BUDGETFiscal Years 2020 – 2021
PARKS, RECREATION & WATERFRONT DEPARTMENT
CAPITAL BUDGET
PRW
• Capital Improvement DivisionParks, Camps, Pools and Waterfront
• 52 Parks and 5 Community Centers• 3 Resident Camps• 2 Pools• 1000 Boat berths
• 30 Additional Buildings• Restrooms• Parking Lots• Docks• Sports courts• Pathways/Trails• Utilities
OVERVIEWPARKS, RECREATION & WATERFRONT
PARKS, RECREATION & WATERFRONT
STAFFINGDEPARTMENT
DIRECTOR
DEPUTY
DIRECTOR
CAMPS
CAPITAL IMPROVEMENT PRGM MGR
1.0 FTE
2.0 FTE Assoc Civil Engineer
1.0 FTE Asst Civil Engineer
1.0 FTE Asst Mgmt. Analyst (share w/ PW)
PARKS AND POOLS
SUPERVISING CIVIL ENGINEER
1.0 FTE
WATERFRONT
SUPERVISING CIVIL ENGINEER*
1.0 FTE
1.0 FTE Assoc Civil Engineer*
* 2 FTEs are 3-year positions
• Parks, Pools & Waterfront completed projects in FY18 & FY19:
• Camps completed projects in FY18 & FY19:
ACCOMPLISHMENTS
PARKS, RECREATION & WATERFRONT
•Strawberry Creek Phase I - courts renovation •Willard Park - pathways and totlot renovation
•Becky Temko Park - Totlot renovation •Bait Shop - siding/structural beam replacement
•Glendale LaLoma - basketball court renovation •King & West Campus Pools - boiler replacements
•Tom Bates Sports Field Complex - artificial turf replacement
•South Cove Parking Lot - renovation of parking lot and new restroom
•Grove Park - restroom, tennis court and basketball court renovation
•Marina Launch Ramp - parking lot gate and barrier improvements
•James Kenney Park - community center and BAHIA child care seismic, siding and ADA upgrades
•Skate Park - safety improvements and technical upgrades
• Echo Lake Camp - emergency repairs and south bathhouse septic repair
• BTC -completed environmental processes (CEQA & NEPA)
• Echo Lake Camp - ADA design • BTC - completed planning & design
• Cazadero Camp - permanent landslide repair • Cazadero Camp - Jensen dorm design
FINANCIALSPARKS, RECREATION & WATERFRONT
$3.8MParks Tax
$11.9MMeas. T1
$0.4MCIP
$0.35MMarina
$1.5MMeas. WW
FY20 Parks, Pools & Waterfront Capital BudgetTotal $17.9M
Parks Tax
Measure T1
CapitalImprvmt
Marina
Grant-Measure WW
$46.9MBTC
$2.9MCatas. Res.
$0.9MCazadero $0.6M
Echo Lake
FY20 Camps Capital BudgetTotal $51.3M
BTC-Insurance, FEMA,CalOES, & Donations
BTC-CatastrophicReserve Fund
Cazadero Dorm
Echo Lake Camp
Waterfront Unfunded Capital Needs
More than $109 million in total unfunded needs at the Waterfront.
$3.45 million emergency request to fix needed electrical and safety issues in FY20-FY21
Forestalls Marina Fund insolvency until FY22
PARKS, RECREATION & WATERFRONT
Waterfront Urgent Capital Needs Total Cost FY20 FY21
Finger Dock & Piling Replacement $1,725,000 $900,000 $825,000
Electrical Upgrade at O Dock $1,100,000 $220,000 $880,000
Electrical Upgrade at K Dock $300,000 $60,000 $240,000
Restroom Upgrades $325,000 $325,000
Total $3,450,000 $1,505,000 $1,945,000
F U N D I N G R E Q U E S T
• Capital Improvement software system in collaboration with Public Works Cost and project timelines are not known at this time
TECHNOLOGICAL NEEDS
PARKS, RECREATION & WATERFRONT
• WETA MOU (for Pier and ferry project)
• Berkeley Marina Area Specific Plan (BMASP)
• Berkeley Tuolumne Camp (BTC) Rebuild Project
STRATEGIC PLAN
PARKS, RECREATION & WATERFRONT
• Capital projects in FY20 total more than $68 million
Parks, Pool & Waterfront projects total $17.9 million
• EBRPD Measure WW Grant projects• Berkeley Marina Area Specific Plan (BMASP)
Camps projects total $51.3 million• Berkeley Tuolumne Camp (BTC) Rebuild Project
• Cazadero dorm
Measure T1 Phase 1 projects (see Measure T1 presentation)
N E X T S T E P S / A C T I O N
PARKS, RECREATION & WATERFRONT