bsbpmg522a : undertake project work diploma of business understanding assessment task 2 gantt charts

5
BSBPMG522A : UNDERTAKE PROJECT WORK DIPLOMA OF BUSINESS Understanding Assessment Task 2 GANTT CHARTS

Upload: joshua-barker

Post on 23-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BSBPMG522A : UNDERTAKE PROJECT WORK DIPLOMA OF BUSINESS Understanding Assessment Task 2 GANTT CHARTS

BS B P M G 5 2 2 A : U N D E RTA K E P R O J E C T W O R K

DIPLOMA OF BUSINESS

Understanding Assessment Task 2GANTT CHARTS

Page 3: BSBPMG522A : UNDERTAKE PROJECT WORK DIPLOMA OF BUSINESS Understanding Assessment Task 2 GANTT CHARTS

GANTT CHART : PURPOSE

• A Gantt chart is used to show what needs to be done in a project (tasks) and relate it to a timeline

• On the left of the chart is the list of tasks• On the top of the chart is a suitable timeline• Each activity is reflected by a bar. The length of the

bar is from the start date of the task till the end date of the task

• Your Gantt Chart must show:• All the things that need to be done in your project (tasks)• When the task starts and ends• How long (duration) a task is supposed to last• The start and end date of the whole project

Page 4: BSBPMG522A : UNDERTAKE PROJECT WORK DIPLOMA OF BUSINESS Understanding Assessment Task 2 GANTT CHARTS

GANTT CHART : EXAMPLE

• My project (Renovation of House) has 5 tasks1. Planning (for me to plan in detail what needs to be

done, budget, timeline)2. Get legal documents (permit from council to make sure

my renovation is approved, drawing from architect, etc)3. Finalise contractors (research online to find out who can

do the job and sign contract with contractors)4. Renovate the house 5. Check quality of renovation

Page 5: BSBPMG522A : UNDERTAKE PROJECT WORK DIPLOMA OF BUSINESS Understanding Assessment Task 2 GANTT CHARTS

GANTT CHART : EXAMPLE

• This is the Gantt Chart that I have created to manage my project, using Excel: