Broward County-wide

Master Reuse Plan

Southeast Florida Utility Council

March 10, 2014

Presentation Overview - Road Map

Where we started:• Background• Goals

What we did:• Team Selection• Scope Development • Project Tools Development

Where we’re going:• Implementation• Planning, and Data Collection

BACKGROUND

Background: Water Resources

Task Force• Task Force Report - January 2011

• Included 40 recommendations in the areas of:

• Water conservation• Reuse planning and

development• Regional water supply projects• Investigation and modeling

Eleven (11) recommendations specific to reuse including;

• Recommendation #19

Regional Reuse Master Plan

Background: Water Resources

Task Force

Challenges:• Developed urban areas

• 25 distinct water providers

• 15 distinct wastewater providers

• Seasonal demand fluctuations

• Treatment costs/disposal options

Background: Water Reuse

Challenges

Background: Water Reuse Drivers

• Water/Wastewater concurrency

• Saltwater intrusion• Costs for alternatives

Key Drivers in the Past

• Regional Water Availability Rule

• Ocean Outfall Rule• Climate Change• Regulatory

Requirements

Key Drivers Today

Reclaimed Water

Feasibility Study

Renewing Facility Permits

Renewing Water Use

PermitsRenewing UIC Permit

Background: Regulatory Reuse

Drivers

• To develop a Regional Reuse Master Plan that will build upon current municipal and county efforts and coordinate a regional approach to reuse planning, maximizing cost-effective reuse development within Broward County

• To create a platform for shared communication

• To provide flexible and interactive planning tools

Background: Reuse Master Plan

Goal

COORDINATION&

TOOL DEVELOPMENT

• Water and Wastewater Providers/Local Gov’ts

• Consultants• Hazen and Sawyer, P.C.• Craven Thompson & Associates, Inc. • Cordova Rodriguez & Assoc., Inc. • Steve Lamb

• Broward County:• Natural Resources Planning and Management• Development and Environmental Review• BC Water and Wastewater Services

• FLDEP, DOH, DOT, SFWMD

Work Effort: Team Selection

• Review of Previous Studies/Reports

• Stakeholder Meetings

• Stakeholder Specific Interactive Project Analysis

• Reclaimed Water Planning Tools Development

Work Effort: Team Collaborations

Work Effort: Tool Production

GIS Reclaimed Water Planning Tool

Project Evaluation Model

• Foundation for data storage and interpretation

• Database of existing and planned reclaimed water infrastructure

• Addition of planned County Public Works Projects

• Google Earth platform allows for easy manipulations of alternatives

• Tool was used to develop proposed regional projects

Work Effort: GIS Planning Tool

• Evaluated potential users based on distance from WWTP

• Two scenarios:• With utility

boundaries• Without utility

boundaries

Broward NRWWTP

5 Miles

3 Miles

1 Mile

Broward WWS Utility Boundary

Work Effort: BC WWS Example

Scenarios Within Utility Boundary No Utility Boundary

No. of Customers

Demand (mgd)

No. of Customers

Demand (mgd)

Potential Partners

One mile radius

3 0.37 4 0.39 Pompano Beach

Three mile radius

38 3.63 78 9.42 Pompano Beach, Deerfield Beach, Margate

Five mile radius

59 4.55 154 13.83 Pompano Beach, Deerfield Beach, Margate, Coral Springs, Fort Lauderdale, North Lauderdale, Parkland

Work Effort: BC WWS Example, cont.

• Criteria were developed with stakeholders

• Final criteria included the following categories• Project Benefits• Project Implementation• Project Reliability• General Acceptance of Project• Project Costs

• Weights and scaling factors were established

• Model is in Excel – simplifies revisions

Work Effort: Project Evaluation Model

• Existing and planned reclaimed water infrastructure

• Planned County Public Works projects

• Costs and carbon footprint of potential reclaimed water projects

• Climate change impacts on reclaimed water options

• Potential reclaimed water opportunities by utility

• Regional reclaimed water projects

• Regional projects using Criteria Model

• Guidelines for future maintenance of tools

Work Effort: Master Reuse Plan

FUTURE IMPLEMENTATION

Implementation: Benefits

Current:

• Database of existing reclaimed water infrastructure-not previously available

• Catalyst for multijurisdictional partnering • Documents reuse projects for future funding under SB

444 or otherFuture: • Reduction in engineering costs for future planning efforts• Ability to visually analyze options• Platform to coordinate with future public works projects

and potentially reduce construction costs

Implementation: Potential Projects for

Analysis

$0

$2

$4

$6

$8

$10

$12

$14

$16

$18

Estimated Capital Cost ($/gpd)

Average

Implementation: Criterion

• Initial Implementation Plan is based on criteria today

• The Implementation Plan is flexible• Will be updated as drivers change

over time• To be updated by utilities in the

future

Implementation: Initial

Regional Projects Implementation Phasing

Capital Cost per Gallon

Total Capital Cost Reason for Grouping:Project Name

Reclaimed Water

Demand (mgd)

Phase & Timing

MGD per

PhaseCumm. MGD

BC - PBC Agreement (to PBC) 15.00

I2015 - 2020

24.54 24.54

$5.43 $104M ongoing/ocean outfall requirementBC - PBC Agreement (within BC) 4.2

Sunrise Sawgrass Large User - Phase A 2.00 $14.62 $29M ongoing/ FDEP permit requirement

Davie Large User - Phase A 3.34 $10.23 $34M ongoing/outfall compliance

Cooper City (credit sharing with other) 0.96

II2020 - 2025

23.61 48.15

TBD TBD outfall compliance by 2025

Pompano Beach Residential Irrigation – Phase A for BC Outfall Compliance 2.25 TBD TBD outfall compliance by

2025

Hollywood Aquifer project 20.40 $8.92 - $13.82 $182M - $282M outfall compliance by 2025

Implementation: Preliminary

Project Name Reclaimed Water

Demand (mgd)

Total Capital Cost

Partners

BC - PBC Agreement (to PBC) 1

15.00 $104 M Palm Beach County, Deerfield Beach,Coconut CreekBC – PBC Agreement

(within BC) 14.20

Sunrise Sawgrass Large User – Phase A 2 2.00 $29 M Plantation

Davie Large User – Phase A 3 3.34 $34 M Sunrise

PHASE I RECLAIMED WATER DEMAND 24.54

1 – BCWWS will progress in incremental amounts.2 – City is required to construct 2 mgd but may install additional capacity.3 – Town is presently constructing.

Implementation: Phase I 2015-2020

Project Name Reclaimed Water

Demand (mgd)

Total Capital Cost Partners

Cooper City Credit Sharing 1 0.96 TBD TBD

Pompano Beach Residential Irrigation – Phase A for BCWWS 2

2.25 TBD --

Hollywood Floridan Aquifer 20.40 $182 M –$282 M --

PHASE II - RECLAIMED WATER ADDED

23.61

TOTAL RECLAIMED WATER DEMAND 48.15

1 – City will pay another utility to construct for ocean outfall compliance.2 – BCWWS compliance alternative for ocean outfall compliance.

Implementation: Phase II 2020-2025

Implementation: Phase I 2015-2020

Implementation: Phase II 2020-2025

Implementation: Future !!!

Questions?