Brief Report
On
Public Consultation meeting held at Saphale Station for
Quadrapuling of Virar - Dahanu of MUTP III projects
On 14th
June 2019
Mumbai Railway Vikas Corporation Ltd.
2
Report on Public Consultation held at Saphale Station for Quadrupling of Virar –
Dahanu corridor of MUTP III projects.
Introduction:
Mumbai Railway Vikas Corporation (MRVC) has planned to implement MUTP-III project in
Western and Central Railway corridors. MRVC has sought loan assistance from AIIB (Asian
Infrastructure Investment Bank) for implementation of the following projects of MUTP-III.
a. Quadrupling of Virar - Dahanu corridor (63 RKms)
b. Panvel-Karjat – Double Line Suburban corridor (30 RKm)
c. Mid-Section Trespass Control Measure on Mumbai Suburban Section of Central and
Western Railway.
The Quadrupling of Virar - Dahanu section of Western Railway will include laying of 3rd and
4th line parallel to existing railway lines. It is 63 Kms in length and will pass through seven
intermediate stations. It will not only ease overcrowding in Suburban trains bound for Dahanu
Road and back to Churchgate but also ensure hassle free journey and greater comfort to the
commuters. Panvel and Karjat Double Line Suburban Corridor (30 RKm) on Central
Railways is a long-standing demand of the people living in the area, which will effect faster
and easy railway movement in the stretch.
A general public consultation on social and environmental issues and safeguards with all the
stakeholders has been conducted by MRVC during each phase of project implementation. The
consultation primarily helped in disclosing technical information about the project, social and
environmental safeguards with the people centric approach. The MRVC has conducted
consultation and participation of the people likely to be affected or displaced due to the
MUTP III projects both in formal and informal way. During the consultation with PAP’s
various issues has been addressed regarding Land Acquisition, compensation, GRM,
structures likely to be affected, social risk, Common Property Resources (CPR), issues related
to land acquisition, values of affected assets and role of administration. Various
methodologies has been adopted by MRVC for Public consultation like informal and formal
group consultation, FGD, in-depth interviews etc. The consultations were also conducted with
different homogeneous group such as traders, women, vulnerable group etc.
During the pre-appraisal meeting of Asian Infrastructure Investment Bank (AIIB) which was
held in May 2019 at MRVC office at Mumbai, the AIIB has said to keep one more Public
Consultation before Land Acquisition process starts. Accordingly, on AIIB requirement
MRVC has planned to conduct Public Consultation at two locations Saphale Station and
Boisar Station of Virar - Dahanu corridor.
Date : 14th June, 2019
Location : Saphale Station
Starting time : 11.00 am
End time : 03.00 pm
3
MRVC officials present:
1. Shri. Anand Kulkarni- Dy.CPM- IV
2. Shri.Ravinder Guleria – Dy.CE
3 Shri. S.K. Mishra – Dy.COM
4 Shri. Iyer – Dy.CE
5 Shri. Vinay Kumar – Project engineer
6 Shri. Anuraag Mishra – Project Engineer
7 Shri. U.B. Sonawane – LA field staff
8 Dhanalaxmi Bhosale, Environmental Specialist
9 Vikas Tambe. – Social Scientist
10 & Support staff of MRVC
Objective of the meeting:
The main objective of this public consultation was to inform and gather opinion of common
public on the Environmental and Social Impact and its mitigation measures as proposed in the
Environment and Social management plan (ESMP) of Virar - Dahanu corridor Social &
Environment Assessment Report as published on MRVC website. Also to make aware about
the current situation, benefits, method and process of Land acquisition of project.
The issues discussed during consultation are as follows:
o Environmental and Social issues
o Impact on Environment and social aspects due to project
o Proposed ESMP as given in Environment Assessment Report for the project
o Expectation of the people from the project.
Opening Remark:
Shri. Anand Kulkarni, Dy. CPM IV, MRVC, opened the meeting by welcoming the
participants and explained briefly about the aim of meeting and describes the project.
Public Consultation at Saphale station:
The Public Consultation planning has started one month before starting from
selection of location, making banner, preparing information broacher, notice publication in
local newspapers, creating awareness among the nearby catchment community area for better
attendance. The concern Stakeholders were invited by sending official letters and publishing
consultation notice of various reputed newspapers (Times of India, Loksatta, Samana,
Maharashtra Times, Navbharat Times and Dahanu Times) dated on 9th
June, 2019. The local
4
community and project affected people were also informed by MRVC field level staff. Over
60 people participated in the meeting including local residents, project affected people, etc.
Public Consultation meeting start with welcoming of all people and introduction of MRVC
staff and local attendees. The people are well aware about Quadrupling of Virar – Dahanu
corridor of MUTP III project. The team has explained the current situation, silent features
passenger’s amenities and benefits of the project. People were also informed about the method
and process of Land acquisition i.e. direct purchase through negotiation. It was informed that
the process includes
The Government Decision No. SANKIRNA-03/2015/Para. Kra. 34/A-2 dated 12th
May 2015, Revenue & Forest Department, Govt. of Maharashtra.
a notice (number 3) will be published in local newspaper giving details of land being
acquired i.e. survey/Gut number, area being acquired and nae of the land owners with
request to submit consent form to respective SDO.
In addition, formal notice will be issued to all PAPs for requesting them to give
consent for purchase of land for the project with proposed rates.
Village wise rates will be finalised by District Level Committee headed by District
Collector and as per Procedure given in the provision of Article No. 26 to 30 of Land
Acquisition Act 2013 & Schedule I, including other related features, then 25% will be
added to the above-calculated compensation.
Assets attached to the land i.e. structures, trees etc. will be paid as per valuation of
these assets by respective departments of Govt of Maharashtra with 100% Solatium.
In case, PAP does not agree sale of land by Direct Purchase Method for the project,
land will be acquired under Land Acquisition Act 2013 and compensation will be paid
accordingly. PAPs are not entitled for additional 25% compensation in such cases.
The people were asking more questions regarding the Land Rates and requested for increased
rates. It was informed that rates are finalised as per provision given in Article No. 26 to 30 of
Land Acquisition Act 2013 & Schedule I, including other related features. It was also told to
provide any details available for increase in rates. If, there is any omission in deciding rates
by District Level Committee, it will be considered, and rates will be revised.
Some of people has quarry on Joint Measurement and not having their names in survey
number, the MRVC team has given answer to all such kind of question arises and people
were satisfied with answer.
Overall, the Saphale Station public consultation was done in positive way as people were
happy with the project and the compensation.
Participants: There were around 62-65 Participants present for names and more details See
Annexure I. (Attached participant attendance list).
***
5
Quadrupling between Virar–Dahanu Road Section” under Mumbai Urban
Transport Project-III (MUTP-III)
Public Consultation on
Environment Assessment and Social Impact Assessment
एम यू टी पी – III अतर्गत विरार – डहाणू रोड रेल्िे मार्ागच ेचौपादरीकरण
प्रकल्पाचा पयागिरण ि सामाजिक प्रभाि मूल्याांकन – सािगिननक सल्लामसलत
S.
No. Name of Participant Occupation Place/Village
Contact
Details
1 Ravilal S. Patel Farmer Saphale 9326699281
2 Ravi K. Shivade Farmer Saphale 7738599459
3 D.K. Patil Farmer Saphale 9224376334
4 Ashok S. Patil Farmer Saphale 8830210983
5 Keshav A. Raut Farmer Saphale 8698967283
6 Nivrutti D. Patil Farmer Vaitarna 9923440886
7 Sudam Somar Patil Farmer Saphale 9923600018
8 Deepak Keshav Raul Farmer Vaitarna 9923159033
9 Namkya L. Patil Farmer Vaitarna 7798375118
10 Nandan Deoram Patil Farmer Vaitarna 9764604960
11 Dattu Arjun Raut Farmer Vaitarna 8600361601
12 Laxmibai Kamalakar Patil Farmer Vaitarna
13 Kisan Kukama Patil Farmer Vaitarna 9987064621
14 Manohar Dhondu Kini Farmer Vaitarna 9850322647
15 Naresh Sadanand Patil Farmer Saphale 954504970
16 Vinod H. Shinde Farmer Saphale 7038630825
17 Vivek Tame Service Saphale 8975107095
18 Jamunaprasad Singh Farmer Bhyandar (W) 9867837074
19 Jassuprasad Prajapati Farmer Bhyandar (W) 829138880
20 Madhukar Shivade Farmer 9226353229
21 Omprakash Farmer Saphale 8999853460
22 Mangesh M. Gharat Farmer Saphale 9860180220
23 Hemchaya Vaidyesh Farmer 8097377975
24 Nikesh Mishra Farmer 8779980526
25 Bandu Gopal Patil Farmer Saphale 7387116282
26 Ramamkant V. Gharat Service Saphale 9226939310
27 Vishal B. Gule Farmer Saphale 9226882803
28 Dhansh Patil Farmer Saphale 8380989089
29 Jayesh Bandu Patil Farmer Saphale 9226777073
30 Ashish Madhukar Raut Farmer Makunsar 9270702570
31 Kishor Damodar Mhatre Farmer Kelave Rd 9029542483
32 Sushma Surendra Mahtre Farmer Kelave Rd 8412931469
33 Indramal Jain Self –
employed Umbarpada 9921054154
34 Rupesh Patil Farmer Umbarpada 920970898
35 Ramchandra Pawar Farmer Umbarpada
6
S.
No. Name of Participant Occupation Place/Village
Contact
Details
36 Dilip Kashinath Patil Farmer Vaitarna 9975084678
37 Ravi Atamaram Raut Farmer Vaitarna 7875707788
38 Bhiva Arjun Raut Farmer Vaitarna
39 Tukaram Arjun Raut Farmer Vaitarna
40 Mohammad Shaikh Farmer Umbarpada 9226145942
41 Tukaram Arjurn Raut Farmer Saphale
42 Anant Shantaram Patil Farmer Saphale 9221632894
43 Shridhar N. Gharart Farmer Saphale 9271910399
44 Vaibhav S. Gharat Farmer Saphale 9359252176
45 Sachin A. Gharat Farmer Saphale 9209540123
46 Sunil S. Gharat Farmer Saphale 9209540123
47 Anush Subhash Patil Farmer 9822037377
48 Kamish Raut Farmer Nandade 8007911333
49 Prabhakar Kini Farmer Saphale 9022112648
50 Jangnaath Patil Farmer Gaskopari 9823852435
51 Prashant Gharat Farmer Umbarpada 9930897075
52 Nihal G. Farmer Umbarpada 7972468626
53 Vanita Baban Gharat Farmer Umbarpada 9930897074
54 Krishakant D. Mhatre Farmer Kelave Rd. 9763040666
55 Krupa Krishnakant Mahtre Farmer Kelave Rd. 9226341251
56 Rajankumar D. Raut Service Makunsar 8999691032
57 Raut Dilip D. Service Makunsar 9890912574
58 Prag Kolekar Service Umbarpada
Nandade 9324083286
59 Naresh P. Patil Retired Kapase 9226755315
60 Mukesh Patil Service Gaskopari 9881916402
61 Rajesh C. Farmer Gaskopari 8793568182
7
Annexure II
Points of Discussion: Public Consultation held at Saphale station on 14/06/2019
Quadrupling between Virar-Dahanu Road Section under Mumbai Urban Transport Project – III
(MUTP – III)
Public Consultation on Environmental Assessment and Social Impact Assessment
एम.यू.टी.पी. – III अांतर्गत विरार – डहाणू रोड रेल्िे मार्ागच ेचौपदरीकरण
प्रकल्पाचा पयागिरण ि सामाजिक प्रभाि मूल्याांकन – सािगिननक सल्लामसलत
चचचे ेमुद्दे
Sr.no Name of Person Points of Discussion MRVC Reply,
1.
Naresh Patil
9226755315
We need toilet, fans and proper
sitting arrangement on the
proposed stations.
Public Toilets are planned at
every station in the project.
2.
Krishnakant D. Mahtre
9763040666
How will the committee
decided the Land rate?
For those whose whole land is
to be acquired will they get any
alternate Land?
Village wise rates has been
finalised by District Level
Committee headed by District
Collector and as per Procedure
given in the provision of
Article No. 26 to 30 of Land
Acquisition Act 2013 &
Schedule I, including other
related features, then 25% will
be added to the above-
calculated compensation.
There is no provision for
providing alternate land.
3
Ramakant Gharat
226939310
We want 100% on the land rate
We want 25% addition is not
only on said amount but want
on every loose.
From the date when land
acquisition notice is issue to
last notice date we want 12%
interest on the decided amount.
Village wise rates has been
finalised by District Level
Committee headed by District
Collector and as per Procedure
given in the provision of
Article No. 26 to 30 of Land
Acquisition Act 2013 &
Schedule I, including other
related features, then 25% will
be added to the above-
calculated compensation.
4. Rajkumar D. Raut
8999691032
After the Land Acquisition, our
10 -15 ft land remain, but there
is PWD road on middle of this
land. If possible, that PWD
road is shift to just adjacent to
rail track then we can get plane
and more land to use.
For this case we need
permission from competent
respective authority. Further, it
shall be agreed by all land
owners. It will be sorted out in
consultation with all
concerned.
8
Sr.no Name of Person Points of Discussion MRVC Reply,
5. Madhukar Shivade
Ravi Shivade
Mahendra Shivade and
Vinod Shivade
7738599459
9226353229
Due to acquisition of Land, the
local commuter road is
affected, it is request to MRVC
management form the acquire
land we want local road to
travel.
The MRVC will build alternate
road if the existing public road
is acquired for the project.
6. Ramakant Patil
9226882803
In the Umbarpada Nandade
there is village name Tepecha
pada, there were around 50-60
household situated, after the
land acquisition there will not
be any road to travel theses
pada villagers towards station
which result low connectivity
and transportation hence
requesting MRVC to make an
alternate arrangement for road.
For Land looser family the
railway authority should make
an arrangement for job
placement in railway.
As discussed, if due to Virar-
Dahanu Quadrapuling project
any local road connectivity
affected, then MRVC will
build alternative road in lieu of
existing road.
There is no any kind of
provision in MUTP III policy
for getting job in Railways.
7. Dilip Raul (
Valanwadi, Makunsar)
9890912574
We have Motor pump, Bore
well, Taki in my own land
being acquired for the project
and this is the only source of
water for us, Hence it is
request to railway authority to
give us permission for laying
water pipe line under the
railway track.
Road to be shifted.
This will be dealt at the time of
land acquisition and joint visit.
8. Indramal Jain (
Umbarpada Nandade)
survey no. 56/2
9921054154
Due to Land acquisition the
main access or approach road
is affected hence in future
villagers will phase many
challenges in transportation
and accessibility. Hence
railway authority will have to
arrange or identify the
alternative road for villagers.
The MRVC will build alternate
road if the existing public road
is acquired for the project.
9. Anil Patil ( Umbarpada
Nandade) survey no.
56/1, 57/1
9226980338
There is no road to travel from
east to west, hence requesting
to railway authority to make
and arrangement for alternate
road or subway to travel from
east to west.
DFCCIL is already building
ROB for providing east to
West connectivity. Any
additional connectivity if any
require, it shall be proposed by
the road authority.
9
Sr.no Name of Person Points of Discussion MRVC Reply,
10. R.P.Saphale Aagar,
Palghar Section
If railway authority does not
need for acquisition bore well
near bus station then requesting
authority to not to demolish
that because it is only the
source of water for bus
commuters.
Noted.
11.
Nitin N. Patil ( Narangi
– jayashrinagar- Virar
(E) )
9273087208
In our area people are crossing
railway track for travelling
from East to west or vice a
versa. The crowd is increasing
continuously.
After this project is done then
what about the people who
cross the track.
What about the compensation
for structure or house and Land
and how much is that?
As discussed, if due to Virar-
Dahanu Quadrupling project
any authorised local road
connectivity affected, then
MRVC will construct
alternative road.
Village wise rates has been
finalised by District Level
Committee headed by District
Collector and as per Procedure
given in the provision of
Article No. 26 to 30 of Land
Acquisition Act 2013 &
Schedule I, including other
related features, then 25% will
be added to the above-
calculated compensation.
12. Jaiwant Patil and Jagan
patil ( Narangi –
jayashrinagar- Virar
(E) )
9272889518
There is one gaon devi mandir
(religious structure) in our
village which is going to affect
in the acquisition. Hence
requesting railway authority to
provide alternative land to
construct the mandir or provide
us compensation to construct.
Noted If it is authorised
religious structure, then it will
be rebuild at suitable location
in consultation with local
authorities.
************