eni Development Project Staffing - Typical project organization charts Referring to the document bp dev-dms 002 eni e&p r02 , here you can find the typical project organization charts to be implemented for different project typologies and for the organizational chart documentation.

Upload: zizu1234

Post on 30-Sep-2015

12 views

Category:

Documents


0 download

DESCRIPTION

Project Staffing Guidelines

TRANSCRIPT

  • eni Development Project Staffing - Typical project organization chartsReferring to the document bp dev-dms 002 eni e&p r02, here you can find the typical project organization charts to be implemented for different project typologies and for the organizational chart documentation.

  • *

  • *6.1.1.1 Program Overall

  • *6.1.1.2 Program Staffing units

  • *

    6.1.2.1 Strategic projects Execution phase - Overall

  • *6.1.2.2 Strategic projects Execution phase Development staffing units

  • *

    6.1.2.3 Strategic projects Exec. phase eng. & commissioning

  • *

    6.1.2.4 Strategic projects Execution phase Procurement

  • *

    6.1.2.5 Strategic projects Exec. phase Drilling & Completion

  • *

    6.1.2.6 Strategic projects Execution phase Reservoir

  • *

    6.1.2.7 Strategic projects Execution phase Quality & HSE

  • *

    6.1.2.8 Strategic projects Execution phase Logistic

  • *6.1.2.9.1 Strategic projects Execution phase WP DEEP WATER - WP FPSO - Structure (2 Yards)

  • *6.1. 2.9.2. Strategic projects Execution phase WP DEEP WATER - WP SPS - Structure

  • *6.1. 2.9.3 Strategic projects Execution phase WP DEEP WATER - WP URF&I - Structure

  • *6.1. 2.9.4 Strategic projects Exec. phase WP SHALLOW WATER - WP Platform Structure (2 Yards)

  • *6.1.2.9.5 Strategic projects Ex. phase WP SHALLOW WATER - WP EXPORT/INTRAFIELD PIPELINE/SEAL. WP - StructureMATERIAL & CORROSION PREVENTION ENGINEER

  • *

    6.1.2.9.6 Strategic projects Execution phase WP ONSHORE - CENTRAL PROCESSING FACIL.(CPF) WP - Structure

  • *

    6.1. 2.9.7 Strategic projects Execution phase WP ONSHORE - INTEGRATED PW PLANT (IPP) WP - Structure

  • *6.1. 2.9.8 Strategic projects Execution phase WP ONSHORE - EXPORT/INTRAFIELD ONSHORE PIPELINE WP-Structure

  • *6.1.3 NON STRATEGIC / NON OPERATED PROJECTS

    **