Briefing on the Implementation of ASPA-WRM. Agenda 6.6 : Knowledge Sharing and Exchange Agenda 6.7 : Exchanging Information and Creating Awareness in a Structured Basis Between Peak Bodies. By Engr. Jorge M. Estioko OIC, Deputy Executive Director National Water Resources Board - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Briefing on the Implementation of  ASPA-WRM

Briefing on the Implementation of ASPA-WRM

ByEngr. Jorge M. Estioko

OIC, Deputy Executive DirectorNational Water Resources Board

Philippines

Agenda 6.6 : Knowledge Sharing and ExchangeAgenda 6.7 : Exchanging Information and Creating

Awareness in a Structured Basis Between Peak Bodies

Page 2: Briefing on the Implementation of  ASPA-WRM

Agenda: 6.6Knowledge Sharing and Exchange

No additional hub from the previous 17 confirmed knowledge hubs

No significant development in the Asia Pacific Water Forum –Knowledgehubs website http://www.apwf-

knowledgehubs.net/

Page 3: Briefing on the Implementation of  ASPA-WRM

Agenda 6.7Exchanging Information and Creating Awareness

in a Structured Basis Between Peak Bodies

Page 4: Briefing on the Implementation of  ASPA-WRM

Background

The proposed project is one of the ten project concepts in the ASEAN Strategic Plan of Action (ASPA) on water resources management formulated in 2005Taking off from the ADB study on National Water Sector Apex Bodies in different countries and for SEA conducted in 2003, the Philippines initiated the dissemination of a questionnaire patterned from the UN Water Survey to all ASEAN Member States regarding the status of implementation of Water Peak Bodies and IWRM.

Page 5: Briefing on the Implementation of  ASPA-WRM

In order to meet the objectives set for the project, a workshop is necessary. Hence, the Philippines through NWRB seeks for funding support to carry out the said workshop and hire an expert/consultant to provide guidance in carrying the analysis of implementation of agencies as peak bodies including the status of implementation of IWRM .

Page 6: Briefing on the Implementation of  ASPA-WRM

Objective

The project objective is to create awareness on key water resources management problems and exchange information about generic solutions with NGOs and peak industry bodies and associations with interest in water management issues throughout ASEAN.

Duration: 4 months

Page 7: Briefing on the Implementation of  ASPA-WRM

Expected Output

A pooled information resource through records of methodological evaluation, data analysis, and interpretation of data. Identification of key government agencies, NGOs

and industry bodies with an interest in water management issues (consultant in conjunction with the ASEAN Secretariat);

Analysis of the responses of AMS for the questionnaire disseminated entitled: Status of implementation of water peak bodies and IWRM and gather other information;

Page 8: Briefing on the Implementation of  ASPA-WRM

Cont. . .

Preparation of workshop design and other pre workshop activities;

Conduct of an initial workshop guided by the consultant to define core water resource issues that would benefit from such programme, ie. the issues where sharing would be advantageous (some of these have been identified in the “State of Water Resources Management in ASEAN report;

Page 9: Briefing on the Implementation of  ASPA-WRM

Cont. . .

An improved and sustained interpersonal network between ASEAN water managers. Develop a communications plan associated with the

outcomes of each forum (the consultant and ASEAN partners). The consultant will provide an initial draft for review by ASEAN partners.

Page 10: Briefing on the Implementation of  ASPA-WRM

Cont. . .

Programmes on key water resource issues e.g. water quality etc. which have common generic approach. Preparation of forum design and agenda/programme

with indicative budget on the conduct of three forums per year covering the most significant water resource issues in the ASEAN region. (An initial list can be drawn up from the Strategic Plan of Action and updated based on the result of workshop)

Page 11: Briefing on the Implementation of  ASPA-WRM

Status

The proposal was already sent to AWGWRM Chairperson/ASEC and National Focal Points for inputs or endorsement of the project.

Page 12: Briefing on the Implementation of  ASPA-WRM

NATIONAL WATER RESOURCES BOARD8th Floor, NIA Building, EDSA, Quezon City, PhilippinesTelefax Nos. 02-9202641 /02- 9202365 /02-9202724Website: www.nwrb.gov.ph

THANK YOU!

Water Management is a Shared Responsibility