brownsburg multigenerational community center · public art - plazas entry / patio special events /...
TRANSCRIPT
Summary• Larger Building Program – 86,600 square feet
Cost of $33.8 Mil. to $37.5 Mil. - Preferred• Building Concept A - Preferred • Site Concept 3 combined with Site Concept 1• Larger Group X Room• Safe Entry Drop – Off• Parkside Parking• Separation of Vehicular and Pedestrian
Circulation
Core Program Component/Space Type
Parking 280 Spaces
Stormwater -
Utilities -
Landscaping -
Public Art -
Plazas Entry / Patio
Special Events / Flex Lawn Multifunctional
Trails 1/4 Mile
Spray Pad Interactive
Core Program Component/Space Type Community Center Area (SF)
Athletics 23,700
Aquatics 17,100
Fitness 7,000
Multi-Use / General Program 4,200
Facility Administration 2,500
Common Space 17,600
Utility Space 2,700
IU Health (Partner) 10,000
Kids Count (Partner) 1,800
Total 86,600
MAIN ENTRY
PARK ENTRY
ENTRY
GROUND LEVEL
IU HEALTH
COMMON SPACE
ADMINISTRATION
KIDS COUNT
GENERAL PROGRAM
MULTI-USEATHLETICS
AQUATICS
LOCKER ROOMS
FAMILY LOCKER ROOMSSUPPORT
PARTY
THERAPY POOL
ACTIVITY POOL
STORAGE
INTERACTIVE PLAY
CONTROL
To get more info or to submit questions, go to www.planbrownsburgparks.com
Thank You!
Arbuckle Acres Park• 100 dedicated parking spaces in new parking
garage reduces size of Community Center surface lot, leaving more green space.
• Soil conditions at the Tague property make it less desirable for construction, as significant portions of the property are inside floodway/floodplain limits.
• Development at the Tague Property will focus on flood-resilient amenities (multi-purpose field sports) and passive uses like birdwatching.
Arbuckle Acres Park• Located next to new Town construction,
making accessibility easy. • Placed in Arbuckle Acres Park to provide a
variety of health and wellness opportunities in one location.
• Increased traffic to Arbuckle Acres Park area means more visibility for business owners and can increase occupancy rates of new developments.