    14Prestressed

    December 2004

    Box Girder Diaphragm for CIP Prestressed Girder

    Notes: Inset d iaphragm ____ mm to al low for prestress shortening. Bottom of b lockout should be located at or above the top surface of the bottom slab.Diaphragm > 40 skew i l lustrated.

    Recommended Diaphragm Dimensions

    )seergeD(wekS"a"noisnemiDmuminiM

    tnemtubAtaegniHtA

    41-0 009 008

    92-51 0011 0001

    44-03 0031 0021

    55-54 0051 0041

    B8-5

    100 mm min fillet

    See Bridge Design Details,page 8-32"a"

    Abutment

    #13 @ 250 mm

    B8-5

    #__ @ ___

    #____ tot ____

    1

    2

  • 8/22/2019 Bridge Girder Intermediate Diaphragms_1

    2/5

    14-2

    etric

    Caltrans

    Bridge Design Details

    December 2004

    Box Girder Cell Access

    In post- tensioned concrete box girder br idges with tendons exposed in the cel ls, i t isnecessary to provide access to al l cel ls to permit removal of deck forms and also forfuture inspection of the tendons.

    A m in im um of tw o m anholes per span shou ld be prov ided for fu ture access. Th is m aybe reduced for mu lti -span structures. M an holes are usua l ly located in shoulders orsidew alks, bu t access openings in the bo ttom slab are perm issible. Open ings ind iaphragms and webs shou ld be as la rge as possib le .

    Temporary openings in the top or bottom slab shal l be permitted for removal of deckforms. Open ings in the top slab are preferred. Location and m axim um size sha l l be

    show n and ind icated as op tiona l for the contractor. If po ssible, form lum ber should nothave to be moved through more than 2 open ings in d iaphragms or webs.

    Permanently left- in-place galvanized, corrugated steel forms are an acceptableal ternative.

    1250 m m x 1250 m m tempo rary open ings w i ll be perm i tted in top or bot tom s lab, w hereindicated, at con tractor 's option.

    A

    A

    A A

    600 mm min openings

    Lap 20 dia (all reinforcement)

    Section A-A

    Girder Layout

  • 8/22/2019 Bridge Girder Intermediate Diaphragms_1

    3/5

    14Prestressed

    December 2004

    Diaphragm Details for Precast Girders

    A

    A

    ElevationElevation

    B

    B

    Construction joint

    ection B-BIntermediate Diaphragm

    Section A-AEnd Diaphragm

    Construction joint

    C

    Elevation

    Form soffit of capand enddiaphragm as astraight linebetween edges ofgirders (see note 4)

    See Note 2 (typ)See Note 1 (typ)

    Section C-CEnd Diaphragm

    Construction joint

    Notes

    1. #25 x 1200 mm dowels placedthrough 37.5 mm dia hole formedin girder, when diaphragms arecontinuous. Hole need not begrouted.

    2. 25 mm dia bolts x 400 mm withinsert assemblies whendiaphragms are discontinuous.Bolts required for exterior girder.

    3. Intermediate and enddiaphragms are to be placed 5days before placing deck. Thisnote appears on Std. Plan B0-5.

    4. This note clarifies forming so as toprevent spalling problems of thinunreinforced concrete undergirders.

    75 mm minchamfer cont.

  • 8/22/2019 Bridge Girder Intermediate Diaphragms_1

    4/5

    14-4

    etric

    Caltrans

    Bridge Design Details

    December 2004

    Stirrup Anchorage for Precast Girders

    Girder s t i r rups shou ld extend 75 mm in to the deck and be hooked around alongi tudinal bar. The design er wi l l determ ine if Case A or B is need ed. If Case B isneeded for part of a structure, i t is to be used for the enti re structure, and the StandardSheet changed accordingly.

    #13 cont, 2 per girder

    450mm50mm cl*

    Field bend as necessary

    #13 cont, 2 per girder

    *65 mm in Marine Environment

    Case A

    Normally used

    Case B

    Use where fillet will theoretically exceed 50 mm at center of girder.

    The stirrup hooks will usually

    be located as shown. Addtwo #13 bars per girderlocated in the hook.Do not show the stirruphooked around a top orbottom longitudinal bar, ofusual deck reinforcement.

  • 8/22/2019 Bridge Girder Intermediate Diaphragms_1

    5/5

    14Prestressed

    December 2004

    Welded Wire Fabric in Decks

    The use of welded wire fabr ic should be considered in detai l ing precast and precast-prestressed tees, channels, boxes, etc., where the deck reinforcement is relatively l ightand bend ing is min imal .

    Precast Box Girders

    75mm minhookembedment

    Specify thisdimension asdetermined bydesign

    #13 cont.4 per boxgirder

    25 mm min, 100 mm max on low side. Allowance for constructiontolerance.Do not show the stirrup hook around a top or bottom bar of longitudinaldeck reinforcement.

    De

    pth@C

    LBearing