Breaking the Surface!
Sara AllenAssociate Director Of AnalyticsJuly 8th, 2013
UAT Testing Process and Documentation for SAP Business Objects
UAT-User Acceptability Testing Process Overview
• Data Prep
• Data validation
• Joins
• BO Attributes
• Changes
• Critical Dates
• Report Validation
• Misc. Test
https://www.mtholyoke.edu/datawarehouse/documents-and-templates
Overall Use of the Document:
• Tabs number correlate with the Test Case
o Example: 400 correlate with Critical Dates Test Case
• Home Page: Date Tested and Sign offs- List the Names of all the
testers
• Test Cases:
o Test ID numbers for each item Example 100-1
o List the Query criteria when applicable
o List the expected results
o PASS/FAIL
o Retest Date
o Comments- start with the date- then your comment-your initials. • Example: 7/1/12- Smith was listed instead of Jones-SA
Data Prep –Regroup and really think through what we have.
• Circle back to the Data Inventory - do we have what we
need? anything we don't?
• Naming
• Organization (in universe)
• Domain validation - do the attribute names describe the
values in the data
• Data types, Format
• Data validation (100) –
This test case validates
all of the data attributes
and ensures that those
data elements are
displaying the correct
values and the correct
format, examples;
mm/dd/yyyy, $, commas,
text vs. numeric. Is
everything there that we
need?
• Joins (200) - This test
case validates how the
data elements are
joined with the tables
at the source level.
How are the attributes
are joined/ fit together
and what is the query
criteria.
• Counts and BO Created
Attributes (300) - This
test case validates that all
the counts are counting
accurately and that all
attributes created only in
BO function as defined in
the requirements.
Essentially testing the
measures created by the
Data Architect and validate
the query criteria behind
them.
• Changes (400) - Tests the
changes to the source system
and how they are reflected in
BO. Tests that all "track"
data elements defined in the
requirements, are actually
tracking the history. This test
case is testing how new data
is introduced, which in
essence is tracking the
business process. We want to
see how the data is populated,
refreshed and tracked.
• Critical Dates (500)
- Testing that all
critical dates and/or
snapshots function as
they should. Testing a
point in time.
• Report Validation
(600) - Reconcile
reports run from the
core system against
reports created and
produced in BO.
• Misc. Test (700) - Any
misc. test scenarios
determined to test
during UAT
Looking Ahead
• What’s Next? Universe will go into
Production/Swan.
Tidbits of advice to make testing less painful:
• Ask for help
• Patience is a virtue
• Communication is a must
THANK YOU!