brts_gujrat

Upload: anuj-shah

Post on 06-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 brts_gujrat

    1/41

    State of Art Planning, DesignState of Art Planning, Designand Operation of BRTand Operation of BRT

    Presented by:

    Shri. I. P. Gautam, IAS

    Principal Secretary (UD),

    Gujarat

    Case of GUJARAT

  • 8/3/2019 brts_gujrat

    2/41

    JANMARG, Ahmedabad Bus Rapid Transit System

    JANMARG - A METRO EXPERIENCE ON ROAD THROUGH TECHNOLOGY INNOVATIONS AT

  • 8/3/2019 brts_gujrat

    3/41

    BRTS StatisticsBRTS Statistics At GlanceAt Glance

    Network Length 45 Km

    Number of Stations 67

    Operational Timings 6:00 AM to 11:30 PM

    Peak Hour

    Peak Hour Frequency

    8:00 AM 12:00 PM ; 5:00 PM 9:00 PM

    2.5 mints-3mints both side

    Bus operated during Peak 77

    DAILY AVERAGE-

    Average Daily Ridership 1,35,000 -1,45,000Average Daily Collection Rs 7,70,000 avg

    Ave. Daily Operational Km. 20,000 Km.

  • 8/3/2019 brts_gujrat

    4/41

    Anjali- Naroda- Anjali

    (38.0 kms)

    Operational Routes

    RTO - Maninagar loop

    RTO (38.6 km)

    BRT corr idors(88.8 kms.)

    RTO to Maninagar loop

    (22.5 km s.) 33 busstops

    Danilimda to Naroda

    (16.4 km s.) 28 busstops

    Operational Corridors(45.0 km )

    RTO- Naroda- RTO

    (61.8 kms)

    JANMARG Corridor and Operational Routes

    Narol- Naroda- Narol(26.4 kms)

    Chandkheda

    Narodavillage

    Odhav

    Bopal

    Narol

    Kalupur

    Rly. Stn.

    ManinagarRly. stn.

    RanipSola RoB

    Shivranjani Nehrunagar

    AEC

    Naroda

    Soninichaali

    AhmedabadAirport.

    Naroda

    GIDC

    OdhavIndustrialestate

    VatvaIndustrialestate

    GandhigramRly. stn

    Sabarmati Rly.stn

    GujaratUniversity

    RTO

    GeetaMandir

    Danilimda

    Kankaria

    Anjali

    Junction

    JashodanagarJn

    Duringpeak hours

    Dur ing offpeak hours

    Naroda

    Narol

    RTO to Sarkari L it ho Press

    (5.5 kms.) 6 bus stops

    RTO - SLP- RTO

    (11.0 kms)

  • 8/3/2019 brts_gujrat

    5/41

    AHMEDABAD APPROACH..AHMEDABAD APPROACH..

    1. Comprehensive Planning Network and a User Friendly Design

    2. Selection of Suitable Road Network

    3. Strong / Decisive Leadership at City and State Level4. Collective decisions of administrative& Elected Wing

    5. Consultation with stake holders at all the stages

    6. Joint management-SPV (Janmarg Ltd.)Chaired By Municipal

    Commissioner& Hble Mayor, Leader of Opposition,TransportComite.Chairman,Joint Police Commissioner, as Directors

    7. Adaptive design based on Local realities by CEPT University

    8. A Unique PP Model of Bus opration & maintinance

    9. Media Response -first mix- moved towards positive

    10. Ownership of the Project-by AMC/AJL-Finaly Citizen.City sawpositive result and taken ownership

    11.Affordable Pricing- Reasonable Fare

  • 8/3/2019 brts_gujrat

    6/41

    Janmarg - State of Ar t Infrast ructure

  • 8/3/2019 brts_gujrat

    7/41

    Janmarg Split flyover

  • 8/3/2019 brts_gujrat

    8/41

    People moved 180Area occupied 90 sq. m.

    People moved -168Area occupied 550 sq. m.

    Janmarg Focus on Moving People..

    Janmarg Mixed t raffic

  • 8/3/2019 brts_gujrat

    9/41

    Closed system trunk and feeder services

    Central bus lanes

    Median bus stops

    Distance based fare smart cards

    Integrated ticketing system Trunk, feeder andAMTS

    IT systems - Automatic vehicle tracking system,Passenger Information Systems, Electronic farecollection

    JANMARG : Characteristics

  • 8/3/2019 brts_gujrat

    10/41

    JanmargJanmargState of ArtState of Art Bus StationsBus Stations

    Bus stations are accessed through ZEBRA crossings

    Signalised &Synchronized with junction signal cycle (ATC)

    Closed Bus Stations & Off board ticketing

    Provide safe and secure environment

    Both side ticket windows Access control through turnstiles/flap barriers

    Automatic and synchronized doors

    Off board ticketing to reduce dwell time, plug revenue leakage

  • 8/3/2019 brts_gujrat

    11/41

    Bus stops below split flyovers

    Split Bus stop at soni ni chaali

    One bus bay Bus stops

    Bus stop at KankariaLake

    Janmarg Bus stations Urban

    Landmarks

  • 8/3/2019 brts_gujrat

    12/41

    LED displays at Bus stations and buses

    Audio announcement systems in buses

    LED and audio announcements inside buses

    Passenger Information SystemsPassenger Information Systems

  • 8/3/2019 brts_gujrat

    13/41

    Use of Intelligent Transport systemsUse of Intelligent Transport systems

  • 8/3/2019 brts_gujrat

    14/41

    At-level Boarding and alighting and Automatic doors

    at bus stations

  • 8/3/2019 brts_gujrat

    15/41

    Innovation in Intelligent Transport systemsInnovation in Intelligent Transport systems

    RFID reader and sensors (non synchronized) at approach RFID reader and sensors (synchronized) at haultAutomat ic door opetat ions

    Use of RFID technology for automatic dooroperations

    At-level and rapid passenger boarding and

    alighting

    Safe and barrier free access

  • 8/3/2019 brts_gujrat

    16/41

    Janmarg Bus prototype - I Janmarg Bus prototype - II

    Janmarg Bus prototype III Janmarg Bus prototype III & IV

    State of art Bus DesignState of art Bus Design -- Alternativeslternatives

    Explored...Explored...

  • 8/3/2019 brts_gujrat

    17/41

    Operations monitoringat JANMARG - Cont rolcentre

    JanmargJanmarg

    Cont rol Cent reCont rol Cent re

  • 8/3/2019 brts_gujrat

    18/41

    Janmarg at Jhansi ki rani

  • 8/3/2019 brts_gujrat

    19/41

    BEFORE .. AT ANJALI

  • 8/3/2019 brts_gujrat

    20/41

    AFTER .. AT ANJALI : AUGMENTING CAPACITIES

  • 8/3/2019 brts_gujrat

    21/41

    Janmarg at Danilim da

  • 8/3/2019 brts_gujrat

    22/41

    Janmarg at Chandola

  • 8/3/2019 brts_gujrat

    23/41

    Bus stop prototype and Free trial runs Special BRT rides for school children,

    industrialists, doctors, religious leaders etc.

    BRT trial runs till 1 am during Navratri

    Extensive public outreach and media coverage(during construction, trial runs, operations)

    Enhanced Accessibility for all (physically and

    visually challenged, senior citizens, women,children etc.)

    Special training programmes for staff, Bus drivers

    for improved skills and public interaction

    Regular passenger feedback surveys and forperformance monitoring

    JANMARG Ext ensive Public Out reach

  • 8/3/2019 brts_gujrat

    24/41

    Special BRT r ides

    Special BRT rides for Citys Industrialists,

    Doctors, entrepreneurs, School children..

  • 8/3/2019 brts_gujrat

    25/41

    Surpr ise visit by Hon. Chief

    Minister of Gujarat , Shri. NarendraModi

    On the bus r ide, he discussed with

    the passengers, their response andfeedback for the system

    Surpr ise BRT r ide

  • 8/3/2019 brts_gujrat

    26/41

    JANMA RG display at GIHED Property show, February 2008,2009

    Janmarg Information display for citizen at public exhibitions

    Public Exhibitions

    BRT audio-visual film screening and display at public exhibitions/conferences

    GIHED property show (February 2008, 2009)Nirman (November - 2007, 2008, 2009, 2010)Urban Mobility Conference, December 2009,2010Asian Planning Students Association (APSA) meet, December, 2009

    Vibrant Gujarat Summit (2007,2009, 2011)

  • 8/3/2019 brts_gujrat

    27/41

    INAU GRATION INTEGRATED W ITH KANKARIACARNIVAL

    PEDESTRIANISED ZONE ALO NG W ITH BRT LA NE

    BUS STA TIO N LOCATED AT PUSPAKU NJ A PUBLIC SPACE

    SEATING AREAS ALONG PEDESTRIAN SPACES

    Access to Public spaces / recreat ional hub -KANKARIA BRT dur ing Carnival

  • 8/3/2019 brts_gujrat

    28/41

  • 8/3/2019 brts_gujrat

    29/41

    BRT special rides for

    school children

  • 8/3/2019 brts_gujrat

    30/41

    Janmarg during Navratri (September 2009) Free

    Trial runs

    G

  • 8/3/2019 brts_gujrat

    31/41

    JANMARG Way Ahead Innovations Planned and UnderImplementation

    Soni ni chaali Split bus stations

    BRT at Gujarat College RoB (Elevated Bus station)

    JANMARG A ibili f All

  • 8/3/2019 brts_gujrat

    32/41

    JANMARG Accessibility for All

    B R id T it S t S t

  • 8/3/2019 brts_gujrat

    33/41

    Bus Rapid Transit System , Surat

    SURAT RAILWAY STATION

    DELHI DARWAJA

    SAHARA DARWAJA

    UDHNA DARWAJA

    TEXTILE MARKET

    KAMELA DARWAJA

    MAANDARWAJA

    JEEVAN JYOT CINEMA

    UDHNA TEEN DARWAJA

    UDHNA GSRTC

    HARINAGAR SOCIETY

    BRC GATE JUNCTION

    DAKSHESHWAR TEMPLE

    BHEDWAD DARGAAH

    PANDESARA GIDC

    NAVIN FLUORINE INDUSTRIES

    UNN PATIA

    SACHIN GIDC NAAKA

    NEWCITYLIGHT

    ANUVRA

    TDWAR

    RUNDH

    DUMAS RESORT

    UNIVERSITY

    WEST

    UNIVERSITY

    EAST

    CENTREFORSOCIALSTUDIES

    RUPALINEHAR

    JAMNANAGA

    R

    ISHWARFAR

    M

    NEWBHATAR

    ROAD

    BHAMROLIROADJUNCTION

    AAIMATAJUNC

    TION

    DUMASROADJUNCTION

    AMBEDKARNA

    GAR

    ANJANAAPARTMENT

    BHATENAROAD

    JUNCTION

    PRABHATPATIA

    PUNAKHAMBH

    ARIA

    VARACHHA WATER WORKS

    SAVITA PARK SOCIETY

    S

    ARTHANAJAKATNAKA

    SA

    VJIKORATBRIDGEJUNCTION

    SACHIN GIDC

    K

    INNARYJUNCTION

    UDHNA RAILWAY STATION

    BHESTAN RAILWAY STATION

    UTRAN RAILWAY STATION

    BHESTAN VILLAGE

    CHAR RASTA

    BHAGVATI

    INDUSTRIAL ESTATE

    KAAMNATH MAHADEV

    JUNCTION

    BHESTAN RLY. STN.

    CHAR RASTA

    ADAJAN GSRTC

    SUBHASH BAUG CIRCLE

    ATHWA GATE

    MAJURAGATE

    R.T.O.JUNCTIONPARLE POINT

    KHARWARNAGARC.N.G. CIRCLE

    BRT S

    BRT MI

    CITY B

    REGIO

    BRT- CI

    BRT- B

    CITY B

    BRT - R

    TAPI RI

    HAZIRA

    JAHANGIR PURA

    TO AIRPORT

    Phase 1 : 30.5 kms.

    Surat- Navsari corridor 10kms.

    Canal road 19.5 kms.

    Prototype Bus shelter ready byDecember 2011

    Bus shelters tendered out

    B t ti d i

  • 8/3/2019 brts_gujrat

    34/41

    Bus station design

    Bus station Prototype under construction

    Transforming Canal corridor

  • 8/3/2019 brts_gujrat

    35/41

    Transforming Canal corridor

    existing proposed

    Landuse Transformation Strategy

    Bus station along Canal corridor

  • 8/3/2019 brts_gujrat

    36/41

    A safe, accessible and efficient BRT Bus Shelter..

    Bus station along Canal corridor

    Transit Hub at Kharwarnagar Surat

  • 8/3/2019 brts_gujrat

    37/41

    PARCEL - A

    PARCEL - B

    BRTBRT

    INTERCHANGEINTERCHANGE

    (15889.62SQM)

    (5525.18

    SQM)

    Transit Hub at Kharwarnagar, Surat

    Transit Hub at Kharwarnagar Surat

  • 8/3/2019 brts_gujrat

    38/41

    Transit Hub at Kharwarnagar, Surat

    Transit Oriented Development

    BRT interchange, control centre

    High density mixed landuse development

    BRT and NMV facilities in Rajkot

  • 8/3/2019 brts_gujrat

    39/41

    BRT and NMV facilities in Rajkot

    Pedestrian facilities and cycle tracks

    Central BRT lanes

    Split flyovers with at-grade BRT lanes

    BRT Infrastructure in Rajkot

  • 8/3/2019 brts_gujrat

    40/41

    BRT Infrastructure in Rajkot

  • 8/3/2019 brts_gujrat

    41/41

    Thank you

    I. P. Gautam, IASPrincipal Secretary (UD)Gujarat