Are You Making These Risk Management Mistakes? Bryan Barrow CITP MAPM MBCS MPSA

©2016 Bryan Barrow

Are You Making These Risk Management Mistakes? Bryan Barrow CITP MAPM MBCS MPSA

TODAY’S AGENDA

• Why Manage Risk? • Black Swans • Failure: Infectious and

Avoidable • Throwing Away Bad Apples • The Case For Plan B • How to Create Plan A

WHY MANAGE RISK?

!me

cost

target

max

target max

LET’S LOOK AT PROJECTS

time

cost

target max

target

max

THIS IS WHERE WE SHOULD BE

time

cost

target max

target

max

THIS IS SEEN AS ACCEPTABLE

time

cost

target max

target

max

WHAT WOULD YOU CALL THIS?

BLACK SWANS

“ THE AVERAGE PROJECT

SCHEDULE OVERRUN

IS 70%”

SOURCE:HARVARDBUSINESSREVIEW(Sep2011),“WhyYourITProjectMayBeRiskierThanYouThink”

“17% OF PROJECTS HAD A COST OVERRUN OF

200%

” SOURCE:HARVARDBUSINESSREVIEW(Sep2011),“WhyYourITProjectMayBeRiskierThanYouThink”

“ THE AVERAGE PROJECT

COST OVERRUN IS

27%”

SOURCE:HARVARDBUSINESSREVIEW(Sep2011),“WhyYourITProjectMayBeRiskierThanYouThink”

FAILURE IS INFECTIOUS

!me

cost

target max

target

max

INSTEAD OF TIME VS. COST

!me

risk

100%

target max

LOOK AT TIME VS. RISK

!me

risk

100%

target max

LOOK AT TIME VERSUS RISK

TOP 10 MISTAKES

• People Mistakes • Process Mistakes • Publicity Mistakes

PEOPLE MISTAKES

1.  Not Involving your Team 2.  Ignoring People Risks 3.  Assuming the Worst Can’t

Happen

PROCESS MISTAKES

4.  Not identifying specific risks

5.  No contingency planning 6.  Mistaking risks for issues 7.  Not looking for new risks

PUBLICITY MISTAKES

8.  Not publicising risks to stakeholders

9.  Excluding partners from risk reviews

AND FINALLY . . .

10.  Having no risk management plans whatsoever!

THROWING AWAY BAD APPLES

STOP THESE PROJECTS!

POOR PROJECT PLAN

NO CONTINGENCY PLANS

NO RISK MANAGEMENT PLAN

NO EXIT CRITERIA

NO CONTINGENCY BUDGET

THE CASE FOR PLAN B

PREPARE PLAN B IN ADVANCE

“Most projects only have a ‘Plan A’. These projects are never successful because Plan A never works.” -- @bryanbarrow

Tweet this

FOCUS ON TOP 10 RISKS

80%ofproblemsissuesand

delays20%

ofrisks

HOW TO CREATE PLAN A

PLAN USING INDEX CARDS

BRYAN SAYS . . .

“You can successfully kick off even the most challenging projects but only if you have the right process and the right people.” -- @bryanbarrow

Tweet this

MY STORY

BRYAN SAYS . . .

“Just because life is full of risks, it doesn’t mean you have to be beaten by them -- Bryan Barrow”

Tweet this

Go to http://bryanbarrow.com/

FOR MORE INFORMATION . . .

• The Biggest Drawbacks Of The ‘Sticky Note’ Workshop

• How To Plan Your Project Using Index Cards

• The Business Benefits Of Facilitated Planning Workshops

EVEN MORE INFORMATION . . .

My take on running successful project kickoff workshops: •  How To Plan Your

Projects using Index Cards

•  Who should attend •  Converting outputs

to schedules in record time

Available on Amazon

END CREDITS

“THEFARAWAYEYES” TheFarawayEyesviaPhotopin

“BRICKWALL” VIZZualviaPhotopin

KANDYANPLATESPINNERS KandyanPlateSpinnersviaPhotopin

“BLACKSWAN” BirdaspoetryviaPhotopin

DOMINOES Unknown

“BLACKCOFFEE” JennyFaberviaPhotopin

“REDBULL” SpacePirate82viaPhotopin

“BUDDY” BryanBarrow,allrightsreserved

“BADAPPLES” RoreviaPhotopin

“PLANB” GoodToHaveviaPhotopin

“CauWon!Smombie! A_PeachviaFlickr

“AreYouMakingTheseRiskManagementMistakes”©2016BryanBarrow