bridgeport ct awarded projects - prime and sub - 2008
TRANSCRIPT
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 1/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
COB1028A - Site
Improvements -
Fairchild Wheeler Turco Golf 01/03/08 $782,560.00
Resource Services(AA MBE) $19,950.00 $19,950.00 100.00%
Technology
Infrastructure -
South End Schhol
HB
Communications 01/07/08 $562,823.55 0.00%
Nik-Tek (MBE) $50,670.00 $50,670.00 n/a
J Electrical (AAMBE) $33,780.00 $33,780.00 0.00%
NetworkInstallationServices (WBE) $50,120.00 $50,120.00 n/a
CanterburyCommunications $343,599.00 0.00%
Sonitrol $101,695.00 50.00%
CDB218B - Roof
Work - RNP
Allen Construction
(AA MBE) 01/23/08 $15,000.00 $15,000.00 80.00%
COB10681 - East
Side Streetscapes Mark IV 03/11/08 $910,356.00 20.00%
T. Arduini (WBE) $136,650.00 $136,650.00 100.00%
Eaton Enterprises(AA MBE) $136,500.00 $136,500.00 20.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 2/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
COB11081 -
Boiler
Replacement &General Trades -
Harding & Read
Southport
Contracting (WBE) 03/13/08 $2,387,500.00 $2,387,500.00 75.00%
P & C Fence(WBE) $10,387.00 $10,387.00 25.00%
QSR Steel Corp. $28,280.00 0.00%
A & R Electric
(MBE) $103,000.00 $103,000.00HargroveEnvironmental (AAMBE) $158,700.00 $158,700.00 40.00%
Norwalk Glass Co. $37,800.00
AutomatedBuilding Systems $188,900.00 0.00%
Dalling Const. $197,420.00 50.00%
Turnpike Furnace $8,174.00 66.00%
J & W Heating $14,630.00 0.00%
CDB1372R -
Medical Storage System - Southwest
Community Center
Executive Suites
(AA MBE) 02/22/08 $24,648.00 $24,648.00 n/a
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 3/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
APB0782 - Runway Marking - Sikorsky
Airport Safety Marking Inc. 04/10/08 $15,685.00 33.00%
PKB4384 -
Fencing Diamond
#9 ABC Fence 04/22/08 $23,240.00 75.00%
COB11482 - Repair
& Replacement -
Hallen & Dunbar
Management
Strategies, Inc. 04/28/08 $443,500.00 50.00%
Lyon Workspace $14,078.00 0.00%
Unviversal BuildingControls $20,000.00 0.00%
Allen's Abatement(AA MBE) $76,700.00 $76,700.00 100.00%
Horizon Glass $67,980.00 0.00%
CDB22181 -
Parking Lot
Surveillance -
Roberto Clemente Condos Holzner Electric 04/30/08 $7,895.00 100.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 4/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
CDB22882 - Roof Work - Charles
Smith Foundation
Allen Construction
(AA MBE) 05/07/08 $18,500.00 $18,500.00 100.00%
CDB22581 - Misc.
Repairs - Charles
Smith Foundation
Tim's Enterprises
(AA MBE) 05/07/08 $38,000.00 $38,000.00 16.00%
CDB22481 - Roof
Work - Stone
Ridge 2
U & I Roofing (AAMBE) 05/14/08 $32,340.00 $32,340.00 75.00%
CDB22081 -
Driveway Gate
Repair - Roberto
Clemente Condos
Carjen Fence
Company 05/14/08 $12,717.00 33.00%
CDB22281 -
Parking Lot Repair
- Roberto Clemente Condos DeeringConstruction 05/14/08 $22,550.00 0.00%
Industrial BusinessGroup $9,794.00 0.00%
COB11582R -
Transit Garage
Expansion
Blakeslee
Prestress 05/14/08 $5,954,000.00
Moore Metals (AAMBE) $584,000.00 $584,000.00 n/a
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 5/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
Sandair (WBE) $56,000.00 $56,000.00 n/a
MNB8282 -
Municipal Garage
Exhaust System
Automotive
Resources Inc. 05/27/08 $55,818.80 0.00%
Rivercliff Electric(AA MBE) $5,500.00 $5,500.00 0.00%
CDB22682 -
Exterior Painting -
American Red
Cross
B & W Painting (AA
MBE) 05/28/08 $21,800.00 $21,800.00 0.00%COB11683 -
Chairlift @
Ballpark Merritt Contractors 06/03/08 $39,000.00 33.00%
City Electrical (AAMBE) $2,400.00 $2,400.00 0.00%
Handilift $33,500.00 0.00%
COB11984 -
Premise Data
Cabling
Electrical Energy
Systems 06/10/08 $86,763.00 0.00%
Kerr Electric (AAMBE) $13,500.00 $13,500.00 n/a
Jan Electronics(WBE) $5,000.00 $5,000.00 n/a
FWB0685 -
Carpet
Replacement -
Reliable Flooring
(MBE) 06/13/08 $9,356.00 $9,356.00 0.00%
CDB2089 - Chain
Link Fence - BRLL Creative Fence 07/01/08 $13,000.00 0.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 6/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
Lawns By Sean
(AA MBE) $3,900.00 $3,900.00 0.00%PKB4585 - Barrier
Guiderail
Installation
*****Total Fence
(WBE) 07/02/08 $62,492.00 $62,492.00 0.00%
CDB22782 - Roof
Work - American
Red Cross
Allen Construction
(AA MBE) 07/07/08 $23,650.00 $23,650.00 100.00%
CDB219B - Roof
Work - Roberto
Clemente Condos
Allen Construction
(AA MBE) 07/07/08 $180,000.00 $180,000.00 100.00%
CDB1774 - New
Sidewalks - Phase II
AmedeoConstruction 07/09/08 $27,643.00
Rose Construction(AA MBE) $7,572.00 $7,572.00 60.00%
COB11884 -
Playscape - New
Barnum School
*****Pat Corsetti
Contracting 07/10/08 $193,000.00 0.00%
CDB22381 - Misc.
Repairs - Roberto
Clemente Condos
Resource Services
(AA MBE) 07/23/08 $183,000.00 $183,000.00 75.00%
MNB8885R - Welcome To
Bridgeport Signs Sign Designs 07/28/08 $79,950.00 0.00%
Hunter Sign (AAMBE) $4,770.00 $4,770.00 0.00%
COB1008AR2 -
South
Frontage/Main
Streetscape G. Pic & Son 07/31/08 $219,000.00 40.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 7/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
T. ArduiniConstruction(WBE) $32,850.00 $32,850.00 60.00%
Resource Services(AA MBE) $32,850.00 $32,850.00 100.00%
COB12286 -
Playscape - North
End School
********Pat Corsetti
Contracting 08/08/08 $126,500.00 0.00%
COB12186B -
Repair &
Replacement
Package 1.1 & 1.3
- Beardsley &
Longfellow
Gennarini
Construction
(WBE) 08/21/08 $2,282,808.00 $2,282,808.00 tba
Mackenzie
Painting (WBE) $35,450.00 $35,450.00 tba
Barall & Konover(WBE) $41,000.00 $41,000.00 tba
Fitzpatric Electric $21,600.00 tba
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 8/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
G & O Mechanical $50,608.00 tba
MilestoneRestoration $11,570.00 tba
Neals WoodFlooring $34,000.00 tba
David Roncari $48,000.00 tba
Resource Services(AA MBE) $65,000.00 $65,000.00 tba
Allen's Abatement(AA MBE) $96,000.00 $96,000.00 tba
COB1098C -
Relocation of Four
New Schools Wlliam B Meyers 08/21/08 $42,000.00 50.00%
Ampson LaborForce (AA MBE) $5,280.00 $5,280.00 0.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 9/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
COB12085 -
Parapet & Window Replacement -
Engine 12 GL Capasso 08/27/08 $147,300.00 tba
CapassoRestoration (WBE) $52,000.00 $52,000.00 tba
StatewideRestoration (AAMBE) $30,000.00 $30,000.00 tba
CDB1674 - New
Sidewalks - Phase
I
Amedeo
Construction
(WBE) 09/22/08 $23,891.00 $23,891.00 33.00%
Rose Construction(AA MBE) $4,770.00 $4,770.00 40.00%
COB12486 -
Wonderland Of
Ice Concession
Stand Holzner Electric 09/23/08 $252,400.00 75.00%
New EnglandMasonry (WBE) $41,400.00 $41,400.00 0.00%
Jordan Elecric (AAMBE) $42,000.00 $42,000.00 100.00%
COB12186A -
Repair &
Replacement -
Blackham School Holzner Electric 09/23/08 $1,213,300.00 75.00%
New EnglandMasonry (WBE) $193,113.00 $193,113.00 0.00%
Allen's Abatement
(AA MBE) $24,800.00 $24,800.00 25.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 10/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
Jordan Elecric (AA
MBE) $159,000.00 $159,000.00 100.00%COB1279A - East
End Brownfield
Remediation Industrial Wrecking 11/13/08 $294,825.00 100.00%
ConTest Labs(WBE) $11,000.00 $11,000.00 n/a
Clean SlateEnvironmental(WBE) $44,000.00 $44,000.00 0.00%
AI Engineers(MBE) $15,000.00 $15,000.00 0.00%
Mill CityEnvironmental (AAMBE) $18,000.00 $18,000.00 0.00%
Bofam Sanitation(AA MBE) $500.00 $500.00 0.00%
COB12386 -
Transit Garage
Expansion
Bismark
Construction 11/14/08 $1,598,850.00 tba
A & R Electric(MBE) $364,479.00 $364,479.00 40.00%
Jordan Elecric (AAMBE) $94,000.00 $94,000.00 50.00%
Bofam Sanitation(AA MBE) $2,000.00 $2,000.00 0.00%
A & B Mechanical $96,000.00 50.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 11/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
CDB23186 - Roof
Work - Marrakech
TLC Services (AA
MBE) 11/24/08 $29,850.00 $29,850.00 100.00%
CDB23084 -
Bathroom
Renovations
TLC Services (AA
MBE) 12/30/08 $12,832.00 $12,832.00 100.00%
Award
Total $18,470,343.35 Sub Contractor Total $4,191,219.00
Prime MWBE
Award Totals $5,345,667.00 Sub MWBE Totals $2,863,591.00
Calculated on 2/22/10 Prime MWBE % 28.94%
Sub MWBE % of
the Total Sub
Contracts 68.33%
(4) WBE Amount $4,756,691.00
Sub MWBE % ofthe Total Prime
Awards 15.51%
(12) MBE Amount $588,976.00
Sub WBE Total
Amounts $708,970.00
(11) AA MBE
Amount $579,620.00
Sub WBE % of the
Total Sub
Contracts 16.91%
Sub WBE % of the
Total Prime
Awards 3.84%
Sub MBE TotalsAmounts $2,154,621.00
Sub MBE % of the
Total Sub
Contracts 51.41%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 12/24
Awarded Physical Development Projects - Prime & Sub - 2008
Project Contractor
Date
of
Award
Award
Amount
MBE
Amount
Sub
Contractor Sub Amount
MBE
Amount
Projected
Bpt
Workers %
Sub MBE % of the
Total Prime
Awards 11.67%
Sub AA MBE Total
Amounts $1,621,472.00
Sub AA MBE % of
the Total Sub
Contracts 38.68%
Sub AA MBE % of
the Total Prime
Awards 8.78%
keys:
Not awarded to low
bidder, because they
failed to comply with
the City's MBE
Ordinance
*****Grantedwaiver throughGood FaithEfforts
WBE = Certified
Woman OwnedBusiness
MBE = CertifiedMinority OwnedBusiness
AA MBE =Certified AfricanAmericanOwned Business
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 13/24
Projected
Minority
Workers %
100.00%
0.00%
n/a
100.00%
n/a
0.00%
50.00%
100.00%
50.00%
20.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 14/24
Projected
Minority
Workers %
75.00%
50.00%
25.00%
90.00%
33.00%
75.00%
83.00%
0.00%
n/a
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 15/24
Projected
Minority
Workers %
50.00%
25.00%
0.00%
0.00%
0.00%
62.00%
0.00%
50.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 16/24
Projected
Minority
Workers %
100.00%
66.00%
100.00%
100.00%
16.00%
50.00%
n/a
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 17/24
Projected
Minority
Workers %
n/a
50.00%
100.00%
100.00%
33.00%
100.00%
0.00%
0.00%
n/a
n/a
0.00%
42.85%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 18/24
Projected
Minority
Workers %
100.00%
25.00%
100.00%
100.00%
100.00%
100.00%
100.00%
57.00%
100.00%
40.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 19/24
Projected
Minority
Workers %
60.00%
100.00%
100.00%
50.00%
50.00%
100.00%
50.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 20/24
Projected
Minority
Workers %
0.00%
75.00%
66.00%
0.00%
100.00%
80.00%
75.00%
100.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 21/24
Projected
Minority
Workers %
tba
tba
tba
0.00%
40.00%
75.00%
0.00%
100.00%
75.00%
0.00%
50.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 22/24
Projected
Minority
Workers %
100.00%
100.00%
n/a
0.00%
25.00%
50.00%
100.00%
tba
20.00%
100.00%
100.00%
50.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 23/24
Projected
Minority
Workers %
87.50%
100.00%
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2008
http://slidepdf.com/reader/full/bridgeport-ct-awarded-projects-prime-and-sub-2008 24/24
Projected
Minority
Workers %