brooklyn navy yard cogeneration partners edison mission energyyork research operator - palmark plant...
TRANSCRIPT
Brooklyn Navy Yard Cogeneration Partners
Edison Mission Energy York Research
Operator - Palmark
Plant Engineer - Yefim Kashler
Con Edison Steam Plant
Williamsburg
Bridge
Brooklyn Navy Yard
Midtown Manhattan
Cogen Plant
East River
New York Location
Plant Facilities Layout
Compressor Gas Turbine #2
Steam
Turbine #2#2 Heat Recovery Steam Generator
Gas/Fuel Oil
Air
Water Treatment Plant
Compressor Gas Turbine #1
Steam
Turbine #1#1 Heat Recovery Steam Generator
Gas/Fuel Oil
Air
City Water
De-Ionized Water
100MW
100MW
40MW
40MW
350kpph
350kpph
Customers MW Kpph Con Edison 220 800 BNY 5-6 20-50 Red Hook 10
Extraction Steam
Extraction Steam
Business & Operational Challenges
Con Edison Contract Provisions:
20 Year Contract for 220MW + 800,000 Lbs Steam/Hour
Dictate Plant Operating Mode
Curtailments - 50% or 100% up to 25 Instances/Year before Penalty
Conversions - Any Time/Duration (Steam to MW and MW to Steam)
Payment Terms
GDP Implicit Price Deflator - 3Q Previous Year
NYMEX gas - Average 3 Day Closing back 5 Days from Month End
Equivalent Availability - Calculated Hourly Based on Performance
Fuel Scenarios
Winter Cold Periods - Gas Uneconomic. Use Fuel Oil or shutdown plant?
Summer Heat Periods - How to Maintain Contract EA
Information & Control Systems - Phase 1
COGEN Plant
Bailey Infi 90
CIU
Data Scan
Power Suite Paradox
Office Lotus Notes
Maintenance MP2-Paradox
Client - Power Advisor - Excel
Why PI?
Never Able to Configure Power Suite to Real Plant Environment
Reports Were Not Valid and Had to Redo Manually Using Spreadsheets with Manual Input from Bailey Logs
Power Suite Only Handled Under a Hundred Data Points and Was Unable to Support Technical Monitoring
There Was a Need for Fast, User Friendly Interface to Support Operations and Business Decisions
PI Implementation
3Q 97 4Q 97 1Q 98 2Q 98 3Q 98 4Q 98 1Q 99 2Q 99
Evaluate PI Capabilities
Approve Project Funding
Place Orders (OSI - Matrikon
System Development
Installation and Checkout
Water Treatment Plant
2Q 97
Information & Control Systems - Today
COGEN Plant Water Treatment Plant
Bailey Infi 90 Allen Bradley/W-Ware
CIU
PI Interface
PI Server 5,000 Tags
Office Lotus Notes
Maintenance MP2-SQL
PI Combo (5) - Process Book - DataLink-Excel
Current Applications
Monitor Plant Operations from Desktop - Mimic Operator Graphics and Provide Plantwide Overview of Current Operation
Use PI Trends to Troubleshoot Problems
Use DataLink and Excel to Provide Daily Operational and Business Reports, and a Large Number of Reporting Applications: Billing Logs Plant Testing Reports Emission Reports Chemistry Reports
Plant Overview Display
MW Adhoc Trend
HRSG-1 Performance
Unit 1 Air Emissions
HRSG-1 Feedwater System
Water Pretreatment
Water Treatment System
Turbine Inlet Air Conditions
Application Plans
Set Key Operating and Business Targets for Plant Units and Monitor Actual Performance Against Target
Enable Management to Assess Impact of Different Operating Strategies by Integrating Plant Operating Model with PI
Present Current Plant Status and Key Performance Indicators to Management (Plant and Owners).
PI Benefits at BNYCP
Monitors Current Plant Operations Continuously
Enables Close Cooperation Between Plant Engineering, Operations and Maintenance
Pinpoints Cause and Effect when Troubleshooting Problems
Responds to Any and All Requests for Information from Customers, Regulatory Agencies and Owners, Involving the Analysis of Large Volumes of Operational History
Automates the Calculation and Reporting of Complex Business Parameters Affecting Operations and Revenue
Is Available at All Times from Office or Home
Thank You OSI
PI Makes All The Difference!
It Allows Us to Be Effective.