DESCRIPTION

Bridge Report. Team Total Domination. Outline. Introduction…………….. Zach Chaviers Prototype……………….. Ali Nikkhah Final Design……………. Bobby Schneider Conclusion……………… Derrick Wang. Introduction Prototype Final Conclusion. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Bridge Report
Page 2: Bridge Report

Bridge Report

Team Total Domination

Page 3: Bridge Report

Outline

Introduction…………….. Zach Chaviers

Prototype……………….. Ali Nikkhah

Final Design……………. Bobby Schneider

Conclusion……………… Derrick Wang

Introduction Prototype Final Conclusion

Page 4: Bridge Report

Problem

Build most efficient bridge

Efficiency:

Limited to 125 tongue depressors

Introduction Prototype Final Conclusion

bridge

load

mm

Page 5: Bridge Report

Background

Warren Truss

Component testing

Four-step process

Introduction Prototype Final Conclusion

Page 6: Bridge Report

Prototype Design

3 preliminary designs

Criteria for design

• Simple

• Triangle-based

• Allow for easy layering

Introduction Prototype Final Conclusion

Page 7: Bridge Report

Construction

Warren Truss design used

Built quickly

Main goal: test structure

Introduction Prototype Final Conclusion

Page 8: Bridge Report

Before Testing

Introduction Prototype Final Conclusion

Page 9: Bridge Report

Test

Stable load increase

Bent at joint

Support popped out

Introduction Prototype Final Conclusion

Page 10: Bridge Report

Test

Introduction Prototype Final Conclusion

Page 11: Bridge Report

Results

Max load 397 pounds

Efficiency: 630

Joints weak

Introduction Prototype Final Conclusion

Page 12: Bridge Report

Final Design

Fix weaknesses

• Joints

• Glue type

• Precision

• Symmetry

Introduction Prototype Final Conclusion

Page 13: Bridge Report

Construction

Graph paper

Clamping

Glue Coating

Introduction Prototype Final Conclusion

Page 14: Bridge Report

Before Testing

Introduction Prototype Final Conclusion

Completed Final Bridge

Page 15: Bridge Report

Test

Stable load increase

Twisted

Did not break

Introduction Prototype Final Conclusion

Page 16: Bridge Report

Test

Introduction Prototype Final Conclusion

Page 17: Bridge Report

After Testing

Introduction Prototype Final Conclusion

Dead Bridge

Page 18: Bridge Report

Results

Max load 811 pounds

Efficiency: 1080

71% more efficient

Introduction Prototype Final Conclusion

Page 19: Bridge Report

Summary

Truss Design

Prototype performed well

Minor changes made

Improved performance

Introduction Prototype Final Conclusion

Page 20: Bridge Report

Improving Final Design

Stabilizers created rectangles

Add triangles to prevent twisting

Introduction Prototype Final Conclusion

Page 21: Bridge Report

References

http://cee.carleton.ca/Exhibits/Tacoma_Narrows/

http://www.nwrain.com/~newtsuit/recoveries/

narrows/narrows.htm

http://www.bridgemeister.com/pic.php?pid=839

Introduction Prototype Final Conclusion

Page 22: Bridge Report

Any Questions?

Page 23: Bridge Report

Team TOTAL DOMINATION

Ali Nikkhah

Zach Chaviers

Derrick Wang

Bobby Schneider