PAKET : 3,225 0,000 I MATERIAL UTAMA 1 Tiang besi 11 mtr 200 daN Btg 77,00 77,0 2 Isolator tumpu 20 kV Bh 198,00 198,0 3 Isolator tarik 20 kV Bh 87,00 87,0 4 Cut Out 20 kV + Fuse Bh 3,00 3,0 5 Lighting Arester 20 kV Bh 3,00 3,0 6 Konduktor AAAC 70 mm2 kms 3,225 3,225 II MATERIAL NON UTAMA 1 Perlengkapan druck schoor set 6,00 6,0 2 Perlengkapan kontramast set 2,00 2,0 3 Treck schoor set 39,00 39,0 4 Cross Arm UNP 100 (Balance) : a. Type A1 set 39,00 39,0 b. Type A2 set 10,00 10,0 c. Type A3 set 17,00 17,0 d. Type B3 set 3,00 3,0 5 H. Type Conector 70 mm2 Bh 42,00 42,0 6 Alluminium Bending wire Mtr 297,00 0,00 297,0 7 Joint sleeve 70 mm2 Bh 12,00 12,0 8 Penghalang panjat Bh 31,00 31,0 9 Tanda kilat Bh 69,00 0,00 69,0 10 Arde Arester Set 1,00 1,0 11 Beton kaki tiang Btg 77,00 0,00 77,00 III PEKERJAAN PERSIAPAN 1 Angkutan Material m3 16,569 0,000 16,57 2 Angkutan Tiang Besi Btg 77,000 0,000 77,00 3 Pembersihan Trace Kms 3,225 0,000 3,23 IV PEKERJAAN FINISHING 1 Foto dokumentasi Lbr 16,00 16,0 2 Gambar revisi Lbr 8,00 8,0 3 Pengecatan tiang Btg 77,00 0,00 77,0 4 Komisioning Kms 3,225 0,000 3,23 BILL OF QUANTITY (BQ) PER LOKASI PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV KABUPATEN MANGGARAI DESA COMPANG CIBAL KEC. CIBAL 024.DL/611/LISDES.NTT/2015 NO. JENIS MATERIAL STN DESA COMPANG CIBAL KEC. CIBAL 0 JUMLAH

Upload: shinobiinfiltran

Post on 17-Jan-2016

247 views

Category:

Documents


0 download

DESCRIPTION

BQ 024 Compang Cibal

TRANSCRIPT

Page 1: BQ 024 Compang Cibal

PAKET :

3,225 0,0001 1

I MATERIAL UTAMA

1 Tiang besi 11 mtr 200 daN Btg 77,00 77,0

2 Isolator tumpu 20 kV Bh 198,00 198,0

3 Isolator tarik 20 kV Bh 87,00 87,0

4 Cut Out 20 kV + Fuse Bh 3,00 3,0

5 Lighting Arester 20 kV Bh 3,00 3,0 6 Konduktor AAAC 70 mm2 kms 3,225 3,225

II MATERIAL NON UTAMA

1 Perlengkapan druck schoor set 6,00 6,0

2 Perlengkapan kontramast set 2,00 2,0

3 Treck schoor set 39,00 39,0

4 Cross Arm UNP 100 (Balance) :

a. Type A1 set 39,00 39,0

b. Type A2 set 10,00 10,0

c. Type A3 set 17,00 17,0

d. Type B3 set 3,00 3,0

5 H. Type Conector 70 mm2 Bh 42,00 42,0

6 Alluminium Bending wire Mtr 297,00 0,00 297,0

7 Joint sleeve 70 mm2 Bh 12,00 12,0

8 Penghalang panjat Bh 31,00 31,0

9 Tanda kilat Bh 69,00 0,00 69,0

10 Arde Arester Set 1,00 1,0

11 Beton kaki tiang Btg 77,00 0,00 77,00

III PEKERJAAN PERSIAPAN

1 Angkutan Material m3 16,569 0,000 16,57

2 Angkutan Tiang Besi Btg 77,000 0,000 77,00

3 Pembersihan Trace Kms 3,225 0,000 3,23

IV PEKERJAAN FINISHING

1 Foto dokumentasi Lbr 16,00 16,0

2 Gambar revisi Lbr 8,00 8,0

3 Pengecatan tiang Btg 77,00 0,00 77,0

4 Komisioning Kms 3,225 0,000 3,23

BILL OF QUANTITY (BQ) PER LOKASI

PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV

KABUPATEN MANGGARAI

DESA COMPANG CIBAL KEC. CIBAL

024.DL/611/LISDES.NTT/2015

NO. JENIS MATERIAL STN

DESA COMPANG CIBAL

KEC. CIBAL0

JUMLAH

Page 2: BQ 024 Compang Cibal

PAKET :

1,00 0,001 1

I MATERIAL UTAMA

1 Tiang besi 11 mtr 200 daN Btg 1,00 1,0

2 Isolator tumpu 20 kV Bh 3,00 3,0

3 Cut Out 20 kV + Fuse Bh 3,00 0,00 3,0

4 Lighting Arester 20 kV Bh 3,00 0,00 3,0

5 Trafo 3 phs 50 kVA - 20 kV Bh 1,00 0,00 1,0

II MATERIAL NON UTAMA

1 Penghalang panjat Bh 1,00 0,00 1,0

2 Tanda kilat Bh 1,00 0,00 1,0

3 Rangka Dudukan u/.trafo 3 phs Set 1,00 0,00 1,0

4 Cross Arm type A1 Set 1,00 0,00 1,0

5 Cross Arm u/ dudukan CO Set 1,00 0,00 1,0

6 Cross Arm u/ dudukan Arester Set 1,00 0,00 1,0

7 LV Board 3 phs 1 tiang Set 1,00 0,00 1,0

8 Pipa Inlet-Outlet Medium B + Invoring Set 1,00 0,00 1,0

9 Alluminium Bending wire Mtr 4,50 0,00 4,5

10 Arde Gardu (5 Ohm) Set 1,00 0,00 1,0

11 Arde Arrster ( 3 Ohm) Set 1,00 0,00 1,0

12 Lantai Kerja Bh 1,00 0,00 1,000

13 paralel Grove u/ jumper TM Bh 6,00 0,00 6,0

14 Kabel NYY 50 mm2 mtr 96,00 0,00 96,0

15 Sepatu Kabel AL-CU 35-50 mm2 Bh 4,00 0,00 4,0

16 Sepatu Kabel CU 50 mm2 Bh 16,00 0,00 16,017 Beton kaki tiang Btg 1,000 0,000 1,000

III PEKERJAAN PERSIAPAN

1 Pengedropan Material m3 1,56 0,00 1,56

2 Pengedropan Tiang Besi btg 1,00 0,00 1,00

IV PEKERJAAN FINISHING

1 Foto dokumentasi Lbr 2,00 0,00 2,0

2 Pengecatan tiang Btg 1,00 0,00 1,0

3 Penomoran tiang Btg 1,00 0,00 1,0

4 Komisioning Bh 1,00 0,00 1,0

JUMLAH

DESA COMPANG CIBAL

KEC. CIBAL0

BILL OF QUANTITY (BQ) PER LOKASI

PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV

KABUPATEN MANGGARAI

DESA COMPANG CIBAL KEC. CIBAL

024.DL/611/LISDES.NTT/2015

NO. JENIS MATERIAL STN

Page 3: BQ 024 Compang Cibal

PAKET :

4,153 0,000

I MATERIAL UTAMA

1 Tiang besi 9 mtr 100 daN Btg 64,00 0,00 64,0

3 LVTC 3 x 50 + 1 x 35 mm2 km 4,153 0,000 4,153

II MATERIAL NON UTAMA

1 Perlengkapan druck schoor Set 5,00 0,00 5,0

2 Perlengkapan kontramast Set 3,00 0,00 3,0

3 Treck schoor Set 19,00 0,00 19,0

4 Beton kaki tiang btg 64,000 0,000 64,000

ACCESSORIES LVTC :

5 Suspension Assembly Set 58,00 0,00 58,0

6 Large Angle Assembly Set 30,00 0,00 30,0

7 Fixed Dead End Assembly Set 5,00 0,00 5,0

8 Adjustable Dead End Assembly Set 5,00 0,00 5,0

9 Bundle End Protection Set 5,00 0,00 5,0

10 Bimetalic joint NYY-LVTC Bh 8,00 0,00 8,0

11 Joint Sleves Bh 20,00 0,00 20,0

12 Arde TR ( 5 ohm ) Set 8,00 0,00 8,0

13 Tap Conector Bh 12,00 0,00 12,0

III PEKERJAAN PERSIAPAN

1 Pengedropan Material m3 7,89 0,00 7,89

2 Pengedropan Tiang Besi Btg 64,00 0,00 64,00

3 Pembersihan Trace kms 4,153 0,000 4,153

IV PEKERJAAN FINISHING

1 Foto dokumentasi Lbr 16,00 0,00 16,0

2 Gambar revisi Lbr 8,00 0,00 8,0

3 Penomoran tiang Btg 93,00 0,00 93,0

4 Pengecatan tiang Btg 64,00 0,00 64,0

5 Percobaan / testing kms 4,153 0,000 4,153

0

024.DL/611/LISDES.NTT/2015

NO. JENIS MATERIAL STN JUMLAH

DESA COMPANG CIBAL

KEC. CIBAL

BILL OF QUANTITY (BQ) PER LOKASI

PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)

KABUPATEN MANGGARAI

DESA COMPANG CIBAL KEC. CIBAL

Page 4: BQ 024 Compang Cibal

SATUAN KERJA LISTRIK PERDESAAN

PROVINSI NUSA TENGGARA TIMUR

I JARINGAN TEGANGAN MENENGAH

- PENGADAAN

- PEMASANGAN

II GARDU DISTRIBUSI 1 50

- PENGADAAN

- PEMASANGAN

III JARINGAN TEGANGAN RENDAH

- PENGADAAN

- PEMASANGAN

Terbilang :

KMS 4,153

KMS 3,225

BH/KVA

024.DL/611/LISDES.NTT/2015

NO URAIAN SATUAN VOLUMEJUMLAH HARGA

RP

PT. PLN (PERSERO)

REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)

PEMBANGUNAN JARINGAN DISTRIBUSI DAN GARDUKABUPATEN MANGGARAI

DESA COMPANG CIBAL KEC. CIBAL

Page 5: BQ 024 Compang Cibal

PAKET 012 A3C 70 mm2 = 3,225 kms

SA- JUMLAH

NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA

AN RP RP RP RP RP

I MATERIAL UTAMA

1 Tiang besi 11 meter 200 daN Btg 77

2 Isolator tumpu 20 kV Bh 198

3 Isolator tarik 20 kV Bh 87

4 Cut Out 20 kV + Fuse Bh 3

5 Lighting Arester 20 kV Bh 3

6 Konduktor AAAC 70 mm2 kms 3,225

II MATERIAL NON UTAMA

1 Perlengkapan druck schoor set 6

2 Perlengkapan kontramast set 2

3 Treck schoor set 39

4 Cross Arm UNP 100 (Balance) :

a. Type A1 set 39

b. Type A2 set 10

c. Type A3 set 17

d. Type B3 set 3

5 H. Type Conector 70 mm2 Bh 42

6 Alluminium Bending wire Mtr 297,000

7 Joint sleeve 70 mm2 Bh 12

8 Penghalang panjat Bh 31

9 Tanda kilat Bh 69

10 Arde TM u/ Arrester Set 1

11 Beton kaki tiang Btg 77

III PEKERJAAN PERSIAPAN

1 Angkutan Material m3 16,570

2 Angkutan Tiang Besi Btg 77

3 Pembersihan Trase Kms 3,225

IV PEKERJAAN FINISHING

1 Foto dokumentasi Lbr 30

2 Gambar Lbr 8

3 Pengecatan tiang Btg 77

4 Komisioning Kms 3,225

SUB. JUMLAH Rp

PPN 10 % Rp

JUMLAH Rp

DIBULATKAN Rp

VOLUME

HARGA SATUAN HARGA BAGIAN

RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV

KABUPATEN MANGGARAIDESA COMPANG CIBAL KEC. CIBAL

024.DL/611/LISDES.NTT/2015

Page 6: BQ 024 Compang Cibal

PAKET 012 TRAFO 3 PHS 50 KVA = 1 BH

SA- JUMLAH

NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA

AN RP RP RP RP RP

I MATERIAL UTAMA

1 Tiang besi 11 meter 200 daN Btg 1

2 Isolator tumpu 20 kV Bh 3

3 Cut Out 20 kV + Fuse Bh 3

4 Lighting Arester 20 kV Bh 3

5 Trafo 3 phs 50 kVA - 20 kV Bh 1

II MATERIAL NON UTAMA

1 Penghalang panjat Bh 1

2 Tanda kilat Bh 1

3 Rangka Dudukan u/.trafo 3 phs Set 1

4 Cross Arm type A1 Set 1

5 Cross Arm u/ dudukan CO Set 1

6 Cross Arm u/ dudukan Arester Set 1

7 LV Board 3 phs 1 tiang 2 Jurusan 2 Pintu Set 1

8 Pipa Inlet-Outlet Medium B + Invoring Set 1

9 Alluminium Bending wire Mtr 4,50

10 Arde Gardu Set 1

11 Arde TM u/ Arrester Set 1

12 Pondasi Lantai Kerja Bh 1

13 Paralel Grove 35 - 70 mm Bh 6

14 Kabel NYY 50 mm2 mtr 96,00

15 Sepatu Kabel AL-CU 35-50 mm2 Bh 4

16 Sepatu Kabel CU 50 mm2 Bh 16

17 Beton kaki tiang Btg 1

III PEKERJAAN PERSIAPAN

1 Pengedropan Material m3 1,56

2 Pengedropan Tiang Besi btg 1

IV PEKERJAAN FINISHING

1 Foto dokumentasi Lbr 2

2 Penomoran Tiang Btg 1

3 Penomoran Tiang Btg 1

4 Komisioning Bh 1

SUB. JUMLAH Rp

PPN 10 % Rp

JUMLAH Rp

DIBULATKAN Rp

RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV

KABUPATEN MANGGARAIDESA COMPANG CIBAL KEC. CIBAL

024.DL/611/LISDES.NTT/2015

VOLUME

HARGA SATUAN HARGA BAGIAN

Page 7: BQ 024 Compang Cibal

PAKET 012 LVTC 3X50+1X35 MM2 = 4,153 KMS

SA- JUMLAH

NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA

AN RP RP RP RP RP

I MATERIAL UTAMA

1 Tiang besi 9 mtr 100 daN Btg 64

3 LVTC 3 x 50- + 1 x 35 mm2 km 4,153

II MATERIAL NON UTAMA

1 Perlengkapan druck schoor Set 5

2 Perlengkapan kontramast Set 3

3 Treck schoor Set 19

4 Beton kaki tiang btg 64

ACCESSORIES LVTC :

5 Suspension Assembly Set 58

6 Large Angle Assembly Set 30

7 Fixed Dead End Assembly Set 5

8 Adjustable Dead End Assembly Set 5

9 Bundle End Protection Set 5

10 Bimetalic Joint 50 mm2 Bh 8

11 Joint Sleves 50 mm2 Bh 20

12 Arde TR ( 5 ohm ) Set 8

13 Tap Conector Bh 12

III PEKERJAAN PERSIAPAN

1 Pengedropan Material m3 7,890

2 Pengedropan Tiang Besi Btg 64

3 Pembersihan Trase kms 4,153

IV PEKERJAAN FINISHING

1 Foto dokumentasi Lbr 16

2 Gambar revisi Lbr 8

3 Penomoran tiang Btg 93

4 Pengecatan tiang Btg 64

5 Komisioning kms 4,153

SUB. JUMLAH Rp

PPN 10 % Rp

JUMLAH Rp

DIBULATKAN Rp

VOLUME

HARGA SATUAN HARGA BAGIAN

RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)

KABUPATEN MANGGARAIDESA COMPANG CIBAL KEC. CIBAL

024.DL/611/LISDES.NTT/2015

Page 8: BQ 024 Compang Cibal

JUMLAH HARGA

(Rp)

I MATERIAL

1 Tiang besi 11 meter 200 daN Btg 78 2 Isolator tumpu 20 kV Bh 201 3 Isolator tarik 20 kV Bh 87 4 Cut Out 20 kV + Fuse Bh 3

5 Lighting Arester 20 kV Bh 3 6 Konduktor AAAC 70 mm2 km 9,869

JUMLAH I

II ANGKUTAN

1 Tiang besi 11 meter 200 daN btg 78 2 Isolator tumpu 20 kV m3 2,874 3 Isolator tarik 20 kV m3 2,010 4 Cut Out 20 kV + Fuse m3 0,025 5 Lighting Arester 20 kV m3 0,025 6 Konduktor AAAC 70 mm2 m3 1,974

JUMLAH II

TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN

Terbilang ;

RENCANA ANGGARAN BIAYA (RAB)

PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kVKABUPATEN MANGGARAI

DESA COMPANG CIBAL KEC. CIBAL024.DL/611/LISDES.NTT/2015

NO URAIAN STN VOLHARGA SATUAN

(Rp)

Page 9: BQ 024 Compang Cibal

JUMLAH HARGA(Rp)

I MATERIAL

1. Trafo 3 P 50 KVA 20 KV - B2 Buah 1 - 2. Cut Out 20 KV 100 A + Fuse Link Bh 3 - 3. L Arrester 20 KV 10 kA Bh 3 -

JUMLAH I

II ANGKUTAN

1. Trafo 3 P 50 KVA 20 KV - B2 m3 0,693

2. Cut Out 20 KV 100 A + Fuse Link m3 0,069

3. L Arrester 20 KV 10 kA m3 0,025

JUMLAH II

TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN

Terbilang ;

RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV

KABUPATEN MANGGARAIDESA COMPANG CIBAL KEC. CIBAL

024.DL/611/LISDES.NTT/2015

NO URAIAN STN VOLHARGA SATUAN

(Rp)

Page 10: BQ 024 Compang Cibal

JUMLAH HARGA(Rp)

I MATERIAL1 Tiang Besi 9 meter 100 daN btg 64 2 LVTC 3 X 50+1X35 mm2 km 4,236

JUMLAH I

II ANGKUTAN

1 Tiang Besi 9 meter 100 daN btg 64 2 LVTC 3 X 50+1X35 mm2 m3 5,083

JUMLAH II

TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN

Terbilang ;

RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)

KABUPATEN MANGGARAIDESA COMPANG CIBAL KEC. CIBAL

NO JENIS MATERIAL STN VOLHARGA SATUAN

(Rp)

Page 11: BQ 024 Compang Cibal

LOKASI : AREA FLORES BAGIAN BARAT

TRAFO

NO. KABUPATEN / KECAMATAN DESA/DUSUN A3C LVTC 3 x 50 + KET.

3 x 70 1 x 35

mm2 mm2 BH KVA

1. KABUPATEN MANGGARAI

DESA COMPANG CIBAL KEC. CIBAL3,225 4,153 1 50

3,225 4,153 1 50

JUMLAH --------->>

DAFTAR LOKASI PEKERJAAN JARDIS. TAHUN 2015LISTRIK PERDESAAN NUSA TENGGARA TIMUR

KONDUKTOR

JENIS MATERIAL / V O L U M E

50 KVA

Page 12: BQ 024 Compang Cibal

PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT

JUMLAH

URAIAN STN VOLUME HARGA

( Rp.) (Rp.)

1 Type A1 Balance UNP 100x50x5x2000

1 UNP 100x50x5x2000 mm Btg 1

2 Pole band 1/2, 4" (6x50) Bh 1

3 Pole band 2/2, 4" (6x50) set 1

4 Arm Tie ( Besi L. 50x4x1270 mm) btng 1

5 Steel plat type 2 bh 2

6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 5

7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 2

Jumlah

Pembulatan

2 Type A2 Balance UNP 100x50x5x2000

1 UNP 100x50x5x2000 mm Btg 2

2 Pole band 2/2, 4" (6x50) bh 2

3 Steel Plate typre I (6x100x37,5) bh 4

4 Steel Plate typre II (6x100x12) bh 4

5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1

6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3

7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14

Jumlah

Pembulatan

3 Type A3 Balance UNP 100x50x5x2000

1 UNP 100x50x5x2000 mm btng 2

2 Pole band 2/2, 4" (6x50) bh 2

3 Steel Plate typre I (6x100x37,5) bh 4

4 Steel Plate typre II (6x100x12) bh 4

5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1

6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3

7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14

Jumlah

Pembulatan

4 Type B3 Balance UNP 100x50x5x2200

1 UNP 10x50x5x2200 mm btng 2

2 Pole band 2/2, 4" (6x50) set 2

3 Steel Plate typre I (6x100x37,5) bh 6

4 Bollt & nut 5/8 x 140 + ring (galvanis) bh 12

5 Bollt & nut 5/8 x200 + 4 mur (galv) bh 4

Jumlah

Pembulatan

5 Treck scoor - Guy Wire TM

1 Stall drad 64 mm2 mtr 15

2 Pole band 2/2, 4" (6x50) set 1

3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 2

4 Spanschroef 3/4" / Turn Bucle 50 KN bh 1

5 Guy isolator/tui isolator bh 1

6 Wire clip/cros by 35 mm2 bh 4

7 Stay road 16 mm2 panjang = 2500 mm (anker) btng 1

8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 2

9 Beton Block 40x40x10 bh 1

10 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1

Jumlah

Pembulatan

6 Kontramast - Horizontal Guy Wire

1 Stall drad 64 mm2 mtr 26

2 Pole band 2/2, 4" (6x50) set 2

3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4

4 Spanschroef 3/4" / Turn Bucle 50 KN bh 2

5 Guy isolator/tui isolator bh 2

6 Wire clip/cros by 12 mm2 bh 6

7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1

8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4

9 Beton Block 40 cmx40 cmx10 cm bh 1

10 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1

Jumlah

Pembulatan

ANALISA HARGA SATUAN MATERIAL AKSSESORIS

TAHUN 2015

HARGA SATUANHARGA BAGIAN

NO.

( Rp.)

Page 13: BQ 024 Compang Cibal

7 Druck Schoor TM

1 Pole band galvanise 1/2 4" bh 1

2 Pole band galvanise 2/2 4" (atas) bh 2

3 Pole band galvanise 2/2 8' (bawah) u/sekang bh 2

4 Pipa galvanise Diameter 2"- panajang 2000 mm btng 1

5 Besi UNP 100x50x5x200 mm u/stop druck btng 1

6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9

Jumlah

Pembulatan

1 M2 CAT TIANG BESI

Cat dasar Kg 0,1

Minyak cat Ltr 0,05

Cat besi Kg 0,15

kuas Lbr 0,1

Pekerja HO 0,3

Mandor HO 0,125

Tukang HO 0,25

Jumlah

Pembulatan

8 Pengecatan T. besi 9 mtr (1 batang) - Material m2/btg 2,814

Upah m2/btg 2,814

Jumlah

Pembulatan

9 Pengecatan T. besi 11 mtr (1 batang) - Material m2/btg 4,691

Upah m2/btg 4,691

Jumlah

Pembulatan

8 ARDE ARESTER

1 Grounding Rod 16 mm2 L = 1750 mm bh 2,00

2 BC 50 mm2 Mtr 15,00

3 Pipa Galvanis 1/2" L= 6000 mm Btg 1,00

4 Klem Steinless Steel 4 titik mtr 4,00

5 Connector CU 35 - 50 mm2 Buah 3,00

6 Stoping Bukle bh 4,00

7 Link 25 x 25 bh 4,00

Jumlah

Pembulatan

9 ARDE GARDU

1 Grounding Rod 16 mm2 L = 1750 mm bh 1,00

2 BC 50 mm2 Mtr 11,00

3 Pipa Galvanis 1/2" L = 2000 mm bh 1,00

4 Klem Steinless Steel 4 titik mtr 4,00

5 Connector Cu 35 - 50 mm mm2 bh 2,00

6 Sepatu Kabel CU 50 mm2 bh 1,00

7 Stoping Bukle bh 4,00

8 Link bh 4,00

Jumlah

Pembulatan

10 RANGKA DUDUKAN TRAFO 25-50 KVA (CANTOL) :

1 UNP 100 x 45x4x1500 mm galv Btg 2,00

2 UNP 100 x 45x4x750 mm galv Btg 2,00

3 UNP 100 x 45x4x 600mm galv btg 2,00

4 Arm tie galvanise 50x50x5 1000 mm btg 2,00

5 Arm tie galvanise 50x50x5 1200 mm btg 2,00

6 Bolt nut + plat & spring plat 5/8" 300 mm bh 2,00

7 Bolt nut + plat & spring plat 5/8" 50 mm bh 18,00

8 Pole band 1/2 6" u penahan dudukan trafo bh 4,00

Jumlah -

Pembulatan -

11 TRAVERS UNTUK CUT OUT DAN ARRESTER :

1 UNP 100x50x5x2000 mm u/dudukan CO dan Arester btg 1,00

2 Pole band 1/2, 4" (6 X 70) bh 1,00

3 Bolt nut + plat & spring plat 5/8" 50 mm bh 2,00

Jumlah

Pembulatan

12 BETON BLOCK UNTUK SCHOOR TARIK

1 Beton Cor : 1 ; 2 ; 3 (40cmx40 cm x10 cm) M3 0,0160

2 Besi Beton 16 mm2 Galvanis L=2500 mm btg 1,0000

3 U. Bolt 3/4" Buah 1,00

Jumlah -

Pembulatan -

Page 14: BQ 024 Compang Cibal

13 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu

1 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu set 1,00

2 UNP 100 x 50x100 mm L 1000 mm galv btg 2,00

3 Pole band 1/2, 7" bh 2,00

4 Bolt nut + plat & spring plat 5/8" 50 mm bh 4,00

Jumlah -

Pembulatan

14 Pipa Inlet / Oulet Gardu

1 Pipa 2" Galvanise btg 3,00

2 L - bow pipa PVC 2" u/ bagian atas bh 3,00

3 UNP 100 x 50 x 5 x 500 mm u/ dudukan pipa galv btng 2,00

4 Pole band 1/2 4" bh 2,00

5 Pole band 1/2 2" bh 6,00

6 Bolt nut + plat & spring plat 5/8" 50 mm bh 16,00

Jumlah

Pembulatan

15 PONDASI COR BETON MANSET :

1 M3 COR BETON 1:2:3 :

1 Semen (PC) Zak 8,30

2 Kerikil Beton M3 0,83

3 Pasir Pasangan M3 0,54

4 Pekerja Org 6,00

5 Tukang Batu Org 1,00

6 Kepala Tukang Org 0,10

7 Mandor Org 0,30

Jumlah

Pembulatan

8 Cor Kaki Tiang Besi 11 mtr 200 daN m3 0,118

9 Cor Kaki Tiang Besi 9 mtr 100 daN m3 0,093

10 Cor Lantai Kerja Gardu 120cm x 100 cm x 10 cm m3 0,269

Jumlah

Pembulatan

16 1 M3 GALIAN TANAH BIASA SEDALAM 2 M :

1 Pekerja OH 0,667

2 Tukang Batu OH 0,333

3 Tukang Listrik OH

4 Mandor OH 0,333

Jumlah

Pembulatan

17 1 M3 GALIAN BATU CADAS SEDALAM 2 M :

1 Pekerja OH 2,500

2 Tukang Batu OH 1,250

3 Tukang Listrik OH

4 Mandor OH 1,250

Jumlah

Pembulatan

18 1 M3 URUGAN KEMBALI :

1 Pekerja OH 0,400

2 Tukang Batu OH -

3 Kepala Tukang OH -

4 Mandor OH 0,200

Jumlah

Pembulatan

19 1 M3 PEMADATAN TANAH :

1 Pekerja OH 0,250

2 Tukang Batu OH

3 Kepala Tukang OH

4 Mandor OH 0,125

Jumlah

Pembulatan

RATA2 GALIAN PER M3 NTT(1/2 CADAS+1/2 TANAH) m3 1,00

Volumer galian satu lubang tiang 11m 200 daN m3 0,45

Volumer galian satu lubang tiang 9m 100 daN m3 0,38

Mendirikan tiang 11 m 200 daN

Pekerja HO 0,50

Tukang Listrik HO 0,13

Mandor HO 0,13

Jumlah

Pembulatan

Mendirikan tiang 9 m 100 daN

Pekerja HO 0,33

Tukang Listrik HO 0,08

Mandor HO 0,08

Jumlah

Pembulatan

Page 15: BQ 024 Compang Cibal

20 MENDIRIKAN TIANG 11 M 200 daN PERMANENT btg 1

21 MENDIRIKAN TIANG 9 M 100 daN PERMANENT btg 1

22 Alluminium Bending wire mtr 1

23 Joint sleeve 70 mm2 bh 1

24 Penghalang panjat bh 1

25 Tanda kilat Kecil bh 1

26 Tanda kilat Besar u. Gardu bh 1

27 Parel Grove 35-70 mm bh 1

28 Sepatu Kabel Cu 50 mm bh 1

29 Sepatu Kabel AL-CU 35-50 mm bh 1

Page 16: BQ 024 Compang Cibal

PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT

JUMLAH

NO. URAIAN STN VOL HARGA

( Rp.) ( Rp.) (Rp.)

1 Suspension Assembly

1 Suspension Clamp bh 1

2 Pole Bracket bh 1

3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

4 Stopping bukle bh 2

5 Plastic strip bh 3

Jumlah

Pembulatan

2 Large Angle Assembly

1 Strain Clamp 25 - 70 bh 2

2 Pole Bracket bh 1

3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

4 Stopping bukle bh 2

5 Plastic strip bh 3

Jumlah

Pembulatan

3 Fixed Dead And Assembly

1 Strain Clamp 25 - 70 bh 1

2 Pole Bracket bh 1

3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

4 Stopping bukle bh 2

5 Plastic strip bh 2

Jumlah

Pembulatan

4 Adjustable Dead And Assembly

1 Strain Clamp 25 - 70 bh 1

2 Pole Bracket bh 1

3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

4 Stopping bukle bh 2

5 Plastic strip bh 2

6 Turn Buckle/Span Scroef bh 1

Jumlah

Pembulatan

5 Bundle Protection

1 Pipa PVC 2" 50 cm bh 1

2 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

3 Stopping bukle Bh 2

4 Link Set 2

5 End cap Set 4

Jumlah

Pembulatan

ANALISA HARGA SATUAN MATERIAL SUTR

TAHUN 2015

HARGA

SATUAN

HARGA

BAGIAN

Page 17: BQ 024 Compang Cibal

PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT

JUMLAH

NO. URAIAN STN VOL HARGA

( Rp.) ( Rp.) (Rp.)

ANALISA HARGA SATUAN MATERIAL SUTR

TAHUN 2015

HARGA

SATUAN

HARGA

BAGIAN

6 Treck scoor - Guy Wire TR1 Stall drad 35 mm2 mtr 11 2 Pole band 2/2" dia 4" (45 x 4 mm) bh 1 3 Mur Baut 5/8"-50 mm +Plat+Ring Plat bh 2 4 Spanschroef/ Turn Bucle 17 KN bh 1 5 Guy isolator/tui isolator dia 8 mm bh 1 6 Cousen gegalv 8 mm2 bh 2 7 Stay road 16 mm2 panjang = 1800 mm bh 1 8 Cros by 8 mm2 bh 4 9 Beton Block 40x40x10 dengan besi penguat 8 mm bh 1

10 U bolt 16 mm + nut plat u. Beton block bh 1

Jumlah - Pembulatan -

7 Kontramast - Horizontal Guy Wire

1 Stall drad 35 mm2 mtr 26 2 Pole band 2/2, 4" (6x50) bh 2 3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4 4 Spanschroef 3/4" / Turn Bucle 17 KN bh 2 5 Guy isolator/tui isolator bh 2 6 Wire clip/cros by 12 mm2 bh 8 7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1 8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4

9 Beton Block 40 cmx40 cmx10 cm bh 1

10 U bolt 16 mm + nut plat u. Beton block bh 1

Jumlah -

Pembulatan -

8 Druck Schoor TR

1 Pole band galvanise 1/2 3" bh 1

2 Pole band galvanise 2/2 3" (atas) bh 2

3 Pole band galvanise 2/2 5' (bawah) u/sekang bh 2

4 Pipa galvanise Diameter 2"- panjang 1200 mm btng 1

5 Besi UNP 8 L=160 mm btng 1

6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9

Jumlah -

Pembulatan -

9 GROUNDING TR

1 Grounding Rod 16 mm2 L = 1750 mm bh 1

2 BC 50 mm2 Mtr 10

3 Pipa Galvanis 1/2" L= 6000 mm Btg 1

4 Klem Steinless Steel 4 titik 3 titik mtr 4

5 AL/CU 35 - 50 mm2 bh 1

6 Electroda clam cu bh 1

7 Stoping bukle bh 4

8 Link 25 x 25 bh 4

Jumlah -

Pembulatan -

10 Tap Connector 25 - 50 mm2 bh 1

11 Compression Joint 50 mm2+ heat shrink set 1

Page 18: BQ 024 Compang Cibal

O----rd9<l

Fi-1--, .-

t.,

Ft.lF- , tFi-: lii

-': I:tiF,\

!iA r

;H/i

i?

"t

g

omaO!Om!t!zzOOoC=Z?7ex;3|-!!r@!r->()6)4

9,24.B!P2;iolzrr -=2>oz>O-ov

s(o

zg,

!l

!cr{7t-{ r-azT-O

->m^x,FaO;EE>>oz7-oQ€

2>rtL-x-

-{

oo-

I

z9o3

Page 19: BQ 024 Compang Cibal

qi...'T-

,1./

-o\.?irY

..\l

\

omoOEOm3=!Ez2OOoCEl",.>a>sr-!! r E!,=Fo6v9>iesPioi==E>oz>O-oF

I I3

z

q.

!cJ1t{r-azt- 'u

->m^x,ealt;:$>>oz--oo€2iI'CTx-

-{

o

so

zIo3

Page 20: BQ 024 Compang Cibal

€9

ftt ar lf

:2,tlt

.Ot

o

,

(i'",

ag

zU)

!:

I3o

maO-EOm==!EzzOOoC=ZY?g-;=F1tso6)/gtd

eEP-oi=

=4>E'z>OTou

!

Zt-{TazF!

->m^xteUrO->mazF>>o27.-og€

q;F'CTx-

-{

oa

I

z9o3