email protected]

Construction Project Manager / Estimator Monterey CA $80,000-$90,000 a year General Contractor specializing in Prevailing Wage Projects seeks experienced Project Manager for California. Must have a minimum of 10 years hands-on abilities to handle the planning, coordination, and control of a project from inception through comple-tion. Strong estimating skills a must. Our projects are fast paced and require immedi-ate response to field personnel and customer requirements. The position will require job walks and client meetings throughout Central and Northern California. In addition to the required experience above, the right candidate will have natural leadership abilities, be able to work independently, and is organized and detail-oriented. It is criti-cal that you have the ability to communicate effectively and appropriately with clients, colleagues and coworkers, as well as the ability to recognize a potential problem and resolve immediately and effectively. Must have experience supervising field staff in-cluding sub-contractors. Responsibilities Include: Bidding and estimating TI projects throughout California, performing prevailing wage projects. Selecting, negotiating and coordinating the work of sub-contractors Adhering to proper administration of construction contracts with knowledge of and the experience with AIA documents Reporting/updating to owners the progress of projects including any changes needed Preparing transmittals, submittals, contracts and daily logs Preparing and processing change orders timely and accurately Supervising and supporting field staff Timely preparing of monthly invoicing for the accounting department Maintaining data and cost of projects Travel will be required Strong verbal and written communication skills Advanced computer skills including MS Project, Word, Excel and Outlook MUST be able to read plans and be willing to work as a Team member to ensure the success and timely completion of all projects Email resume to [email protected] Job Type: Full Time Salary: $80,000-$90,000 & Federal Holidays + 2 weeks of Vacation Experience: Construction: 5 years minimum

Construction Project Management: 5 years minimum

Architectural Photography

Harold Gomes Email:

[email protected] Cell: 831-227-1942

Page 38: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Your Local Plan Room Just Got Better!! STATEWIDE ACCESS

Introducing the Golden State Plan Service

Single Statewide Plan Room - You choose the counties you want to see. No more searching multiple Plan Rooms for projects

Mobile Device Accessible - Take your plan room with you

Your local, community based Exchange has always been the best resource for the local con-struction industry. Now your local exchange just got BETTER and STRONGER. This new

plan room combines 14 of the best exchanges in the state, decades of local plan room experi-ence with our local relationship and resources to bring you the most comprehensive plan

room available. Our plans aren’t uploaded from one central location, rather each exchange cultivates its local relationships to bring the best projects from each region to our contractors.

LOCALLY GROUNDED - STATE POWERED

Keep the Plan Room You Know & Use Your company bidding history & saved projects are preserved Updated Plan Room Platform 2.0 - Increased functionality, ease of use & updated search options. You told us what you wanted - WE IMPROVED

More Private Projects- Our collaboration means more cultivation of private work

Page 39: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural

Safety Tip of the WeekSUMMER - HOT WEATHER

Summer is here and we need - to think serious about working in heat and high humidity. Too much heat and humidity can make people sick and in some cases, even cause death. Everyone reacts differently to heat but we all need to know how to recognize and treat heat emergencies.

Normally the body cools itself by sweating. When the outside temperature is equal to or above the temperature of the body and the humidity is high, our sweat does not evaporate and the body can become overheated. Heat emergencies fall into three different categories:

HEAT CRAMPS cause painful spasms of the leg and stomach muscles resulting from loss of fluids and salt from sweating. Treatment is simple: massage the cramped muscles and drink fluids.

HEAT EXHAUSTION - the skin will be cold, pale and clammy from perspiration. You may feel fatigue, nausea and have a headache; you may also feel weak and faint. Treatment - move the victim to a cooler place and lay them down with their feet elevated. Have them drink small amounts of fluids at frequent intervals. Medical follow-up may be advisable.

HEAT STROKE is the most serious and potentially deadly heat emergency. here is a malfunction in the body's regulating system resulting in lack of sweating. Heat stroke is a medical emergency and requires immediate treatment by a doctor. Symptoms include mental confusion, the victim may stagger or even lapse into unconsciousness. The skin will be dry, hot and flushed. Treatment - call an ambulance or nearest medical responder immediately. Move the victim to a cooler place and lay them down with the head elevated. Sponge with cool water until help arrives.

Here are some basic things we can do to prevent heat emergencies and make it easier for our bodies to handle the heat and humidity. Get a good nights sleep, eat moderately on hot days, wear loose fitting, lightweight clothing, drink plenty of cool water, avoid intake of alcohol, drugs, etc. Even some prescription drugs may affect your tolerance to heat. Never ignore the symptoms of heat illness in yourself or a co-worker. Get help immediately!

THE 'ASSURED EQUIPMENT GROUNDING CONDUCTOR PROGRAM FOR JULY, AUGUST & SEPTEMBER IS RED. ALL ELECTRICAL CORDS & TOOLS MUST BE TESTED

& COLOR CODED

Safety Recommendations:__________________________________________________________________________________

Job Specific Topics:_______________________________________________________________________________________

M.S.D.S Reviewed:_______________________________________________________________________________________

Attended By:

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

Page 40: Builders Bulletin - CCBA · Modernization existing kitchen in building M1 and restrooms in building S1 and S2. Work includes exterior site improvements, D.A. site improvements, structural