brah irrip ibrahim fibres limited - … modification/ibrahim... · 2013-01-16 · units of ibrahim...

21
IM112/1111111 MAK= brah irri p IBRAHIM FIBRES LIMITED 0 u R 6 December 19, 2012 'e s‘ Ref No IFL/NEPRA/1030-02 The Registrar National Electric Power Regulatory Authority (NEPRA) 2ND Floor, OPF Building G-5/2 Islamabad Sub: - Licensee Proposed Modification (LPM) in Generation and Distribution Licenses (IFL) Dear Sir, Ref our letter No. IFL/NEPRA/1030-01 we have submitted the LPM in generation and distribution licenses on 17 th December 2012 at your good office. Please find attached herewith resolution draft approved by Ibrahim Fibres Limited board of directors, authorizing Mr. Abdul Hameed Bhutta G.M.HR/Admin to sign and plead the LPM documentation and process. In view of above, it is requested that the attached board resolution may be considered as a part of documentation /files already submitted for proposed modification in generation and distribution licenses.. Yours faithfully, Abdul Ha d Bhutta General Manager HR/Admin C C--(..-4._0‘...,4- .)'714..toto‘... - Ibrahim Centre, 15-Club Road, Faisalabad, Pakistan. Ibrahim Centre, GK•7/59, Bagh-e-Zehra Street, Kharadar, Karachi, Pakistan. Web Site WWI igcpk corn Tel 92 41 2617836 Tel 92 21 2311511 E. Mail infoegc com.pk Fax 92 41 2617842 Fax 92 21 2312262 Ibrahim Centre, 1 - Ahmad Block, New Garden Town, Lahore, Pakistan. Tel 92 42 5869151 Fax 92 42 5864915

Upload: trancong

Post on 08-Sep-2018

238 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

IM112/1►111111 MAK=

brah irrip IBRAHIM FIBRES LIMITED 0 u

R 6

December 19, 2012

'es‘

Ref No IFL/NEPRA/1030-02

The Registrar National Electric Power Regulatory Authority (NEPRA) 2ND Floor, OPF Building G-5/2 Islamabad

Sub: - Licensee Proposed Modification (LPM) in Generation and Distribution

Licenses (IFL)

Dear Sir,

Ref our letter No. IFL/NEPRA/1030-01 we have submitted the LPM in generation and

distribution licenses on 17th December 2012 at your good office.

Please find attached herewith resolution draft approved by Ibrahim Fibres Limited board of directors, authorizing Mr. Abdul Hameed Bhutta G.M.HR/Admin to sign and plead the LPM documentation and process.

In view of above, it is requested that the attached board resolution may be considered as a part of documentation /files already submitted for proposed modification in generation and distribution licenses..

Yours faithfully,

Abdul Ha d Bhutta General Manager HR/Admin

C

• C--(..-4._0‘...,4-.)'714..toto‘... -

■ Ibrahim Centre, 15-Club Road, Faisalabad, Pakistan.

■ Ibrahim Centre, GK•7/59, Bagh-e-Zehra Street, Kharadar, Karachi, Pakistan.

Web Site WWI igcpk corn Tel 92 41 2617836 Tel 92 21 2311511

E. Mail infoegc com.pk Fax 92 41 2617842 Fax 92 21 2312262

Ibrahim Centre, 1 - Ahmad Block, New Garden Town, Lahore, Pakistan. Tel 92 42 5869151 Fax 92 42 5864915

Page 2: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

By order he Board

AQUE TARY

AN COMP

, r

iTrahun P

IBR AIIIM i'IBRES LIMITED 11 11

CERTIFIED COPY OF THE RESOLUTION PSED BY THE BOARD OF DIRECTORS ON 20-11-

A20

S12

Resolved that Mr.Abdul Hameed Bhutta S/o Ghulam Yasin-General Manager HR/Admin holding CNIC No.35201-1501828-7 be and is hereby authorised to represent the company

and to sign and process in the office of National Electric Power Regulator)/ Authority (NEPRA) the documentation of LPM licensee proposed modifications in generation and distribution licenses already granted by NEPRA as required under National Electricc Power Regulatory authority

licensing (application and modification procedure) Regulations,

-Resolved further that all actions taken by Mr. Abdul Hameed Bhutta in this behalf shall be

deemed to have been taken by the Company itself."

Company Seal

Web Site www igcpk tom

E Mail infoArgc corn pk

• Ibrahim Centre, 15-Club Road, Faisalabad, Pakistan. Tel 92 41 2617836 ■ Fax 92 41 2617842

• Ibrahim Centre, 11-8, Lala Zar, M T Khan Road, Karachi, Pakistan. Tel 92 21 35611601 Fax 92 21 35611609

■ Ibrahim Centre, 1 - Ahmad Block, New Garden Town, Lahore, Pakistan. Tel 92 42 35869151 Fax 92 42 35864915

Page 3: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

)41c 4,7, J j

x72 4..-"?

e.

Web Site ,,i..0,1gcph corn E Mail Tfoxi'!ac car, pt<

Ibrahim Centre 15-Club Road. Faisalabad Pakistan. T9' 02 41 'R17 83e

C'ix 92 4 , 2i"17°42

Ibrahim Centre, GK-7/59 Bagh-e-Zehra Street Kharadar Karachi, Pakistan

' Tel 92 21 2311511 Fax 92 21 711226?

•"1 ho„, )

brd h IM

6 R 0 u p IBROHIM FIBRES LIMITED

ReiNo IFL/NEPRA/1030-01

DecembeN, 2012

F0 t cxyvi4 ,z 'R $

Registrar

National Electric Power Regulatory Authority

(NEPRA)CLIC)

1-* ')N1) Floor, OPF Building D»

0-5/2 Islamabad — LA CA:lc)

Licensee Proposed Modification (LPM) in Generation Licence (No. SGC/33/2007, October 10, 2007) of Ibrahim Fibres Limited (IFL)

— IAD (7—)

Sub: -

Dear Sir,

11/4k CLI c)

The Authority had granted us the above subject generation facilities located at 38-KM-Faisalabad-Shekhupura Road. We will like to inform you that we are in the process of expansion of our existing power generation facilities of by adding additional

units to cater the growing load requirement of our group companies. The proposed

addition will result in enhancement of our installed capacity, requiring a modification in our granted Generation Licence.

(2). In view of the above, we hereby communicate to you an LPM in accordance

with Regulation 10 of the National Electric Power Regulatory authority licensing

(application and modification procedure) Regulations, 1999 (the Regulations) as detailed below:-

(a). The text of the proposed modification;

At present our installed capacity is 31.80 MW [consisting of 6 x 5.80 MW

Diesel Generating (D.G.) Sets operating on Residual Furnace Oil]. We

plan to add another 26.50 (5 x 5.30 MW D.G.) which will increase our Installed Capacity to 58.30 MW.

(b). A statement of the reasons in support of the modification;

Our group plans to install another Polyester Staple Fiber Plant at our facilities at 38-KM Faisalabad-Shekhupura Road. Being a sensitive chemical unit requiring uninterrupted power supply for its operation, we

plan to enhance the installed capacity of our above mentioned generation facility by installing more D.G. sets as explained above.

Ibrahim Centre. I 1 - Ahmad Block,

New Garden Town Lahore, Pakistan. Tel 92 42 5869151 Fax 92 42 586491 5

Page 4: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Ibrahim u p IBRREilifi FIBRES MIMED

(c). A statement of the impact on the tariff, quality of service and the performance by the licensee of its obligations under the licence.

The proposed enhancement in capacity will not have any impact on our tariff as we are operating the above generation facility for feeding our own units of Ibrahim Fibers Limited. The proposed addition will result in better quality of service for IFL as not only we will be able to serve the growing load of our units but it will result in more flexibility of the plant operation. All these factors mentioned will definitely improve our performance as Licensee.

(3). As stipulated in Regulation 10 (3) of the Regulations, we are also sending you a demand draft amounting to Rs. 2,39,408/- after tax adjustment as per law as our enhancement in cacpity falls in the band of 20.00 MW — 50.00 MW.

(4). In order to facilitate you in processing of our LPM, We are also attaching expansion plant details as per Standard Perfroma used by NEPRA wherein the changes have been marked in Red. A copy of our Generation License is also attached for your information and ready reference.

(5). In view of above, it is requested that our LPM for Generation Licence may be processed. We will be pleased to furnish any other information required in this regard. Thanking you for your understanding and consideration.

Yours faithfully,

Abdul Name hutta General Mana er FIR/Admin

Ibrahim Centre

15-Club Road Faisalabad

Pakistan Web Site wmv1000C corn TO C? 41 SCI 7P.1t:

E Mail alfuj,igt: Lori) pi., Fax ;2 41 22,1754:

Ibrahim Centre GK-7, 59 Bagh-e-Zehra Street Kharariar

Karachi, Pakistan re10? 21 24,15,,

T-'ax 52 21 2312262

Ibrahim Centre,

1 - Ahmad Block, New Garden Town,

Lahore, Pakistan

Tel 92 42 5859151 max 92 42 5864915

Page 5: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Standard Chartered Standard Chartered,Bank (Pakistan) Limited

Railway Road Branch Faisalabad

PKR 2963233

HOT TO EXCEED PKR *225,044.00** REF : 0007691212100470

10-12-2012

02963233

Or Order Pay

NATIONAL ELECTRIC POWER REGUL TO)Y AUTHORITY

0/A IBRAHIM FIBRES LTD. I z_.,

o PAKISTAN RUPEE TWO HUNDRED TWINqff IVE THOUSAND

FORTY FOUR ONLY. I r m thc4id igotory

-;:i 0- 1,161

BILLS PAY SCB CONSUMER '11'1',,4114: Voz14066

A/C # 09-9016422-72 o /

,st:M,F,,

“..y,z,",,

0, PAYABLE AT ANY BRANCH IN PAKISTAN.

l:e° ,.." , S en91.' 0„,o,

1111 0 2963 233003800? LI: 1110 2 0 .0

For Standard Chartered Bank (Pakistan) Limited

PKR *225,044.00**

Page 6: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

38-KM, Faisalabad- Sheikhupura Road

Faisalabad, Punjab

S

SCHEDULE-1

(Existing + Extension) Power Generation Plant

The location, size (Capacity in MW) technology, interconnection arrangements, technical limits, technical functional specifications and other details specific to the generation facilities of the licensee.

Page 7: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

38-KM, Faisalabad- Sheikhupura Road Faisalabad, Punjab

S

Plant fle e

1 General Information

i. Name of Applicant IBRAHIM FIBRES LTD

ii. Registered/Business Office

1-A, Ahmed Block, New Garden Town Lahore, Punjab

iii. Plant Location 38 Km Faisalabad-Sheikhupura Road, Faisalabad

iv. Type of Generation Facility

Thermal Generation

2. Plant Configuration (Existing)

i. Plant size installed Capacity (Gross ISO)

31.8 MW

iii.

iv.

Type of Technology Reciprocating Engines

Unit Size (MW)/No. of Units

5.3 MW/06 Units

v. Unit make, Model and Date of Manufacture

Unit Make Model Date of

Manufacture Unit (1-4) NIIGATA 16V32CLX 1992 Unit (5-6) NIIGATA 16V32CLX 1996

vi. De-rated Capacity at Mean Site Conditions (MW)

26.5 MW

vii. Auxiliary Consumption 1.MW

ix. Date of Commissioning of the Plant

Unit (1-4) November 30, 1993

Unit (5-6) December 31, 1996

X. Expected remaining life of facility

14 years

Page 8: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

• Generation License Ibrahim Fibres Limited

38-KM. Faisalabad- Sheikhupura Road Faisalabad, Punjab

0 quaL.LrIzTion I Pc.j:.!liv t C 11 S JILL

I.

Plant size installed Capacity (Gross ISO)

26.5 MW

iii. Type of Technology Reciprocating Engines

iv. Unit Size (MW)/No. of Units

5.3 MWx05 DG Sets

V. Unit make, Model and Date of Manufacture

Unit Make Model Date of

Manufacture Unit (7-11) NIIGATA 16V32CLX 2012

vi. De-rated Capacity at Mean Site Conditions (MW)

21.2 MW

vii. Auxiliary Consumption 0.8 MW

viii. Date of Commissioning of the Plant

Unit (7-11) F,,---bruari 901 3(Prr-,p,-,,,,,,ii)

ix. Expected remaining life of facility

"-)5 ears

3. Fuel Detail

i. Primary Fuel Heavy Furnace Oil .(HFO)

ii . Fuel (imported/Indigenous)

Imported as well as Indigenous

iii. Alternate Fuel Diesel Oil (DO)

iv. Fuel Supplier PSO/Shell/Chevron/Attock

v. Supply Arrangement Through Oil Tankers

vi. No. of Tanks HFO DO

Page 9: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

38-KM, Faisalabad- Sheikhupura Road I-aisalabad, Punjab

Vii vii. "

3

HFO

1

DO Capacity of Each Tank 2500 M TON 375000 LTRS

viii. Gross Storage HFO DO

7500 M TON 375000 LTRS

3. Emission Values

i. SOX 920 p.p.m

ii. NOx 1095 p.p.m

iii. CO2 6.5 %

iv. Particulate -

4. Cooling System

Cooling Water Source/Cycle

Underground Water Obtained from tube well is treated in the Reverse Osmosis plant for supplying cooling water to the plant/closed Loop Cycle.

6. Plant Cost (Existing)

i. Equity (Rs. Million) 186.874

ii. Debt (Rs.Million) 370.993

iii. Hi. Project Cost

(Rs. Million) 557.867

Page 10: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

38-KM, Faisalabad- Sheikhupura Road Faisalabad, Punjab

6. Piqn t p %J.,/ Fs en9i004

i. Equity (Rs. Million) 700 000

ii. Debt (Rs.Million) 1800.000

iii. Total Project Cost (Rs. Million)

2500.000

7. Plant Characteristics

1. Generation Voltage(kV)

11 kV

ii. Frequency 50 Hz

iii. Power Factor 0.8

iv. Automatic Generation Control

Yes

v. Ramping Rate 30min & can be fully loaded in 5 minutes

vi.

Time required to Synchronize to Grid and loading the complex to full load

N/A

Page 11: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

38-KM. Faisalabad- Sheikhupuia Road Faisalabad, Piaij,ib

Lincensee-Proforma for information regarding Distribution issues. Network facts

Part-A

A. No. of Feeders Er .teen (18) Feeders. '-

B.

Length of each feeder (KM) XLPE feeders marked in RED

Fl F2 F3 F4 F5 F6 F7 F8

16 16 16 16 16 16 16 16

F9 F10 F11 F12 F13 F14 F15 F16

1.6 1.6 1.6 3.4 3.4 3.4 3.4 3.4

Length of each feeder (KM)

F17 F18

3.4 0.7

C. Length of each Feeder to each consumer

-Do-

D.

In respect of all the Feeders, describe the property (Streets, farms, Agri land, etc.) through, under or over which they pass right up to the customer's premises, whether they cross-over or pass near the DISCO lines.

ri , Fio

Feeders FJ, F1 & F11 are crossing over the FESCO line at one location. Similarly Feeders F12 & F13 crosses FESCO lines at three different locations. .

E

Whether owned by IFL Consumer or FESCO — (deal with each Feeder Separately)

Page 12: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

38-KM, Faisalabad- Sheikimpura Road Faisalabad. Pun ab

I if owned by F 17- 5; CI 1--)

please furnish particulars of contractual arrangement.

N/A

Operation and maintenance responsibility for each feeder.

The Captive Power Plant supplying power to its sister concerns only. The Operation and Maintenance is the responsibility of small Power producer (SPP), IFL.

F.

Whether connection with network of FESCO exists (whether active or not)- if yes, provide details of connection arrangement (both technical and contractual)

N/A

G.

Any other network information deemed relevant for disclosure to or consideration by NEPRA.

N/A

as .

Page 13: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

38-KM, Faisalabad- Sheikhupura Road Faisalabad, Punjab

Licensee Proforma for information regarding Distribution issues, Consumer Facts

Part-B

A. No. of Consumers

Four (04) Consumers including Ibrahim Fibres Limited (Polyester Plant-PP),Ibrahim Fibres Limited ( Textile Plant-1), Ibrahim Fibres Limited (Textile Plant-2), Ibrahim Fibres Limited (Textile Plant-3).

B. Location of consumers (distance and/or premises) Length of each Feeder

Ibrahim Fibres Limited (Polyester Plant-PP), 38- Kilometer, Faisalabad- Sheikhupura Road.

1.6 KM

Ibrahim Fibres Limited (Textile Plant-1), 40- Kilometer, Faisalabad- Sheikhupura Road.

3.4 KM

Ibrahim Fibres Limited (Textile Plant-2), 40- Kilometer, Faisalabad- Sheikhupura Road.

3.4 KM

Ibrahim Fibres Limited (Textile Plant-3), 38- Kilometer, Faisalabad- Sheikhupura Road.

0.7 KM

Page 14: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

38-KM, I-aisalabad- Sheikhupura Road taisalabad, Punjab

C. Contracted Capacity and Load Factor for consumer

Ibrahim Fibres Limited ( Polyester Plant )

12 MW at 0.83 load factor(Existing) + 10 MW at 0.83 load factor(New Extension)

Ibrahim Fibres Limited ( Textile Plant-1 )

6.0 MW at

0.92 load factor

Ibrahim Fibres Limited ( Textile Plant-2 )

4.2 MW at

0.88 load factor

Ibrahim Fibres Limited ( Textile Plant-3 )

3.5 MW at 0.94 load factor

D.

Specify Whether

i) The consumer is an Associate undertaking of the IFL- If yes, specify percentage ownership of equity;

Ibrahim Fibres Limited (Polyester Plant-PP), Ibrahim Fibres Limited (Textile Plant-1), Ibrahim Fibres Limited (Textile Plant-2), Ibrahim Fibres Limited (Textile Plant-3), are the Associated Undertaking of IFL.

ii) There are common directorships:

Yes

iii) Either can exercise influence or control over the other.

Yes

E.

Specify nature of contractual Relationship Between

i) each consumer and SPP Firm Supply of Electricity on continuous basis.

ii) consumer and DISCO No

F. Capacity originally sanctioned by Provincial Government — If

Phase-1 21.2 MW by Government of Punjab

Page 15: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

3O-KN1, Faisalabad- Sheikhupura Road Faisalabad, Punjab

subsequently enhanced, eviden ce of permission foi enhancement.

Phase-2 10.6

. MW by Government of

Punjab

!Thaz ., 2, 26.5 MW (Applied NEPRA fo permission)

G. Any other network information deemed relevant for disclosure to or consideration by NEPRA.

Nil

SCHEDULE-II

The net capacity of the Licensee's Generation Facilities

Page 16: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

Generation License Ibrahim Fibres Limited

38-KM. Faisalabad- Sheikhupura Koad laisalabad, Punjab

SCHEDULE-II

(EXISTING)

1. Installed Capacity Gross ISO 31.8 MW

3. De-rated Capacity Mean at Site Conditions

26.5 MW

4. Auxiliary Consumption 1.00 MW

5 Net Capacity of the Plant at Mean Site Conditions

25.50 MW

(NEW EXTENTION)

1. Installed Capacity Gross ISO 26.5 MW

3. De-rated Capacity Mean at Site Conditions

21.2 MW

4. Auxiliary Consumption 0.8 MW

5 Net Capacity of the Plant at Mean Site Conditions

20.4 MW

Page 17: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

‘1111M, 1(m1 NS 1.11,1 I

1 - 1 1

) 1 |( : 0011,0 IIMIKSPII 177

PLANT LAYOUT \II I (III Sli )1( \I I I \

0 0

0 0

Page 18: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

IBRAHIM FIBRES LIMITED POWER GENERATION—I I I KV DISTRIBUTION NETWORK

51

F C:13

11 11)1 I4 r. I -I I5

ouee 0 43—e--e—e-- o o 0 oo-fau.e-4p—ii n eta f;

sof-, 00 OU LI LI 000 0 0 0000 no oaidocp C5-€1 H-F1 es 7i o

•••

27I 134

if,. cs: Fs

I.11111101 ( P.I' ) ,„, \ t- rl

1 '1' 1" _1 11

1

AI'S A LA BA D

1;)

II I I II'- 2 1

et7 AHORE

1:1,•• ■II ,

1 I 111 111 "

IP I TV 1 IC] I

-4•44---, 4 ' I • I _I UF1 0

III I III-I I

Page 19: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

IBRAHIM FIBRES LTD (POLYESTER PLANT-I) (POLYESTER PLANT-2)

FAISALABAD-SHEIKHOPURA ROAD

BALOCHINI

BUS STOP

IBRAHIM FIBRES LTD (TEXTILE PLANT-I)

POLICE STATION

RAI OEIIINT

SOCIAL SECURITY

'ANNEAL

61-LANK BUS

SITS

IBRAHIM FIBRES LTD (POWER GENERATION-I)

(TEXTILE PLANT-3)

Ibrahim Fibres Limited Plant Location Map

38-Kilometer Faisalabad-Sheikhupura Lahore Road

40-Km-Faisalabad-Sheikhupura Lahore road

IBRAHIM FIBRES LTD (TEXTILE PLANT-2)

v/i Lahore

N

SH

AH

KO

T T

OO

L P

LA

ZA

Faisalabad

SHAHKOT BO', STOP

Page 20: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

SINGLE LINE DIAGRAM GEN. & DIST.

X •• ele-ou elmnteen X wwwwomamma X wwwww.....1 X ••••••

vcrILTV:. 7or. A.:. COU•li • et

In ...AR III, 1,10,

14, 053,(13Sef \ ■•■••11-1

WI SCH121711111/(1111141,11,7,

I I xl 111, A

DS 1

-.!

P11.1.4 \ 1•1■1 ....

FE

ED

EQ

II4 T

O

;E

EC

, To

(11—E-1—F21

(56101

loo °" III

I I 2. Proirction %chernc .okme for

Proircioon arhroor some for •Il fertler.

`,1 IlokM11 I OR/ V.11

:2

X _C 1/

11=7,r

Page 21: brah irrip IBRAHIM FIBRES LIMITED - … Modification/Ibrahim... · 2013-01-16 · units of Ibrahim Fibers Limited. The proposed addition will result in better ... Ibrahim Fibres Limited

CHAK NO 61 R B.

CHAK NO 60 R 8

raill 1111111.111111111111

111111 IMMUMML 011.117111.1111111111111110110 Maiiiiiill ' - ram imaimanamaamiamaiiii - ammo - -mom Immulanimmaimsfill. IITa aisiamosiamon maim - - orm , fillammooll morums- --- NNE oneammaanasan amino • • a ansaamasmaaa ansaalanimma ij, Lr-, anamonsianaaan imam - - a an....iammomoun me anal ligilimmassimumma

isseemir out monsommill mmormasmill H nail ilmonammonsenamman . /. me . - anaammaanuman ummummus . MI .10111 sparammea esimase - • . mom - sanamenasasan no In-mai • ligiiiainaminanril." mans .- - met . - - , MINION Jrnilmal . 110000101000 MEN IMMIMPI i liallirallirall . UNE I am nammisma sivimmammuto in • :..am see . ,.._._ . sin" mai- emarimmilm oluilmnau mil

111111 - MONO — , iri pERIROPI 0_ MOIMMIllamanigra Nor EN ' . a Nuannamamtummaiiiiimi „..P.millumonitimmaimi , ‘mml, . • L mem aea asemaimmonee . 1 El IIII 11 ' II mommommummomm. =MOO OM MOMM •imm OM 0 MOMOMMOMOMMOOM MORON pm . ... IIIII IIMIIIMIMMill MIPP If ■ IMILIMMI OM I I NM= I IA iirmv

a asammeassmaa E ell ilMOIMOMMIBOMORM OMMIOOOMOM 111. PIP- - IOW - OM 10011011111M0010000 Mir laillinKal ii

. 10111100101101M OOMMOOMMIM pr ,, nismenesse mommaii -111MMOONIMMO 00101010110,"- - ! 1 - - 1100101101101010 - - - - PP- WATER DRAIN

FEEDER #

FEEDER # 2

FEEDER # 2 & 3

FEEDER # 8 & 1

FEEDER # 5

✓ FEEDER

FEEDER # 10

FEEDER # 9 & 10