broadband modernization impact on the communication industry · • 5‐year transition from...

63
Broadband Modernization Impact on the Communication Industry CostQuest Associates January, 2013

Upload: others

Post on 29-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

BroadbandModernizationImpactonthe

CommunicationIndustryCostQuest AssociatesJanuary, 2013

Page 2: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

PanelAgenda• Introduction

• NBP• Developments• Drivers

• Industry Response• Government Response• Replacement Cost impact• Impact on Valuation

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

2

Page 3: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

OurPanel• Charles Burkhardt, ASA CAE

• Charles Burkhardt is a Senior Consultant with CostQuest Associates. He is an ASA appraiser with the American Society of Appraisers, and a CAE from the International Association of Assessing Officers. He has 35 years of appraisal experience in valuing utility property and negotiation and litigation of values for property taxation.  He previously was a manager in the Verizon Property Tax Group.

• Robert M. Garringer Jr., ASA• Robert Garringer is a property tax manager for Verizon Communications located in Irving, 

Texas.  His current primary areas of responsibility include completion or supervision of all property tax functions (including compliance, appraisal, negotiation and litigation) in the southeast region and Mid‐Atlantic seaboard of the United States.  He began his career with the State of Indiana as a personal property auditor, leaving five years later as the Utilities Director to join GTE Corporation’s tax department.  He has continued his career in appraisal and taxation with Verizon Communications. He is a graduate of Ball State University in Muncie, IN with a B.S. degree in accounting.  He holds the ASA Senior professional appraisal designation from the American Society of Appraisers in the Machinery & Technical Specialties discipline with a specialty in Public Utilities.

• Mike Wilson • Mike Wilson is Vice President of professional Services with CostQuest Associates.  He focuses 

his work efforts on Broadband Mapping and Planning initiatives, as well as mobile wireless regulation and economics.

• James Stegeman• James Stegeman is President of CostQuest Associates.   He is recognized around the world as 

a leading expert on network cost models used for regulatory, management, and tax purposes.

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

3

Page 4: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

INTRODUCTION

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

4

Page 5: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

NationalBroadbandPlan“ConnectingAmerica”• National Broadband Plan 

• Goals• At least 100 million homes  having affordable access at 100 megabits per second 

download and 50 megabits per second up loads• US should lead world in mobile innovation• Every American should have affordable access to robust broadband service• Every American community should have affordable access to 1 gigabit per second 

broadband service to schools, hospitals, and government buildings• To ensure the safety the safety of the American people, every first responder 

should have access to a nationwide wireless broadband public safety network• Ensure America leads in in the clean energy economy

• Key Objectives• Move money from the Universal Service Fund to a new Connect American Fund to 

help support  the National Broadband Plan in unserved areas• Create a Mobility Fund to ensure  the wireless network nationwide 3G coverage• Develop plans to  give access to broadband for low  income Americans• Launch a National Digital Literacy Corps to train youth and adults digital literacy 

skills• The impact of the National Broadband Plan is to make the United States a 

world leader in providing internet communications nationwide

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

5

Page 6: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CurrentTelcoBroadband

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

6

Page 7: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CurrentCableBroadband

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

7

Page 8: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CurrentFixedWirelessBroadband

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

8

Page 9: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CurrentWirelessBroadband

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

9

Page 10: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

BroadbandPenetration

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

10

Page 11: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

BroadbandObstacles

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

11

Page 12: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

IndustryDevelopments• Wireless

• The U.S. is the first country to deploy 4G wireless at scale and is home to most of the world’s LTE subscribers

• Wireline• ~80% of homes are passed with broadband networks capable of 100Mbs >> nearing the world lead

• Verizon plans • Local exchange 

• Increase use of the fiber network• Converting customers• Retiring copper

• Using wireless to augment non‐fiber areas• MCI  with higher speed in the network, call server voice architecture• Wireless continues to expand 4G• Purchased cable owned spectrum for $3.6B

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

12

Page 13: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

IndustryDevelopments• AT&T

• Project Velocity• Local exchange to expand U‐verse• Non U‐verse areas to be candidate for Fixed Wireless

• Wireless continues to expand 4G• Continued acquisition of spectrum (ATNI purchased within the last week)

• Comcast• Replacing usage cap with data usage management approach • Increasing broadband internet speed tiers 

• CenturyLink/Windstream/Frontier• FTTT – Fiber to the tower to support wireless bandwidth demand

• Consolidated/Surewest• Continuing aggressive broadband penetration plans • Deploy capital for backhaul and other wholesale opportunities 

• Google• Building it’s own high‐speed broadband network – Google Fiber • Google Fiber plans include TV and Video Services 

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

13

Page 14: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

EconomicValueAdd

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

14

Page 15: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

ROICs

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

15

Page 16: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

ROICs

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

16

Page 17: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

GovernmentDevelopments• FCC

• Revisions to the universal service• Connect America Fund – Focus is on Broadband deployment in high cost areas via landline and wireless technologies ‐‐ $45B over 10 years

• Broadband Acceleration Initiative• Lowers the cost of stringing new fiber on utility poles and reducing the wait times for cell tower approval

• Spectrum expansion (wireless and wifi)• 35% increase in unlicensed 5 Ghz band for Wifi• Broadcaster incentive auctions for white space (120Mhz in the 600Mhz band, estimate of $22B)

• Allowance of DISH to use S band for terrestrial service• First Responders network

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

17

Page 18: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

GovernmentDevelopments• States/Cities

• ID, AL, WY, WI, etc…• States are looking at economic development plans and the cost to deploy

• Cities are encouraging fiber deployment• Chattanooga and Kansas City have built out fiber networks that have gained attention

• Other cities have plans: Cleveland, Lafayette, LA, Chicago, New York, Seattle to name a few

• In all, 42 communities in 14 states have access to “ultra‐high‐speed” fiber providers that reach a gigabit

• Various states are looking at revamping their state specific USF programs

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

18

Page 19: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

GovernmentDevelopments• Gig.U

• The University Community Next Generation Innovation Project, or Gig.U, is a broad‐based group of over 30 leading research universities from across the United States

• Drawing on America’s rich history of community‐led innovation in research and entrepreneurship, Gig.U seeks to accelerate the deployment of ultra high‐speed networks to leading U.S. universities and their surrounding communities

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

19

Page 20: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

DrivingtheNeed…• Smartphones/Smart Devices/Tablets

• Demand growth• Apps• Internet is ever increasing part of life

• Audio/Video (65% of peak traffic*)• Hulu/Amazon/Netflix/YouTube/SmartTvs 

• Netflix accounted for 33% of all downstream peak traffic in the fall of 2012 – up from 20% in 2010• Hulu and Amazon are only at 3.2%

• Increased exclusive content• Increased demand for over the top video

• Peer to peer

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

20

* http://news.cnet.com/8301‐1023_3‐57546405‐93/netflix‐gobbles‐a‐third‐of‐peak‐internet‐traffic‐in‐north‐america/

Page 21: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

DrivingtheNeed…• Home Security

• Security/Monitoring cameras• Health Care Expansion and Digitization• Online Education• Machine to Machine

• Monitoring, Information flow, sensors• Cloud Computing/Storage and Big Data

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

21

Page 22: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

DrivingtheNeed….

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

22

Page 23: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

DrivingtheNeed…

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

23

Page 24: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

GlobalDemandGrowth

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

24

Page 25: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

WirelessDemandGrowth

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

25

Page 26: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

WirelessDemandGrowth

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

26

Page 27: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

ShiftofDemand

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

27

Page 28: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

INDUSTRYRESPONSE

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

28

Page 29: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

Wireline ‐ Telecom & Verizon BusinessWireless

Page 30: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

Upgrade electronics to 100 Gigabit per second Project started in 2012 13,000 route miles complete in US

Activate & market health monitoring & fleet management services via LTE

Page 31: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

Remove Customers from Copper  Move copper trouble pairs to FTTP where overbuilt All “Sandy” repairs will be FTTP 

Expand FTTP wire center per plan “Sandy” repairs Will pass approximately 19M homes

In rural non‐FTTP wire centers  Move customers to Home Fusion

Page 32: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

Move network to all IP Protocol Replace Digital Circuit Switching

Softswitch LAG Equipment – Line Access/ Aggregation Gateways Switch bypass

Move from SONET to ROADM Move video customers from Set top boxes to Home Media Server

Page 33: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

Complete 4G LTE build out Enable voice service on LTE network Expand Home Fusion penetration in non‐FTTP wire centers

Page 34: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

GOVERNMENTRESPONSE

Mobile Subsidization (CAF)BTOP/ARRA UpdateRUS LoansNTIA’s FirstNet

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

29

Page 35: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

MobileBroadbandSubsidization• ConnectAmericaFund(CAF):$6,400,000,000fordeploymentandoperationsofMobileBroadbandoverthenext10years

• Phasedapproach• Phase1:$300milonetimedeploymentfundthroughreverseauction

• Phase2:$500milperyearforongoingsupport• Plus:$100mil‐ Triballandsdeploymentand$100mil/yearongoing

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

30

Page 36: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

31

SubsidySupportModel

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Janu

ary, 2013

Page 37: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CurrentMobileBroadbandDeployment

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Janu

ary, 2013

Page 38: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CAF‐Mobility• Phase 1

• $300m for deployment of 3G or 4G in unserved areas• Use of reverse auctions for selection of recipients (Q3 2012)• One time support for deployment• 3G – 200kbps/50kbps• 4G – 768/200• Must serve 75% of road miles/Collocation/Reasonably comparable rates/other

• Also, $100m for Tribal Lands

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

33

Page 39: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CAF‐Mobility• Phase 2

• $500m for ongoing Mobile Broadband support• 5‐year transition from existing CETC support• NPRM for design, most likely reverse auctions• Potential for model‐based system• Timing:  Late 2013

• Also, $100m for Tribal Lands

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

34

Page 40: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CAFIMobilityFundResults(ReverseAuctions)

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

35

Sum of Total Bid Amount

Sum of Road Miles

Sum of $ / Road Mile

Sum of Population

Pop per Road Mile

Sum of Total Bid

Amount per Pop

Number of CT's w/

>100 Pops

% of Winning Bids w

>100 PopsAverage for Auction 299,998,632$ 83,494 3,593$ 224,462 2.7 1,337$ 117 15% 795

Census Tracts w/ Multiple Bidders 28

Road Miles Population

Total Winning

Bids

Winning Bids

Percent of Total UnservedRoad Miles served by winning bids 83,494               12.8%Pops served by winning bids 224,462            12.9%

Road Miles for all FCC CAFI Census Tracts 650,393           Pops for all FCC CAFI Census Tracts 1,738,828        

Total Awarded 

Total Unserved

Page 41: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CAFIMobilityFundResults(ReverseAuctions)

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Janu

ary, 2013

Page 42: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

37

SupportModel– CAFIMobilityResults

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Janu

ary, 2013

Page 43: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

BroadbandTechnologyOpportunitiesProgram–NTIA• BTOP:  NTIA invested approximately $4 billion in 233 BTOP projects benefitting every state.  The portfolio of projects initially included: • Infrastructure projects totaling $3.5 billion in Federal grant • Public Computer Center (PCC) projects totaling $201 million• Sustainable Broadband Adoption (SBA) projects totaling nearly $251 million 

• State Broadband Initiative (SBI), NTIA granted approximately$293 million to states

• Source: NTIA, January 2012

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Page 44: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

RUSLoanProgramUpdateRUS 2012 ‐ $173 million in telecommunications loans and grants

• RUS 2009‐2011 ‐ Broadband Initiatives Program (ARRA) ‐Completed

• 320 awards obligated a total of $3.529 billion • 285 last‐mile projects that totaled over $3 billion, • 12 middle‐mile awards total $172.6 million, • 4 satellite awards for $100 million, and • 19 technical assistance awards for over $3.4 million 

Source: RUS, January, 2012

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Page 45: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

FirstResponderNetworkAuthority(FirstNet)• A nationwide interoperable broadband network that will help police, firefighters, emergency medical service professionals 

• Funded through The Middle Class Tax Relief and Job Creation Act of 2012,

• Single, national network architecture• FirstNet will hold the spectrum license for the network, and is charged with taking “all actions necessary” to build, deploy, and operate the network

• $7 billion in funding towards deployment of this network• $135 million for a new State and Local Implementation Grant Program administered by NTIA to support State, regional, tribal and local jurisdictions’ efforts to plan and work with FirstNet to ensure the network meets their wireless public safety communications needs

Source: NTIA, January, 2012

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Page 46: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

REPLACEMENTCOSTIMPACT

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

41

Page 47: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CostQuestRCNDevelopment

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

42

Service area with geocoded customer locations and roads

Geocoding success relies on the quality of the address data and the quality of the geocoding databases. On average we typically achieve 80-95% success rates to the street segment.

For those records that do not geocode, we fall back to an accepted process of surrogation to the roads within a Census Block.

Page 48: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CostQuestRCNDevelopment

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

43

Designed Network

Legend: – DSLAM – AAN – Terminal – Fiber Feeder

– Copper Feeder – Distribution

Page 49: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

Wire Center

Management• OSS

“the Cloud”

Access Offices• Gateways

Router

Common Resources

IMS Core Geo Location #1

Applications / Other•Application Servers

Module1

Module…

44

IMSSoft‐SwitchingCommon Resources

IMS Core Geo Location #2

Module1

Module…

Matched – Geo Redundancy

Matched – Geo Redundancy

Router

Router

Router

Router

Router

PSTN Network

• Gateways

•Feature Servers

•Session Manager

• Gateways

•Feature Servers

•Session Manager

Router

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Page 50: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

45

CellSite– OwnedorLeased

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Page 51: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

ModernizationImpactonReplacementCost• Factors addressed in Replacement Cost Modeling with the push for broadband modernization• Telco Distribution/last mile

• Focus on optics and wireless• Fiber deployment• All‐packet (IP and native ethernet) solutions

• In more rural areas, use of a fixed wireless solution to allow for broadband access  • Cable access/last mile

• Push the fiber node farther out• Reduces homes per node• Increases bandwidth• Reduces actives

• Central office, Headend, Hub and  circuit equipment• Replacing digital switches with an IMS platform for cVoip offerings• Moving to converged core functionality including content delivery networks• Circuit equipment moving to routers/ethernet switches

• Wireless• LTE networks with VoLTE• MetroNodes• Use of WiFi offloads

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

46

Page 52: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

TheLocalTelcoNetwork• Fixed wireless blended with FTTp

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

47

Page 53: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

AdditionalFactors

Technology Price Trends Electronic Price Trends

48

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

Page 54: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

ConnectAmericaFund• Connect America Fund ‐ Landline

• CAF1 was to distribute $300M in one time support to Price Cap carriers to spur immediate 4/1 buildout 

• Disbursement based on CostQuest regression model of cost• Carriers will receive $775 for each unserved location deployed• Only a portion was accepted by carriers• Continued discussion at the FCC to encourage providers to accept funding 

• CAF2 will distribute up to 4B annually to landline providers• Up to $1.8b annually to high cost areas served by Price Cap Carriers• Up to $100m for remote very high cost areas• Up to $2b annually to high cost areas served by Rate of Return carriers

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

49

Page 55: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CostQuestandCAF2• CostQuest was retained by USAC to develop and deploy the model to guide disbursement of CAF2’s $1.8B in annual funds for Price Cap Carriers • Model is referred to as CACM >> Connect America Cost Model

• CACM• Based on prior work:

• BAM and CQBAT• Models every wire center in the U.S. 

• Includes AK, PR, VI, HI, MP• Over 20,000 service areas

• Current efforts focused on Price Cap areas• Forward looking network deployment (i.e., RCN)

• FTTd12k and FTTp• Funding to high cost census blocks• Excludes areas already served by an unsubsidized competitor (e.g., cable)

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

50

Page 56: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

TheChallenge

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

51

Full U.S. FTTp Deployment ‐ RCN

Page 57: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

CosttoServe

Janu

ary, 2013

52

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Chart is for demonstration purposes only and may not reflect current CACM output

Page 58: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

ReviewofPreliminaryResults• CQBAT Support Model Output FTTd – Company Level 

FTTd BM 80, Alt 138Solution Set: SS20120201PublicFTTdSum of Support Capped Funding *Company YearlyACS 5,180,753                   ATT 569,088,980              CBT 2,111,335                   Cent 512,150,019              Cons 6,682,149                   Fair 17,923,258                 Fron 331,674,907              HTC 2,977,401                   PRT 1,611,144                   VIT 368,638                       VZN 174,338,291              Wind 186,337,754              

Grand Total 1,810,444,627           

Janu

ary, 2013

53

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Chart is for demonstration purposes only and does not reflect current CACM output

Page 59: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

ReviewofPreliminaryResults

Janu

ary, 2013

54

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Chart is for demonstration purposes only and does not reflect current CACM output

Page 60: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

ReviewofPreliminaryResults

Janu

ary, 2013

55

Chart is for demonstration purposes only and does not reflect current CACM output

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

Page 61: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

IMPACTONVALUATION

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.  

Any use with

out p

ermission is strictly

 prohibited

56

Page 62: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

BroadbandModernizationImplicationforValuation• Impact on lives of existing plant

• Competition• Customers demands for additional services and faster speed

• Developing the replacement cost – Options to consider• Fiber to the premise (FTTP)• Internet Protocol (IP)• Fixed Wireless• Wireless 

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

57

Page 63: Broadband Modernization Impact on the Communication Industry · • 5‐year transition from existing CETC support • NPRM for design, most likely reverse auctions • Potential

BroadbandModernizationImplicationforValuation• What RCN address  and not from a depreciation standpoint

• Physical depreciation• Functional obsolescence 

• Excess capital• Excess operating cost

• Economic/External  obsolescence• Inutility or excess capacity (Present/Future)• Inability to make market rate of return on investment

• Replacement cost and addressing software• Developing replacement cost and identifying current and future ownership

Janu

ary, 2013

Prop

erty of C

ostQue

st Associates, Inc.   An

y use 

with

out p

ermission is strictly

 prohibited

58