BR 6/07 1 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal is to generate a clock signal in which you want the clock to arrive at the same time at equivalent points on the chip Problem – Clock skew Clock skew – mismatches in wire delays can cause differences in arrival times at equivalent points in the clocks. Can only predict the arrival time of the clock at clock arrival = Y +/- Skew Clock skew must accounted for in timing budget when determing delay paths to meet setup/hold constraints Clock skew is THE problem – everything else, such as power costs with regards to the clock distribution system, comes from trying to solve the clock skew problem

Upload: august-rich

Post on 18-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 1

Clock Distribution – from Past to Present

• A synchronous system needs a clock which signals are synchronized with

• Clock distribution network: goal is to generate a clock signal in which you want the clock to arrive at the same time at equivalent points on the chip

• Problem – Clock skew– Clock skew – mismatches in wire delays can cause differences in arrival

times at equivalent points in the clocks. Can only predict the arrival time of the clock at clock arrival = Y +/- Skew

– Clock skew must accounted for in timing budget when determing delay paths to meet setup/hold constraints

– Clock skew is THE problem – everything else, such as power costs with regards to the clock distribution system, comes from trying to solve the clock skew problem

Page 2: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 2

Clock Distributionclk

want clk to arrive at same time at equivalent parts of chip 0 ps

reference point

100 ps 100 ps

100 ps 100 ps

Page 3: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 3

Clock Distribution (cont)

clk

if clock arrival is known, can accurately compute delay constraints when sending data from one register to another

0 ps

reference point

100 ps 100 ps

100 ps 100 ps

Data

Page 4: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 4

Clocking Regions

clk

0 ps

reference point

102 ps 98 ps

100 ps 100 ps

local skew: 6 ps

97 ps

103 ps99 ps

93 ps

96 ps92 ps

local skew: 6 ps

skew to neighboring region: 11 ps

Chip is divided into regions, the further a signal has to travel, the larger the skew budget

Page 5: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 5

Skew: Flip-Flops

F1

F2

clk

clk clk

Combinational Logic

Tc

Q1 D2

Q1

D2

tskew

CL

Q1

D2

F1

clk

Q1

F2

clk

D2

clk

tskew

tsetup

tpcq

tpdq

tcd

thold

tccq

setup skew

sequencing overhead

hold skew

pd c pcq

cd ccq

t T t t t

t t t t

Source: David Harrison

Skew adds to both setup and hold when calculating constraints

Page 6: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 6

Clock Distribution Evolution

• Alpha 21064 (1993, 750 nm), 150-200 MHz: Global Clock/1 driver/gridded clock, 180 ps clock skew

• Alpha 21164 (1995, 500 nm), 300 Mhz –Global Clock, 2 drivers, gridded clock, 80 ps clock skew,

• Alpha 21264 (1997/ 350 nm) 500-600 MHz, Clock distribution network – global/local/conditional clocks – deskew by delay insertion, gridded global clock, 65 ps clock skew

• IA-64 Gen1 (2000/180 nm) 800 MHz, H-tree global clock, active de-skew (distributed PLLs), 28 ps skew

• IA-64 Gen2 (2002/180 nm) 1 GHz, H-tree global clock, regional clocks, NO active deskew, 62 ps skew

• IA-64 Gen3 (2003/130 nm) 1.5 GHz, H-tree global clock, regional clocks, fuse-based deskew, 7 ps (scan based) to 24 ps (fuse based)

Page 7: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 7

Clock Distribution Evolution (cont)

• IA-64 Dual-core (2004/90 nm) 2.5 GHz (Montecito), H-tree and balanced binary-tree routing, regional clocks, active regional deskew, 10 ps skew

• Xeon Dual-core (2006/65 nm) 3.4 GHz (Tulsa) – two different clock systems– Core clocks (clocks for processor cores) uses same core clock

scheme as used in Xeon Single Core (2003,/90 nm). This clock scheme was designed to scale up to 6 GHz, and used a H-tree distributed clock with shorted nodes that had produced less than 10 ps skew. No active de-skew or fuse-based de-skew.

– Un-core clock (everything outside the core) – Cache, bus logic, etc. Large area prevented use of gridded clock (power restriction), used a clock tree (9 vertical, 2 horizontal) with fuse-based deskew at root of each vertical spine. Achieved less than 11 ps skew.

Page 8: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 8

Definition: Gridded ClockIn early clock distribution systems, large drivers + metal clock grid used for clock distribution. Subsystems just tapped into the clock grid for connectivity – easy to do, but takes a lot of power, chews up routing resources (grid density is exaggerated in this picture, there is a lot more white space than is shown

Page 9: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 9

Alpha 21064 Die Photo (1993)

Single Clock driver, 2 transistors for buffer visible to naked eye

Clocking scheme was 2 phase, single wire.

Clock load was 3.5 nF

Gate length of final driver was 35 cm (not a misprint, used serpentine layout to get this gate length).

Page 10: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 10

21064 Clock Skew Distribution Max clock skew approx. 180 ps (3.6% of 5 ns clock period) – 1 gate delay about 300 ps, so clock skew about 50% of a gate delay.

Note the skew is smallest closest to center of chip where driver is located.

Page 11: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 11

Thermal Image of 20164 76C at center of chip

46C at edges of chip

30C thermal gradient across chip!!

Page 12: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 12

21164 Clock Distribution (1995)

Goal of 21164 Clock distribution was to reduce skew by 30% and reduce the thermal gradient.

A predriver was centered between two main clock drivers

Predriver

Main clock drivers

Clock skew was reduced by factor of 2, and thermal gradient was reduced.

Page 13: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 13

Max clock skew approx. 80 ps (2.4% of 3.3 ns clock period) – 1 gate delay about 240 ps, so clock skew about 1/3 of a gate delay.

Clock skew lowest near two main clock drivers.

Page 14: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 14

Aside: Why a Gridded Clock?

• Both 21064, 21164 used a single global clk distributed by a metal clock grid.

• Skew is largely determined by grid interconnect density and is insensitive to gate load placement– Why? Because capacitance of grid wiring dominates the gate loads

connected to it.

• Universal availability of clock signals• Design teams can proceed in parallel since clock constraints

well known• Good process-variation tolerance• The disadvantage is the extra capacitance of the grid

– Power-performance tradeoff is determined by choice of skew target, which establishes the needed grid density, which determines the clock driver size.

Page 15: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 15

21264 Clock Distribution (1997)

• 21264 clocking fundamentally different from previous Alphas because it supported a hierarchy of clocks– Still had a GCLK (global Clk) grid, but conditional and local clocks

had several buffer stages after GCLK

• Conditional clocks used to save power– Clocks gated to functional units in design– If not executing a floating point instruction, then stop the clock to the

floating point unit to save power!

• State elements and clocking points were 0 to 8 gates past Gclk

• Six major regional clocks two gain stages past GCLK with grids juxaposed with GCLK, but shielded from it.– Major clocks drive local clocks and conditional clocks

• Goals were to improve performance, reduce power.

Page 16: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 16

Clock Hierarchy of 21264

Page 17: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 17

21264 Global Clock Distribution

Window pane arrangement - same skew to all ‘panes’ . Note redudant drive to clock nets

Page 18: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 18

Phased Lock Loops (PLLs)

• PLLs and Delay Locked Loops (DLLs) are used to perform clock multiplication of an off-chip clock– PLLs/DLLs used to align clock edges of original clock with

multiplied clocks

• PLLs are analog circuits that use a charge pump and a voltage controlled oscillator (VCO) to perform phase alignment– Alpha 21264 PLL used a separate, regulated 3.3 V supply and was

located in the corner of the chip to minimize noise impact– Section 9.5.2 of Rabaey text has a block diagram of a PLL

• All high performance CPUs and most ASICs now include a PLL for internal clock generation

Page 19: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 19

Global clock grid.

Uses 3% of M3/M4 routing layers

(lines in picture are misleadingly thick).

Page 20: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 20

All GCLK lines are laterally shielded by Vss/Vdd

signal

Vss

GCLK

Vdd

signal

Lateral shielding via Vss/Vdd prevents clock noise from coupling into signal lines.

Clock wires and lateral shields were manually placed

Page 21: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 21

Simulated worst case GCLK skew was 72 ps .

Skew on M1, M2 was less than 10 ps.

Measured worst case GCLK skew via ebeam tester was 65 ps

Page 22: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 22

Major clocks are two inversions past GCLK

Major clocks saved power over a single global clocks because they service a lighter load and distribution area is smaller – both of these means smaller drivers are needed.

Gclk+Major clocks used 24 W @ 2.2 V, 600 Mhz. It is estimated that at least 40W would have been required if only global clocks were used. 10%-90% rise/fall times were targeted at < 320 ps.

Page 23: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 23

Major Clock grids.

Densest major clock grids used up to 6% of M3/M4 routing.

White areas are serviced by local clocks, local clocks also present in major clock grids.

Major clocks also laterally shielded.

Page 24: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 24

Local, Conditional Clocks

• Local clocks generated from any clock – GCLK, Major clocks, other local clocks

• Local clocks were neither shielded or gridded

• Having local clocks gave freedom to move clock edges with respect to data to solve timing problems– This is another form of “time borrowing”

• 60,000 local clock nodes, all were analyzed with SPICE using minimum and maximum gate capacitance estimates– Some local clocks had very high min/max delay variation

tolerances (up to 280 ps)

Page 25: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 25

Power Consumption 21264

• 72 W total (600 Mhz @ 2.2 V)

• Clock distribution power consumption: 46.8 W– Gclk 10.2 W

– Major Clocks 24 W

– Local unconditional clocks 7.6 W

– Local conditional clocks 15.6

• Clocking accounted for 65% of the total power in the 21264!

Page 26: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 26

The IA-64 (Gen 1)

• IA-64 ISA is successor to the Pentium 4, which was the successor to the Pentium 3/2/1.– 64-bit architecture, all registers 64-bits wide

– 128 General Registers, 128 Floating Point Registers

– G0-G31 are global registers, G32-G127 are part of the “Register Stack” where a dynamic number of them can be allocated as part of procedure call/return and be visible to only that procedure (similar to Sparc register windows).

– Superscalar, maximum issue of 6 instructions per clock

– Supports both speculative branching and speculative loading

• Itanium is the first implementation of the IA-64 ISA.– Executes x86 code (IA-32) with a separate execution engine.

Page 27: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 27

Technology

• 0.18 CMOS

• 25.4 million transistors

• 6 metal layers

• Flip-chip with 1014 pads

Recall that the Alpha had 21264 had 15.2 million transistors

Page 28: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 28

IA-64 Clock Distribution (Gen 1)

DSK – deskew buffers, RCD – Regional Clock Distribution Network

Page 29: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 29

Reference, Core clocks

• On chip PLL generated 2X reference clock which is then divided by two to form a 50% duty cycle core clock– External clock (system clock) is input to PLL

• Both 2X reference clock and core clock is distributed across die via an H tree

Routed in M5/M6

Fully laterally shielded with Vss/VDD

Inductive reflections minimized at branch points by sizing wires to match impedances

Page 30: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 30

Inductance Affects Delay

Delay in Clock distribution metal H-tree network affected by R, C, and L.

For Ghz speed clocks in a metal distribution network, must include L in delay calculations

Inductance adds extra delay in current return pathInductive effects decreased clock buffer delays dues to faster transition rates.

Page 31: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 31

Regional Clock Distribution

• De-skew buffers (DSK), Regional Clock Drivers (RCD), and Region Clock Grid (RGD)

• 30 clock regions serviced by regional clocks

• Regional Clock Grid implemented in M4, M5– Floats over one or more functional units

– Full lateral shielding via Vss/Vdd

Page 32: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 32

Alpha vs IA64 Approach

• Alpha CPU Major Clock = IA 64 Regional clocks– Alpha did not attempt to deskew Major clocks with GCLK

– Alpha used local clocks generated from major clocks and did timing analysis, path delay matching between clocks and data to solve timing problems

• This does NOT account for delays due to on die process variations– At Ghz clock speeds, skew due to on die process variations can cause

timing failures

• IA64 used an ‘active’ distributed deskewing approach for GCLK and Regional Clocks– Wanted to avoid the detailed delay matching, timing analysis required in

the Alpha design after complete implementation because of impact on design schedule

– Account for delay due to on die process variations

Page 33: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 33

Feedback clock!!!

Delay circuit used to control edge alignment of Global clock with Regional Clock.

In general, this is a form of a Digital Delay Locked Loop (DLL). Any form of PLL/DLL must have feedback for correction!

Think of reference clock as the ‘golden’ clock

Page 34: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 34

Regional clock can be gated

Shifting a ‘1’ from one end decreases delay, shifting a ‘0’ from opposite end increases delay (this is a variable delay line).

Delay range was 170 ps in 8.5 ps steps. Phase adjustments made every 16 clock cycles. Could also be adjusted manually via test access port (TAP)

Decoupling caps

Page 35: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 35

Controller for Deskew Buffer Register

Deskew Register adjusted every 16 clock cycles of Reference Clock.

The Deskew buffer is just a simple form of a Delay Locked Loop (DLL).

Page 36: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 36

Why a Reference Clock?

• The goal of the DSK was to deskew the global (core) clock with respect to the regional clocks– Reference clock was 2X core clock

– Regional clocks were simply a delayed version of the global clock

– Reference clock was not deskewed but smaller distribution region and more balanced routing gave less skew in reference clock.

• Not possible to maintain a balance routing network and load matching for core clock over such a large design with multiple design teams since the core clock was driving logic– However, it was possible to design balanced routing network and

have load matching for the reference clock since all it drove were the DSK’s and global clock design team solely responsible for reference clock design

– Feedback clocks from the regional clock distribution were then used to deskew regional clocks with respect to reference clock.

Page 37: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 37

Skew Elements

• Total skew of design based on residual skew in reference clock, uncertainty of phase detector in DSK, and mismatches of feedback clocks– Reference clock did not have as large a distribution region as the

core clock, and loads were better matched, so had tighter skew than would have been possible with global clock

– Feedback clock routes were kept short with respect to DSKs

– Phase detector uncertainty kept small via symmetric layout techniques and by allowing a long time for phase comparison

• Achieved maximum skew was 28 ps (2.8% of a 1 Ghz clock period).

Page 38: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 38

Measured skew via Laser voltage probing

Page 39: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 39

Local Clocks

• Local clocks generated from Regional Clocks and provided clocks needed by domino logic

• Full timing analysis performed on local clocks

• Local clocks responsibility of functional block design teams

• Global and regional clock responsibility of global clock design team

Delay added for time borrowing or to account for skew in local clock

Page 40: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 40

Hold Time Analysis (another look)

TdI includes delay through combinational logic plus hold time on G2

This was called ‘race analysis’ in Alpha notes

Min(Td) max (Skew)

If shortest path from G1 to G2 is less than max Skew, than incorrect value may get clocked into G2 when clock edge arrives at G2.

Page 41: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 41

Four different cases for Max(skew)

LCB = local clock buffer.Common reference means in same DSK cluster

Page 42: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 42

IA-64 Generations 2,3 CPU and CLK

• This lecture uses two papers that discuss the clock and CPU design of the second and third generations of the IA-64– Anderson, F. E., Wells, J. S., Berta, E. Z, “The Core Clock System on the

Next Generation Itanium Processor", ISSCC 2002, pp 453-456.– Tam, S., Desai, U. Limaye, R., “Clock Generation and Distribution for the

Third Generation Itanium Processor ", 2003 Symposium n VLSI Circuits, pp 9-12.

– Stinson, J., Rusu, S., “A 1.5GHz Third Generation Itanium Processor”, ISSCC 2003, paper 14.4.

– The implementation of the Itanium 2 microprocessor Naffziger, S.D.; Colon-Bonet, G.; Fischer, T.; Riedlinger, R.; Sullivan, T.J.; Grutkowski, T.; Solid-State Circuits, IEEE Journal of , Volume: 37 Issue: 11 , Nov. 2002 Page(s): 1448 -1460

• All notes in this lecture are from these four papers.

Page 43: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 43

Clock Comparison of three generations of IA-64

Page 44: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 44

Comments

• Active de-skewing used in 1st generation jettisoned in 2nd generation– 2nd generation just used a balanced H-tree

– Difficult to route this type of structure - all clock routing was reserved prior to block layout

– Differential clocks used for 2nd level clock distribution – reduced jitter

– Non-active de-skew easier to test, and more deterministic behavior

– Intentional clock skewing for time borrowing easier

• 3rd generation uses programmable fuses for skewing– allows skew adjustment after fabrication

Page 45: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 45

2nd Generation Clock distribution

Gated clocksdifferential clocks

Page 46: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 46

2nd Generation Clock Shielding

This level reduces inductive effects.

Locates gnd current return close to clock lines.

CLK+ CLK-

Page 47: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 47

3rd Generation Distribution

Copper interconnect used, extra performance headroom

Page 48: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 48

Fuse-Based De-skewing69 fuses controlling 23 clock zones.

Delay increments in 30.5 ps over 220 ps range.

Exhaustive search for best fuse settings not possible, use a generic search algorithm with statistical history to help; done during production sort.

SLCB = second level clock buffer

Page 49: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 49

Results of Skew Adjustment

Made a big difference here. Skew reduced from 60ps to 24 ps.

Page 50: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 50

90 nm IA Microprocessor (2003)

Global clock distribution scaled up to 6 GHz

Used a clock distributed by H-tree, but shorted clock nodes at about every third level in order to reduce the skew. No active de-skew or fused-based de-skew.

Page 51: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 51

90 nm IA Microprocessor (2003) (cont)

Skew attenuation nodes are shorted

Page 52: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 52

90 nm, Dual-Core Itanium (2005)Up to 2.5 GHz, used region-based, active de-skew

active de-skew

2nd-level clock buffer

drives 200 CVDs (clock vernier devices)

Page 53: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 53

90 nm, Dual-Core Itanium (2005) (cont)

Each 2nd- level clock buffer can dynamically adjust its delay by up to 128 ps with 1 ps resolution

Each clock vernier device (CVD) gave an additional 70 ps of skew adjustment

delay at each clocking level and power consumption – note the number of end points! Post gater delay matching handled by designers

Page 54: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 54

Xeon Dual-core (2006/65 nm) 3.4 GHz (Tulsa) – two different clock systems

–Core clocks (clocks for processor cores) uses same core clock scheme as used in Xeon Single Core (2003,/90 nm). This clock scheme was designed to scale up to 6 GHz, and used a H-tree distributed clock with shorted nodes that had produced less than 10 ps skew. No active de-skew or fuse-based de-skew.

–Un-core clock (everything outside the core) – Cache, bus logic, etc. Large area prevented use of gridded clock (power restriction), used a clock tree (9 vertical, 2 horizontal) with fuse-based deskew at root of each vertical spine. Achieved less than 11 ps skew.

Top measured frequency: 3.4 GHz

Page 55: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 55

Dual Core die photograph

Page 56: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 56

Clock Domains

Page 57: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 57

Clock Generator Arch.

Page 58: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 58

Clock Distribution

Zclk is the IO clock

Fused-based deskew buffers located at the root of the vertical MCLK spines

Page 59: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 59

Clock Hierarchy

Page 60: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 60

Core to Un-Core deskew

Core Clock Un-core clock

Core and un-core clocks are aligned, this just de-skews the data

different VCCs – Core 1.25 V, uncore – 1.10 V

Page 61: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 61

IO Bus to un-core clock domain

IO-bus and Un-core clock at 8 to N (N is integer multiple of 200 MHz)

Page 62: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 62

Global Skew

Skew < 10 ps

Page 63: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 63

Power

Page 64: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 64

Papers–Gronowski, Paul E., et.al., “High Performance Microprocessor Design”, IEEE Journal of Solid-State Circuits, Vol. 33, No. 5, May 1998, pp. 676-686–Bailey, Daniel W. and Bradley J. Benschneider, “Clocking Design and Analysis for a 600-Mhz Alpha Microprocessor”, IEEE Journal of Solid-State Circuits, Vol. 33, No. 11, November 1998, pp. 1627-1633

–Tam, S. et.al, "Clock Generation and distribution for the First IA-64 microprocessor", IEEE Journal of Solid State Circuits, Vol 35, Issue 11, Nov 2000.– Rusu, S. and Singer G, "The first IA-64 microprocessor ", IEEE Journal of Solid State Circuits, Vol 35, Issue 11, Nov 2000.–Anderson, F. E., Wells, J. S., Berta, E. Z, “The Core Clock System on the Next Generation Itanium Processor", ISSCC 2002, pp 453-456.– Tam, S., Desai, U. Limaye, R., “Clock Generation and Distribution for the Third Generation Itanium Processor ", 2003 Symposium n VLSI Circuits, pp 9-12.–Stinson, J., Rusu, S., “A 1.5GHz Third Generation Itanium Processor”, ISSCC 2003, paper 14.4.–The implementation of the Itanium 2 microprocessor Naffziger, S.D.; Colon-Bonet, G.; Fischer, T.; Riedlinger, R.; Sullivan, T.J.; Grutkowski, T.; Solid-State Circuits, IEEE Journal of , Volume: 37 Issue: 11 , Nov. 2002 Page(s): 1448 -1460

–A 90-nm variable frequency clock system for a power-managed itanium architecture processor, Fischer, T.; Desai, J.; Doyle, B.; Naffziger, S.; Patella, B.; Solid-State Circuits, IEEE Journal of Volume 41, Issue 1, Jan. 2006 Page(s):218 – 228 Digital Object Identifier 10.1109/JSSC.2005.859879 –Clock distribution on a dual-core, multi-threaded Itanium/sup /spl reg//-family processor, Mahoney, P.; Fetzer, E.; Doyle, B.; Naffziger, S.; Solid-State Circuits Conference, 2005. Digest of Technical Papers. ISSCC. 2005 IEEE International 6-10 Feb. 2005 Page(s):292 - 599 Vol. 1 Digital Object Identifier 10.1109/ISSCC.2005.1493984

Page 65: BR 6/071 Clock Distribution – from Past to Present A synchronous system needs a clock which signals are synchronized with Clock distribution network: goal

BR 6/07 65

Papers (cont)

–Scalable sub-10ps skew global clock distribution for a 90nm multi-GHz IA microprocessor Bindal, N.; Kelly, T.; Velastegui, N.; Wong, K.L.; Solid-State Circuits Conference, 2003. Digest of Technical Papers. ISSCC. 2003 IEEE International 2003 Page(s):346 - 498 vol.1 Digital Object Identifier 10.1109/ISSCC.2003.1234329 –A 65-nm Dual-Core Multithreaded Xeon® Processor With 16-MB L3 Cache Rusu, S.; Tam, S.; Muljono, H.; Ayers, D.; Chang, J.; Cherkauer, B.; Stinson, J.; Benoit, J.; Varada, R.; Leung, J.; Limaye, R. D.; Vora, S.; Solid-State Circuits, IEEE Journal of Volume 42, Issue 1, Jan. 2007 Page(s):17 – 25 Digital Object Identifier 10.1109/JSSC.2006.885041 –Clock Generation and Distribution of a Dual-Core Xeon Processor with 16MB L3 Cache Tam, S.; Leung, J.; Limaye, R.; Choy, S.; Vora, S.; Adachi, M.; Solid-State Circuits, 2006 IEEE International Conference Digest of Technical Papers Feb. 6-9, 2006 Page(s):1512 - 1521