budgeting technology. start with a plan learners learning environments professional competency...
TRANSCRIPT
![Page 1: Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bf9f1a28abf838c94c05/html5/thumbnails/1.jpg)
Budgeting TechnologyBudgeting Technology
![Page 2: Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bf9f1a28abf838c94c05/html5/thumbnails/2.jpg)
Start with a Start with a PlanPlan
•Learners•Learning Environments•Professional Competency•System Capacity•Community Connections•Technology Capacity•Accountability
SevenSevenDimensionsDimensions
Identify Costs (TCO)
Match FundingStream
Tech PlanTech Plan
FinanceFinancePlanPlan
![Page 3: Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bf9f1a28abf838c94c05/html5/thumbnails/3.jpg)
Identify the Identify the CostsCosts
People
WiringHubs&Routers
File ServersInstallation
LicensesMedia & Documentation
Subscriptions
Technical Support
ManagementStaff
DevelopmentHelp DesksIntegration Specialists
Desktops Laptops Scanners Printers Projection Device
Cameras
Equipment
Infrastructure
Software
![Page 4: Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bf9f1a28abf838c94c05/html5/thumbnails/4.jpg)
What is the Cost of What is the Cost of Technology?Technology?
One Time Costs
Recurring Costs
3 - 5 YEAR PERIOD
• Hardware and software• Replacement costs• Maintenance and operation• Human support• Training and staff
development• On-going connectivity costs
(leased lines)• Expansion of networks
• Routers and equipment to connect to the LAN / WAN
• Wiring of schools and districts for LAN and WAN capabilities
• Equipment for students• Equipment for teachers• Interactive Video
Equipment• File servers and hubs• LAN / WAN surge
protection and UPS
![Page 5: Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bf9f1a28abf838c94c05/html5/thumbnails/5.jpg)
Infrastructure Budget Infrastructure Budget ChecklistChecklist• Assess existing
infrastructure• Establish your upgrade
plan• Gather information on
costs• Decide responsibility and
budget resources• Timeline the project• Bid if required• Manage project details
Wiring and cablingVentilation & coolingElectrical capacity and placementHubsRoutersFile ServerUPS ProtectionTelecommunications equipmentSoftware
![Page 6: Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bf9f1a28abf838c94c05/html5/thumbnails/6.jpg)
Equipment and Equipment and SoftwareSoftware• Assess what is usable based
in minimum standards• Estimate Costs of Equipment • Establish budget sources• Implement purchasing
The primary factor affecting total up-front
hardware cost is densityor the
student:computer ratio
Wiring and cablingVentilation & coolingElectrical capacity and placementFurnitureDesktops or laptopsPrinter(s)Surge ProtectionProjection Device SoftwareSupplies (disks,paper,ink)
Basic Classroom Needs:
![Page 7: Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bf9f1a28abf838c94c05/html5/thumbnails/7.jpg)
Human ResourcesHuman Resources• Staff Development:
– every teacher must receive between 30-50 hours of up-front training
– Staff time: estimate $30/hr + 30% for benefits– Trainer: $60-$100 / hr + facility and equipment
• Technical Support:– Industry standard is 1 technician for every 50 computers– Education standard is 1 technician for every 150 computers– Entry level technician $12-$15.00 / hr + benefits– Network Technician $25 - $40.00 / hr + benefits
• Curriculum Support:– Master Teachers or Teachers on Special Assignment– Technology Integrators
• Project Management:– Technology Director or Building Coordinator
![Page 8: Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697bf9f1a28abf838c94c05/html5/thumbnails/8.jpg)
Budget SourcesBudget Sources
• Redeployment of existing dollars– Title 1, Facilities, Furniture &
Equipment
• Separate budget categories– Curriculum; Healthy Kids;
SLIG/LID
• Grants and Foundations• Parent Organizations• Levies and Bonds