Build-Up Rates Road Furnitures - Guardrails Maintenance Of Guardrail And Crush Cushion Guardrail - Page 1 / 62 Heading Removal, Dismantle and Replace of Damage Components Item No. Desc. Removal, dismantle and dispose the damaged guardrail beam. (a) a) Machinery Cost i) Pick-up truck (3.0T) for carring,materials, workers and tools :- 1 x 1 day @ RM 150.00 per day = RM 150.00 ii) Backhoe operation, overhead cost incl. maintenance cost :- 1 x 1 day @ RM 270.00 per day = RM 270.00 iii Tipper truck (6-wheeler) operation, overhead cost incl. maintenance cost :- 1 x 1 day @ RM 250.00 per day = RM 250.00 iv) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools) Allow a est. sum fo 1 day @ RM 100.00 per day = RM 100.00 v) Sub - Total Overall Cost for Machinery = RM 770.00 Productivity of Work : 91 m per day Machinery Cost per Metr : RM 770.00 / 91 m = RM 8.51 b) Workmen & Manpower Cost i) Ganger daily basic salary :- 1 x 1 day @ RM 65.00 per day = RM 65.00 ii) General Worker daily basic salary :- 5 x 1 day @ RM 38.00 per day = RM 190.00 iii Sub - Total Overall Cost for Workmen & Manpower = RM 255.00 Productivity of Work : 91 m per day Manpower Cost per Metre : RM 255.00 / 91 m = RM 2.82 c) Total Machinery + Workmen & Manpower Cost = RM 11.33 so, ADD Profit & Overhea : 15% = RM 1.70 Total Rate per Unit = RM 13.02

Upload: faiz-ahmad

Post on 16-Nov-2014

41 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 1 / 31

Heading Removal, Dismantle and Replace of Damage Components Item No. Page No. Desc. Removal, dismantle and dispose the damaged guardrail beam. (a) 29

a) Machinery Costi) Pick-up truck (3.0T) for carring,materials, workers and tools :-

1 x 1 day @ RM 150.00 per day = RM 150.00 per day

ii) Backhoe operation, overhead cost incl. maintenance cost :-1 x 1 day @ RM 270.00 per day = RM 270.00 per day

iii) Tipper truck (6-wheeler) operation, overhead cost incl. maintenance cost :-1 x 1 day @ RM 250.00 per day = RM 250.00 per day

iv) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools)Allow a est. sum for 1 day @ RM 100.00 per day = RM 100.00 per day

v) Sub - Total Overall Cost for Machinery = RM 770.00 per day

Productivity of Work : 91 m per dayMachinery Cost per Metr : RM 770.00 / 91 m = RM 8.51 per m

b) Workmen & Manpower Costi) Ganger daily basic salary :-

1 x 1 day @ RM 65.00 per day = RM 65.00 per day

ii) General Worker daily basic salary :-5 x 1 day @ RM 38.00 per day = RM 190.00 per day

iii) Sub - Total Overall Cost for Workmen & Manpower = RM 255.00 per day

Productivity of Work : 91 m per dayManpower Cost per Metr : RM 255.00 / 91 m = RM 2.82 per m

c) Total Machinery + Workmen & Manpower Cost = RM 11.33 per mso, ADD Profit & Overhead : 15% = RM 1.70 per m

Total Rate per Unit = RM 13.02 per m

Page 2: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 2 / 31

PROPOSED RATE RM 13.00 per m

Heading Removal, Dismantle and Replace of Damage ComponentsItem No. Page No.

Desc.(bi) 29

a) Machinery Costi) Pick-up truck (3.0T) for carring,materials, workers and tools :

1 x 1 day @ RM 150.00 per day = RM 150.00 per day

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):Allow sum (per day) = RM 100.00 per day

iii) Sub - Total Cost for Machinery = RM 250.00 per day

Productivity of Work : 33 nos. per dayMachinery Cost per no. : RM 250.00 / 33 nos. = RM 7.69 per no.

b) Workmen & Manpower CostI) Ganger daily basic salary :-

1 x 1 day @ RM 65.00 per day = RM 65.00 per day

ii) General Worker daily basic salary :-4 x 1 day @ RM 38.00 per day = RM 152.00 per day

iii) Sub - Total Cost for Workmen & Manpower = RM 217.00 per day

Productivity of Work : 33 nos. per dayManpower Cost per no. : RM 217.00 / 33 nos. = RM 6.68 per no.

c) Total Machinery + Workmen & Manpower Cost = RM 14.37 per mso, ADD Profit & Overhead : 15% = RM 2.16 per m

Total Rate per Unit = RM 16.52 per m

PROPOSED RATE RM 16.50 per m

Removal, dismantle & dispose the damaged End Wing or Fish Tail (Terminal end Type 1)

Page 3: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 3 / 31

Remove, Dismantle and Replace of Damaged Components Item b ii, page 29Removal, dismantle and dispose the damaged Terminal Anchorage Unit Type 2)

A) MACHINERY

I) Pick-up truck (3.0T) for carring,materials, workers and tools :1 x 1 Day @ RM 150.00 per Day = RM 150.00 per Day

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):Allow sum (per day) = RM 100.00 per Day

Tota= RM 250.00 per DayProductivity Per Day : 17 NO Machinery Cost Per NO : RM 250.00 / 17 = RM 14.71 per No.

B) WORKMEN & MANPOWER

I) Ganger :1 x 1 Day @ RM 65.00 per Day = RM 65.00 per Day

ii) General Worker :4 x 1 Day @ RM 38.00 per Day = RM 152.00 per Day

RM 217.00 per DayProductivity Per Day : 17 NO Workmen Cost Per NO : RM 217.00 / 17 = RM 12.76 per No.

TOTAL MACHINERY +WORKMEN & MANPOWER COST = RM 27.47 per No.P & O : ### = RM 4.12 per No.

TOTAL RATE PER UNIT = RM 31.59 per No.Say; RM 31.60 per No.

Remove, Dismantle and Replace of Damaged Components Item b iii, page 29Removal, dismantle and dispose the damaged 90 degrees Twist Unit Type 3

A) MACHINERY

:- ADD

Page 4: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 4 / 31

I) Pick-up truck (3.0T) for carring,materials, workers and tools :1 x 1 Day @ RM 150.00 per Day = RM 150.00 per Day

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):Allow sum (per day) = RM 100.00 per Day

Tota= RM 250.00 per DayProductivity Per Day : 17 NO Machinery Cost Per NO : RM 250.00 / 17 = RM 14.71 per No.

B) WORKMEN & MANPOWER

I) Ganger :1 x 1 Day @ RM 65.00 per Day = RM 65.00 per Day

ii) General Worker :4 x 1 Day @ RM 38.00 per Day = RM 152.00 per Day

= RM 217.00 per DayProductivity Per Day : 17 NO Workmen Cost Per NO : RM 217.00 / 17 = RM 12.76 per No.

TOTAL MACHINERY +WORKMEN & MANPOWER COST = RM 27.47 per No.P & O : ### = RM 4.12 per No.

TOTAL RATE PER UNIT = RM 31.59 per No.Say; RM 31.60 per No.

Remove, Dismantle and Replace of Damaged Components Item b iv, page 29Removal, dismantle and dispose the damaged Terminal 1 : 6 / Sloping End Unit Type 4

A) MACHINERY

I) Pick-up truck (3.0T) for carring,materials, workers and tools :1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 17 NO Machinery Cost Per NO : RM 250.00 / 17 = RM 14.71 per No.

:- ADD

Page 5: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 5 / 31

B) Workmen

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :4 x 1 Day @ RM 38.00 Per day RM 152.00

RM 217.00

Productivity Per Day : 17 NO Workmen Cost Per NO : RM 217.00 / 17 = RM ###

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Take RM ###

Rate Per NO.

Page 6: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 6 / 31

ROAD FURNITURESMAINTENANCE OF GUARDRAIL AND CRASH CUSHIONRemove, Dismantle and Replace of Damaged Components Item c, page 29Removal, dismantle and dispose the damaged guardrail post

A) MACHINERY

I) Pick-up truck (3.0T) for carring,materials, workers and tools :1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Backhoe :1 x 1 Day @ RM 270.00 Per day RM 270.00

iii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools):Allow sum (per day) RM 100.00

Total RM 520.00

Productivity Per Day : 27 NO Machinery Cost Per NO : RM 520.00 / 27 = RM ###

B) Workmen

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :3 x 1 Day @ RM 38.00 Per day RM 114.00

RM 179.00

Productivity Per Day : 27 NO Workmen Cost Per NO : RM 179.00 / 27 = RM ###

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Rate Per NO.

Page 7: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 7 / 31

Take RM ###

Page 8: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 8 / 31

ROAD FURNITUREMAINTENANCE OF GUARDRAIL AND CRASH CUSHIONRemove, Dismantle and Replace of Damaged Components Item d, page 29Dismantle and removed existing damaged nose yellow

A) MACHINERY

I) Backhoe1 x 1 Day @ RM 270.00 Per day RM 270.00

ii) MiscellaneousAllow sum (per day) RM 150.00

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools :1 x 1 Day @ RM 280.00 Per day RM 280.00

Total RM 700.00

Productivity Per Day : 6 NO Machinery Cost Per NO : RM 700.00 / 6 = RM ###

B) Workmen

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :3 x 1 Day @ RM 38.00 Per day RM 114.00

RM 179.00

Productivity Per Day : 6 NO Workmen Cost Per NO : RM 179.00 / 6 = RM ###

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Rate Per NO.

Page 9: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 9 / 31

Take RM ###

Page 10: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 10 / 31

ROAD FURNITUREMAINTENANCE OF GUARDRAIL AND CRASH CUSHIONRemove, Dismantle and Replace of Damaged Components Item e, page 29Dismantle and removed existing damaged cartridge

A) MACHINERY

I) Backhoe1 x 1 Day @ RM 270.00 Per day RM 270.00

ii) MiscellaneousAllow sum (per day) RM 150.00

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools :1 x 1 Day @ RM 150.00 Per day RM 150.00

Total RM 570.00

Productivity Per Day : 3 NO Machinery Cost Per NO : RM 570.00 / 3 = RM ###

B) Workmen

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :3 x 1 Day @ RM 38.00 Per day RM 114.00

RM 179.00

Productivity Per Day : 3 NO Workmen Cost Per NO : RM 179.00 / 3 = RM ###

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Rate Per NO.

Page 11: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 11 / 31

Take RM ###

Page 12: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 12 / 31

ROAD FURNITUREMAINTENANCE OF GUARDRAIL AND CRASH CUSHIONRemove, Dismantle and Replace of Damaged Components Item f, page 29Dismantle and removed existing beam panel

A) MACHINERY

I) Backhoe1 x 1 Day @ RM 270.00 Per day RM 270.00

ii) MiscellaneousAllow sum (per day) RM 150.00

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools :1 x 1 Day @ RM 150.00 Per day RM 150.00

Total RM 570.00

Productivity Per Day : 5 NO Machinery Cost Per NO : RM 570.00 / 5 = RM ###

B)

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :3 x 1 Day @ RM 38.00 Per day RM 114.00

RM 179.00

Productivity Per Day : 5 NO Workmen Cost Per NO : RM 179.00 / 5 = RM ###

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Rate Per NO.

Page 13: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 13 / 31

Take RM ###

Page 14: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 14 / 31

ROAD FURNITURESMAINTENANCE OF GUARDRAIL AND CRASH CUSHIONRealigning of existing (line & level) Item g, page 29Realign and straighten the line of existing guardrail including correct the level and verticality position ofexisting guardrail post.

A) MACHINERY

I) Pick-up truck (3.0T) for carring,materials, workers and tools :1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Hydraulic jack1 x 1 Day @ RM 100.00 Per day RM 100.00

iii) Backhoe :1 x 1 Day @ RM 270.00 Per day RM 270.00

Total RM 520.00

Productivity Per Day : 97 M Machinery Cost Per M : RM 520.00 / 97 = RM ###

B) Workmen

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 97 M Workmen Cost Per M : RM 255.00 / 97 = RM ###

Row cost P = RM ###

ADD: P& O : 15% = RM ###

Page 15: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 15 / 31

Rate Per M = RM ###Take RM ###

Page 16: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 16 / 31

ROAD FURNITURESMAINTENANCE OF GUARDRAIL AND CRASH CUSHIONRealigning of existing (line & level) Item h, page 29Supply and replace missing delinator piece on guardrail

A) MATERIAL

I) G.I strip, c/w, clip, washer, bolt and nuts (supply price/Set) = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying materials, workers , tools and equipments :

1 x 1 Day @ RM 150.00 per day RM 150.00

ii) Miscellaneous items (Temporary traffic signs, cleaning tools and equipments)

Allow sum : RM 80.00

C) WORKMEN & MANPOWER

I) General worker

3 x 1 Day @ RM 38.00 per day RM 114Total RM 344.00

Productivity Per day : 43 NOWorkmen Cost Per No. : RM 344.00 / 43 = RM ###

Raw cost per No. = RM ###

ADD : P&O : ### = RM ###

Rate Per No. = RM ###Take RM ###

Page 17: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 17 / 31

ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHIONInstallation of New Sections Item a, page 30Supply and install galvanised new guardrail beams

A) MATERIAL

I) Guardrail (supply price/M) : RM 35.00

ii) Transportation(per M) : RM 10.00

iii) Material cost (per M) : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, workers and tools :1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):

Allow sum (per day) RM 100.00 Total RM 250.00

Productivity Per Day : 71 M Machinery Cost Per M : RM 250.00 / 71 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 71 M Workmen Cost Per M : RM 255.00 / 71 = RM ###

Page 18: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 18 / 31

Row cost Per M = RM ###

ADD: P& O : 15% = RM ###

= RM ###Take RM ###

Rate Per M

Page 19: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 19 / 31

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHIONInstallation of New Sections Item b i, page 30Supply and install galvanised End wing or Fish Tail (Terminal unitType 1)

A) MATERIAL

I) Terminal End Type l (supply price/No) RM 58.00

ii) Transportation(per No) : RM 5.00

iii) Material cost (per No) : : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 29 NO Machinery Cost Per No : RM 250.00 / 29 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 29 NO Workmen Cost Per No : RM 190.00 / 29 = RM ###

Page 20: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 20 / 31

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Take RM ###

Rate Per NO.

Page 21: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 21 / 31

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHIONInstallation of New Sections Item b ii, page 30Supply and install galvanised Terminal anchorage unit Type 2

A) MATERIAL

i) Terminal anchorage unit Type 2 (supply price/No) RM 380.00

ii) Transportation(per No) : RM 5.00

iii) Material cost (per No) : : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 80 NO Machinery Cost Per No : RM 250.00 / 80 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 80 NO Workmen Cost Per No : RM 255.00 / 80 = RM ###

Page 22: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 22 / 31

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Take RM ###

Rate Per NO.

Page 23: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 23 / 31

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHIONInstallation of New Sections Item b iii, page 30Supply and install galvanised 90 degrees Twist Unit Type 3

A) MATERIAL

I) Twist unit type 3 (supply price/No) RM 550.00

ii) Transportation(per No) : RM 5.00

iii) Material cost (per No) : : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 9 NO Machinery Cost Per No : RM 250.00 / 9 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 9 NO Workmen Cost Per No : RM 255.00 / 9 = RM ###

Page 24: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 24 / 31

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Take RM ###

Rate Per NO.

Page 25: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 25 / 31

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHIONInstallation of New Sections Item b iv, page 30Supply and install galvanised Terminal section 1:6 / Sloping End Type 4

A)

I) Terminal Anchorage Type 4 (supply price/No) RM 158.00

ii) Transportation(per No) : RM 5.00

iii) Material cost (per No) : : = RM ###

B) Machinery.

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):Allow sum (per day) RM 100.00

Total RM 250.00

Productivity Per Day : 14 NO Machinery Cost Per No : RM 250.00 / 14 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Productivity Per Day : 14 NO Workmen Cost Per No : RM 255.00 / 14 = RM ###

Material

Page 26: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 26 / 31

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Take RM ###

Rate Per NO.

Page 27: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 27 / 31

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHIONInstallation of New Sections Item c, page 30Supply and install galvanised guadrail post complete with packer

A) MATERIAL

I) Guardrail post (supply price / No) RM 87.00

ii) Transportation(per No) : RM 2.00

iii) Material cost (per No) : : = RM ###

B) MACHINERY

I) Pick-up truck (3.0T) for carrying, materials, tools and equipments :1 x 1 Day @ RM 150.00 Per day RM 150.00

ii) Arrow Rammer :1 x 1 Day @ RM 300.00 Per day RM 300.00

iii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools):Allow sum (per day) RM 100.00

Total RM 550.00

Productivity Per Day : 52 NO Machinery Cost Per No : RM 550.00 / 52 = RM ###

C) WORKMEN & MANPOWER

I) Ganger :1 x 1 Day @ RM 65.00 Per day RM 65.00

ii) General Worker :5 x 1 Day @ RM 38.00 Per day RM 190.00

RM 255.00

Page 28: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 28 / 31

Productivity Per Day : 52 NO Workmen Cost Per No : RM 255.00 / 52 = RM ###

Row cost P = RM ###

ADD: P& O : 15% = RM ###

= RM ###Take RM ###

Rate Per NO.

Page 29: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 29 / 31

ROAD FURNITUREMAINTENANCE OF GUARDRAIL AND CRASH CUSHIONInstallation of New Sections Item d, page 30Supply and replace new yellow nose for the crash cushion inclusive of all necessary preparatory work.

A) MATERIAL

I) Nose Yellow = RM ###

ADD: P& O : 15% = RM ###

= RM ###Take RM ###

Rate Per NO.

Page 30: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 30 / 31

ROAD FURNITUREMAINTENANCE OF GUARDRAIL AND CRASH CUSHIONInstallation of New Sections Item e, page 30Supply and replace new cartridge for the crash cushion inclusive of all necessary preparatory work.

A) MATERIAL

I) Cartridge = RM ###

ADD: P& O : 15% = RM ###

Rate Per NO. = RM ### Take RM ###

Page 31: Build Up Rate - Guard Rail

Build-Up RatesRoad Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion Guardrail - Page 31 / 31

ROAD FURNITUREMAINTENANCE OF GUARDRAIL AND CRASH CUSHIONInstallation of New Sections Item g, page 30Supply and replace new beam panel.

A) MATERIAL

I) Cartridge = RM ###

ADD: P& O : 15% = RM ###

= RM ### Take RM ###

Rate Per NO.