bt area melbourne retail water agencies

6
MRWA SEWERAGE STANDARDS VERSION ISSUED MELBOURNE RETAIL WATER AGENCIES DATE: DATE: CHECKED: DRAWN: DESIGNED: 1 2 6 7 8 9 10 12 11 3 4 5 H H GWW SEW YVW DATE NAME APPROVED: GWW SEW YVW DATE NAME APPROVED DATE DESCRIPTION REV A 1 2 6 3 4 5 B C D A E F G 1 2 6 7 8 9 10 12 11 3 5 A B C D E F G H Planning Design Construction R. JAGGER R. JAGGER D. MOORE C. PAXMAN K. DAWSON R. CARRUTHERS J. TOMASI 1 JULY 2015 1 JULY 2015 PRE-PUBLISHED DRAFT 1 2 PUBLISHED FIRST ISSUE 01/10/15 CP / JT / KD / RJ 2015 1 CP / JT / KD / RJ D. O'DONOVAN 01/09/15 01/09/15 01/09/15 01/09/15 01/09/15 01/09/15 01/03/15 ALL DIMENSIONS IN mm UNLESS STATED OTHERWISE NOT TO SCALE SEWERAGE NETWORK AIRFLOW MANAGEMENT MRWA-S-401 TABLE 401-A: HYDROGEN SULPHIDE RISK CONTROL · Limited or no property boundary traps or water seals. · Natural ventilation. SYSTEM TYPE OPEN SYSTEM (LOW RISK AS PER TABLE 401-C) RELEVANT SYSTEM DESIGN RULES (REFER TABLE 401-D) CLOSED SYSTEM (MED / HIGH RISK AS PER TABLE 401-C) MED RISK HIGH RISK Seal system to contain gas where hydrogen sulphide production cannot be adequately controlled. · Use property boundary traps &/or water seals at all: ·· Junctions of properties and closed systems. ·· Junctions of closed systems and open systems. · Ventilation requires air treatment. MHs require coating protection as per Table 307-E. MHs constructed of geopolymer concrete, plastic or lined as per Table 307-E PRINCIPLE OF H 2 S RISK CONTROL Odour: Disperse H 2 S at multiple locations while concentrations remain low. Concrete Corrosion: Keep pipe wall dry (maintain a low relative humidity in the head space of the sewerage system) to reduce the formation of sulphuric acid. NOTES Regarding H S Risk Assessment of Sewage: · This assessment needs to be completed for each sewer, starting from the upstream ends of the catchment and working downstream. · Formula for calculating risk of intersecting flow is as follows: RISK (HS) = F 1 / (F 1 + F 2 ) x (A 1 + B 1 + C 1 ) + flow is ADWF F 2 / (F 1 + F 2 ) x (A 2 + B 2 + C 2 ) + D (Refer Figures 401-B & C). · All concrete manholes in closed systems shall be protected as per Table 307-E. RISK LEVEL POINTS > 6 HIGH RISK TABLE 401-C: H 2 S RISK SCORES > 3 & <6 MEDIUM RISK · Low risk sewers typically should be open. · Medium and High risk sewers typically should be closed. < 3 LOW RISK DN375 OPEN SYSTEM BT BT BT BT AREA BT AREA BT BT BT AREA BT AREA BT BT BT AREA BT AREA BT AREA OPEN RETIC MAIN LEGEND OPEN BRANCH SEWER ( > DN300) CLOSED BRANCH SEWER ( > DN300) WATER SEAL PRESSURE MAIN HIGH B.O.D CUSTOMER CONNECTION HYBRID PRESSURE SEWERAGE / GRAVITY SYSTEM PUMP STATION WITH CHEMICAL DOSING BT BOUNDARY TRAP AREA TABLE 401-D: SYSTEM DESIGN RULES RULE VENTS ON OPEN BRANCH SEWERS VENTS ON CLOSED BRANCH SEWERS Not typically required (unless pressure main discharge point or sewer terminates at a wet well). Where required, forced ventilation with air treatment is required unless there is a significant buffer of land around vent (ie: > 100m). Upstream end of ventilated Closed System requires ventilation with an induct. RULE DESCRIPTION Install a vent at the MH upstream from water seals which terminate at open branch sewers. Install vents on open branch sewers ( > DN300) at 1000m spacing (without air treatment). 1 2 BOUNDARY TRAP (BT) AREAS Required where: 1) a retic sewer which contains < 5 property connections discharges to a closed system, or 2) the property connects directly to a closed system, or 3) a retic sewer discharges to an established BT area. 3 FORCED VENTILATION + AIR TREATMENT SPS WET WELL VENTILLATION Typically, at least natural ventilation will be required at sewage pump stations. Forced ventilation with air treatment may be required where: 1) Detention time within the wet well is excessive, or 2) the SPS is in a built up area with limited buffer, or 3) the sewage entering the SPS presents a medium or high risk. 4 Where the combined flow from an Open and Closed system is considered low risk: 1) the downstream system shall be considered an Open system, 2) install a water seal just upstream of the junction on the Closed system. Where the combined flow from an Open and Closed system is considered a medium or high risk: 1) the downstream system shall be considered a Closed system, 2) install a water seal just upstream of the junction on the open system. Refer Figure 401-B. JUNCTION OF OPEN & CLOSED SYSTEMS 5 VENT Vent and treat air at the discharge of pressure mains in accordance with the calculated risk level and Table 317-B. DISCHARGE OF PRESSURE MAINS 6 FIGURE 401-C: EXAMPLE 2 OF HS RISK ASSESSMENT RISK SCORE = ( 40 50 x 3) + ( 10 50 x 0) = 2.4 DETENTION = 6 HRS RISK SCORE = 2.4 + 2 = 4.4 FIGURE 401-A: EXAMPLE SEWERAGE NETWORK AIRFLOW CONFIGURATION REFER RULE 1 REFER RULE 4 REFER RULE 1 REFER RULE 6 F 1 = 10 l/s 0 POINTS F 2 = 40 l/s 3 POINTS RISK FACTOR DESCRIPTION AGE OF SEWAGE SEWAGE CONTENTS VENTILATION & TURBULENCE SEWER < DN300 IND / COMM- SIGNIFICANT B.O.D DISCHARGE UPSTREAM SYSTEM IS OPEN KEY CONSIDERATIONS NO. POINTS 2 3 6 0 1 TABLE 401-B: HYDROGEN SULPHIDE RISK FACTORS FACTOR A B C IND / COMM HIGH B.O.D DISCHARGE SEWER DN375 SEWER DN450 to DN600 SEWER > DN800 0 > 90% RESIDENTIAL 2 CLOSED U.S BRANCH SEWERS HAVE MINIMAL DROP PRESSURE MAIN DETENTION TIME SEWER IS NOT A PRESSURE MAIN D < 4 HRS AT ADWF 4 to 7.9 HRS AT ADWF > 12 HRS AT ADWF 0 2 3 4 1 2 6 0 FOR GRAVITY SEWERS FOR PRESSURE MAIN INFLOWS CLOSED U.S BRANCH SEWERS HAVE MODERATE DROP CLOSED U.S BRANCH SEWERS HAVE HIGH DROP · sewer DN300 · residential · open system = 0 points · sewer < 375 · significant B.O.D · closed system with minimal drops = 3 points 4.4 points (add 2 points due to pressure main detention) 2.4 POINTS FIGURE 401-B: EXAMPLE 1 OF HS RISK ASSESSMENT RISK SCORE = ( 40 50 x 0) + ( 10 50 x 3) = 0.6 F 1 = 40 l/s 0 POINTS F 2 = 10 l/s 3 POINTS · sewer < 375 · residential · open system = 0 POINTS · sewer < 375 · significant B.O.D · closed system with minimal drops = 3 POINTS 0.6 POINTS CLOSED SYSTEM CLOSED SYSTEM RISK SCORE = ( 200 250 x 5) + ( 50 250 x 0.6) = 4.1 · sewer DN375 · significant B.O.D · closed system with minimal drop = 5 POINTS F 3 = 200 l/s 5 POINTS VENTILATION + INDUCT REFER RULE 2 HYBRID PRESSURE SEWERAGE / GRAVITY SYSTEM BT 3 UPDATED RISK SCORING CP / GA / RL SEP 20 · Factor A: Sewer size is usually provides a good approximation for sewerage age. · Factor B: discharges high in B.O.D typically come from production plants processing food, animal or petrochemical products (eg: juice, leather, wool, meat, wine, beer etc). · Factor C: Turbulence is typically beneficial in Open Systems. Exclude vortex drops. Minimal drop is < 5m of cumulative drop in upstream branch sewer MHs. Moderate drop is 5 to 10m of cumulative drop in upstream branch sewer MHs. High drop is >10m of cumulative drop in upstream branch sewer MHs. · Factor D: Pumped flows which have been chemically treated for H 2 S suppression shall be considered not to or only partially increase H 2 S risk. 8 to 12 HRS AT ADWF 4 4 SEWER DN675 to DN750 REFER RULE 4 PUMP STATION CLOSED RETIC MAIN BT AREA

Upload: others

Post on 19-Oct-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

MRWA SEWERAGE STANDARDS

VERSIONISSUED

MELBOURNE RETAIL WATER AGENCIESDATE:

DATE:

CHECKED:DRAWN:DESIGNED:

1 2 6 7 8 9 10 12113 4 5

H HGWW

SEW

YVW

DATENAME APPROVED:

GWW

SEW

YVW

DATENAME

APPROVEDDATEDESCRIPTIONREV

A

1 2 63 4 5

B

C

D

A

E

F

G

1 2 6 7 8 9 10 12113 5

A

B

C

D

E

F

G

H

Planning Design Construction

R. JAGGERR. JAGGER

D. MOOREC. PAXMANK. DAWSON

R. CARRUTHERS

J. TOMASI

1 JULY 20151 JULY 2015

PRE-PUBLISHED DRAFT1

2 PUBLISHED FIRST ISSUE 01/10/15 CP / JT / KD / RJ

2015 1CP / JT / KD / RJ

D. O'DONOVAN01/09/1501/09/1501/09/15

01/09/1501/09/1501/09/1501/03/15

ALL DIMENSIONS IN mm UNLESS STATED OTHERWISE NOT TO SCALE

SEWERAGE NETWORKAIRFLOW MANAGEMENT

MRWA-S-401

TABLE 401-A: HYDROGEN SULPHIDE RISK CONTROL

· Limited or no property boundary traps or water seals.· Natural ventilation.

SYSTEM TYPEOPEN SYSTEM(LOW RISK ASPER TABLE 401-C)

RELEVANT SYSTEM DESIGN RULES (REFER TABLE 401-D)

CLOSED SYSTEM(MED / HIGH RISK AS

PER TABLE 401-C)

MED RISKHIGH RISK

Seal system to contain gas where hydrogensulphide production cannot be adequatelycontrolled.

· Use property boundary traps &/or water seals at all:·· Junctions of properties and closed systems.·· Junctions of closed systems and open systems.

· Ventilation requires air treatment.MHs require coating protection as per Table 307-E.MHs constructed of geopolymer concrete, plastic or lined as per Table 307-E

PRINCIPLE OF H 2S RISK CONTROL

Odour:Disperse H

2S at multiple locations while concentrationsremain low.Concrete Corrosion: Keep pipe wall dry (maintain a lowrelative humidity in the head space of the seweragesystem) to reduce the formation of sulphuric acid.

NOTES Regarding H₂S Risk Assessment of Sewage:· This assessment needs to be completed for each sewer, starting from the upstream ends of the

catchment and working downstream.· Formula for calculating risk of intersecting flow is as follows:

RISK (H₂S) = F 1 / (F

1 + F 2) x (A

1 + B 1 + C

1) + flow is ADWF F

2 / (F 1 + F

2) x (A 2 + B

2 + C 2) + D (Refer Figures 401-B & C).

· All concrete manholes in closed systems shall be protected as per Table 307-E.

RISK LEVELPOINTS > 6

HIGH RISKTABLE 401-C: H

2S RISK SCORES

> 3 & <6MEDIUM RISK

· Low risk sewers typically should be open.· Medium and High risk sewers typically

should be closed.< 3LOW RISK

DN375 OPENSYSTEM

BT

BT

BT

BT AREA

BT A

REA

BT

BTBT AREA

BT AREA

BT

BT

BT AREA

BT AREA

BT AREA

OPEN RETIC MAINLEGEND

OPEN BRANCH SEWER (> DN300)

CLOSED BRANCH SEWER (> DN300)

WATERSEAL

PRESSURE MAIN

HIGH B.O.DCUSTOMERCONNECTION

HYBRIDPRESSURESEWERAGE/ GRAVITYSYSTEM

PUMP STATION WITHCHEMICAL DOSING

BT BOUNDARYTRAP AREA

TABLE 401-D: SYSTEM DESIGN RULESRULE

VENTS ON OPENBRANCH SEWERS

VENTS ONCLOSED BRANCHSEWERS

Not typically required (unless pressure main discharge point orsewer terminates at a wet well).Where required, forced ventilation with air treatment is requiredunless there is a significant buffer of land around vent (ie: > 100m).Upstream end of ventilated Closed System requires ventilation withan induct.

RULE DESCRIPTIONInstall a vent at the MH upstream from water seals which terminateat open branch sewers.Install vents on open branch sewers (> DN300) at 1000m spacing(without air treatment).

1

2

BOUNDARY TRAP(BT) AREAS

Required where: 1) a retic sewer which contains < 5 propertyconnections discharges to a closed system, or 2) the propertyconnects directly to a closed system, or 3) a retic sewerdischarges to an established BT area.

3

FORCEDVENTILATION +AIR TREATMENT

SPS WET WELLVENTILLATION

Typically, at least natural ventilation will be required at sewagepump stations.Forced ventilation with air treatment may be required where:1) Detention time within the wet well is excessive, or 2) the SPSis in a built up area with limited buffer, or 3) the sewage enteringthe SPS presents a medium or high risk.

4

Where the combined flow from an Open and Closed system isconsidered low risk:1) the downstream system shall be considered an Open system,2) install a water seal just upstream of the junction on the Closedsystem.

Where the combined flow from an Open and Closed system isconsidered a medium or high risk:1) the downstream system shall be considered a Closed system,2) install a water seal just upstream of the junction on the opensystem. Refer Figure 401-B.

JUNCTION OFOPEN & CLOSEDSYSTEMS

5

VENT

Vent and treat air at the discharge of pressure mains inaccordance with the calculated risk level and Table 317-B.

DISCHARGE OFPRESSURE MAINS

6

FIGURE 401-C: EXAMPLE 2 OF H₂S RISK ASSESSMENT

RISK SCORE =(4050 x 3) + (10

50 x 0)= 2.4

DETENTION = 6 HRSRISK SCORE = 2.4 + 2= 4.4

FIGURE 401-A: EXAMPLE SEWERAGE NETWORK AIRFLOW CONFIGURATION

REFERRULE 1

REFERRULE 4

REFERRULE 1

REFERRULE 6

F 1 = 10 l/s

0 POINTS

F 2 = 40 l/s

3 POINTS

RISK FACTORDESCRIPTION

AGE OFSEWAGE

SEWAGECONTENTS

VENTILATION&TURBULENCE

SEWER < DN300

IND / COMM- SIGNIFICANT B.O.D DISCHARGE

UPSTREAM SYSTEM IS OPEN

KEYCONSIDERATIONS

NO.POINTS

23

601

TABLE 401-B: HYDROGEN SULPHIDE RISK FACTORSFACTOR

A

B

CIND / COMM HIGH B.O.D DISCHARGE

SEWER DN375SEWER DN450 to DN600

SEWER > DN800

0

> 90% RESIDENTIAL

2

CLOSED U.S BRANCH SEWERS HAVE MINIMAL DROP

PRESSUREMAINDETENTIONTIME

SEWER IS NOT A PRESSURE MAIND< 4 HRS AT ADWF4 to 7.9 HRS AT ADWF

> 12 HRS AT ADWF

0234

12

6

0

FOR GRAVITY SEWERS

FOR PRESSURE MAIN INFLOWS

CLOSED U.S BRANCH SEWERS HAVE MODERATE DROPCLOSED U.S BRANCH SEWERS HAVE HIGH DROP

· sewer DN300· residential· open system= 0 points

· sewer < 375· significant B.O.D· closed system with

minimal drops= 3 points

4.4 points(add 2 points due topressure maindetention)

2.4 POINTS

FIGURE 401-B: EXAMPLE 1 OF H₂S RISK ASSESSMENT

RISK SCORE =(4050 x 0) + (10

50 x 3)= 0.6

F 1 = 40 l/s

0 POINTS

F 2 = 10 l/s

3 POINTS

· sewer < 375· residential· open system= 0 POINTS

· sewer < 375· significant B.O.D· closed system with

minimal drops= 3 POINTS

0.6 POINTS

CLOSEDSYSTEM

CLOSEDSYSTEM

RISK SCORE =(200250 x 5) + ( 50

250 x 0.6)= 4.1

· sewer DN375· significant B.O.D· closed system with

minimal drop= 5 POINTS

F 3 = 200 l/s

5 POINTS

VENTILATION +INDUCT

REFERRULE 2

HYBRIDPRESSURESEWERAGE/ GRAVITYSYSTEM

BT

3 UPDATED RISK SCORING CP / GA / RLSEP 20

· Factor A: Sewer size is usually provides a good approximation for sewerage age.· Factor B: discharges high in B.O.D typically come from production plants processing food, animal or

petrochemical products (eg: juice, leather, wool, meat, wine, beer etc).· Factor C: Turbulence is typically beneficial in Open Systems.

Exclude vortex drops.Minimal drop is < 5m of cumulative drop in upstream branch sewer MHs.Moderate drop is 5 to 10m of cumulative drop in upstream branch sewer MHs.High drop is >10m of cumulative drop in upstream branch sewer MHs.

· Factor D: Pumped flows which have been chemically treated for H 2S suppression shall be

considered not to or only partially increase H 2S risk.

8 to 12 HRS AT ADWF 4

4SEWER DN675 to DN750

REFERRULE 4

PUMP STATION

CLOSED RETIC MAIN

BT AREA

AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X

VERTICAL VENTTUBE REFERTABLE 402B-A

FOR CONCRETE NOTESREFER MRWA-S-402.

PILE LENGTH AS PERTABLE 402B-B

FSL

MIN COVER AS PERMRWA-S-201

150

CUT AND REMOVE REINFORCEMENTWHICH INTERFERES WITH VENTPIPEWORK. INSTALL ADDITIONAL BARS,REFER NOTE C3 ON MRWA-S-402

REINFORCED CONCRETE PILE

75 M

IN C

OVER

.10

0 MAX

. (TY

P.)

NOTE : NOT ALLVERTICAL BARS SHOWN

FOR CLARITY

SPIRAL LIG N8 (MIN.)HELIX 150 PITCH. 1.5

EXTRA TURNSTOP AND BOTTOM

FALL (5%)MIN SN8 PVC DWV PIPE TOAS/NZ 1266 (RRJ). SIZE AS PERMRWA-S-402B-C

900

L (RE

F TA

BLE

402B

-A)

STAINLESS STEEL (SS) DOUBLE NUTSWITH SS DOME NUTS TO FINISH. REFERFOUNDATION NOTES ON MRWA-S-402

HOLD DOWNBOLT CAGEREF FIG 402B-G

NOTE: * DENOTES MINIMUM SOCKET LENGTH INTO ROCK

RUBBER RING JOINTS

BLINDING LAYERREFER MRWA-S-402

FOUNDATION NOTES

LOCATING RINGS, AS REQUIRED6 THICK SS, TOP AND BOTTOM WITHSUITABLE LOCK NUTS TO ALLOWTHREADED ROD ADJUSTABILITY

IF HOLD DOWN BOLT CAGE (CIRCULAR) ANDVENT PIPE CLASH LOCALLY, A MAXIMUM OFTHREE No. HOLD DOWN BOLT EMBEDMENTMAY BE REDUCED FROM 600mm TO 400mm.COVER TO BOLTS TO BE MAINTAINED.

HOLD DOWNTHREADED

RODS, SS316

600 E

MBED

MENT

INTO

PILE

12 N20 VERTICALBARS EQUISPACED

100

10 THICK GUSSET PLATE EQUISPACED(REFER FLANGE MOUNTING DETAIL)Ø20 HOLES (X4)FOR GROUT INSERTION

HOLES FOR HOLDDOWN BOLTS,REFER TABLE 402-A

30 THICK BASE PLATE

101

12

5

3

79 2

11

6

4

8

TIGHTENING SEQUENCE

50

OD

1200

115

VENT TUBEREFER TABLE 402B-A

1.6 THICKCOVER PLATE

ANEMOMETER OPENING.FIX COVER TO VENT SHAFTWITH 4 x M8 TAMPER PROOFx 25 FULLY THREADEDFASTENERS THROUGHTHREADED HOLES IN VENTSHAFT. INSTALL WITHSPRING WASHERS.

1m MIN TO ANY EXISTING OR NEWSTRUCTURES. DO NOT UNDERMINE.REFER MRWA-S-402 FOUNDATION NOTES.

60°HEIG

HT: R

EFER

MRW

A-S-

402 V

ENT

NOTE

S

PCD

COWL, REFERMRWA-S-402

UPPER FLANGEJOINT, IF REQUIRED

8 BOLT ARRANGEMENT SHOWN,REFER TABLE 402B-A

PCD

OD

FULL STRENGTHBUTT WELD

1

2

34

5

67

8TIGHTENING SEQUENCE

20 THICK FLANGE PLATES. INSTALL 3THICK EDPM RUBBER GASKETBETWEEN UPPER FLANGE FACES

65MAX

65MAX

MAX.

>2000 MIN. CLEARANCETO ANY STRUCTURE

FOR HEIGHT, REFER MRWA-S-402NOTES FOR GUIDANCE. HEIGHTTO BE < THE MAXIMUM NOTED INTABLE 402B-A.

-

-

SPIRAL LIG N6 HELIX 150PITCH. 1.5 EXTRA TURNSTOP AND BOTTOM

12 x N20 BAR, EQUISPACED

BOLT END PLATESREFER TABLE 402B-D

REMOVE AS LITTLEREINFORCEMENTAS PRACTICAL

ADD ADDITIONAL N20 VERTICALBAR BOTH SIDES, 1500 LONG.REFER NOTE C3 ON MRWA-S-402

900

20

GUSSET PLATE, 10 THICK

VENT TUBE(REFER TABLE402B-A)

20 X 20 CUT OUT

SN8 PVC DWVPIPE, SIZED TOMATCH VENTTUBE.

50 MPa NON SHRINKAGECEMENTITIOUS

FLOWABLE GROUT

HOLD DOWN BOLT AS PERTABLE 402B-A,

4 THICK WASHERS ANDDOUBLE NUTS OR LOCK NUTS

D (DIAMETER)

50

130

30

600

RUBBER CAP

BOLT END PLATEREFER TABLE 402B-D

FIGURE 402B-B: TYPICAL UPPER LANGE DETAIL

FIGURE 402B-A: VENT SHAFT (ELEVATION)

FIGURE 402B-C: VENT TUBE BASE PLATE DETAIL

FIGURE 402B-D: VENT SHAFT FOUNDATION DETAILS (ELEVATION)

FIGURE 402B-E: SECTION 1

FIGURE 402B-G: HOLD DOWN BOLT CAGEDETAIL (ELEVATION)

FIGURE 402B-F: SECTION 2

75 MIN COVER100 MAX COVER

TABLE 402B-B: FOUNDATION PILE LENGTH FOR DIFFERENT SOILS (m)SOIL / ROCKTYPE

COHESIVE

GRANULAR

DESIGNPARAMETER

C U = 25 kPa

CONSISTENCY/ STRENGTH

FIRM

WEATHEREDROCK

STIFF

VERY STIFF

ɸ' = min 30°

HARD

LOOSE TO DENSEUSC < 0.5 MPa VERY LOW

LOW

3.2

150

2.5

2254.03.0

2.11.8

2.62.0

2.2 (1.3 *)1.8 (0.9 *)

3.53.0

1.6 (0.7 *)1.5 (0.6 *)

C U = 50 kPa

C U = 100 kPa

C U = 200 kPa

USC < 2.0 MPa

300

3.8

5.0

2.4

3.0

2.4 (1.5 *)

4.0

1.8 (0.9 *)

NOMINAL VENT DIAMETER

TABLE 402B-A: VENT TUBE, BASE PLATE AND UPPER FLANGE DETAILSNOM VENTDIAMETER

150

D.S SEWERAGEMAIN SIZE (DN)

225 to 375

MAX HEIGHT (m)

14

18

18

273.1

SCH

S40

O.D

168.3S80

323.9S40

450 to 525

600 to 750

I.D

254.6

146.4

304.8

VENT TUBE56 m/s

9

12

14

89 m/s

225

300

500

O.D

580

PCD

400480

550630

NO. HOLES

12

12

16

BASE PLATE

28

HOLE Ø

24

28

BOLT

M24

M20

M24

356

O.D

405

PCD

235280

406455

NO. HOLES

8

8

12

UPPER FLANGE

22

HOLE Ø

18

22

BOLT

M20

M16

M20

< 10m

10 to 25m

25 to 50m

TOTAL LENGTHAS VENT NOMINAL DIAMETER IN TABLE 402B-A

ON SIZE LARGER THAN NOMINAL VENT DIAMETER

TWO SIZES LARGER THAN NOMINAL VENT DIAMETER

BURIED VENT PIPE DIAMETERTABLE 402B-C: BURIED VENT PIPE DIAMETER

M20

M24

BOLT DIAMETER75

90

D

TABLE 402B-D: BOLT CAGEEND PLATE DIMENSIONS

12

16

T

FIGURE 402B-H: FLANGE MOUNTINGDETAIL (ELEVATION)

NOTES Regarding Table 402B-C:· Total length = vent tube length + buried

vent length.· If buried vent pipe > DN450, construct

buried vent pipe from PP or GRP.· Refer MRWA-S-103 for standard sizes

and determining what one size or twosizes larger mains.

· Transition to larger sized buried vent pipe&/or different material pipe usingapproved couplers and adaptors.

MRWA SEWERAGE STANDARDS

VERSIONISSUED

MELBOURNE RETAIL WATER AGENCIESDATE:DATE:

CHECKED:DRAWN:DESIGNED:

1 2 6 7 8 9 10 12113 4 5

H HGWWSEWYVW

DATENAME APPROVED:GWWSEWYVW

DATENAME

APPROVEDDATEDESCRIPTIONREV

A

1 2 63 4 5

B

C

D

A

E

F

G

1 2 6 7 8 9 10 12113 5

A

B

C

D

E

F

G

H

Planning Design Construction

R. JAGGERR. JAGGER

PRE-PUBLISHED DRAFT FROM PARENT 40212 PUBLISHED FIRST ISSUE FROM PARENT 402SEP 20 CP / GA / RL

2020 1CP / GA / WSNOV 19

ALL DIMENSIONS IN mm UNLESS STATED OTHERWISE NOV 2019NOV 2019

G. ANTHONSENC. PAXMANW. SHIMMIELD

S. TRIKHA

R. LEOND. STEWART

SEP 20SEP 20SEP 20

SEP 20SEP 20SEP 20

NOT TO SCALE

VENT CONSTRUCTION DETAILSMRWA-S-402B

10 to 25m

AS LO

NG A

S PO

SSIB

LE. T

YPIC

ALLY

6m A

VAILA

BLE

FIGURE 402B-I: GROUND LEVEL VENT ARRANGEMENT(ISOMETRIC CUT THROUGH CENTRE)

· Only place ground level vents in non-trafficable areas.· Ground level square grate shall be galvanised steel class B.· Sealed lower level covers and frames as per Figures 301-B (DN150 &

DN225) and Figure 305-C (DN300) with DWV cap removed.· Set level of lower cover and frame to maintain > 30 clearance between the

top of the Air Admittance Valve and the underneath of the grated cover.· Lower cover: solid top class D, bolted down with 50Ø equi-spaced holes

drilled through cover midway between load bars (ribs) of cover.· BSP thread tap the 50Ø cover holes and fit Air Admittance Valves.· < DN225 vents require 4 holes and Air Admittance Valves in the cover.· DN300 vents require 6 holes and Air Admittance Valves in the cover.· Cover FSL shall be as per Table 313-E.

FRAME & CONCRETE SURROUNDFOR GRATED COVER

SHROUD

AIR ADMITTANCE VALVES

FRAME AND CONCRETESURROUND FOR SOLID

TOP COVER

GRATED SQUARECOVER AT FSL

>30

SOLIDTOP

COVER

Ø50 HOLESTAPPED WITHBSP THREAD

INTERNALDIAMETER

50 - 100

10 T

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
8
AutoCAD SHX Text
10
AutoCAD SHX Text
6
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X

MRWA SEWERAGE STANDARDS

VERSIONISSUED

MELBOURNE RETAIL WATER AGENCIESDATE:

DATE:

CHECKED:DRAWN:DESIGNED:

1 2 6 7 8 9 10 12113 4 5

H HGWW

SEW

YVW

DATENAME APPROVED:

GWW

SEW

YVW

DATENAME

APPROVEDDATEDESCRIPTIONREV

A

1 2 63 4 5

B

C

D

A

E

F

G

1 2 6 7 8 9 10 12113 5

A

B

C

D

E

F

G

H

Planning Design Construction

R. JAGGERR. JAGGER

D. MOOREC. PAXMANK. DAWSON

R. CARRUTHERS

J. TOMASI

1 JULY 20151 JULY 2015

PRE-PUBLISHED DRAFT1

2 PUBLISHED FIRST ISSUE 01/10/15 CP / JT / KD / RJ

2015 1CP / JT / KD / RJ

D. O'DONOVAN01/09/1501/09/1501/09/15

01/09/1501/09/1501/09/1501/03/15

ALL DIMENSIONS IN mm UNLESS STATED OTHERWISE NOT TO SCALE

VENTS - GENERALMRWA-S-402

FOUNDATION NOTES:F1. Pile standards are not suitable in aggressive soil conditions such as acid sulphate soils, salt rich soils and

soils in areas affected by salinity.F2. Pile standards designed for ultimate limit state loading and it has been assumed not to be sensitive to

deflection.F3. The designer shall nominate the required pile length and the assumed ground conditions.F4. A qualified geotechnical engineer shall inspect the pile excavation and confirm that the ground conditions

encountered on site are consistent with those nominated by the designer and the pile length proposed(refer Table 402B-B). This standard allows for 900mm depth of low resistance soil from surface toaccommodate for variable or poor near surface soils.

F5. Design advice to be sought should the piles by installed on sloping ground (> 1 in 7), below groundwatertable, on fill material or within 2m of slope crest.

F6. The drilled shaft shall be clean of loose debris, top soil, root material, water or collapsed material prior toplacement of concrete.

F7. Contractor shall not commence excavation if a rain event is forecast that day.F8. Pile excavation shall not be left open for more than 24 hours. Design advice shall be sought for delays in

pouring concrete under exceptional circumstances.F9. Where the foundation becomes softened or loosened due to adverse weather, ground seepage, or other

causes, all soft or loose materials shall be removed down to where the encountered ground conditions areas nominated by the designer and replaced by 6% cement stabilised sand or concrete.

F10. Any over excavation shall be backfilled with blinding concrete class N-20 mass concrete to AS 1379.Blinding concrete shall be placed as soon as possible within 24 hrs following excavation to avoid softeningor drying out of the base soil.

F11. Excavation near existing footings shall not extend below the footing base level without approval of thefooting's asset owner. Any such potential undermining conditions shall be referred to the footing's assetowner immediately for resolution.

DESIGN WIND SPEED NOTES:D1. The vent stack structural design has been designed on the basis of the following:

i) design wind speed of 89 m/s has a resulting design wind pressure of 3.7 kpaii) design wind speed of 56 m/s has a resulting design wind pressure of 1.5 kpa

D2. Wind speed to be determined by a suitably qualified and experienced structural engineer in accordance withAS 1170.2 Structural Design Actions: Wind Actions.

D3. As a guide only, the two factors affect the wind speed category of a site: Terrain Category (TC) andTopography Multiplier (MT).

D4. Terrain Categories are defined in AS 1170.2: 2011 (AMD 5) and can be summarised as :a. Category 1: Very exposed open terrain with few or no obstructions. e.g. flat, treeless, poorly grassed

plains; rivers, canals and lakes.b. Category 2: Open terrain, including grassland, with well scattered obstructions having heights generally

from 1.5m to 5m.e.g. farmland and cleared subdivisions.

c. Category 2.5: Intermediate between TC2 and TC3 and represents the terrain in developing outer urbanareas with scattered houses, or large acreage developments with fewer than ten buildings per hectare.

d. Category 3: Terrain with numerous closely spaced obstructions having heights generally from 3m - 10m.e.g. suburban housing with at least 10 house sized obstructions per hectare or light industrial estates.

e. Category 4: terrain with numerous large, high (10 - 30m tall) and closely spaced obstructions such aslarge city centres and well developed industrial complexes.

D5. Topographic Multiplier (MT) ranges from 1.0 (minimum, classed as not on a hill) to 1.71 (maximum).D6. The relationship between MT and TC can be seen in Table 402-A.

Note, this is valid for the Melbourne region only (A1 - A5), a design life of 50 years and importance level 2.

VENT & COWLING SELECTION NOTES:V1. For sewage mains > DN750, a custom vent stack design shall be completed.V2. Vent location, colour and height to be determined in consultation with the applicable Water Agency.

Specifications for these requirements shall be established on a case-by-case basis.V3. Vent colour is recommended to match the existing environment that it is placed in, noting the colour of

surrounding buildings and existing utility poles.V4. A risk assessment (which may include odour dispersion modelling) shall be undertaken to establish an

appropriate height for the vent stack and the type of cowling. It shall consider the risk level of the sewage (referMRWA-S-401), the position of the vent in the network, TC and MT, nearby vegetation, nearby buildings andland use.As a guide:· Vents with air induct cowls may be reduced to 3m in height.

Such vents will typically be the upper most vents in the system and so are typically air induct vents.· Vents shall extend 2m above the height of adjacent buildings.

A building is considered adjacent to the vent stack if it is within five times the minimum of projectedbuilding width or building height (whichever is greater).The projected building width is indicated in the Figure 402-C.

· Vents shall extend above the vegetation canopy.· Vents shall be > 7m high in open parkland.· Vents shall be > 9m high in residential areas.· Vents shall be > 12m high in high density areas or public thoroughfares.· Vent height may be reduced where there is air treatment &/or forced ventilation..

STEELWORK & FASTENER NOTES:S1. All workmanship and materials to be in accordance with AS 4100 (steel structures), AS 1554 (structural

welding) and AS 4855 (weld consumables).S2. The inspection and testing of all welds shall be carried out by qualified personnel in accordance with AS 2214.S3. All plates to be stainless steel grade 316L to ASTM A240 uno.S4. Vent stack to be stainless steel grade 316L to ASTM A312 uno.S5. Vent steelwork to be matt finish. Glass bead blast abrade to RA 3.5 to 4.5 micron surface roughness.

Do not paint unless directed by the Water Agency.S6. All fasteners to be stainless steel grade 316L (A4) to ASTM A276 uno.S7. All bolts shall be of such length that at least two full threads are exposed beyond the nut after the nut has been

tightened.S8. Fasten lower flange to snug fit.S9. Fasten upper flange using the part-turn method or load indicating washers in accordance with AS 4100.

Calibrated torque wrenches shall not be used. A hardened washer shall be used under the bolt head or nut,whichever is rotated. The reuse of fully tensioned bolts is prohibited.

S10. Hammer pin welds and tow grind all welds after the cessation of welding.S11. No stop-start positions of the weld within 40mm of the end of the stiffener.S12. Vent tubes shall be joined using only the prescribed flange joint as per Figure 402B-B.

Vent tubes shall not be welded together.S13. Minimise the number of vent tube joints by using vent tube of the longest available length (typically 6m).

CONCRETE NOTES:C1. Refer to MRWA-S-309 for concrete and reinforcement requirements in addition to those stated within

MRWA-S-402B and the notes below.C2. Pouring of concrete shall be in a single pour.C3. Longitudinal reinforcing bar to be locally cut to avoid clash with penetrating pipe. Additional

longitudinal bars are to be added either side of penetrating pipe and be lapped 750mm min with the cut barabove and below pipe. Ligatures are to be locally cut around penetrating pipe.

C4. All reinforcement shown in MRWA-W-402B is represented diagrammatically and not necessarily shown intrue projection.

C5. Erect vent stack when concrete base is greater than 25 MPa strength.

TABLE 402-A: WINDSPEED (m/s)

56

2.5

56

TOPO

GRAP

HIC

MULT

IPLIE

R (M

T)

TERRAIN CATEGORY (TC)

1.0

1.1

1.2

1.0

56

56

3.0

56

2.0

56

56

56

4.0

56

56

56561.3

1.4

56

89

5656

56

56 56

56

89891.5

1.6

89

89

8989

89

89 89

89

89891.71

89

89

8989

89

89 89

89

WIRE 2.5Ø, SPOT WELDED TO RIBS ATALL INTERSECTIONS

VENT SHAFT

30NECK SLEEVE, 1.6 THICK.SNUG FIT INTO VENT SHAFT.

WIND VANE DESIGNED TO ENSUREOPENING FACES INTO THE WIND.SURFACE AREA > 2 x p(VENT R)2

COWL TO ROTATE FREELY RELATIVETO VENT SHAFT USING 2 x Ø15 SS316BEARINGS LOCATED IN THROAT OFINTERNAL SPIDER STRUT.

OPENING ROTATES TO FACE WINDDIRECTION.COVER OPENING WITH 10 x 10 SS316OR 304 MESH IF LESS THAN 3m ABOVEGROUND.

VENT SHAFT Ø + 100

6 OR MORE U SHAPED RIBS, 4 THICK.SECURELY SPOT WELD TO NECK ATALL INTERSECTIONS.

FIX COWL TO VENT SHAFT WITH 8 x FULLYTHREADED M6 x 25 FASTENERS THROUGHTAPPED HOLES IN VENT SHAFT. INSTALLWITH SPRING WASHERS.

FIX COWL TO VENT SHAFT WITH 4 x SS316FULLY THREADED M6 x 25 FASTENERSTHROUGH TAPPED HOLES IN VENT SHAFT.INSTALL WITH SS316 SPRING WASHERS.

NOTE: ALL MATERIALS TO BE GRADE SS316

FIGURE 402-A: EDUCT COWL ELEVATION (NTS)

NOTE: ALL MATERIALS TO BE GRADE SS316

FIGURE 402-B: ROTATING INDUCT COWL (ISOMETRIC) (NTS)

BUILD

ING

VENT STACK

FIGURE 402-C: ADJACENT BUILDING EXAMPLE (NTS)

A = DISTANCE TO BUILDING

(AT CLOSEST POINT)

B = PROJECTED WIDTH(FROM NORMAL TO BUILDING CENTRE)

Building is adjacent as A < 5 x B

3 ADD DETAILS. REMOVE STRUCTURAL FIGS CP / GA / RLSEP 20

AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X

MRWA SEWERAGE STANDARDS

VERSIONISSUED

MELBOURNE RETAIL WATER AGENCIESDATE:

DATE:

CHECKED:DRAWN:DESIGNED:

1 2 6 7 8 9 10 12113 4 5

H HGWW

SEW

YVW

DATENAME APPROVED:

GWW

SEW

YVW

DATENAME

APPROVEDDATEDESCRIPTIONREV

A

1 2 63 4 5

B

C

D

A

E

F

G

1 2 6 7 8 9 10 12113 5

A

B

C

D

E

F

G

H

Planning Design Construction

R. JAGGERR. JAGGER

D. MOOREC. PAXMANK. DAWSON

R. CARRUTHERS

J. TOMASI

1 JULY 20151 JULY 2015

PRE-PUBLISHED DRAFT1

2 PUBLISHED FIRST ISSUE 01/10/15 CP / JT / KD / RJ

2015 1CP / JT / KD / RJ

D. O'DONOVAN01/09/1501/09/1501/09/15

01/09/1501/09/1501/09/1501/03/15

ALL DIMENSIONS IN mm UNLESS STATED OTHERWISE

MRWA-S-403NOT TO SCALE

WATER SEALSAND

MARKER POSTS

FIGURE 403-A: SEGMENTED BEND WATER SEAL CONNECTING TO A CONCRETE MAINTENANCE HOLE

FIGURE 403-B: PVC DWV WATER SEAL CONNECTING TO A PLASTIC MH

>50

>100

<2000

UPSTREAM MAINTENANCESTRUCTURE:· < 50m AWAY (GWW & SEW)· MC or MH 2m AWAY (YVW)

<2000

Type B (cement stabilised)embedment requiredwithin 1m of Water Seal

Type B (cement stabilised)embedment required within

1m of Water Seal

3 DS OF WATER SEALS, MHs ONLY. 1 / 2 PIECE CP / GA / RLSEP 20

STRUCTUREDOWNSTREAM OF

WATER SEALSSHALL BE A MH

FULL-RANGE MARKER REQUIRED AT UPSTREAMEND OF WATER SEALS (REFER FIGURE 104B-B)

FULL-RANGE MARKER REQUIRED AT UPSTREAMEND OF WATER SEALS (REFER FIGURE 104B-B)

UPSTREAM MAINTENANCESTRUCTURE SHALL BEVENTED IF WATER SEAL> DN300

>50>100

NOTES Regarding Marker Post:1. Install marker post where maintenance structures or

bends are located in public land where there may be:1.1. long grass1.2. significant vegetation

2. Install 1m from maintenance structures with themarker plate facing towards the structure's cover.

STRUCTUREDOWNSTREAM OF

WATER SEALSSHALL BE A MH

350 ± 50

>50

>250

FIGURE 403-C: MARKER POST FOR SEWERS

MARKER PLATE MADE OFVINYL, ALUMINIUM, FIXEDWITH M3 SS316 FASTENERS

GREEN POST. MADE FROMGALVANISED STEEL, PAINTEDHARDWOOD OR PLASTIC

REFLECTOR DISC (GREEN)

BOLT OR PIN

CEMENT STABILISED SOIL (5%)

1500

+/-

200

SEWER

MATERIAL AND INSTALLATION REQUIREMENTS OF WATER SEALS:1. Water seals shall be included in designs when specified by the Water Agency.2. With one exception, any > DN150 pipe system specified within Table 103-A may be used to construct water seals.

FW GRP pipe may only be used for Water Seals where this is expressly stated in the product data sheet listed in the MRWA products portal.3. Where practical, the number of pieces used in a Water Seal shall be minimised by using prefabricated sections of combined bends.

Water Seals can typically be made as one or two piece fabrications by suppliers.4. Only 22.5 degree Long Radius Bends may be used in the construction of Water Seals in accordance with Table 104B-A.

Bends for Water Seals shall differ from those specified in Table 104B-A in one respect.DN225 DWV Water Seals shall be fabricated from segmented DN225 DWV pipe.

5. Whole of sewer line containing the Water Seal shall be constructed of the same pipeline product (eg: all PVC-DWV, all PP, all PE).6. Embedment around and within 1m of the Water Seal shall be Type B (cement stabilised).

Refer to MRWA-S-202 for details.7. Water Seals shall be filled with water and CCTV'd to confirm that they are pipe full and there is no air gap at the lowest point.

Push rod CCTV may be used. CCTV footage shall be supplied with the As Constructed records.

NEIGHBOURING STRUCTURES AND LOCATION OF WATER SEALS:A. Next structure upstream of > DN300 Water Seals shall be vented in accordance with MRWA-S-402 and 402B.B. Water Seal maintenance structures require vehicular access. Locate within the road reserve or within public open space with vehicular access.C. Water Seals shall not be located within private land.D. Water Seals shall not be located under road pavement.E. Locate Water Seals adjacent to and as close as possible upstream of a MH (ie: within 2000).F. Next structure upstream of > DN300 Water Seals shall be vented in accordance with MRWA-S-401.G. Water Seals > 6m deep require Water Agency approval.

ENSURE RRJs AT BOTH ENDS OFWATER SEALS TO PROVIDE FLEXIBILITY

AND ENABLE ACCURATE ALIGNMENT

UPSTREAM MAINTENANCE STRUCTURE:· < 50m AWAY (GWW & SEW)· MC or MH 2m AWAY (YVW)

PRE-FABRICATED ONE / TWOPIECE WATER SEALS

IF DWV, PP OR GRP, PROVIDE RRJs AT BOTH ENDS OF WATER SEALSTO PROVIDE FLEXIBILITY TO ENABLE ACCURATE ALIGNMENT

PRE-FABRICATED ONE / TWOPIECE DWV WATER SEALS

Type B (cement stabilised) embedmentrequired within 1m of Water Seal

<1000

GRP SHOWN. PE, PP AND DWV MITER JOINT BEND WATERSEALS SHALL BE CONSTRUCTED AS SHOWN.FABRICATED MITRE JOINT BENDS SHALL COMPLY WITH TABLE 104B-B, FIGURE 104B-A AND ASSOCIATED NOTES.

AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X

MRWA SEWERAGE STANDARDS

VERSIONISSUED

MELBOURNE RETAIL WATER AGENCIESDATE:

DATE:

CHECKED:DRAWN:DESIGNED:

1 2 6 7 8 9 10 12113 4 5

H HGWW

SEW

YVW

DATENAME APPROVED:

GWW

SEW

YVW

DATENAME

APPROVEDDATEDESCRIPTIONREV

A

1 2 63 4 5

B

C

D

A

E

F

G

1 2 6 7 8 9 10 12113 5

A

B

C

D

E

F

G

H

Planning Design Construction

R. JAGGERR. JAGGER

D. MOOREC. PAXMANK. DAWSON

R. CARRUTHERS

J. TOMASI

1 JULY 20151 JULY 2015

PRE-PUBLISHED DRAFT1

2 PUBLISHED FIRST ISSUE 01/10/15 CP / JT / KD / RJ

2015 1CP / JT / KD / RJ

D. O'DONOVAN01/09/1501/09/1501/09/15

01/09/1501/09/1501/09/1501/03/15

ALL DIMENSIONS IN mm UNLESS STATED OTHERWISE NOT TO SCALE

EMERGENCY RELIEF STRUCTURE DESIGNMRWA-S-404

SEWERAGE MAIN

>75

OVERFLOWMONITORING PIT(REFER FIGURE

406-A)OFFTAKE

MAINTENANCEHOLE (REFERMRWA-S-300

SERIES DRAWINGS)

SEWERAGEDISCHARGEOUTLET (REFERFIGURES 406-B to F)

FIGURE 404-A: GENERAL ARRANGEMENTS AND LEVELS(WHERE THERE IS ADEQUATE DISTANCE BETWEEN THE OFFTAKE MHAND OVERFLOW MONITORING PIT TO INSTALL BACK FALLING SEWER)

SEWERAGE MAIN

OVERFLOWMONITORING PIT(REFER FIGURE

406-A)SEWERAGEDISCHARGE(REFER FIGURES406-B, E & F)

OFFTAKEMAINTENANCEHOLE (REFER

MRWA-S-300 SERIESSTANDARDS)

FIGURE 404-B: GENERAL ARRANGEMENT B(WHERE THERE IS NOT ADEQUATE DISTANCE BETWEEN OFFTAKE MH AND OVERFLOW

MONITORING PIT TO INSTALL BACK FALLING SEWER)

SPILL LEVEL

GENERAL NOTES Regarding ERSs:1. ERSs shall be provided on advice from the Water Agency.2. The Water Agency may specify the approximate location, spill level and capacity of the overflow.3. Discharge preferences as follows:

3.1. Drainage pit3.2. Waterway3.3. Drainage pipe

4. Where the discharge point and Offtake MH are less than 800 apart, consult with the Water Agency aboutalternative overflow monitoring arrangements.

5. Obtain approval for and conditions of connection to the stormwater system or waterway from the relevant authority.The relevant authorities' conditions shall take precedence over any conditions stated within this standard.

6. Maximise the height of the discharge point within a waterway embankment.

MIN 800

SPILLLEVEL

CONCRETEWALL

~75

~75

INSTALL SHAFTCONNECTION ASPER MRWA-S-311

"TEE" FITTING TO BE THESAME PIPE MATERIAL ASSEWER OVERFLOW PIPE

STEEPER THANMIN GRADE

YVW & SEWREQUIRE LEVELMONITORING INOFFTAKE MH

SEW and YVW REQUIRELEVEL MONITORING IN

OFFTAKE MAINTENANCEHOLE (AS PER FIGURE 404-A)

3 DESIGN REQUIREMENTS CLARIFIED CP / GA / RLSEP 20

FLATTER THANMAX GRADESEWERAGE MAIN

MOST SPILLPRONE

MAINTENANCESTRUCTURE IN

UPSTREAMCATCHMENT

DISCHARGE PIPE,CAPACITY > PWWF

FINISHED SURFACE LEVEL (FSL)

MAX HYDRAULIC GRADE LINE (HGL) >500 (ie: FSL > HGL + 500)

OVERFLOW OBVERT

OVERFLOW PIPE

STEEPER THAN

MIN GRADE

MAX HYDRAULIC GRADE LINE (HGL)

>500 (ie: FSL > HGL + 500)

NOTES Regarding ERS Levels and Pipe Hydraulics:1. The designer shall specify the points of connection and the location, diameter, material type and inverts of all pipework,

maintenance structures and pits.2. The overflow pipe shall be designed for spills equal to Peak Wet Weather Flow (PWWF).3. ERS levels and diameters shall be calculated as follows:

3.1. Determine the most spill prone catchment MH and its FSL. Deduct 500.3.2. Calculate the head loss between this MH and the overflow monitoring pit at PWWF. Deduct this from the above (step 3.1).3.3. Determine FSL at the the Offtake MH. Deduct 500 and the overflow pipe headloss at PWWF.3.4. The obvert of the ERS overflow pipe at the monitoring pit shall be the lower of steps 3.2 or 3.3 calculated levels.3.5. Calculate the required diameter of the overflow pipe so that the pipe full velocity is < 3 m/s at PWWF.3.6. Deduct the overflow pipe diameter from the obvert calculated in step 3.4. This becomes the "Spill Level".3.7. Ensure that the Spill Level is above the required top sewage level of any emergency storage or wet well.3.8. Calculate the invert level of the ERS overflow pipe at the offtake MH using: Spill Level - (grade x overflow main length).3.9. Modify overflow pipe grade if necessary to ensure that:

3.9.1. the Spill Level is >75 above the obvert of the overflow pipe at the offtake MH.3.9.2. the overflow pipe is steeper than the minimum grade.

3.10. Estimate the diameter of the discharge pipe so that it is < pipe full at PWWF.3.11. Deduct the discharge pipe diameter from the Spill Level. This shall be the upstream invert of the discharge pipe.3.12. Determine the optimum discharge level into the waterway or stormwater system.3.13. Confirm that the diameter and grade of the discharge main are appropriate and adjust as required to ensure grade is within

gravity pipeline limits and pipe capacity is adequate.4. Calculations shall be submitted to the Water Agency with the design.

FINISHED SURFACE LEVEL (FSL)

SPILL LEVEL

OVERFLOW PIPE HEADLOSS

HEADLOSS BETWEEN MOST SPILL PRONE CATCHMENTMAINTENANCE STRUCTURE AND OVERFLOW MONITORING PIT

THE DESIGNER SHALL:SEW- Designate Blockaid level so that there is 2 hrs at PDWF volume between the blockaid level and spill level, or

if this is not possible, 1m below the spill level.Specify that SEW shall be contacted to arrange for SEW monitoring equipment to be installed in both theOfftake MH and Overflow Monitoring Pit.

YVW- Specify installation of monitoring in the Overflow Monitoring Pit as per Figure 406-A.Specify installation of the same hydrostatic level monitoring plus an additional float switch in the Offtake MH.

AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X

MORTAR

EROSIONPROTECTION(GEOTEXTILE ORROCK BEACHING)

HEADWALL,OVERSIZE ONESIZE > PIPE DN

BOTTOMSCREEN(GRID SPACING 100x30 NOM)

TOP SCREEN(GAL SL81 MESH)

100 GAP FOROVERFLOWFIGURE 406-B: SEWER OVERFLOW TO WATERWAY (SECTION)

FIGURE 406-D: END ELEVATION

FIGURE 406-C: SECTIONAL PLAN

FIX BRACKETS TO HEADWALL USINGMASONARY ANCHORS, REF 314-F to H

DRILL HOLES THROUGHWALL TO FASTEN BRACKETS

NOTES Regarding Figures 406-B, C & D:A. Screens and brackets to be hot dipped galvanised mild steel or stainless steel minimum grade 316.B. Fasteners and masonry anchors to be 316 stainless steel.

CEMENT STABILISE BACKFILL PIPEWHERE COVER IS LESS THAN 450

NON-RETURN FLAPVALVE TO MATCHSEWER OVERFLOW PIPE

-D

ROUGHEN PIPE AND SEALWITH COMPO, REFERTABLE 500-B

-CFSL

MRWA SEWERAGE STANDARDS

VERSIONISSUED

MELBOURNE RETAIL WATER AGENCIESDATE:

DATE:

CHECKED:DRAWN:DESIGNED:

1 2 6 7 8 9 10 12113 4 5

H HGWW

SEW

YVW

DATENAME APPROVED:

GWW

SEW

YVW

DATENAME

APPROVEDDATEDESCRIPTIONREV

A

1 2 63 4 5

B

C

D

A

E

F

G

1 2 6 7 8 9 10 12113 5

A

B

C

D

E

F

G

H

Planning Design Construction

R. JAGGERR. JAGGER

NOV 2019NOV 2019

PRE-PUBLISHED DRAFT. FROM PARENT 4041

2 PUBLISHED FIRST ISSUE. FROM PARENT 404 SEP 20 CP / GA / RL

2020 1CP / GA / WSNOV 19

ALL DIMENSIONS IN mm UNLESS STATED OTHERWISE

G. ANTHONSENC. PAXMANH. GERHARD

S. TRIKHA

R. LEOND. STEWART

SEP 20SEP 20SEP 20

SEP 20SEP 20SEP 20

NOT TO SCALE

EMERGENCY RELIEF STRUCTURESCONSTRUCTION DETAILS

MRWA-S-406

INSTALL AT MINIMUMGRADE (REFER TABLE103-A)

EXTENT OFEXCAVATION

NOTES Regarding Figure 406- E & F:1. Obtain approval for and conditions of connection to the storm water system from the drainage authority. The drainage

authorities conditions shall take precedence over any conditions stated within this standard.2. Diameter of sewer discharge pipe must be less than half the diameter of any existing drain.3. Connect the sewer pipe to the storm water drain or pit at between 45° and 90° of the upstream alignment of the drain.4. Construct as follows:

4.1. Do not undertake works during or shortly after wet weather events where the water level in the storm water drainmay approach the level of the cut out.

4.2. Mark the centre of the hole to be cut, ensuring the connection is as high as possible (while not connecting withinDrain Ø/6 of the crown of a drain).

4.3. For connections into R.C drainage pipe or pits, carefully break through concrete, keeping the reinforcement intactand minimising the overbreak (to < 50).Cut any reinforcement centrally and bend bars back and into the space to be concrete encased.For larger drains, fix additional reinforcement bars above the drain to beyond the crown of the drain.

4.4. For connections into plastic / GRP drainage pipe, machine core a hole through the drain no more than 20 greaterin diameter than the outside diameter of the sewer overflow pipe.

4.5. Profile the end of the sewer overflow pipe so that it matches the curvature of the storm water drain / pit at thatlocation.

4.6. Using the Jointing Compound specified in Table 503-C, prepare the end of the sewer overflow pipe with the toensure this pipe bonds adequately to the drainage pipe or pit. Wait until the bonding agent has satisfactorily set.

4.7. Draw a witness mark on the sewer overflow pipe, set back the thickness of the storm water pit (if connecting topit) or the thickness of the pipe - 10 (if connecting to a pipe).

4.8. Insert the sewer overflow pipe into the cut out to the witness mark.It is essential that the overflow pipe does not over extend into the storm water drain.

4.9. Compo (ref Table 500-B) fill the gap around pipe penetration and produce a fillet 50 (in radius) around the outsideof the join.Finish the inside mortar from within the pit or drain if practicable to ensure a clean inside finish.

4.10. Embed the joint in concrete to a minimum 500 back from joint.Ensure minimum 65 clear cover of reinforcement is achieved.

4.11. Bed and backfill as per MRWA-S-201 & 202 after concrete has set (ie: min 24 hours after placement).

MAXIMISE THE HEIGHT OF THECONNECTION WHILE ENSURINGOBVERT OF CONNECTION IS > DRAINØ/6 BELOW OBVERT OF DRAIN

DISCHARGE PIPE

REINFORCEDCONCRETE STORM

WATER DRAINSHOWN

EMBEDMENT

CONCRETE

FLAP GATE

DISCHARGE PIPE

> 500

ENSURE MORTAR ANDSEWER PIPE DO NOTEXTEND INTO DRAIN

~50

FIGURE 406-F: SEWER OVERFLOW TO STORM WATER DRAIN CONNECTION

EMBEDMENT

EXTENT OFEXCAVATION

DISCHARGE PIPE

STORMWATER

PIT

CONCRETE

> 500

~50

FINISH MORTARFLUSH WITH PIT WALL

COMPO, REFTABLE 500-B

FIGURE 406-E: SEWER OVERFLOW TO STORM WATER PIT CONNECTION

BACKFILL BACKFILL

<50 <5

0

MAXIMISE THEHEIGHT OF THECONNECTION

NOTES Regarding Figure 406-A:1. GWW and YVW monitoring arrangements shown.

Contact SEW to arrange for SEW monitoring equipment to be installed inboth the Offtake MH and Overflow Monitoring Pit.

2. Support stilling tube with brackets top and bottom.Add centrally to maintain no more than 1.5m spacing between brackets.

3. Locate stilling tube 100 from step irons.

4. Discharge pipe upstream obvert shall be < spill level.5. Above ground electrical and telemetry connections and level sensor as per

Water Agency requirements.6. Flap gate not required in overflow monitoring pit where discharge is to

waterway as per Figure 406-B.7. Initially, locate pre-cast pit on an undersized bed of compacted embedment

material to enable concrete to later support the underside perimeter of the pit.

FIGURE 406-A: SEWER OVERFLOW MONITORING PIT (SECTION)

CONCRETE> 500

EMBEDMENT

30 GAP

600 600

PITREINFORCEMENT

REINFORCEMENT IFCONCRETE DRAIN

INSTALL REINFORCEDCONCRETE PASTCROWN OF DRAIN

> DRAIN Ø 6

DRAIN PIPEREINFORCEMENT

HEADWALL,OVERSIZE ONESIZE > PIPE DN

~30

EMBEDMENT

EXTENT OF EXCAVATION

SEWER OVERFLOW PIPE

900 x 600 PRE-CAST PIT(WITH STEP IRONS AND

TOP AS PERMRWA-S-313B & 314)

CONCRETE

> 500

BACKFILL

SPILL LEVELEMBEDMENT

EMBEDMENTCONCRETE

FINISH MORTARFLUSH WITH PIT

WALL

<30

FLAPGATEDN100 SLOTTED ABS

STILLING TUBE WITH 4SLOTS AND 45° MITRED

CUT AT BASE

LEVEL SENSOR

SS316 BRACKET &M6 FASTENERS

DISCHARGE PIPE

> 50

200

10

2 x M16 SS316 BOLTS3°

MATCH INVERTAT END OFOVERFLOWPIPE WITHOBVERT ATBEGINNING OFDISCHARGEPIPE

~100

COMPO, REFTABLE 500-B

AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X