brett fletcher executive general manager png & indonesia · brett fletcher executive general...
TRANSCRIPT
DisclaimerForward Looking Statements
These materials include forward looking statements. Forward looking statements inherently involve subjective judgement and analysisand are subject to significant uncertainties, risks and contingencies, many of which are outside of the control of, and may be unknownto, the company. Actual results and developments may vary materially from those expressed in these materials. The types ofuncertainties which are relevant to the company may include, but are not limited to, commodity prices, political uncertainty, changes tothe regulatory framework which applies to the business of the company and general economic conditions. Given these uncertainties,readers are cautioned not to place undue reliance on such forward looking statements.
Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicableForward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicablelaw or any relevant stock exchange listing rules, the company does not in providing this information undertake any obligation to publiclyupdate or revise any of the forward looking statements or any change in events, conditions or circumstances on which any suchstatement is based.
Ore Reserves and Mineral Resources Reporting Requirements
As an Australian company with securities listed on the Australian Securities Exchange (“ASX”), Newcrest is subject to Australiandisclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of Ore Reserves and Mineral Resources in Australia comply with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”) and that Newcrest’s Ore Reserve and Mineral Resource estimates comply with the “JORC Code”.
Competent Persons Statement
The information in this presentation that relates to Exploration Results is based on information compiled by Colin Moorhead, EGMMinerals for Newcrest Mining Limited who is a Fellow of The Australasian Institute of Mining and Metallurgy, and a full-time employee ofNewcrest Mining Limited. Mr Moorhead has sufficient experience which is relevant to the styles of mineralisation and types of depositsunder consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the“JORC Code”. Mr Moorhead consents to the inclusion in this presentation of the matters based on this information in the form andcontext in which they appear.
Exploration Target
Th t ti l tit d d l t d t E l ti T t i thi t i t l i t th h b i ffi i t
2
The potential quantity and grade related to Exploration Targets in this report is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource.
Newcrest4th largest global gold producerby market capitalisation
Predominately SE Asia/Pacificgold focus
12th largest ASX listed company(A$27.5 Billion)
Largest POMSoX listed company
FY11 - Gold production – 2.7Moz and Go d p oduct o o a dCopper production of 75,600t
Proven ability to find, build andyoperate world class gold and copper mines
Strong balance sheet and technical mining
3
capability
World Class Asset Portfolio
Gosowong
LihirWafi GolpuProducing Asset
Namosi
Hidden ValleyWafi-Golpug
Advanced Project
TelferNamosi
CracowBukina FascoBukina FascoMaliMali Bukina FascoMali Mt Rawdon
Cadia ValleyYamoussoukroYamoussoukro
AbidjanAbidjan
BonikroBonikro
CÔTE D’IVOIRECÔTE D’IVOIRECÔTE D’IVOIRECÔTE D’IVOIRE
Yamoussoukro
Abidjan
Bonikro
CÔTE D’IVOIRECÔTE D’IVOIRE
AbidjanAbidjan
100 km100 km
Abidjan
100 km
410 operating mines in 4 countries
Gold InventoryReserves - 2011
80.0 MILLION OUNCES Reserves - 2010
47.3 MILLION OUNCESReserves - 2011 Post LGL Merger
77.7 MILLION OUNCES
5%5%
2% 3%
3%
17% 3%
39%
15%
3%28%
5%
37%
54%
3%
4%
33%3%
33%
4%5%
30%2% 2%30%
Resources - 2011147.5 MILLION OUNCES
Resources - 201083.6 MILLION OUNCES
Resources -2011 Post LGL Merger135.8 MILLION OUNCES
13%
6%
23%
3%11%
30%
14%
4%2%
13%
4%
30%
52%38%
4% 8%
39%
4%
5 Reserve estimates are based on Newcrest’s production interest. For details refer to the Newcrest Annual Statement of Mineral Resources and Ore Reserves. Reserves based on US$850/oz & Resources based on US$900/oz
CVO Gosowong Telfer Morobe OtherLihir Namosi
Financial Results SummarySales Revenue Growth + 46% Record Profit
A$M A$M1200
4,102
3,500
4,000
4,500
600
800
1000
776
557
1058908
2,802
2 000
2,500
3,000
0
200
400
557
Cash Flow from Operations + 33% Strong Profit Margins Maintained
Underlying Profit Statutory Profit
2,000FY10 FY11
FY10 FY11
%A$M
1,303
1,729
1,400
1,800
50
60
52 50,
1,00030
4041
38
6EBITDA Margin EBIT Margin
600
FY10 FY11
20FY10 FY11
Strong Balance Sheet
Low gearing – currently 4% at 30 June 2011)
– gearing of around 15% acceptable (BBB+ profile)
Strong unhedged cashflow– dividends increased 500% over last 3 years
– dividends evaluated each six months: cash v capital commitment
Access to liquidity Access to liquidity – as at 30 June 2011 US$500 million facility undrawn
8 b k l it t– 8 banks, equal commitments
Well placed to fund growth opportunities
7
Gold Production: Target of 4 Million Ounces in FY16
~ 50% increase in Gold production over 5 years
FY16 Target 4.0 Moz
FY17+ Large resource, low-
cost assets best th t iti
FY15
FY16
3,650 – 3,900 koz
growth opportunities
5 year growth
FY13
FY14
2,950 – 3,100 koz
3,400 – 3,600 koz primarily from Cadia and Lihir
FY12 2,775 – 2,925 koz
2 702 k
Wafi-Golpu to underpin growth beyond 4Moz
FY11 2,702 koz
4.0 Moz
y
2.7 Moz
8 Note: Gold production profile includes production from Cracow and Mt Rawdon
Current Operations New ProjectsCurrent Projects
Growth Pipeline
Concept & Prefeasibility Feasibility Execution OperationPrefeasibility
Ridgeway Block CaveHidden Valley Mine
Gosowong ExpansionLihir “MOPU” Expansion
Cadia East Mine
Bonikro Mine
Hidden Valley Expansion
Wafi - Golpu
O’Callaghans
NamosiNamosi
Two major projects two major studies
9
Two major projects, two major studies
Newcrest in PNG In just under three years Newcrest has moved from an interested observer to the major
mining house in PNGL t POMS X- Largest company on POMSoX
- Strong confidence in PNG’s ongoing support of the resource sector- Newcrest prepared to make the long-term commitment
Newcrest’s entry into PNG- Started with our Morobe Mining Joint Venture with Harmony Gold- Expanded to include the acquisition of Lihir Goldp q- Pre-feasibility of the potentially world class Wafi-Golpu
Committed to exploration- in Morobe through the Morobe Mining Joint Venture- in Morobe through the Morobe Mining Joint Venture- at Lihir- Manus Island JV with Triple Plate Junction plc, Golden Success Ltd, Pacrim
Energy Ltd & Terenure LtdEnergy Ltd & Terenure Ltd Approximately 8,500 employees and contractors in PNG out of a total global workforce
of around16,000 – of the 8,500 approximately 7,800 are Papua New GuineansNew Port Moresby office headed by Peter Aitsi
10
New Port Moresby office headed by Peter Aitsi
Newcrest PNG Operations
1.2B Kina contributed to the PNG economy in calendar 2010
Royalty5% Employment
4%National Govt. taxes, tax credit scheme & production levy
11%
Lihir Contractors27%
C it B fitCommunity Benefits8%
PNG Contractors27%
PNG Goods & Services18%
11
27%
Portfolio Overview – PNG Operations
Lihir (Reserves 31Moz & Resources 56Moz gold) MOPU delivers production from 850koz to 1.2 -
1.3Moz per year Scope for further optimisation and extension ofScope for further optimisation and extension of
mine life
Hidden Valley (Reserves 1.9Moz & Resources 2 M ld)2.7Moz gold) Stabilise production around 300 koz pa Incremental growthg
12
Lihir – Fast Facts
Located on Niolam Island, New Ireland Province, 900km north of Port Moresby Volcanic sea mountain rising 600m above sea level 22km long &14 5km wideVolcanic sea mountain rising 600m above sea level, 22km long &14.5km wide Ore body discovered in 1982 at Luise Caldera on east coast of island – all
known deposits located here Exploration conducted 1983 to 1995; construction phase 1995 to 1997 Exploration conducted 1983 to 1995; construction phase 1995 to 1997 Production commenced May 1997 – over 9 Moz of gold produced since then Mine consists of single ore body with 3 linked open pits Lihir processes ~ 6 Mt ore annually Current ore reserves 31 Moz & measured resources 56 Moz
14
Newcrest Lihir Gold - Overview
Lihir islandMalle island
• 900 km northeast of900 km northeast of Port Moresby
• 1,700 km northeast ,of Cairns
• 3º south of equator
15
q
• New Ireland province
Newcrest Lihir Gold - Overview
Lihir Statistics• 4800mm avg /year• 19-35 celcius• 22 km long
16
g• 14.5 km wide• Pop: 18 000
Lost Time Injury Frequency Rate (LTIFR)
2.0 Industry benchmark* = 1.8
1.551.5rs
)
1 0llion
hou
r
• 12 million hours 2009• 14 million hours 2010
0 53
1.0
IFR
(1 m
il
0.53
0.180.26
0.18 0.14
0.5LT
0.0
2005 2006 2007 2008 2009 2010
17*Minerals Council of Australia, Australian Minerals Industry Safety & Health Quarter 4 2007-08 Survey report, Feb 2009
Calender Years
Sustainable Development and Community Liaison
Build trust by delivering on Build trust by delivering on commitments
Proactively working with the Proactively working with the community to meet their goalsg
Align interests where possible
Lihir Sustainable Development Plan
Social Awareness Training
19
Environmental Management
• Originally permitted in 1996
4
g y
• Re-permitted to PNG Environment Act 2000
2
Significant Environmental Incidents
• Comprehensive Management and Monitoring Plan
1 1 1
2
1 1
and Monitoring Plan
• ISO 14001 certification
0 0 0 0 0 0
98
99
00
01
02
03
04
05
06
07
08
09
10
• 20 years baseline data
• 14 years operating199
199
200
200
200
200
200
200
200
200
200
200
20114 years operating
performance
• No significant incidents >5
20
No significant incidents >5 years
Newcrest Lihir Gold - Employees
2 146 direct employees2,146 direct employees– 33% Lihirian employees
– 90% PNG nationals%
Camp and Residential65% FIFO camp resident– 65% FIFO camp resident
– 33% Lihirian local resident
– 2% Townsite resident2% Townsite resident
Rosters– FIFO 15/13 and 21/14 days
– Residential 5/2 days
21
Our People -Training
Lihirian Trainees
– 270 trainees, 1 in 8 workforce
Training Programsg g
– Competency based and accredited, RTO’s
– >90 workplace trainers
Training Centre Training Centre
– PNG National Training Council accreditedaccredited
– 96 apprentices , 11 trades
– 100% Lihirian 23% Female
22
– 100% Lihirian, 23% Female
– 2007 PNG Apprentice of the Year
People - Training and Development
• Graduate Development
– 67 graduates
– 6 Lihirian
• Tertiary Sponsorships
– 47 students– 47 students
– 60% Lihirian/NIP
P ti d R• Pre-vocation and Resource Centre
C it B ildi• Capacity Building
– Public sector and other institutions
23
institutions
People - Camp Improvement Program
Accommodation Accommodation
– 42 Person Blocks
– Lakenbut (Camp 4)
New Mess
– Officially opened Oct 2010
Amenities
– Covered walkways
– Sports field upgrade– Sports field upgrade
– TV and internet
24
Newcrest Lihir Gold - Mining
The main mine consists of distinct production pitsThe main mine consists of distinct production pits with Minifie and Lienetz pit currently in production
and the Kapit pit in development.
25
Newcrest Lihir Gold – Mining OperationsPit mining conditions include high rainfall, low cloud, steam g
venting, hot water/ground, sulphur gas and PGOA.
27
Newcrest Lihir Gold - Processing
Processing plant currently undergoing a million ounceundergoing a million ounce
upgrade project.
28
Processing - History and Background
Process Plant commissioned 1997
– nameplate capacity 2.8 Mt pap p y p
Elevated cut off grade strategy
– High grade ore processed
– Lower grade ore stockpiled
Original plant design allowed for expansionp
29
Processing - Background
Gold is locked within pyrite Gold is locked within pyrite
– Direct cyanidation - only 30% gold recovered
– Greater than 90% contained pyrite needs to be oxidised
Sherritt Gordon whole ore pressure oxidation technology Sherritt-Gordon whole ore pressure oxidation technology
– High temperature, high pressure process with addition of pure oxygen 205oC 2650 kPaoxygen - 205oC, 2650 kPa
– Exothermic reaction (generates heat)
– Pyrite oxidises to ferrous sulphate
30
Processing - Background
Fl i i i Flotation circuit commissioned 2007
All i f l Allows processing of lower sulphur grade ore
Abilit t t t ti Ability to target optimum sulphur grades for autoclaves
Additional milling capacity Additional milling capacity
Improved operational flexibilityflexibility
31
Processing - Operational Improvement
Focus on two areas
• Removing Constraints– Maximising utilisation of high capital items - Autoclaves & Oxygen
PlantsC hi C i / P bbl C h / CIL / El i– Crushing Capacity / Pebble Crushers / CIL / Elution
• Optimising Autoclaves– Blending strategies– Heat recovery
Q h it– Quench capacity
32
ProcessingIncreasing Autoclave Throughput
(Tonnes/op h / t l )
g g p
175 176185
198205
215hr/autoclave)
126
146 148160
169 170 175 176
126
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
33
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Calender Years
Lihir – MOPU Project Overview
MOPU Milli O Pl t U d MOPU – Million Ounce Plant Upgrade
– Brownfields expansion on Lihir Island
– Increase plant capacity to 12 million tonnes pa.p p y p
– Increase gold output by 200-300k ounces pa.
C it l i t l A$1 3B (K3B)– Capital approximately A$1.3B (K3B)
– Progress 47% complete
– 3.5 million man hours expended to date on site
– Schedule completion December 2012
34
S p 0
Million Ounce Plant Upgrade (MOPU)
OxygenOxygen (tph)
AutoclavesGrinding
7270 10
2
AutoclavesCIL
Pre 2007
2
2007 Flotation Expansion
35
2MOPU
Geothermal - Background
2001 i iti l t di d• 2001 - initial studies commenced
• 2003 - 6 MW “pilot” plant
• 2005/7 - 50 MW commissioned
• 2007 - Exploration and Options2007 Exploration and Options studies
• 2008 - Geothermal team resources2008 Geothermal team resources strengthened
• 2009 - Power department 009 o e depa erestructured
• 2010 - Increased Resource Drilling
36
g(“big rig”)
Geothermal - Carbon Credits
• 50 MW geothermal power station
• PNG’s first large scale geothermalPNG s first large scale geothermal power project
• PNG’s first Clean Development• PNG s first Clean Development Mechanism (CDM) accredited project
C tifi d E i i R d ti (CER)• Certified Emission Reductions (CER)
– 10 year crediting period from 2006 to 20152006 to 2015
– CO2 emission reductions up to 250,000 tpa
38
Geothermal - Resource Drilling
Inferred Resource
00 m
Probable Resource
Deep Upflow
2,00
Inferred Resource
Measured Resource
Zone
Deep Resource
0 m
39
2,00
0
Exploration Activity – 41 Drill Rigs in Operation
Gosowong
LihirManus Island
W fi G lTandai
111 5
Mt Kasi
Hidden ValleyWafi-Golpu
35
Telfer
Mt KasiNamosi
CracowBukina FascoBukina FascoMaliMali Bukina FascoMali Mt Rawdon4
2 1
3
Cadia ValleyMarsdenYamoussoukroYamoussoukroBonikroBonikro
CÔTE D’IVOIRECÔTE D’IVOIRECÔTE D’IVOIRECÔTE D’IVOIRE
YamoussoukroBonikro
CÔTE D’IVOIRECÔTE D’IVOIRE
2
4
AbidjanAbidjan
100 km100 km
Abidjan
100 km
2
41
Drill Rigs in Operation3 Mining Operation
Advanced Project
Exploration
Emerging Project
FY11 Exploration Expenditure by Region
Total spend A$126M
38% of total expenditure in PNG K109 9M
Fiji, 3%Australia, 33%
Cote d’Ivoire, 9%
= K109.9M
Focus on near province opportunities– ~50% resource definition– ~25% brownfields exploration
Greenfield exploration in Cote d’Ivoire and the Morobe Province in PNG
PNG, 38%=K109.9M Indonesia, 17%
42
PNG, Lihir – Resource Growth
Mineralisation in drilling extends
PLAN VIEW
2011 LIHIRRESOURCE(1)
Exploration drilling extends 500m east of the existing resource
2011 LIHIR
31 Moz Au
RESOURCE(1)
Kapit NE Pacific
Target
DDHL1870 188m @ 3 0g/t Au
DDHL1924186m @ 3.9g/t Au
and remains open
Early indication56 Moz Au
2011 LIHIRRESERVE(2)
Kapit
Coastal
DDHL1870 188m @ 3.0g/t AuDDHL1871 212m @ 3.4g/t AuDDHL1875 225m @ 2.4g/t AuDDHL1876 134m @ 4.0g/t Au
Early indication that further extension at Kapit NE lik l
InferredResourceboundary
LIHIRLienetz Borefields
Link
NE likely
Resource and
PLANT
Minifie
Reserve update August 2011
43 (1) Newcrest website, market release LGL Resources, 26 August, 2009.(2) Newcrest website, market release LGL Reserves, 29 October, 2009.
1000 m