Technical Report Documentation Page CA-HWY-MR-642114(2)72-19 1. REPORT No. 2. GOVERNMENT ACCESSION No. 3. RECIPIENT' S CATALOG No. Settlement Study At Bridge Approache s 4. TITLE AND SUBTITLE  April 1972 5. REPORT DATE 6. PERFORMING ORGANIZATION Zeiler, Ben; Kleiman, William F.; Smith, Travis; Hirsch, Albin D. 7. AUTHOR(S) CA-HWY-MR-642114(2)72-19 8. PERFORMING ORGANIZATION REPORT No. State of California Department of Public Works Division of Highways Materials and Research Department 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. WORK UNIT No. 11. CONTRACT OR GRANT No. 12. SPONSORING AGENCY NAME AND A DDRESS Final Report 13. TYPE OF REPORT & PERIOD COVERED 14. SPONSORING AGENCY CODE 15. SUPPLEMENTARY NOTES Excessive differential settlement of the road surface at bridge abutments creates a driving hazard and often requires periodic maintenance work. Over 900 field settlement records of approach embankments to structures located throughout California were collected for analysis. A major portion of the correlational work was accomplished by optical coincidence methods. Settlement vs. log-time plots were prepared and pertinent soil test data affixed to each plot. Only recorded settlements of the foundation soil of 0.20 ft or greater were included in this study. Variables relating time-settlement characteristics to different soil types were analyzed. Soil information was limited to sample borings and penetrometer data. Actual and contract waiting periods were analyzed in conjunction with surcharge data. Benefits of surcharge vs. nonsurge data are described. The failure to find detectable correlation between soil data and other parameters forced the researchers to abandon further work on this project. 16. ABSTRACT Settlements, differential settlement, bridge abutements. approach embankments, settlement rate, field measurements, approach embankments, settlement rate, field measurements, correlations, data processing 17. KEYWORDS 40 18. No. OF PAGES: http://www.dot.ca.gov/hq/research/researchreports/1972/72-19.pdf 19. DRI WEBSITE LINK This page was created to provide searchable keywords and abstract text for older scanned research reports. November 2005, Division of Research and Innovation 72-19.pdf 20. FILE NAME

Upload: thadikkaran

Post on 04-Jun-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 1/41

Technical Report Documentation Page

CA-HWY-MR-642114(2)72-19

1. REPORT No. 2. GOVERNMENT ACCESSION No. 3. RECIPIENT'S CATALOG No.

Settlement Study At Bridge Approaches

4. TITLE AND SUBTITLE

 April 1972

5. REPORT DATE

6. PERFORMING ORGANIZATION

Zeiler, Ben; Kleiman, William F.; Smith, Travis; Hirsch, Albin

D.

7. AUTHOR(S)

CA-HWY-MR-642114(2)72-19

8. PERFORMING ORGANIZATION REPORT No.

State of California

Department of Public Works

Division of Highways

Materials and Research Department

9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. WORK UNIT No.

11. CONTRACT OR GRANT No.

12. SPONSORING AGENCY NAME AND ADDRESS Final Report

13. TYPE OF REPORT & PERIOD COVERED

14. SPONSORING AGENCY CODE

15. SUPPLEMENTARY NOTES

Excessive differential settlement of the road surface at bridge abutments creates a driving hazard and often requires periodic

maintenance work. Over 900 field settlement records of approach embankments to structures located throughout California we

collected for analysis. A major portion of the correlational work was accomplished by optical coincidence methods. Settlement

log-time plots were prepared and pertinent soil test data affixed to each plot. Only recorded settlements of the foundation soil o0.20 ft or greater were included in this study. Variables relating time-settlement characteristics to different soil types were anal

Soil information was limited to sample borings and penetrometer data. Actual and contract waiting periods were analyzed in

conjunction with surcharge data. Benefits of surcharge vs. nonsurge data are described.

The failure to find detectable correlation between soil data and other parameters forced the researchers to abandon further wo

this project.

16. ABSTRACT

Settlements, differential settlement, bridge abutements. approach embankments, settlement rate, field measurements, approa

embankments, settlement rate, field measurements, correlations, data processing

17. KEYWORDS

40

18. No. OF PAGES:

http://www.dot.ca.gov/hq/research/researchreports/1972/72-19.pdf 

19. DRI WEBSITE LINK

This page was created to provide searchable keywords and abstract text for older scanned research reports.

November 2005, Division of Research and Innovation

72-19.pdf 

20. FILE NAME

Page 2: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 2/41

Page 3: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 3/41

Page 4: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 4/41

Page 5: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 5/41

Page 6: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 6/41

Page 7: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 7/41

Page 8: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 8/41

Page 9: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 9/41

Page 10: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 10/41

Page 11: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 11/41

Page 12: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 12/41

Page 13: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 13/41

Page 14: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 14/41

Page 15: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 15/41

Page 16: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 16/41

Page 17: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 17/41

Page 18: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 18/41

Page 19: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 19/41

Page 20: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 20/41

Page 21: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 21/41

Page 22: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 22/41

Page 23: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 23/41

Page 24: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 24/41

Page 25: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 25/41

Page 26: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 26/41

Page 27: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 27/41

Page 28: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 28/41

Page 29: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 29/41

Page 30: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 30/41

Page 31: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 31/41

Page 32: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 32/41

Page 33: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 33/41

Page 34: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 34/41

Page 35: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 35/41

Page 36: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 36/41

Page 37: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 37/41

Page 38: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 38/41

Page 39: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 39/41

Page 40: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 40/41

Page 41: bridge approach settlement study.pdf

8/14/2019 bridge approach settlement study.pdf

http://slidepdf.com/reader/full/bridge-approach-settlement-studypdf 41/41