  • 8/10/2019 BTS 2000 Bus Transfer System

    1/20

    BTS 2000MICROPROCESSOR BASED

    FAST BUS TRANSFERSYSTEM

  • 8/10/2019 BTS 2000 Bus Transfer System

    2/20

    18 January2014

    Aartech Solonics Ltd. 2

    Advantages of aFast Bus Transfer System

    Fast Transfer of Load to a HealthyAlternate Source

    Faster Unit Recovery after Tripping Improved Plant Load Factor

    Reduced Revenue Losses

    Reduced Motor Stress and Fatigue

    Reduced O&M Costs

  • 8/10/2019 BTS 2000 Bus Transfer System

    3/20

    18 January2014

    Aartech Solonics Ltd. 3

    inBus Transfer

    Systems

    25 Years of Rich Experience, R&D 400+ Nos Bus Transfer Systems

    Schemes executed all over India Worked with major Engineering

    Consultancies, Utilities, EPCContractors, SwitchgearManufacturers in India

    Technology Transfer Agreementsigned with Cooper Power Systems,USA for Aartechs BTS 2000

    Only Microprocessor Based FastBus Transfer System Manufacturerin India and one of a handfulglobally.

  • 8/10/2019 BTS 2000 Bus Transfer System

    4/20

    18 January2014

    Aartech Solonics Ltd. 4

    Main-Tie (2 Breaker Scheme)Eg. Thermal Power Station Auxiliaries

    Configurations : Station to Unit Transfer

    Unit to Station Transfer

    Transfer Conditions Manual Transfer

    Planned start-ups Planned shut-downs

    Protective Transfer Class A Trip

    Gen / Transformer Trip

    Load Throwoff

    Class B Trip Boiler, Turbine Trips

    Auto Transfer Self Detection

    BTS

    MM

    GT

    GENERATOR

    GTB EHV BUS STB

    ST

    ST I/C

    UNIT

    BOARD

    TIE-1 TIE-2

    (NC)

    UAT

    UAT I/C

    STATION

    BOARD

    Fig. 1. Thermal power plant: Main-Tie BTS configuration.

  • 8/10/2019 BTS 2000 Bus Transfer System

    5/20

    18 January2014

    Aartech Solonics Ltd. 5

    Unit To Station + Station toStation (4 Breaker Scheme)

    Eg. Industrial Process Plant Auxiliaries Configurations :

    Normally Closed Tie Breaker

    Normally Open Tie Breaker

    Transfer Conditions

    Manual Transfer

    Planned start-ups

    Planned shut-downs

    Protective Transfer Source equipment failure

    Eg, Gen / Transformer Trip

    Automatic Transfer

    Under Voltage/Frequency/|df/dt|

  • 8/10/2019 BTS 2000 Bus Transfer System

    6/20

    18 January2014

    Aartech Solonics Ltd. 6

    Main-Tie-Main (3 Breaker Scheme)Eg. Industrial Process Plant

    Auxiliaries Configurations :

    Normally Closed Tie Breaker

    Normally Open Tie Breaker

    Transfer Conditions

    Manual Transfer

    Planned start-ups

    Planned shut-downs

    Protective Transfer

    Source equipment failure

    Eg, Gen / Transformer Trip

    Automatic Transfer

    Under Voltage/Frequency/|df/dt|

    BTS

    SOURCE I SOURCE II

    I/C I

    BREAKER

    I/C II

    BREAKER

    BUS I BUS II

    TIE

    BREAKERM M M M

    Fig. 2. Process industry: Main-Tie-Main BTS configuration

  • 8/10/2019 BTS 2000 Bus Transfer System

    7/20

    18 January2014

    Aartech Solonics Ltd. 7

    BTS 2000A Technology Profile

    An Industrially rugged, fastmicroprocessor based universalcommunicable platform

    Specially designed for power stations andEHV substations

    Flexible Breaker Configurations: UTS: Unit-to-Station / Main-Tie

    STS: Station-to-Station / Main-Tie-Main

    UTU:Unit-to-Unit / Main-Tie-Main

    For Generator Units with GTB Arrangement

    Various Other Custom Configurations

  • 8/10/2019 BTS 2000 Bus Transfer System

    8/20

    18 January2014

    Aartech Solonics Ltd. 8

    BTS 2000A Technology Profile

    Manual/Protective/Auto Transfers

    Fast/In Phase/Slow/Parallel Modes

    Breaker Failure Detection and CorrectiveAction, Breaker Timings

    Continuous Readiness Monitoring

    Continuous Breaker Circuit Monitoring

    Online / Offline Test Mode Feature ANSI C50.41 Criterion Supervision

    Prioritized Auxiliary Motor Tripping

  • 8/10/2019 BTS 2000 Bus Transfer System

    9/20

    18 January2014

    Aartech Solonics Ltd. 9

    BTS 2000A Technology Profile

    Self Diagnostics

    Serial Communications (RS232C, RS485)

    Protocols: ModBus, DNP, UCA, PEERCOMM

    SCADA interface for Online View

    Event Recording with Oscillography & Playback

    Powerful User Friendly Human MachineInterface

    Sequence of Event Recording (SOE)

    Data Profiler (DP)

  • 8/10/2019 BTS 2000 Bus Transfer System

    10/20

    18 January2014

    Aartech Solonics Ltd. 10

    Outstanding Features ofBTS 2000

    ANSI C50.41 Compliant In Phase Transfer (2ndOrder Taylors Algorithm

    for Phase Angle Predictions) Auto Transfer (U/V, Freq, df/dt) Islanded Transfer for Asynchronous Systems Online Test Mode for Enhanced Operator

    Confidence prior to Planned Transfers. Communicable Platform with Advanced

    Software Features Transfer Event Recording, Step-by-Step Playback, Oscillography,

    Online Viewing, Sequence of Events (SOE), Data Profiler (DP),Convenient in-situ scheme/settings updates

  • 8/10/2019 BTS 2000 Bus Transfer System

    11/20

    18 January2014

    Aartech Solonics Ltd. 11

    Spin Down Characteristics

  • 8/10/2019 BTS 2000 Bus Transfer System

    12/20

    18 January2014

    Aartech Solonics Ltd. 12

    Spin Down Characteristics

  • 8/10/2019 BTS 2000 Bus Transfer System

    13/20

    18 January2014

    Aartech Solonics Ltd. 13

    Fast Transfer

  • 8/10/2019 BTS 2000 Bus Transfer System

    14/20

    18 January2014

    Aartech Solonics Ltd. 14

    In-Phase Transfer

  • 8/10/2019 BTS 2000 Bus Transfer System

    15/20

    18 January2014

    Aartech Solonics Ltd. 15

    BTS 2000 HMI

  • 8/10/2019 BTS 2000 Bus Transfer System

    16/20

    18 January2014

    Aartech Solonics Ltd. 16

    Software Interface

  • 8/10/2019 BTS 2000 Bus Transfer System

    17/20

    18 January2014

    Aartech Solonics Ltd. 17

    Exhibitions & Conferences

    PowerGen International

    New Orleans, USA, Nov-Dec 1999

    3rd Intl R&D Conference (CBIP)

    Hosted by MPEB at Jabalpur (MP), Feb 2000

    SWICON 2000

    Organised by IEEMA in Nov-Dec 2000

    PPIC / IEEE Industry Applications (IAS)Toronto, Canada June 2002

    Published in IEEE IAS Transactions Jan-Feb 2003

  • 8/10/2019 BTS 2000 Bus Transfer System

    18/20

    18 January2014

    Aartech Solonics Ltd. 18

    Exhibitions & Conferences

    Power Gen Middle East 2008Bahrain, Feb

    2008

    IEEE Power India POWERCON 2008

    New Delhi, India, Dec 2008

    National Power System Conference, IIT

    Bombay, India, Dec 2008

  • 8/10/2019 BTS 2000 Bus Transfer System

    19/20

    18 January2014

    Aartech Solonics Ltd. 19

    Approvals & Installations

    Customer Approvals:

    NPCIL, MSEB (MAHAGENCO), CSEB, GEB, MPEB,GMDC, PSEB, NTPC-SAIL, APGENCO, GIPCL, GSECL,RRVUNL, BALCO, BHAVINI etc

    Consultant Approvals:BHEL-PEM, DESEIN, TCE, DCPL, B&W, MOTTMACDONALD, RITE CHOICE etc.

    Supply through EPC Contractors:

    RELIANCE, SIEMENS EPC, ABB-eBOP, L&T ECC, BGRENERGY etc.

    Supply through Switchgear Manufacturers:

    BHEL, SIEMENS, AREVA, ABB etc.

  • 8/10/2019 BTS 2000 Bus Transfer System

    20/20

    18 January2014

    Aartech Solonics Ltd. 20

    Thank You for your Interest & Participation

    For Further Details Contact:Aartech Solonics Limited

    Regd. Office:E-2/57,

    Arera Colony,

    Bhopal (MP) 462016

    India.

    Tel: 91-755-5276335,

    2463593

    Manufacturing Works:Khasra No. 311,

    Sector-1A,

    Parwanoo, H.P. 173220

    India.

    Email: [email protected] [email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]