Mining Infrastructure Investment opportuni3es on the Braemar Iron Forma3on
A Presenta3on from the Braemar Iron Alliance
Australian Resources Chinese Investment Conference, Adelaide 7 July 2011
Andrew WoskeG, Spokesman for the Braemar Iron Alliance
Managing Director, Minotaur Explora3on Ltd (ASX: MEP)
矿业基建投资机遇
Braemar 铁矿石矿床 来自Braemar 铁矿石联盟的报告
澳大利亚资源中国投资会议 阿德莱德
2011年7月7日
Braemar 铁矿石联盟发言人Andrew Woskett Minotaur 勘探有限公司总经理 (ASX: MEP)
This presenta,on has been prepared by the management of Minotaur Explora,on Limited (MEP) on behalf of the Braemar Iron Alliance, an unincorporated body, for the general benefit of analysts and industry and does not cons,tute specific advice to any par,cular party or persons. Informa,on herein is based on publicly available informa,on, internally developed data and other sources. Where an opinion, projec,on or forward looking statement is expressed in this presenta,on, it is based on the assump,ons and limita,ons men,oned herein and is an expression of present opinion only. No warran,es or representa,ons are made or implied as to origin, validity, accuracy, completeness, currency or reliability of the informa,on. MEP and Alliance members specifically disclaim and exclude all liability (to the extent permiIed by law) for losses, claims, damages, demands, costs and expenses of whatever nature arising in any way out of or in connec,on with the informa,on, its accuracy, completeness or by reason of reliance by any person on any of it. Where MEP or the Alliance expresses or implies an expecta,on or belief as to the success of future explora,on and the economic viability of future project evalua,ons, such expecta,on or belief is expressed in good faith and is believed to have a reasonable basis. However, such projected outcomes are subject to risks, uncertain,es and other factors which could cause actual results to differ materially from projected future results. Such risks include, but are not limited to, explora,on success, metal price vola,lity, changes to current mineral resource es,mates or targets, changes to assump,ons for capital and opera,ng costs as well as poli,cal and opera,onal risks and government regulatory outcomes. MEP and the Alliance disclaim any obliga,on to advise any person if it or they become aware of any inaccuracy in or omission from any forecast or to update such forecast.
The following presentation is a visualisation of possible infrastructure solutions to support potential future iron ore mine developments. Locations nominated for the
provision of infrastructure facilities are for illustration purposes only and should not be considered viable technical, economic, environmental, social or State solutions for any
future requirements
Cautionary Statements
本报告由代表Braemar 铁矿石联盟的Minotaur勘探有限公司(MEP)管理层准备, 这是一个为研究和行业综合利益服务的非公司联盟,不为任何特定团体或个人提供具体建议。此处提供的信息是基于已发表的公众信息、内部研究数据和其它来源。此报告中的任何看法、预测或前瞻预测报告,是基于此报告中的假设和限制条件,仅用于表达现有看法 。对信息的来源、有效性、准确性、完整性、现存性或可靠性,本报告不做任何担保或代表。特此声明,如有基于任何原因利用与本报告有关的信息、准确性、完整性,或者任何人基于任何原因采用本报告的任何部分,带来亏损、索赔、损失、查询和费用,MEP公司和联盟成员不承担任何责任(法律相关责任)。如果MEP公司或联盟表达或暗示任何有关未来开发成功和未来项目评估的经济生存力的预计或观点,这些预计或观点是本着诚信和善意的原则作出的,有合理的基础。但是,任何预计结果受风险、不确定性和其他因素影响,可能造成实际结果与预计结果有差别。这些风险包括(不仅限于):开矿成功率、金属价格波动,现有矿资源的预计或目标的变化、资本和运作成本假设的变化,以及政治和运作风险,及政府法规结果。如果MEP公司及联盟个人或公司获知任何关于预测的不准确性或有省略,或者没有更新预测,MEP公司及联盟否认对任何人负有任何责任或义务。
以下报告是对支持潜在铁矿石开发可能性基建方案的形象展示。所建议基建设施的提供地点,仅供参考,不应作为满足任何未来需要的可行性技术、经济、环境、社会或全州解决依据。
申明
Braemar Iron Formation: Location
2 new maps to be inserted here
Braemar 铁矿石矿床:地点
2 new maps to be inserted here
阿德莱德
1. The Braemar Iron Alliance: members and objectives 2. The Braemar Iron Formation: Australia’s next big Iron ore province 3. Mining development scenarios 4. Infrastructure needs:
§ Water § Power § Rail haulage of concentrates and lump ore § Concentrate Slurry transfer § Port § Sea Freight
5. Investment opportunities
Braemar Iron: The Investment background
1. Braemar 铁矿石联盟: 成员和目标 2. Braemar 铁矿石矿床: 澳大利亚的下一个大型铁矿石矿产地区 3. 采矿开发方案 4. 基础设施面临的需求:
§ 水 § 电 § 用于精矿和块矿运输的铁路 § 精矿浆的运输 § 港口
§ 海运 5. 投资机遇
Braemar铁矿石: 投资背景
The Braemar Iron Alliance comprises: Bonython Metals Group (private)
Carpentaria Exploration (ASX: CAP)
Havilah Resources (ASX: HAV)
Minotaur Exploration (ASX: MEP)
Royal Resources (ASX: RRL)
Sinosteel PepinNini JV (SPCM)
Braemar Iron Alliance
The Braemar Iron Alliance will:
Define and articulate the demand case to
governments and infrastructure investors
for coordinated common user infrastructure
to suit the needs of the iron ore mining
industry along the Braemar Iron Formation
Braemar 铁矿石联盟成员包括:
Bonython金属集团 (私有)
Carpentaria勘探公司 (ASX: CAP)
Havilah资源公司 (ASX: HAV)
Minotaur勘探公司 (ASX: MEP)
Royal资源公司 (ASX: RRL)
Sinosteel PepinNini合资公司(SPCM)
Braemar 铁矿石联盟
Braemar铁矿石联盟的目标:
向政府和基建投资者界定及详细解释这一需求推
动型开发,以促进公用基础设施的协调开发,从
而满足铁矿石开采行业在Braemar铁矿石矿床开
发过程中的需要。
Braemar Iron: Australia’s next big Iron province
This presentation is based on a range of views held and assumptions made by members of the Braemar Iron Alliance, none of which are yet supported by definitive feasibility studies into potential development of mineral resources.
The integrated, multi-user infrastructure facilities envisaged herein are hypothetical in nature and scope and there can be no level of certainty that this or any concept may eventuate
The term "Explora(on Target” used herein should not be misconstrued as an es3mate of Mineral Resources and Reserves as defined by the JORC Code (2004), and the term has not been used in that context. It is uncertain if further explora3on will result in the determina3on of a Mineral Resource.
Refer Cl 18 of the JORC Code (2004).
Braemar 铁矿石:澳大利亚的下一个大型铁矿石矿产地区
此报告是基于Braemar 铁矿石联盟成员的各种观点和假设,其潜在的矿产资源开发可能还未经过最终可行性研究证明。 此处设想的集合型多用户基础设施从类型和规模来说都是假设的,任何想法是否能够最终实现都是不确定的。
此处使用的术语“勘探目标”不能混淆为对矿产资源及储备的估计(JORC代码2004定义),此处用语有不同的含义。不确定进一步勘探是否会发现矿藏资源,。
参考 JORC 代码(2004) Cl 18
Braemar Iron: Australia’s next big Iron province
The Braemar Iron Formation is a regionally extensive sequence of magnetised sedimentary siltstones, with pervasive beds of magnetite mineralisation, often up to 300m thick, stretching over a distance exceeding 200km, as shown in red on the Total Magnetic Image
below. Linear strike length of the tightly folded magnetised siltstone layers is well over 300km.
400km
The Braemar Iron Alliance "Explora(on Target” across the Braemar Iron Forma3on is for 25 – 50 billion tonnes of the magne3te form of iron
Braemar 铁矿石矿床是跨地区的一系列集中磁化沉积型粉砂岩层,矿床底是渗透式磁化矿化物 ,一般达300米深,延伸至超过200公里的范围,如下图(全磁化图)中红线所示。紧密结合的磁化沉积型粉砂岩层呈直线型,远长于300公里以上。
400km
Braemar 铁矿石联盟在整个Braemar铁矿石矿床的“勘探目标”是250到500亿吨磁铁矿
Braemar 铁矿石:澳大利亚的下一个大型铁矿石矿产地区
Braemar Iron: resource development activity
² Iron mineralisation stretches for over 200km from SW of Broken Hill to Peterborough in SA ² The formation straddles the heavy duty E-W rail link to Port Pirie on Upper Spencer Gulf
Braemar 铁矿石:资源开发活动
² 铁矿物层延伸从Broken 山西南到南澳州的Peterborough,超过200公里 ² 矿床横跨东西走向的重工业铁路到在Upper Spencer湾的 Pirie港
Braemar Iron: the potential mining scale
² Alliance members foresee potential for up to 50 billion tonnes of magnetite iron resources to be defined through exploration over the next decade (refer ‘Exploration Target’ disclaimer on earlier slide)
² with scope for say 5 pits each mining 50 million tonnes of ore p.a. and beneficiating around 10Mtpa of concentrate each
² for total annualised output of ~50Mtpa of blast furnace quality magnetite concentrates grading 65% - 70% Fe, exceptionally low in impurities
² and with a foreseeable 100 year life of mining across the Braemar Iron Formation
Braemar 铁矿石: 潜在矿藏规模
² 联盟成员预计潜在达500亿吨规模的磁铁资源,有待在未来十年内经勘探进行限定。(参照上页关于“勘探目标”的解释)
² 假设每个矿地有5个矿坑,每年产5000万吨矿,每矿每年约产1000万吨精矿。
² 每年5000万吨产量中,高炉质量磁化精矿度达65%到 70% ,杂质含量非常低。
² 预计整个Braemar铁矿石矿床开采寿命达100年
Braemar Iron: Water for 25Mtpa concentrate output
CITIC Desalination Plant Feb 2011 photo sourced from www.citicpacificmining.com/en/news/progress-images
Water Supply scenario: ๏ magnetite processing and magnetic recovery circuits use vast amounts of clean water ๏ process circuits will consume ~50Gl per year (50,000 Mega litres pa or 135 Mega litres per day) ๏ A Desalination plant will be required on Spencer Gulf ๏ 350km transfer pipeline, 1m diameter, plus 3 pump stations to deliver water to process facilities
Proposed Olympic Dam Expansion Desalina3on Plant, Point Lowly, 200Ml per day capacity Source: ODX EIS p136-‐154, Fig 5.32
(BHPB’s proposed Desalination facility for Olympic Dam’s new mine is to supply an additional 200 Ml/day from Port Bonython area in Upper Spencer Gulf)
Braemar 铁矿石: 每年2500万吨精矿产量所需用水
CITIC Desalination Plant Feb 2011 photo sourced from www.citicpacificmining.com/en/news/progress-images
供水方案: ๏ 磁铁矿加工和磁铁恢复过程使用大量静水 ๏ 加工过程会每年消耗~50Gl (每年50,000 Mega 升或每天 135 Mega升) ๏ Spencer港将需要建造海水淡化装置 ๏ 350公里运输管道,直径1米,再加3个水泵站,将水运输到工厂
Proposed Olympic Dam Expansion Desalina3on Plant, Point Lowly, 200Ml per day capacity Source: ODX EIS p136-‐154, Fig 5.32
(BHPB为Olympic Dam新矿提议修建的海水淡化工厂,能够每天多供应200MI,来源于Upper Spencer湾的Bonython港)
Braemar Iron: Power for 25Mtpa concentrate output
graphics sourced from www.petratherm.com.au/expmodel.html
Power Supply scenario: ๏ power demand of 500MW for 5 mines
(Olympic Dam’s new mine requires additional 650MW of power generation)
๏ consuming 3,000 GWh pa (Olympic Dam new mine to consume additional 4,400 GWh pa)
๏ Potential for renewable power supplies from just north of the Braemar Iron Formation
Disclosure: MEP holds an economic interest in Petratherm (ASX: PTR)
๏ potential for geothermal energy from shallow ‘hot rocks’ nearby at Petratherm’s Paralana project
๏ a‘meshed’ 275kV transmission ‘NEM’ network between Paralana-Port Augusta-Broken Hill, supplying 500MW into grid
๏ total 1,000km of new HV transmission network
Braemar 铁矿石:每年2500万吨精矿产量所需用电
图像来自于 www.petratherm.com.au/expmodel.html
电力供应方案: ๏ 5个矿的电力需求为500MW
(Olympic Dam的新矿需要额外的650MW发电)
๏ 每年消耗 3,000 GWh (Olympic Dam 新矿每年额外需消耗4,400 GWh )
๏ Braemar铁矿石矿床以北不远处有潜在的可再生电力供应
๏ Petratherm公司的Paralana项目附近有浅地表的“热岩石”,能够提供潜在地热电力。
๏ 从Paralana到 Augusta港到Broken山,有一个“网式”275kV ‘NEM’网络传输,为电网提供500MW电力
๏ 总计1,000公里新HV传输网络 声明:MEP拥有Petratherm公司(ASX:PTR)的股份
Braemar Iron: Transporting iron products to Port
๏ Rail: • Main continental E-W standard gauge rail line
runs right through the Braemar Iron Formation • Deposits are a 150km - 300km rail trip to Port
Pirie where a Pellet Plant could be established • rail line to be upgraded in 2012 • existing spare line capacity of 10Mtpa • rail access to each mine requires a 35km ‘spur’ • ‘balloon loop’ required at each mine for train
turn around and 24 hour loading/unloading • For 25Mtpa ore haul capacity, need;
• 9 train sets each comprising 5 x 4,000hp Traction locomotives & 162 wagons
• 1990 train trips per year • 5 hour load/unload turnaround time (max)
• line duplication needed to provide sufficient train paths beyond 10Mtpa
• need significant stockpile hardstand and negative pressure storage sheds at Port or Pellet plant
Braemar 铁矿石:运输铁矿产品到港口
๏ 铁路: • 主要洲际东西标准铁路从Braemar铁矿石矿床穿过 • 矿藏至Pirie港铁路运输为150公里 – 300公里, Pirie港可建球团矿厂
• 2012年铁路线将进一步升级 • 现有空置铁路,运输能力为年1000万吨 • 铁路与每个矿连接需35公里的“铁路专用线” • 每个矿需要“气球式环形”道,用于火车转换方向及
24小时载货/卸货 • 年产2500万吨能力需要:
• 9 辆火车,每辆含5 x 4,000hp 牵引机车及162节车厢
• 每年1990 次火车班次 • (最多)5个小时的载货/卸货周转时间
• 需要双道铁路线为年产1000万吨以上的产量提高足够火车道
• 在港口或球团矿厂需要大型的储矿堆积场及负压仓库
Braemar Iron: Concentrate transfer to Port
๏ Slurry Pipeline: • Slurry transfer is a cost effective alternative
to rail haulage for a long-term mining project
• Slurry transfer can be used for concentrate movements from mine to port
• we envisage a 300km long buried pipeline to a Pellet plant near Port Pirie or 380km to a deep water port location
• 25Mtpa requires a 600mm diameter Concentrate delivery pipe + Return Water Line
• Example: ✴ Minas Rio iron project, Brazil; 600mm
diameter pipeline is 522km long, to transport 24.5Mtpa of concentrate
• 2-3 intermediate Pump Stations • Port Dewatering station & Concentrate
storage • both rail and slurry line solutions could be
used to transport >25Mtpa of concentrate
Slurry loading via a floa3ng Stockpile vessel Photo courtesy Royal Resources Ltd
Braemar铁矿石: 精矿运输到港口
๏ 矿浆管道: • 对长期采矿项目来说,矿浆运输是比铁路运输节省成本的另一种可供选择的机会
• 矿浆运输可用于精矿从矿区到港口的运输 • 我们设想建造一条300公里长的埋藏管道到Pirie港附近的球团矿厂,或380公里长至深水港位置
• 每年2500万吨的产量需要直径600mm的精矿传输管道及回水管道
• 例如 ✴ 巴西Minas Rio铁矿项目; 直径600mm管道,522公里长,用于每年2450万吨的精矿运输
• 2-3 个中转泵站 • Dewatering港中转站及精矿储存 • 铁路和矿浆管道方案都可用于运输年产量2500万吨以上的精矿
矿浆装载通过一艘浮动储矿船完成 图片来自于 Royal资源公司
Braemar Iron: Concentrate conversion into Pellets
CITIC Stacker Reclaimer Feb 2011 photo sourced from www.citicpacificmining.com/en/news/progress-images
Pelletisation ๏ Pellet plants are common in China ๏ Concentrate is agglomerated to form pellets for direct injection into a steel making Blast Furnace ๏ Pelletisation adds value to the concentrate product ๏ Pellets are easier to ship (no moisture content), less likely to release fugitive dust emissions ๏ Australia is underweight in downstream value-add components of the steel making supply chain
Braemar 铁矿石: 精矿运输到港口
CITIC Stacker Reclaimer Feb 2011 photo sourced from www.citicpacificmining.com/en/news/progress-images
球团矿 ๏ 球团矿厂在中国很常见 ๏ 精矿凝结成团,直接注入钢铁铸造高炉 ๏ 矿团增加精矿产品的价值 ๏ 矿团更易于运输(无潮湿成分),减少短时粉尘排放 ๏ 澳大利亚缺乏钢铁铸造供应链下游的增值环节
Braemar Iron: Port for bulk loading of iron products
ª Minimum 50Mtpa port capacity
ª up to 250 ships loaded per year
ª 6,000tph loading rate
ª 320m long, double sided berth
ª 20m draft accessible in Spencer Gulf
ª Need new deep water port in Spencer Gulf, south of Port Pirie
ª jetty length ~3km
ª Capital cost around $750 million
Biggest challenge to development of new mines is lack of bulk handling port infrastructure: • Port Adelaide: capacity is only 1.7Mtpa • Port Pirie: capacity expanding to 8Mtpa, but has very shallow dra` • Port Bonython (proposed): sub-‐op3mal; extra rail distance incurs addi3onal haulage charges
Braemar Iron Alliance sees an emerging requirement to berth 200,000 DWT ‘Cape Size’ vessels for sea freight of iron concentrates & Pellets:
Braemar铁矿石: 在港口进行铁矿石的大量装载
ª 至少年货运量5000万吨
ª 每年可供达250艘船装卸
ª 每小时6000吨的装载率
ª 320米长,双排泊位
ª Spencer 湾有20米吃水深度
ª 在Pirie 港南部的Spencer湾需建新的深水港
ª 栈桥长3公里
ª 资本投入约7亿5000万澳元
新矿发展面临的最大挑战是缺乏有能力进行大规模装载的港口设施: • Adelaide港: 装载能力仅为每年170万吨 • Pirie港: 装载能力增加至每年800万吨,但吃水浅 • Bonython港 (提案): 次佳,额外铁路距离增加额外运费
Braemar 铁矿联盟预计将需要建造200,000 DWT 泊位的港口,可容纳“港口大小”的货船,用于铁精矿及矿团的海运:
Braemar Iron: Sea Freight 5,300 nautical miles
Braemar 铁矿石:海运 5300海里
Braemar Iron: Infrastructure Investment scenarios
Item Scale Capital Cost A$ million
Power & Transmission 500MW $2,250
Desalina3on Water 50Gl/year $500
Slurry Pipelines 25Mtpa $650
Rail expansion to 25Mtpa 380km $750
Locomo3ves & Wagons 9 train sets hauling 25Mtpa
$550
Port for 200,000 DWT 50Mt $750
Pellet Plant 10Mt $1,250
Total Capital Investments ±$6,650
Braemar 铁矿石: 基建投资方案
项目 规模 投资成本澳元( 百万)
电力及传送 500MW $2,250
海水淡化装置 每年50Gl $500
矿浆管道 每年2500万吨 $650
铁路扩展,可供年产量2500万吨运输
380公里 $750
牵引机车及车厢 9 部完整火车 运输年产量2500万吨
$550
200,000 DWT的港口 50Mt $750
团矿厂 10Mt $1,250
总投资成本 ±$6,650
Mining Infrastructure Investment opportuni3es on the Braemar Iron Forma3on
Andrew WoskeG, Spokesman for the Braemar Iron Alliance
Managing Director, Minotaur Explora3on Ltd (ASX: MEP)
Interested? Please see me at the Minotaur Explora3on display Booth
矿业基建投资机遇
Braemar铁矿石矿床
Braemar 铁矿石联盟发言人Andrew Woskett Minotaur 勘探有限公司总经理 (ASX: MEP)
您是否感兴趣? 请与我在 Minotaur 勘探有限公司展台面谈
and, there are….
Mining Investment opportuni3es with Minotaur Explora3on
Andrew WoskeG Managing Director, Minotaur Explora3on Ltd (ASX: MEP)
Minotaur Explora3on has a diverse resources project porjolio. We seek long-‐term investment partnerships to help develop our resources and build
for wealth and prosperity.
Interested? Please come and talk to the Minotaur team at the Minotaur Explora3on display Booth
另外,还有……
与 Minotaur 勘探公司的矿业投资机遇
Andrew WoskeE
Minotaur 勘探有限公司总经理 (ASX: MEP)
Minotaur开发公司拥有各种投资方案 我们寻求长期的投资伙伴,帮助我们开发资源,共创财富与繁荣
您是否感兴趣?
请到 Minotaur 勘探有限公司展台与我公司人员面谈