by Abdul Wahab Khan 11BNCIV:0382 Faisal Khan 11BNCIV:0392 Fazal Haq 11BNCIV:0398
Public Private Partnership in Urban InfrastructureA Case study of Peshawar Intercity Bus Terminal
SUPERVISOR/ADVISOR: Dr. Fayaz Ahmad Khan PRESENTED TO PROJECT EVALUATION COMMITTEE
![Page 3: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/3.jpg)
3
PRESENTATION CONNTENTS
• Literature Review• What is PPP?• Significance of PPP.• Urban infrastructure.• Bus terminal and its components.
• Problem statement• Objectives • Methodology• Work Schedule• References
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 4: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/4.jpg)
4
LITERATURE REVIEW
![Page 5: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/5.jpg)
5
What is PPP?
A business relationship between a private-sector company and a government
agency for the purpose of completing a project that will serve the public.
Two important characteristics of PPP.
• First, investment by the private sector.
• Second, most of the risk is transferred from the Government to the private
sector.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 6: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/6.jpg)
6
Significance of PPP
PPP is helpful because:
• Focus on outputs
• Expedited project completion
• Improved quality
• Use of private resources
• Risks are allocated to the party best able to manage the risk
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 7: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/7.jpg)
7
Urban infrastructure
Urban Infrastructure is the basic physical and organizational structure needed for the operation of a society.
Such as;
• Transportation system;
• Water and sewage system;
• Communication system;
• Social ,Cultural, sports and recreational facilities.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 8: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/8.jpg)
8
Bus terminal and its components.
Definition: A bus terminal is a structure where city or intercity buses stop to pickup and
drop off passenger having basic facilities.
Components of modern intercity bus service terminal:• Waiting lounges, with seating facilities and lightening facilities• Mosque, bank, facilitation office• Commercial and business areas(shopping malls, restaurants, hotels,
entertainment facilities etc.) • Communication facility, baggage check in system• Ticket booking/reservation system booths/online booking• Separate departure and arrival areas• Public information system
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 9: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/9.jpg)
9
Bus terminal and its components cont.:
• Departure bays, parking for all types of transport• Gender specific rest rooms• Rickshaw/taxi and urban transport stands• Workshops, washing/service areas• Gas filling station, security system• Transport company offices, driver training centers• Driver rest/lodges• Management offices, meeting auditorium• Vehicle inspection and certification centers
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 10: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/10.jpg)
10
PROBLEM STATEMENT
![Page 11: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/11.jpg)
11
Problem statement
• PPP has been adopted around the world as a service delivery tool, instead of
the public sector the private sector creates the asset through a dedicated
standalone business.
• In developed country 7 percent of GDP is invested on infrastructure to make a
balance between basic facilities and growing population, but in Pakistan we
invest less then 6 percent of GDP due to fiscal financial condition of country.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 12: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/12.jpg)
12
Problem statement
• Pakistan is a developing country. It is lacking infrastructure in every field.
• Due to lack of resources government are unable to start infrastructure projects
on a faster pace to meet the demand.
• Passengers using Peshawar bus terminal suffer as the general bus stand at
Peshawar lacks basic facilities.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 13: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/13.jpg)
13
OBJECTIVES
Main objectives are;• To develop a bus terminal in Peshawar through PPP that will lessen
the financial burden on government agencies.
• To reduce risks for government in developing infrastructure.
• To utilize the private sectors resources.
• To improve management and standard of Peshawar bus terminal.
• To improve maintenance and operational efficiency.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 14: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/14.jpg)
14
OBJECTIVES CONT:
• To provide clean and reliable vehicles.
• To provide Better and more user-friendly information(and services) for tourist.
• To improve travel time or reliability.
• To foster economic development.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 15: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/15.jpg)
15
METHODOLOGY
![Page 16: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/16.jpg)
16
PRELIMINARY STUDY PHASE
LITERATURE REVIEW ON PPP IN URBAN INFRASTRUCTURE
QUESTIONNAIRE SURVEY
DATA ANALYSIS PHASE
PREPARING QUESTIONNAIRE
QUESTIONNAIRE
INTERVIEWS
CONCLUSIONS AND RECOMMENDATIONS
DATA COLLECTION
PHASEINTERVIEWS
PILOT SURVEY
![Page 17: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/17.jpg)
17
METHODOLOGY
• PRELIMINARY STUDY PHASE.
• LITERATURE REVIEW ON PPP IN URBAN INFRASTRUCTURE. • DATA COLLECTION PHASE.
• DATA ANALYSIS PHASE .
• CONCLUSIONS AND RECOMMENDATIONS.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 18: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/18.jpg)
18
METHODOLOGY CONT:
PRELIMINARY STUDY PHASE:
• Including Macro overview of Peshawar city and existing bus terminals in Peshawar.
• Estimating the percentage of public using bus terminals for intercity travels per day.
• To find basic deficiencies in existing bus terminal.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 19: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/19.jpg)
19
METHODOLOGY CONT:
LITERATURE REVIEW ON PPP IN URBAN INFRASTRUCTURE:
• To study various material related to our projects, Including case studies of different bus terminals in other countries such as India, USA etc.
• PPP policies prepared for Pakistan by IPDF (Infrastructure Project Development Facility)
• PPP policies for Punjab.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 20: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/20.jpg)
20
METHODOLOGY CONT:
DATA COLLECTION PHASE:
• Preparing questionnaires, through which data will be collected from passengers and bus drivers using existing bus terminal.
• Pilot survey and
• Meetings with key officials of concern department, such as DOT, private operator of existing bus terminal.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 21: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/21.jpg)
21
METHODOLOGY CONT:
DATA ANALYSIS PHASE:
• To estimate the cost of new bus terminal.
• To analyze different risk involved in the project.
• To Develop Base Financial Model .
• Defining of revenue streams for private sector.
• Based on financial analysis, selection of PPP best practices.
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 22: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/22.jpg)
22
Proposed Time Schedule
•
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 23: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/23.jpg)
23
REFRENCES
• The World Bank, 2011. Public Private Partnership in Infrastructure – Resource Center for Contracts, Laws and Regulation
• WWW.ADB.ORG• WWW.PPPININDIA.COM• WWW.PPIAF.ORG• WWW.IPDF.GOV.PK• WWW.TBL.COM.PK• WWW.PUNJABTRANSPORT.COM• WWW.URBANUNIT.GOVT.PK• WWW.FINANCE.GOVT.PK• WWW.PC.GOVT.PK
Pub
lic P
rivat
e Pa
rtne
rshi
p in
Urb
an In
frast
ruct
ure
![Page 24: Bsc Project Proposal Defence](https://reader036.vdocuments.us/reader036/viewer/2022062410/5695d2051a28ab9b0298d389/html5/thumbnails/24.jpg)
24
SEQUENCE OF PRESENTATION
• Introduction• Literature Review
• Objectives
• Research Methodology• Work Schedule