Brunswick High School Feasibility Study
Community Meeting #02
March 7, 2019
![Page 2: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/2.jpg)
Today’s Agenda
1. Site Assessment
2. Building Assessment
3. Program Assessment
4. Stakeholder Engagement
5. Feasibility Study Scenarios
6. Breakout Stations
Q+A
![Page 3: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/3.jpg)
AprMarFebJan
Feasibility Phase
May
Data Collection
Report Preparation
Committee Meetings
Community Meetings
Final Report
Project Schedule
Feb 7th Mar 7th Apr 24th
![Page 4: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/4.jpg)
Educational
Specifications
Design Capacity 1000
![Page 5: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/5.jpg)
LITTLE LEAGUESITE ASSESSMENT
• Amazing natural views
• Upgraded baseball stadium
• Steep slopes – few flat areas to build on
• Hydric soil areas & wetlands – no build zones
HYDRIC SOILS & WETLANDSSite Assessment Findings
Hydric Soils
Wetlands
Steep Slope Area
+259
+255
![Page 6: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/6.jpg)
Building Assessment Findings
1963
1963
1963
19631992
19791982
Gym Addition
Vo-Tech Addition Vo-Tech
Addition
Original Building
Construction History
![Page 7: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/7.jpg)
Brunswick HS Improvements Timeline
1963 Original Building
1965 Year Occupied
1977 Stadium Press Box
1979 Vo-Tech Shop Addition
1982 Vo-Tech Addition
1989 Fire Sprinkler
1990 Auditorium Renovations
1991 Stadium Bleachers
1992 Gymnasium Addition
1993 Concession Stand + Restrooms
1998 Roof Replacement
1999 Tennis Court Restoration
2001 Track Resurfacing
2002 Boiler Replacement
2003 Technology Cabling / Voice-Data Network
2005 Gymnasium Roof
2009 Chiller/Cooling Tower Replacement
2011 HVAC Piping Replacement
2013 Security Vestibule
2015 Unit Ventilator Replacement
2016 Stadium Lighting
2017 Tennis Court Replacement
2017 Parking Improvements
2019 Performance Upgrades
Construction Project
Improvement Project
![Page 8: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/8.jpg)
Building Assessment Findings
EXTERIOR ITEMS – WALLS
• Insulation values below current standards
• Window perimeter sealant currently being replaced
• Original single-pane windows create drafts, condensation + leak
• No evidence of waterproofing in wall construction
• Exposed structural steel– radiates cold into building spaces
![Page 9: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/9.jpg)
Building Assessment Findings
EXTERIOR ITEMS – ROOF
• Roof and flashings have been well maintained – issues typically corrected quickly
• Insulation values below current standards
• Evidence of ponding water
• Roof nearing end of useful life
![Page 10: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/10.jpg)
Building Assessment Findings
CODES + ACCESSIBILITY
• Building is fully sprinklered (1989)
• Stair issues
• Structural movement / settlement
• Door clearances + hardware
• Toilet Room issues
• Building exits
• CTE / Arts building floor level
• Music Rm., Stage + Control Room
![Page 11: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/11.jpg)
Building Assessment Findings
MECHANICAL + ELECTRICAL ITEMS
• Boiler + chillers recently replaced but operating @ max capacity
• Some HVAC equip @ end of useful life + humidity problems in some areas of the building
• Electrical panels and rooms need updating
• Original lighting currently being replaced
![Page 12: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/12.jpg)
Program Assessment
Program area with 10% of Ed. Spec.
Program > 10% belowEd. Spec.
Program > 10% aboveEd. Spec.
Unprogrammed areas
Legend
Existing Program Spaces
2nd Floor 1st Floor
![Page 13: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/13.jpg)
Admin / Guidance
Program Assessment
Media Center
Collaboration
CR775 SF
CR775 SF
Classrooms
Special Ed.
Student Svcs.
Performing Arts Program area with 10% of Ed. Spec.
Program > 10% belowEd. Spec.
Program > 10% aboveEd. Spec.
Unprogrammed areas
Legend
Transition Ed.Business Ed.
Animal Science Horticulture
Food Service
PE & Athletics
Missing Program Spaces
![Page 14: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/14.jpg)
1
Stakeholder Engagement
What one thing would make the modernized BHS project a success for you?
• A welcoming, modern learning environment that is open, inviting, bright; with flexible learning spaces filled with natural daylight.
• Updated and expanded athletic and performing arts facilities – open for community use.
• Updated available technology and improved building systems to create a more healthy leaning environment.
• Facilities on par with other county high schools.• Continued emphasis on safe school environment.
![Page 15: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/15.jpg)
2
Stakeholder Engagement
What is unique and important about the legacy + spirit of BHS that should be considered?
• History of the railroad and canal – “Save the caboose”.
• Hard working, tight community – “small town feel with big school technology & opportunities”.
• Memorial trees• Baseball traditions and community’s
support of sports programs in general.
![Page 16: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/16.jpg)
What are your hopes + aspirations for this feasibility process?
3
Stakeholder Engagement
How does the existing BHS serve the broader community?
• Terrific Arts, and Theatre programs• Sports and “Friday Night Lights”• July 4th celebrations & Community Show• Tradition of student volunteerism with
local youth groups and activities
![Page 17: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/17.jpg)
3
Stakeholder Engagement
How could this improve?
• More community use of improved athletic facilities and theatre
• More on-site parking for community attended events
• Increased opportunities for adult education
• Increased local business / school collaboration – work study
![Page 18: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/18.jpg)
4
Stakeholder Engagement
What are your hopes + aspirations for this feasibility process?
• Continue to have an open and transparent process which includes community input
• Ensure parity of facilities with other county high schools
• Plan for a project that instills student and community pride
• That the report be acted upon without delay.
![Page 19: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/19.jpg)
Feasibility Study Scenarios
Keeps More of Existing Building
Keeps Less of Existing Building
![Page 20: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/20.jpg)
First Floor PlanSecond Floor Plan
Feasibility Study Scenarios
Existing Building
First Floor Plan
Control Rm. + Mech
![Page 21: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/21.jpg)
Feasibility Study Scenarios
Scenario 1
Complete Renovation/Modernization
• Updated and completely new layouts for classrooms, labs, etc. –appropriately sized with latest tech
• Integration of collaboration and support spaces - Next Gen education
• Completely re-imagined performing arts venue and dining hall
• All building systems modernized and code issues addressed
• Area constraints result in some education specification items not accounted for.
![Page 22: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/22.jpg)
Feasibility Study Scenarios
Scenario 1
Complete Renovation/Modernization
MEDIACENTER
First Floor PlanSecond Floor Plan
![Page 23: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/23.jpg)
Scenario 1
Complete Renovation/Modernization
Feasibility Site Plan
![Page 24: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/24.jpg)
Feasibility Site Plan
Scenario 2
Renovation / Addition
Existing Building To Be Renovated
New Construction
• 2-story classroom addition • New Performing Arts / CTE
wing• New Construction to
expand Dining• Addition for P.E./Athletic
Programs• Complete updates and
renovations to Classrooms, Theatre, Dining, PE + Athletics
• All building systems modernized and all code issues addressed
• Full Ed. Spec achieved
P.E. / ATHLETICS
DINING
THEATRE PERF. ARTS / C.T.E.
CLASSROOMS
A/G/H + CLASSROOMS
MECH.
C.T.E.
P.E. / ATHLETICS
![Page 25: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/25.jpg)
Feasibility Site Plan
Scenario 2
Renovation / Addition
Existing Building To Be Renovated
New Construction
![Page 26: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/26.jpg)
Feasibility Site Plan
Scenario 3
Renovation / Addition +
Selective Demolition
Existing Building To Be Renovated
New Construction
• 3-story classroom addition • New Performing Arts / CTE
wing• New Construction to
expand Dining• Addition for P.E./Athletic
Programs + Mechanical• Complete updates and
renovations to Theatre, Dining, PE + Athletics
• Building systems modernized and all code issues addressed
• Full Ed. Spec. achieved
P.E. / ATHLETICS
DINING
THEATRE
PERF. ARTS
A/G/H + CLASSROOMS C.T.E.
P.E. / ATHLETICS
MECHANICAL
DINING
![Page 27: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/27.jpg)
Feasibility Site Plan
Scenario 3
Renovation / Addition +
Selective Demolition
Existing Building To Be Renovated
New Construction
![Page 28: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/28.jpg)
• All new construction, on-site
• Lower impact to delivery of curriculum during construction
• Loss of athletic fields during construction
• Existing school demo and sitework completion after new school occupied
Feasibility Site Plan
Scenario 4
Full Building Replacement
P.E. / ATHLETICS
DINING
PERF. ARTS / C.T.E.
CLASSROOMS + C.T.E.
CLASSROOMS + C.T.E.ADMINGUIDANCEHEALTH
![Page 29: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/29.jpg)
Feasibility Site Plan
Scenario 4
Full Building Replacement
![Page 30: Brunswick High School Feasibility Study Community Meeting ... · 3/7/2019 · 2003 Technology Cabling / Voice-Data Network 2005 Gymnasium Roof 2009 Chiller/Cooling Tower Replacement](https://reader034.vdocuments.us/reader034/viewer/2022042309/5ed61c6c300e8232eb7fab80/html5/thumbnails/30.jpg)
Q+AAny questions?