Brazilian Pre-Salt Update MAURO YUJI HAYASHI Pre-Salt Planning Manager May, 2015

Upload: petrobras

Post on 18-Jul-2015

783 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Brazilian Pre-Salt: Update

Brazilian Pre-Salt — Update

MAURO YUJI HAYASHI Pre-Salt Planning Manager May, 2015

Page 2: Brazilian Pre-Salt: Update

2 2

FORWARD-LOOKING STATEMENTS:

DISCLAIMER

The presentation may contain forward-looking statements about future

events within the meaning of Section 27A of the Securities Act of 1933, as

amended, and Section 21E of the Securities Exchange Act of 1934, as

amended, that are not based on historical facts and are not assurances of

future results. Such forward-looking statements merely reflect the

Company’s current views and estimates of future economic

circumstances, industry conditions, company performance and financial

results. Such terms as "anticipate", "believe", "expect", "forecast", "intend",

"plan", "project", "seek", "should", along with similar or analogous

expressions, are used to identify such forward-looking statements.

Readers are cautioned that these statements are only projections and may

differ materially from actual future results or events. Readers are referred

to the documents filed by the Company with the SEC, specifically the

Company’s most recent Annual Report on Form 20-F, which identify

important risk factors that could cause actual results to differ from those

contained in the forward-looking statements, including, among other

things, risks relating to general economic and business conditions,

including crude oil and other commodity prices, refining margins and

prevailing exchange rates, uncertainties inherent in making estimates of

our oil and gas reserves including recently discovered oil and gas

reserves, international and Brazilian political, economic and social

developments, receipt of governmental approvals and licenses and our

ability to obtain financing.

We undertake no obligation to publicly update or revise any

forward-looking statements, whether as a result of new

information or future events or for any other reason. Figures for

2014 on are estimates or targets.

All forward-looking statements are expressly qualified in their

entirety by this cautionary statement, and you should not place

reliance on any forward-looking statement contained in this

presentation.

NON-SEC COMPLIANT OIL AND GAS RESERVES:

CAUTIONARY STATEMENT FOR US INVESTORS

We present certain data in this presentation, such as oil and gas

resources, that we are not permitted to present in documents filed

with the United States Securities and Exchange Commission

(SEC) under new Subpart 1200 to Regulation S-K because such

terms do not qualify as proved, probable or possible reserves

under Rule 4-10(a) of Regulation S-X.

DISCLAIMER

Page 3: Brazilian Pre-Salt: Update

WHAT IS PRE-SALT?

3

Large reservoirs of oil and natural gas

Located between 5,000 and 7,000 meters below sea level and 300 km from the coast

Water depths that can exceed 2,000 meters from the water line

Under a layer of salt that is more than 2,000 meters deep, in some areas

Characteristics of the oil: light (30º API) and variable content of CO2 (between 1 and 20%)

Page 4: Brazilian Pre-Salt: Update

PRE-SALT PROVINCE, REGIMES AND PARTNERS

Concession - Santos Basin

BMS-8

BMS-9

BMS-11

BMS-21

BMS-24

BMS-50

(66%) (10%) (10%) (14%)

(45%) (30%) (25%)

(65%) (25%) (10%)

(80%) (20%)

(80%) (20%)

(60%) (20%) (20%) Production Sharing Agreement

(40%)

(20%)

(20%)

(10%)

(10%)

Transfer of Rights

(100%)

Concession blocks

Transfer of rights area

Production sharing contract 4

Concession - Campos Basin

(100%)

Xerelete

Alb. Leste

BM-C-33

(41,175%) (41,175%) (17,65%)

(90%)

(35%) (35%)

(10%)

(30%)

Other concessions

Page 5: Brazilian Pre-Salt: Update

PRE-SALT PROVINCE – Size

S

P

650x

US GoM Block

15.000 Km² (3.7 million acres)

4

Page 6: Brazilian Pre-Salt: Update

MAIN RESULTS - Extended Well Tests (EWTs)

E&P PRESAL Atualização: Fevereiro/2014

FPSO Dynamic Producer

FPSO Cidade de São Vicente EWTs Period Block

Lula Apr/09 - Dec/10 BM-S-11

Lula NE Apr/11 - Nov/11 BM-S-11

Iracema S Feb/12 - Oct/12 BM-S-11

Sapinhoá N Jan/13 - May/13 BM-S-9

Lula Sul Nov/13 – Apr/14 BM-S-11

Atapu Mai/15 – On stream Cessão Onerosa

EWTs Period Block

Sapinhoá Dec/10 - Jul/11 BM-S-9

Carioca NE Oct/11 - Feb/12 BM-S-9

Lula Central Oct/13 – Apr/14 BM-S-11

Iara Oeste Jun/14 – Dec/14 BM-S-11

Búzios I Mar/15 – On stream Cessão Onerosa

Page 7: Brazilian Pre-Salt: Update

MAIN RESULTS - Drilled Wells and Operating Rigs

E&P PRESAL Atualização: Fevereiro/2014

1 2 8 23

44 69

81

2 5 9

13 19 28

38

50

57 58

139 Drilled Wells (Santos Basin Pre-Salt Cluster)

Exploration

Production Development

2 2 3 7

11 14 21 23 21 24

24 Operating Rigs (Santos Basin Pre-Salt Cluster)

Reference: Mar/2015 *Petrobras operated wells only

Page 8: Brazilian Pre-Salt: Update

54% of time reduction in well construction, from 2010 to 2014

0%

20%

40%

60%

80%

100%

2010 2011 2012 2013 2014

Drilling Completion

Time reduction in well construction

achievable through:

• Petrobras work force expertise

• Accelerated learning curve usage

• Strong Planning

• Discipline and Methodologies

SESV Skandi Santos

MAIN RESULTS - reduction in well time construction

Page 9: Brazilian Pre-Salt: Update

Mil bpd

First Oil: September 2008

Campos Basin Jubarte Field (EWT)

P-34

Set/

08

MAIN RESULTS - First Oil in Campos Basin Pre-Salt

8

Page 10: Brazilian Pre-Salt: Update

First Oil: May 2009

Santos Basin Lula Field (Tupi) - EWT

FPSO BW Cid. São Vicente

Mil bpd

May/0

9

MAIN RESULTS - First Oil in Santos Basin Pre-Salt

9

Page 11: Brazilian Pre-Salt: Update

First Oil: October 2010

Santos Basin Lula Field (Pilot)

FPSO Cid. Angra dos Reis

First pre-salt horizontal well

CO2 separation and re-injection system

First WAG (Water Alternating Gas) test

Oct/

10

MAIN RESULTS - First Definitive Production System in Santos Basin

10

Page 12: Brazilian Pre-Salt: Update

First Oil: September 2012

Campos Basin Pirambu and Baleia Azul Fields

FPSO Cid. de Anchieta

Sep/1

2

MAIN RESULTS - First Definitive Production System in Campos Basin

11

Page 13: Brazilian Pre-Salt: Update

First Oil: January 2013

Santos Basin Sapinhoá Field

FPSO Cid. de São Paulo

Jan/1

3

First BSR (Buoy Supporting Risers)

MAIN RESULTS - First Oil in Sapinhoá Field

12

Page 14: Brazilian Pre-Salt: Update

Second BSR (Buoy Supporting Risers)

First Oil: June 2013

Santos Basin Lula Field – NE Area

FPSO Cid. de Paraty

Jun/1

3

MAIN RESULTS - Production Development in Santos Basin

13

Page 15: Brazilian Pre-Salt: Update

First Oil: March 2014

Campos Basin Norte Parque das Baleias Area

P-58

Mar/

14

MAIN RESULTS - Production Development in Campos Basin

14

Page 16: Brazilian Pre-Salt: Update

First Oil: October 2014

Santos Basin Iracema Sul Area

FPSO Cid. de Mangaratiba

Wells interconnection with flexible risers

Oct/

14

MAIN RESULTS - First Oil in Lula Field – Iracema Area

15

Page 17: Brazilian Pre-Salt: Update

First Oil: November 2014

Santos Basin Sapinhoá Field – North Area

FPSO Cid. de Ilhabela

First SLWR (Steel Lazy Wave Riser)

Nov/1

4

MAIN RESULTS - Production Development in Santos Basin

16

Page 18: Brazilian Pre-Salt: Update

MAIN RESULTS - Pre-Salt Production Ramp-up

0

50

100

150

200

250

300

350

400

450

500

550

600

650

700

Au

g-08

Oct

-08

Dec

-08

Feb

-09

Ap

r-0

9

Jun

-09

Au

g-0

9

Oct

-09

Dec

-09

Feb

-10

Ap

r-1

0

Jun

-10

Au

g-1

0

Oct

-10

Dec

-10

Feb

-11

Ap

r-1

1

Jun

-11

Au

g-1

1

Oct

-11

Dec

-11

Feb

-12

Ap

r-1

2

Jun

-12

Au

g-1

2

Oct

-12

Dec

-12

Feb

-13

Ap

r-1

3

Jun

-13

Au

g-1

3

Oct

-13

Dec

-13

Feb

-14

Ap

r-1

4

Jun

-14

Au

g-1

4

Oct

-14

Dec

-14

Feb

-15

Ap

r-1

5

CAMPOS BASIN

SANTOS BASIN

Daily Record

THOUSAND BPD

Sep 24th 2012

211 mil bpd

Feb 20th 2013

300 mil bpd

Dec 26th 2010

114 mil bpd

Feb 20th 2014

407 mil bpd

Jun 24th 2014

520 mil bpd

Dec 21st2014

713 mil bpd

Feb 26th2015

737 mil bpd

17

Page 19: Brazilian Pre-Salt: Update

PRE-SALT PRODUCTION CAPACITY

12 Production Units + 2 EWTs (May/15)

Concession contracts

Transfer of rights contract

Production sharing contract

FPSO Cid. Paraty

Lula

FPSO Cid. Angra dos Reis

Lula

FPSO Cid. Mangaratiba

Lula

FPSO Cid. São Paulo

Sapinhoá

FPSO Cid. Ilhabela

Sapinhoá

FPSO Dynamic Producer

Búzios - EWT

Petrobras 48

Carimbé

Petrobras 53

Tracajá

FPSO Cid. Anchieta

Baleia Azul

Petrobras 58

Parque das

Baleias

FPSO Capixaba

Baleia Franca

FPSO Cid. Niterói

Marlim Leste

Petrobras 20

Marlim

FPSO Cid. São Vicente

Atapu -EWT

18

Page 20: Brazilian Pre-Salt: Update

LATEST PRE-SALT PROJECTS ON STREAM

19

Page 21: Brazilian Pre-Salt: Update

PETROBRAS CONTRIBUTION FOR INDUSTRY DEVELOPMENT

New production units on construction

Modules on integration Replicants Platforms

Construction

Transfer of Rights

Platforms Construction

Cid. Caraguatatuba

Cid. Itaguaí

Cid. Maricá

P-66

P-67

P-68

P-74

Cid. Saquarema

P-75

P-76

P-77 20

Page 22: Brazilian Pre-Salt: Update

PETROBRAS CONTRIBUTION FOR TECHNOLOGICAL DEVELOPMENT

OTC 2015

1. First Buoy Supporting Risers (BSR)

2. First Steel Catenary Risers with lined pipes

3. Deepest Steel Lazy Wave Riser (SLWR)

4. Deepest Flexible Risers - 2,220 m WD

5. First Application of Flexible Risers with Integrated Tensile

Armor Wire Monitoring System

21

Page 23: Brazilian Pre-Salt: Update

6. Water depth record for a Subsea Well Drilled with Pressured Mud-

Cap Drilling

7. Intelligent Completion in Ultra-deepwater Satellite Wells with High

Potential for Carbonate Scaling

8. First CO2 Separation from Associated Natural Gas in Ultra-

deepwater with CO2 Re-injection

9. Deepest Offshore Well 2,173 m Water Depth – Injecting Gas with

CO2

10. Water Alternating Gas Injection Method (WAG) in Ultra-

deepwaters

CONTRIBUTION FOR TECHNOLOGICAL DEVELOPMENT

OTC 2015

22

Page 24: Brazilian Pre-Salt: Update

Oil P

roducti

on

Million bopd

Oil Production Evolution

(2006 – 2014)

Production

increase

(kbopd)

2006 - 2014

+230

-570

-548

-50

-546

Source: Evaluate Energy, 2015

MAJORS’ WORLDWIDE OIL PRODUCTION: from 2006 to 2014

23

Page 25: Brazilian Pre-Salt: Update

Global new sources break-even costs

THE PRE-SALT AND THE WORDL ENERGY DEMAND GROWTH

Global population growth*

New reserves sources*

Oil demand growth* 1 2

3 4

Source: Rystad Energy UCUBE, IEA WEO 2012

*Source: Deloitte MarketPoint World Oil Markets and EIA

24

Page 26: Brazilian Pre-Salt: Update

THE PRE-SALT AND THE WORDL ENERGY DEMAND GROWTH

All the strategies and efforts pursued

so far gave Petrobras strong

competitive advantages related to

costs reduction and productivity

improvement.

The propitious falling oil prices

scenario will greater the costs

reduction policy while improving

Petrobras competitiveness. Additionally, Petrobras as the sole pre-salt operator builds competitive advantages based on scale gains. In the end of the day, the pre-salt production is viable, competitive, profitable for Petrobras and partners and also represents Brazilian fully insertion on the world oil players.

Current projects average return

Source: Wood Mackenzie Corporate Benchmarking Tool -

Publicly Traded Companies (04/28/15) 25

Page 27: Brazilian Pre-Salt: Update

27

Thank You!

For more information:

Investor relations

www.petrobras.com.br/ri

+55 21 3224-1510

[email protected]