bruce mayer, pe dir. system engineering 17oct02

25
[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt 1 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods Bruce Mayer, PE Dir. System Engineering 17Oct02 3x00 XY-Stage Transit/Settling Time Engr/Math/Phys 25

Upload: chantale-irwin

Post on 31-Dec-2015

36 views

Category:

Documents


0 download

DESCRIPTION

Engr/Math/Phys 25. 3x00 XY-Stage Transit/Settling Time. Bruce Mayer, PE Dir. System Engineering 17Oct02. Effecting Planer Motion. An XY Stage. Executive Summary. Test Procedure Attach Accelerometer to 3xxx Stage Move Stage in Short, Medium, Long Runs - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt1

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Bruce Mayer, PEDir. System Engineering

17Oct02

3x00 XY-StageTransit/Settling Time

Engr/Math/Phys 25

Page 2: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt2

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Effecting Planer Motion

An XYStage

Page 3: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt3

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Executive Summary Test Procedure

• Attach Accelerometer to 3xxx Stage• Move Stage in Short, Medium, Long Runs• Record Accelerometer OutPut With Oscope

Estimated SETTLING TIME: <15ms Olympus Stage Transit-Time Model

mS5.46mmmS37.4 dTt• d Travel Distance in mm • Tt Transit Time in mS

Page 4: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt4

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Goals & Logistics

Goals → For 3xxx XY-Stage Determine• Typical AntiVibration-Table Settling Time• Model: Transit-Time vs. Transit-Distance

Logistics• Test Date = 15-Oct-2002• Experimenters = B. Mayer, CEE• Test System = YYY-3xxx

– Hi-Accuracy XY-Stage– Mechanical (i.e., spring-based)

AntiVibration Table

Page 5: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt5

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Test Design Attach Accelerometer to XY-Stage Measure Accelerometer Output w/ Oscope Program System for Die Jumps on 200mm

wafer with KLARRF Map Die Patterns• X-Pitch = 7.8408280000e+03 µm (7.8408 mm)• Y-Pitch = 1.4138693000e+04 µm (14.1387 mm)

Die Jumps: L↔R, T↔B, UL↔LR, UR↔LL• Full Cross-Wafer (long) Moves• 4-Die Moves• Single-Die Moves

Page 6: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt6

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

AcceleroMeter Mounting

Wafer & Chuck

OTA-3xxxStage

Major Axis = Z

Omega ACC-102 Accelerometer(100 mV/g)

Page 7: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt7

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Instrumentation

Fluke-199 200 MHz ScopeMeter

Omega ACC-PS1AcceleroMeterPower Supply

Cables To/FromAcceleroMeter

Page 8: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt8

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Stage-Move Profiles – 200mm WaferLEGEND

LONG MOVE4-DIE MOVESINGLE-DIE MOVE

174.4 mm

12.7mm50.9 mm

AVG. DISTANCE

Page 9: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt9

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Results & Analysis - Plots on Next Slides

AntiVibe Table Settling Time 15ms• Time Beyond Motor-Stop• S-Curve Accel & Decel Improves Settling

Time mS5.46mmmS37.4 dTt Transit-Time Model Determined by

Linear-Regression:– d Travel Distance in mm – Tt Transit Time in mS

• Full Speed = 1/[4.37 mS/mm] = 229 mm/S• Very-Short Move Time Const 47 mS

Page 10: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt10

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Results & Analysiscont.1

Max Z-Acceleration = 5.92g Y-Axis “Rattles” about 4-TIMES More

than the X-Axis• Suggests inquiry into the source of the

added Settling Time

Page 11: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt11

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

OTA-3220 Stage Transit-Time Test • Oct02

t = 4.3725d + 46.494

R2 = 0.9871

0

100

200

300

400

500

600

700

800

900

0 20 40 60 80 100 120 140 160 180

Stage Travel Distance (mm)

Sta

ge

Tra

ve

l Tim

e (

mS

)

Travel-Time (mS)

Linear (Travel-Time (mS))

file = OTA3200_Stage-Settling_Time_0210.XLS

Velocity/Slope = 229 mm/S

Page 12: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt12

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

OTA-3220 Stage Settling • Long +X Move

-125

-100

-75

-50

-25

0

25

50

75

100

125

150

-0.4 -0.2 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6

Time (s)

Ac

ce

lero

Me

ter

Ou

tpu

t (m

Vd

c)

Vlo (Vdc)

Vhi (Vdc)

file = OTA3200_Stage-Settling_Time_0210.XLS

Ramp Up/Down

~ConstantVelocity

Page 13: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt13

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

OTA-3220 Stage Settling • Single-Die UR-Diag Move

-350

-300

-250

-200

-150

-100

-50

0

50

100

150

200

250

300

350

400

-0.04 -0.02 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16

Time (s)

Ac

ce

lero

Me

ter

Ou

tpu

t (m

Vd

c)

Vlo (Vdc)

Vhi (Vdc)

file = OTA3200_Stage-Settling_Time_0210.XLS

Ramps Only

Page 14: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt14

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

OTA-3220 Stage Settling • Single-Die +y Move

-250

-200

-150

-100

-50

0

50

100

150

200

250

-0.04 -0.02 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16

Time (s)

Ac

ce

lero

Me

ter

Ou

tpu

t (m

Vd

c)

Vlo (Vdc)Vhi (Vdc)Lt BoundaryRt boundary

file = OTA3200_Stage-Settling_Time_0210.XLS

Se

ttling

time

= ~

12

.8m

s

Page 15: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt15

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

OTA-3220 Stage Settling • Single-Die +y Move

-200

-150

-100

-50

0

50

100

150

200

0.09 0.10 0.11 0.12 0.13 0.14

Time (s)

Ac

ce

lero

Me

ter

Ou

tpu

t (m

Vd

c)

Vlo (Vdc)Vhi (Vdc)Lt BoundaryRt boundary

file = OTA3200_Stage-Settling_Time_0210.XLS

Settling time = ~12.8ms

Page 16: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt16

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

OTA-3220 Stage Settling • Single-Die DIAG-LR Move

-250

-200

-150

-100

-50

0

50

100

150

200

250

-0.04 -0.02 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16

Time (s)

Ac

ce

lero

Me

ter

Ou

tpu

t (m

Vd

c)

Vlo (Vdc)Vhi (Vdc)Lt BoundaryRt boundary

file = OTA3200_Stage-Settling_Time_0210.XLS

Se

ttling

time

= ~

14

.4m

s

Page 17: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt17

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

OTA-3220 Stage Settling • Single-Die DIAG-LR Move

-80

-60

-40

-20

0

20

40

60

80

0.110 0.115 0.120 0.125 0.130 0.135 0.140

Time (s)

Ac

ce

lero

Me

ter

Ou

tpu

t (m

Vd

c)

Vlo (Vdc)Vhi (Vdc)Lt BoundaryRt boundary

file = OTA3200_Stage-Settling_Time_0210.XLS

Settling time = ~14.4

Page 18: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt18

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

OTA-3220 Stage Settling • 4-Die Moves

-600

-500

-400

-300

-200

-100

0

100

200

300

400

500

600

-0.10 -0.05 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40

Time (s)

Ac

ce

lero

Me

ter

Ou

tpu

t (m

Vd

c)

4D +x Vlo 4D +x Vhi 4D -y Vlo

4D -y Vhi 4D LL=>UR Vlo 4D LL=>UR Vhi

file = OTA3200_Stage-Settling_Time_0210.XLS

Page 19: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt19

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

All Done for the COURSE

See You in Fall 13

Page 20: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt20

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

All Done for Today

An XYStage

Page 21: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt21

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Bruce Mayer, PELicensed Electrical & Mechanical Engineer

[email protected]

Engr/Math/Physics 25

Appendix

6972 23 xxxxf tfyyy

735

masterjslave PxhPn

1

Page 22: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt22

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

Bruce Mayer, PEDir. System Engineering

17Oct02

Settling TimeAPPENDIX

Engr/Math/Physics 25

Page 23: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt23

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

AcceleroMeter Instrumentation

Page 24: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt24

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

AcceleroMeter Specifications

Page 25: Bruce Mayer, PE Dir. System Engineering 17Oct02

[email protected] • ENGR-25_XY-Translation-Stage_CaseStudy.ppt25

Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods

KLARFF Map DetailsFileVersion 1 1;

FileTimestamp 08-22-02 13:33:54;

InspectionStationID "NONE" "BITMAP" "ORB102";

SampleType WAFER;

ResultTimestamp 08-22-02 10:14:55;

LotID "QT96B2815340_3";

SampleSize 1 200;

SetupID "T96B_UP" 05-08-02 07:02:28;

StepID "RTP_ANNEAL_2";

SampleOrientationMarkType NOTCH;

OrientationMarkLocation UP;

DiePitch 7.8408280000e+03 1.4138693000e+04;

DieOrigin 0.0000000000e+00 0.0000000000e+00;

WaferID "01";

Slot 1;

SampleCenterLocation 4.3974690000e+03 7.8404710000e+03;