Bower Ashton Masterplan, UWEBuilding 1

Design & Access StatementOctober 2015

Page 2: Bower Ashton Masterplan, UWE Building 1
Page 3: Bower Ashton Masterplan, UWE Building 1

1.0 Introduction

1.1 Client Brief 1.2 Project Team 1.3 Masterplan

2.0 The Site

2.1 Existing Site 2.2 Site Analysis 2.3 Site Photographs

3.0 Space Requirements

4.0 Design Development

4.1 Initial ideas 4.2 Concept Design 4.3 Options Study 4.4 Preferred Design Concept 4.5 Final Preferred Concept 4.6 Precedent

5.0 Final Design Proposal

5.1 Layout 5.2 Amount 5.3 Scale 5.4 Access and Movement 5.5 Appearance 5.6 Visual Impact 5.7 Landscape 5.8 Environmental Sustainability 5.9 Community Safety 5.10 Ecological Interests 6.0 Conclusion

CONTENTS

Austin-Smith:Lord LLPCardiff Glasgow Liverpool

one Dunleavy Drive, Cardiff, CF11 0SN+44 (0)29 2022 [email protected] www.austinsmithlord.com

Page 4: Bower Ashton Masterplan, UWE Building 1
Page 5: Bower Ashton Masterplan, UWE Building 1

1.0 INTRODUCTIONThis Design and Access Statement has been prepared on behalf of the University of the West of England (UWE) to accompany an Application for the Approval of Reserved Matters for the design of Building 1 and associated landscape works at the Bower Ashton campus, Kennel Lodge Road, Bristol, BS3 2JT.

Outline planning permission for the erection of new buildings for academic, administration and support purposes (6,500m use class d1) and associated infrastructure including provision of a new public transport facility, amendments to car park layout, revised access arrangements and landscaping; and the demolition of 4,198m existing buildings, with all matters reserved except for siting, massing and access, was granted on 9th September 2015 (Application No. 15/00291/P), with 17 conditions attached.

Building 1 forms the first phase of the redevelopment of the campus in line with the approved masterplan, and will provide dedicated digital media spaces within a new high quality three storey building, located on the site of the former G Block and facing onto Kennel Lodge Road.

The application includes for landscaping works to the Kennel Lodge Road frontage including a new improved footpath and cycle route.

This statement should be read in conjunction with all relevant application drawings and supporting information.

Page 6: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 6

1.1 CLIENT BRIEF 1.2 PROJECT TEAM

UWE has appointed the following team to assist them in developing the proposals:

Austin-Smith:Lord: Architecture, interior design and landscape design

Arup: Civil, mechanical, structural, electrical engineering and acoustic consultants, BREEAM consultants

Gleeds: Project Manager

Alder King: Planning Consultant

Faithful & Gould: Cost Consultant

Principal Contractor: Willmott Dixon

The Bower Ashton Campus of the University of the West of England (UWE) is the home of the Faculty of Arts, Creative Industries and Education. The Campus’s origins are in the purpose built 1969 West of England School of Art.

In order to meet the current and future needs of the Campus, a new Digital Media building is proposed to aid and enhance the delivery of teaching and learning in purpose built facilities. The new building is known as Building 1.

The proposed new building will be located in the position of the existing G Block, which will be demolished, and will comprise of approximately 2400m2 gross internal floor space.

CAMPUS VISION

The University of the West of England plans to retain and invest in the Bower Ashton site following the development of a clear and compelling vision by the Faculty of Arts, Creative Industries and Education. The Faculty’s strategic aim to be externally connected, practice oriented and professionally accredited includes:

• The importance of retaining a metropolitan base for the University.

• Bower Ashton’s proximity to Bristol’s creative and cultural organisations based in and around the harbour and city centre.

• The importance of developing new and strengthening existing partnerships with organisations in the city (Aardman, Arnolfini, BBC, Bristol Museums Galleries and Archives, Spike Island, Watershed) in order to support the practice-oriented learning of students.

THE DEVELOPMENT OF BOWER ASHTON

Major investment in shared resources are focused at Bower Ashton (i.e. library, digital media, physical making) with non-specialist spaces being provided at partner sites in the city (i.e. general purpose teaching, art and design studio spaces, research offices, student support functions).

The proposed new buildings and refurbishment of existing buildings at Bower Ashton has been carefully considered to respond to the needs of students and staff and also to the surrounding area and the overall environment impact. It does so in the following ways:

• Develops on-site, industry-standard physical resources, grouped around discipline hubs to support practice-oriented learning (Building 1 for Film and Animation; Building 2 for Art and Design)

• Ensures the adjacencies of related disciplines to facilitate learning and encourage multi-disciplinarily; i.e. the proximity of F Block’s Software Learning labs and the News Room link to Building 1; the link between photography in C Block to production studios in Building 1.

• The further development of the Student Hub which brings together catering, retail, Students Union, Student Support Services, Library, and IT support in A and B Blocks works with their proximity to the new main entrance and ‘front of house’ facilities.

• Maximising the functionality of rooms available in B Block for teaching, office and meeting spaces. These spaces offer ceilings with appropriate height for projection and audio-visual facilities; great natural light and inspiring views from windows, which are also easy to blackout for teaching, as necessary.

• The partial demolition of C block enables a courtyard space to be developed within the heart of the campus. This will allow students and staff to easily access outside space, currently very limited on site in spite of the campus’s semi-rural setting. This space will also be the focal point for the site’s public art – an environment within which specially commissioned work can be enjoyed by students, staff and the general public.

BUILDING 1

Subject disciplines to be accommodated within building 1 are high performing, supported by industry and sector skills councils and are currently popular with applicants. However, in an increasingly market-driven higher education sector, the University needs to invest in the facilities required by these subjects order to retain its reputation.

These disciplines are also important to the University’s portfolio and its ability to support the local creative economy with new, diverse talent.

Building 1 will bring together existing resource for filmmaking, animation, and some aspects of photography currently housed in D and B Blocks.

Although students studying on Filmmaking, Animation and Photography programmes mainly use these resources, they are open to all students in the Departments of Art and Design, Film and Journalism.

There are therefore no fixed users of the building, except for the Technical staff. Academic staff spend more than half of their time teaching, not all of which will take place within Building 1.

The development of the new building involves very little expansion of the current resource in comparison to the increase in student numbers and requirement for digital learning.

The new building will be designed to be used as efficiently as possible in order to maximise its benefits by:

• more efficient use of space, including designing spaces that can be easily adapted for secondary or even tertiary use

• harnessing new technology;

• better use of timetabling;

• changing the patterns of use throughout the working day;

• squeezing University space standards in some area, i.e. office space has been reduced from 7.5m² per person to around 5.5m² per person;

• a reduction in typical UWE building circulation space from 30% to 26.3%.

A consequence of spaces that can be adapted for secondary and tertiary use is that these facilities need to be co-located so that teaching and learning can be appropriately supported by staff, including the ability for students to locate technical support nearby when working on self-directed project work.

It is a Faculty principle that students and academic staff within a subject discipline be co-located. Research shows that this improves the student experience.

The new building is the first phase in the replacement of poor quality estate. It enables new technologies that are in use in industry to be installed to ensure students graduate with the skills necessary for their careers within the creative industries.

Page 7: Bower Ashton Masterplan, UWE Building 1

Building 1 and associated landscaping along the Kennel Lodge Road frontage forms the first phase of works based on the outline approved masterplan framework for the Bower Ashton campus.

Building 1 will occupy the position of the existing G Block building on the northern edge of the campus. Future phases will see further demolition of outdated buildings and replacement with two further new buildings, refurbishment of existing retained facilities, as well as significant new landscape works including a central courtyard space.

MASTERPLAN OBJECTIVES• Provide a modern, fit for purpose, digitally connected

environment that will attract and retain high tariff students and retain the reputation as a sector leader

• Provide space for growth in student numbers in high performing areas

• Reduce overhead costs per student by improving space utilisation and energy efficiency

• Improve ancillary support services

• A central landscaped courtyard provides external amenity space for gathering, relaxation, events and public art

• Increased permeability across the campus

• Increased exposure and an enhanced ‘public face’ to the University from Kennel Lodge Road

• A more compact, rational and efficient campus which will improve the staff and student experience

• Enhanced bus and cycle spaces and facilities

• A positive impact on the environment due to more efficient buildings, promotion of sustainable transport strategies and increased soft landscaping and tree planting

Building 1 Digital Media + Production - UWE - 7

1.3 BOWER ASHTON CAMPUS MASTERPLAN

APPROVED BOWER ASHTON MASTERPLAN Source: AHR Outline Planning Application, Design Access Statement

Page 8: Bower Ashton Masterplan, UWE Building 1
Page 9: Bower Ashton Masterplan, UWE Building 1

2.0 THE SITE

Page 10: Bower Ashton Masterplan, UWE Building 1

THE WIDER CONTEXT

The UWE Bower Ashton Campus is located on the western edge of Bristol Ashton Court Estate, the campus’ largest neighbour is a Grade II* registered landscape and a Site of Nature Conservation Interest. Ashton Court Mansion House and stables are Grade 1 listed. The campus itself was originally part of the Estate and was developed in the 1960’s as an art college. The campus forms the western edge of Bower Ashton Village, which has a semi-rural character, due to the historic association with Ashton Court estate buildings and it’s setting within parkland, mature woodland and community allotments. The village is dislocated from the rest of Bristol, due to the physical separation created by the River Avon and busy road junctions including the A370 fly-over and the loop roads in the Cumberland Basin.

Vehicular access is from Kennel Lodge Road, which was formerly the service access to Ashton Court Mansion and is now one of the main vehicular access routes to the Mansion and parkland.

Adjacent to the site to the North is Ashton Court Deer Park which is partially screened from the campus by a small tree copse. The western part of the campus is the Paddock, which is part of the Ashton Court Registered Historic Landscape. The paddock includes groups of mature trees, some were part of the original 19th century Ashton Court plantings.

Beyond the southern boundary of the campus is the Park Farm buildings which are used by Bristol City Council as a training centre and estate depot. The eastern part of the campus is defined by dense tree cover, also part of the Ashton Court Registered historic Landscape, which screens the campus from the road and adjacent residential properties.

TOPOGRAPHY

The campus site is almost flat, most of the buildings ground floor level is +9.3m with the exception of the 5 storey B block which has a ground floor level +10.65m. The North west corner of the campus steps to accommodate the level change between the buildings and the gradual rising level of Kennel Lodge Road. Beyond the campus boundary to the north and west, the land rises to form the south facing valley side of Ashton Brook and Colliters Brook. The hill side extends towards Long Ashton Village and Clevedon to the west

Building 1 Digital Media + Production - UWE - 10

2.1 EXISTING SITE

EXISTING CAMPUS PLANSource: AHR Outline Planning Application, Design Access Statement

SITE LOCATION PLAN

20 0 20 40 60 80 100

Metres

Pond

Allotment Gardens

Allotment Gardens

Allotment Gardens

Allotment Gardens

Allotment Gardens

14.3m

BOWER ASHTON

Sub StaEl

LB

Track

11.6m

Ashton Park

PARKLANDS ROAD

KENNEL LODGE ROAD

COURTLANDS LANE

CLANAGE ROAD

171591m

355968m

171931m

355968m

171931m

356436m

171591m

356436m

356000m

356000m

561

561

562

562

563

563

564

564

716716

717717

718718

719719

BLO

CK

B

BLO

CK

F

BLO

CK

CBLO

CK

A

BLOCK D

BLOCK G

APPLICATION BOUNDARY

OWNERSHIP BOUNDARY

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

B

1 : 1250

Bower Ashton Masterplan, UWE

Site Location Plan

314289 BA-ASL-00-00-DR-A-90001

TE

MAY 2015

1 : 1250Site Location Plan1

NORTH

Revision Description By Chkd By DateA Issued for PLANNING RH TY 16.10.15B Updated for Planning RH TY 21.10.15

Page 11: Bower Ashton Masterplan, UWE Building 1

THE APPLICATION SITE The proposed development site comprises of land adjacent to Kennel Lodge Road, and totals approximately 3830m2. Much of the existing site is occupied by an existing single storey building known as G Block, which is proposed for demolition. The remainder of the site comprises of a grass frontage to the road, paved footpaths, a small car park area with access from Kennel Lodge Road as well as a sunken paved area adjacent to the end of the B Block tower block. BOUNDARIES The northern boundary is formed by Kennel Lodge Road. This includes a grass frontage a footpath. The landscape frontage alongside the road is important in the context of the conservation area, though it’s quality could be greatly improved. The footpath does not follow the edge of the road and is not well used. Kennel Lodge Road rises in level from east to west as it climbs towards Ashton Court. A sunken ‘pit’ area is situated directly at the western end of G block. This is an unused and unsightly external space. It is framed on the southern side by the 5 storey tower building known as B Block. This building is the dominating element on the campus and within the surrounding landscape. The western boundary is formed by the upper car park areas situated in front of A Block. This is also the main entrance to the campus. The car park layout and frontage do not offer a good first impression to the front entrance, and there is scope for improvements to be made. The southern boundary is formed by C block, an existing single storey building comprising of workshop spaces. This building closes off the rest of the campus from the road frontage, though it is proposed for partial demolition in the future in order to open up a new access route into a landscaped central square. The eastern boundary is formed by an area of mature woodland and is a protected part of the conservation area. This woodland offers excellent screening of the proposed site and campus when viewed from the east and on the approach along Kennel Lodge Road. FLOOD RISK ASSESSMENT The flood risk assessment undertaken for the site as part of the outline application indicated that future buildings would be set with a ground floor level of no lower than

9.8m AOD, in order to avoid flood risks associated with tidal flooding and surface water run-off. This compares with an existing approximate floor level for G Block of 9.4m AOD. An existing Wessex Water surface water sewer runs through the corner of the proposed site. It currently runs underneath the existing building. The new development will position the building so as to be clear of the existing sewer and therefore brings betterment. The line of the sewer has dictated the available site area for the new building.

Connection Proved

Route from Records

CL 9.81

CL 9.43

CL 9.46

CL 9.40

150

150 BD

IL 8.28

150

150

150

100

100

100

IL 8.69

IL 8.41

100

100

100

3x100

100

IL 8.13

150150 150

100UTT

100UTT

IL 7.90

IL 7.93

UTL

UTL

225 IL 8.37

225

225d2.0EOT

IL 7.65

IL 8.63

IL 9.2

5

100

IL 9.25

100

100

IL 7.97

225100IL 8.75

150

UTL

150

225

IL 8.92

100

IL 8.71

IL 7.52

900

IL 7.51

225

IL 7.38

IL 7.25

Pit IL 7

.97Catchpit

2x1502xIL 8.24

2x1502xIL 8.21

Pit IL 1

0.37Catchpit

2x150

2xIL 10.76

2x1502xIL 10.65

IL 8.77

IL 7.41

225IL 7.77

IL 8.96

100

IL 7.99225

Pit IL 7

.66

300

IL 7.13

900

100UTT

100

UTT

IL 8.02

225

IL 7.66

IL 7.71

d1.6

600

100

IL 8.16

900

225

d1.5 UTTF

d0.8UTTF

d1.8

UTTF

150

d1.6UTTF

Extent of Buried Services Survey

Extent of

Bur ied Services Survey

Extent ofBuried Services Survey

Extent of Buried Services Survey

Extent of Buried Services Survey

9.37

9.38

9.37

9.51

9.479.80

10.30

9.34

9.52

9.77

9.71

9.72

9.379.50

9.45

9.50

9.46

9.47

9.47

9.36

9.28

9.31

9.35

9.34

9.44

9.51

9.37 9.37

9.34

9.47

9.48

9.48

9.35

9.36

9.419.52

9.39

9.37

10.50

g 0.5

h 5.0

g 0.1

h 1.5

g 0.4

h 2.6

g 0.2

h 2.6

g 0.2

h 3.0

g 0.2

h 2.6

g 0.3

h 6.0

g 0.2

h 5.0

g 0.4

h 7.0

g 0.1

h 3.0g 0

.2

h 3.0

g 0.5

h 7.0

g 0.2

h 3.5

g

hg 0

.3

h 7.0

8 0

h 15.0

h 16.0

g 1.5

h 15.0

h 18.0

g 1.3

h 13.0

g 0.7

h 10.0

g 1.6

h 20.0

g 1.8

h 20.0

g 1.9

h 20.0

g 2.5

h 20.0

g 2.6

h 20.0

h 17.0

h 18.0

h 18.0

h 10.0

g 0.8

h 11.0

g 1.0

h 11.0

g MB

g 2.0

h 14.0

g 1.3

h 15.0

h 10.0

Holly

h 5.0h 1

5.0

h 15.0

g 1.4

g 0.8

g 1.8

g 1.5

g 0.6

h 10.0

g 1.2

g 1.2

g 1.2

g 2.0

g 1.0

g 1.4

g 2.2

Ashg 1

.6

g 2.0

Ashg 2

.0

Ashg 1

.3

Ashg 1

.6

Ashg 2

.0

h 4.0

Elder

g 0.4

g 1.5

Ashg 1

.5

Ash

Ash

Ash

AshAsh

Ash

Ashg 1

.4

h 18.0

g 1.0Ash

Ashg 0

.9

Ashg 0

.8

Ashg 2

.0

Ash

Ash

Ash

Alder

Ash

Ash

g 1.6

h 11.0

g 2.5

h 16.0

g 2.0

h 14.0

h 12.0

h 10.0

g 3.0

h 18.0

1.0

h 12.0

92.0

g 1.3

h 10.0

g 1.1

h 12.0

g 1.2

h 10.0

Conifer

Silver B

irch

Conifer

Ash

Ashg 1

.5

h 20.0

h 10.0

h h Cyp

g 1.0

h 6.0

Cypr

g 0.9

h 8.0

Cyg 1

.3

h 7.0

Ash

g 0.8

h 12.0

Cypres

g 2.0

h 10.0

Cypress

g 1.0

h 10.0

Elder

g 0.9

h 5.0

Ash

Ash

Ash

Ash

Cypress

g 0.9

Hornbeam

g 1.2

g 1.3,1

.1

Syc

Syc

Syc

Sycg 2

.2

Syc

Syc

Syc

Syc

Ash

Syc

h 18.0

h 20.0

h 18.0

h 15.0

h 20.0

h 18.0

h 13.0

Ashg 1

.0

h 13.0

h 20.0

h 12.0

h 20.0

h 13.0

g 1.3Ash

h 13.0

h 15.0

h 18.0

h 15.0

h 20.0

g 0.8

Sycg 3

x0.6,0.9

Sycg 3

x0.7

Ash

h 18.0

h 18.0

Ashg 1

.8,0.7

g MB

h 8.0

Beech

Syc

Tree

g 0.3

h 5.0

g 0.4

h 5.0

g 0.4

h 5.0

g 0.4

h 5.0

g 0.3

h 6.0

Extent of Tree Canopy

9.309.90

9.66

9.43

9.41

9.42

9.44

9.46

9.47

9.43

9.44

9.42

9.44

9.39

9.38 9.39

9.44

9.49

9.52

9.31

11.37

11.07

10.55

9.74

9.80

9.46

9.47

9.52

9.55

9.73

9.66

9.65

9.83

9 8

9.51

9.64

9.6210.1610.37

10.58

10.67

10.15

10.17

10.20

10.25

10.37

10.4910.5810.7010.76

10.90

9.62

10.49 10.27 9.67

11.07

10.97 10.89 10.77 10.70

10.56

10.45

10.39

10.37

10.23

9.56

NFI

NFI

NFI

Land Drain(R)

Land Drain(R)

NFI

CL 9.44MH(F)

SVP

MH(F)

CL 9.55

CL 9.33MH(F)

MH(F)

CL 9.47

MH(F)

CL 9.54

MH(F)

CL 9.39

MH(F)

CL 9.43

MH(F)

CL 9.42

MH(F)

CL 9.40

MH(F)

CL 9.40

MH(F)

CL 9.43

CL 9.30MH(F)

MH(F)

CL 9.55

MH(F)

1WDd0.3UTT

d0.4

d0.5

1WDd0.4

d0.4

1WD d0.3

d0.4

1WD d0.3

d0.8

d1.0

d0.8

2WD

d0.6

2WD

d0.6

2WD

d0.6

2WD

d0.6

1WD d0.4

UTTF

d0.7

UT TF

UTT

d0.8

d0.6

UTT

150

100

IL 7.81

150

13.00

12.00

11.00

13.00

12.00

11.00

10.00

10.00

CPS

Conc

MP

Col

Col ColCol Col

ColColCol

Col

Bench

Ramp

Conc

MP

MP

BB

Sign

BB

HR 1.0mhBushes 1.0mh

Tarmac

Ramp

Ramp HR 1.0mhHR 1.0mh

CBW 0.4mh

Conc

Ramp

Ramp

Ramp

HR 1.0mh

HR 1.0mh

HR 1.0mh

Bench

Conc

Bushes

0.5mh

Pebble Sur face

Pebble Surface

Pebble Sur face

Pebble Sur face

Pebble Sur face

Pebble Sur face

CPS

CPS

CPS

BP

Bench

Bench

Bench

Bench

Bench

Bench

Bench

Pebble Sur face

Bike Rack Bike Rack

Grass

Pebble Surface

CPS

CPS

CPS

M/PF 1.8mh

MG

MG

Stump

Building Overhead

Building Overhead

Building Overhead

Conc

Pebble Surface

BP

BP

CPS

Tempora

ry

Building Tem

porary

Building

Tempora

ry

Building

Smoking

ShelterSmo

king

Shelter

Barrier

RampRamp

CPS

Ramp

Litter Shelter/

Bik R k

Grit Path

Grit Path

Shrubs

0.5mh

Shrubs

0.5mh

Shrubs

0.8mh

Shrubs

Shrubs

Shrubs

Shrubs

Shrubs

Shrubs

Shrubs

HR

R

HR

HR

Grass

Grass

CPS

DK

Brick

Pavior

MG

MG

Brick

Column

2.3mh

Stone

Column

2.1mh

Stone

Column

2.1mh

WG

CPS

Extractors

ConcRamp

MG

Grass

B

B

BB

BB

BB B

BB

Sign

B B

P

Sign

Sign

Sign

BB

MP

MP

BB

Conc

CPS &

BP

BP

BP

BP

BP

CPS &

BP

BP

BP

BP

BP

BP

A/C Un

its

HR 1.1mh

HR

1.1mh

CPS

CPS

Concret

e

Steps

HR 0.9mh

Concret

e

Steps

HR 0.9mh

Tiles

CPS &

BP

BP

BP

BP

Concrete

Rain Channel

Grass

Brick

Steps

Brick

Steps

CRW

2.0mh

Conc

Conc

Conc

Conc

Conc

Conc

Ramp

CPS

Vent

HR

Conc

Ramp

CPS

CPS

Conc

Ramp

HR

Barrier

BW 2.2mh

Container

Tarm

ac

Concrete

Steps

ConcRamp

Conc

Ramp

Concret

e

ConcRamp

MGMG

Conc

Steps

BP

MP

CPS

Grass

Grass

TOB 29. 40

TOB 29.40

TOB 19.06

TOB 29. 40

TOB 20. 52

TOB 20.52

WOOD STORAGE

Ramp CPS

ConcRamp

Portakabin

Portakabin Portakabin

Ramp

MG

Conc

Rampps

TOB 19.05

CPS

Grass

Conc

Steps

3xHR

1.1mh

RB 1.1mh

RB 1.1mh

Gas

Bottle

Store

HR 1.1mhCon

c

Steps

CAR PA

RK

BLOCK

C

BLOCK

B

BLOCK

A

BLOCK

G

TOB 14.55

TOB 12.39

TOB 12.45

TOC 13.20

TOC 14.03

Eaves 12.13

TOB 13.29

FL 9.62

FL 9.79

FL 9.48

Ramp

TOB 13.08

TOB 13.07

FL 9.48

TOB 13.07

FL 9.44

FL 10.68

FL 9.48

FL 11.62

TOB 15.40

FL 11.62

TOB 20

.93

TOB 19.11

TOC 14.95

TOB 14.61

Tarmac

Tarmac

FL 11.60

TOB 15.41

BLOCK

G

BLOCK

C

TOC 13.06

Concrete Ramp

CPS

Conc

CPS

BLOCK

C

Metal Po

st & Ra

iled Fenc

e 2.0m

h

Metal Post & Railed Fence 2.0mh

ConcRamp

Concrete

Ramp

Lift

Plant

ConcRamp

HRHR

Wooden

Plant

Housing

ConcRamp

Conc Ramp

HR

Grass

Grass

Conc

Step

Vent

Tarma

c

Pebbles

in Con

crete

B

B

B

Brick

Duct

CPS

Ramp

Building Extent

Building Overhead

CP

Electrici

ty

Sub-Stat

ion

BW2.2mh

Shrubs

1.0mh

Shrubs

1.0mh

Hedge 1.

Shrubs

1.0mh

SW1.8mh

Cypress

Trees

Overhang

Grass

Wooded

Area

Wooded

Area

Grass

Pebbles

in Concr

ete

BLOCK

C

Concret

e

Concret

e

Portakabin

Grass

Pebbles

Pebbles

Canopy

Canopy

HR

1.1mh

CPS CPS CPS

SW 1.8mh

Metal Railings 2.0mh

Brick Pavior

Meta

l

Railings

1.2mh

SRW

Conc

CW0.8mh

CW1.1mh

HR

CW 1.1mh

HR 0.9mh

HR

0.9mh

Concrete Ramp

BRW 1.2m

h

CRW 0.9mh

Tarmac

HR0.9mh

Brick Paviors

TOC 13.08

TOC 13.05

KITCHEN

HR 1.1mh

HR 1.1mh

Column Column Column

B 14.16

TOC 12.49

KENNEL

LODGE

LANE

Tarmac

Tarmac

KENNEL LODGE LANE

Grass

Grass

Metal Palisade

Fence 1.8mh

Pebble

Sur face

BLOCK

F

BLOCK

F

Metal Railings 1.2mh

100UTT

100

UTT

100UTT

100

900

900

UTT

900

100100

150

150

900

100 IL 8.85

300

300IL 7.61

225

225

225

225UTT

150

150 IL 7.94

150 IL 7.88

9.68

9.49

9.46

9.45

9.45

9.43

9.45

9.43

9.44

9.45

9.36

9.32

9.35

11.43

11.12

10.57

9.38

11.45

11.45

11.49

11.44 10.94

9.35

9.30

9.329.51

9.33

9.32

9.319.30

10.83

9.56

9.47

9.59

9.58

9.42

9.49

9.52

9.39

9.40

10.46

10.54

10.60

10.54

10.70

9.60 9.60

9.64

9.73

10.489.99

10.63

10.05

9.38

9.19

9.36

9.28

9.85

9.94

10.03

10.08

9.50

10.02

9.95

10.01

9.96

10.16

9.94

9.78

10.38

9.51

9.43

9.41

9.38

10.3210.36

10.36

10.26

9.59

9.89

9.89

9

9.979.97

9.96

10.03

10.01

9.92

10.01

9.56

9.87

9.76

9.58

9.84

9.52

9.18

9.61

9.80

9.17

9.35

9.28

9.29

9.4

9.39

11.47

11. 62

11.47

11.53

12.15

12.49

12.96

13.15

12.48

11.84

9.339.38

9.63

9.47

9

9.36

9.40

9.36

9.36

10.91

9.36

9.44

9.33

9.33

9.37

9.35

9.32

9.35

9.37

9.35

9.36

10.67

10.68

9.29

9.33

10.66

10.65

11.24

11.37

11.12

11.19

11.42

11.85

11.90

11.64

11.44

11.75

11.97

10.67

10.88

11.36

11.32

11.27

11.67

11.14

9.35

9.30

9.33

9.44

10.9411.08

9.59 9.58 9.60 9.60 9.59

9.81

9.669.669.68

10.21 9.98

10.02

10.9810.99

10.40

10.56

13.51

10.94

11. 07

11.41

11.48

11.48

13.1813.49

13.47

13.57

13.45

13.40

13.03

13.04

13.03

344

12.58

12.56

11.32

11.6111.48

11.33

11.46

11.32

11.79

11.21

11. 02

11.02

11.17

10.57

11.78

11.6111.4811.48

11.48

11.38

11.45 11.45

11.78 11.78

11.78

11.81

10.54

11.57

11.38

11.43

11.46

11.59

11.60

11.46

11.39

11.43

12.15

12.02

12.36

12.82

13.32

13.55

13.41

13.01

12.59

12.41

13.01

12.52

12.53

13.13

12.54

12.56

13.02

12.49

11.44

11.47

11.49

11.43

11.91

12.08

12.32

11.48

11.40

11. 42

11. 43

11.50

11.51

11.61

11.48

10.55

11.59

11.46

11.46

12.43

9.32

11.46

11.46

11.47

11.55

11.40

11.43

11.05

11.37

11.43

11.42

11.46

11.92

9.28

9.32 9.32

9.27

9.41

9.27

9.26

9. 34

9.32

10.62

11.47

11.47

9.38

9.35

10.4610.92

11.07

9.569.53

9.56

9.40

9.28 9.369.33

9.48

9.49

9.42

9.61

CT

CT

CT

IC

IC

IC

IC

ICCL

11.42

CL 11.4

5

ICCL

11.42

PIG

0.10

PipeICCL

9.32

ICCL

9.35 ICL 9.

31

ICCL

10.65

ICCL

11.47

ICCL

11.43

ICCL

11.46

ICCL

11.52

ICCL

9.34

ICCL

9.34

ICCL

9.28ICCL

9.32

ICCL

9.36

PIG

ICCL

9.32IC

ICCL

9.31

ICCL

11.21

ICCL

11.11

ICCL

11.60

ICCL

11.42

ICCL

11.47

ICCL

12.94

ICCL

11.33

ICCL

11.78

ICCL

11.44

ICCL

11.43

ICCL

11.44

ICCL

11.46

ICCL

11.49

PIG

PIG

IC

PIG

ICCL

10.43

CL 11.4

4IC

ICCL

11.46

IC

A

B C D

A:

B:

C:

D:

BTCL

9.32

BTCL

9.32

CL 10.3

3

BT

BT

BTCIG

D7

L2L3

3

9

10

356120E

3

356200E

356240E

356160E

356200E

356240E

171880

N

171840

N

171800

N

171880

N

171840

N

171800

N

GV

GMK

GV

PIG

GV

Kiln Gas

Supply

Cabinet

Pipe

RE9.40

RE9.42

RE9.45

RE9.43

RE9.43

RE9.44

RE9.43

Gy Gy

9.48

RWC

RWP/RWP

/

9.50

G9.33

CL 10.2

8MH(S)

RE

G9.25RG

9.32

RG9.47

G9.24

RG9.18 RG

9.17

G11.3

1

G10.4

9

G11.4

3

G11.4

2RWP

G11.3

9

G11.3

8

G11.3

9

RG9.22

RG9.24

G

G

RE

RE G

G9.33

G9.25

MH(S)

CL 9.55

MH(S)

CL 9.58

RE

CL 9.33MH(S)

CL 9.30MH(S)

CL 9.43MH(S)

CL 9.42MH(S)

CL 9.38MH(S)

CL 9.39MH(S)

CL 9.72MH(S)

CL 12.2

3MH(S)

CL 9.32MH(S)

MH(S)

CL 9.58

MH(S)

CL 9.55

CL 9.89MH(S)

CL 10.2

8MH(S)

CL 9.31MH(S)

CL 9.31MH(S)

CL 9.48MH(S)

FHCL

9.87

FH 9 2

7V

FH

13.75

13.50

10.25

9.25

11.50

9.50

9.75

10.75

10.50

10.25

10.25

9.75

11.25

11.50

11.75

12.25

12.50

12.75

13.25

11.50

9.75

9.50

LP

UL

ER

ER

ER

ERER

ER

ER

ER

UL

UL

UL

UL

JB

LP

LP

Intercom

LP

JB

ER

ER

CIG

BLOCK B

BLOCK F

BLOCK C

BLOCK A

BLOCK G

PROPOSEDBUILDING 1OUTLINE

PROPOSED BUILDING1 OUTLINE

OWNERHIP BOUNDARY

PROPOSED BUILDING 1OUTLINE

APPLICATION BOUNDARY

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

A

1 : 200

Bower Ashton Masterplan, UWE

Existing Site Layout

314289 BA-ASL-00-00-DR-A-90002

TE

MAY 2015

NORTH

Revision Description By Chkd By DateA Initial Input TE TY 18.06.15

Building 1 Digital Media + Production - UWE - 11

2.2 SITE ANALYSIS

Page 12: Bower Ashton Masterplan, UWE Building 1

LANDSCAPE

The campus is semi enclosed by mature woodland to the east and west and screening trees and shrubs along the southern boundary. Within the campus there is very little green space or quality landscape features due to the need for vehicle routes and hard standing and the low sprawling campus buildings, particularly blocks C, D and G which are all single storey.

The main grass area is currently used for temporary teaching accommodation and the other smaller green areas are disparate and lack focus. Part of the masterplan proposals will be to increase and enhance soft landscaped areas in order to provide social space, biodiversity, surface water mitigation and areas for the display of art. The campus is well screened by mature woodland and recently planted trees.

The height of B Block (5 storeys) is not to be exceeded with any new development, due to the visual impact from Ashton Court Estate and other surrounding areas.

CONSERVATION AREA The site falls within the Bower Ashton Conservation Area. Some of the defining characteristics include :

• Open pasture land on south facing slopes forming a setting to Ashton Court Estate

• Clanage Road bounded by tall stone estate walls-bordering allotments and former estate buildings

• Former estate buildings behind stone walls and hedges, large gardens and allotments

• Small inter-war estate of semi-detached houses

• Two large educational establishments, UWE Bower-Ashton and South West Bristol College

• Former meadows, now sports grounds between Clanage Road and the Railway line

• Kennel Lodge Road is one of the main accesses to Ashton Court Estate, enclosed in places by stone-walls, trees and hedges

The design approach for Building 1 will aim to preserve and enhance the quality of the Conservation Area by using appropriate siting, scale and appearance

VEHICULAR AND PEDESTRIAN CIRCULATION

There are two vehicle access points into the campus. The main access is from the ‘Park Farm Lane’ on the eastern edge. This access is used by buses, delivery vehicles for the cafeteria and campus buildings and most private cars. The access is also shared with cycles and pedestrians, although there is also a dedicated pathway through the woodland which is widely used.

Currently the buses use the mini roundabout adjacent to F block for turning and collecting. Due to the limited turning area, buses have been known to collide with the F block overhanging first floor. In addition there is limited waiting area and congestion can occur if there is more than one bus or during periods of peak traffic. Currently it is necessary that delivery vehicles access the centre of the campus due to the location of the Fabrication facility, which requires delivery of large materials and removal of waste and large-scale student work. This creates central areas which are more urban in character with large areas of hard standing. The necessity of vehicle access in the centre of the campus also creates pedestrian – vehicle conflict areas, notable on the Southern corner of D block, which is a potential safety concern.

The other vehicular access is from Kennel Lodge Road and serves a smaller staff car park in the north western corner. This car park accommodates approximately 30 parking spaces.

Due to the campus arrangement and ad-hoc additions to the buildings, there is a physical boundary between the north and south side of the campus. The pedestrian route must be negotiated through the buildings during opening hours.

Building 1 Digital Media + Production - UWE - 12

2.2 SITE ANALYSIS

Source: AHR Outline Planning Application, Design Access Statement Source: AHR Outline Planning Application, Design Access Statement

Page 13: Bower Ashton Masterplan, UWE Building 1

SITE ANALYSIS SUMMARY • The site has a prominent public frontage to Kennel

Lodge Road and is situated within a conservation area. The demolition of G Block offers opportunity to provide a high quality building design that improves this frontage and adds interest to the approach to the Ashton Court Estate.

• An existing mains sewer bisects the site at the southern end. The new building should avoid building over this sewer.

• The new development should have a ground floor level no lower than 9.8m AOD to minimise future flood risk.

• There are excellent views out from the site to the north across the Ashton Court Estate deer park.

• The height of the proposed development will need careful consideration in order to avoid impacting on the surrounding landscape

• Key views of the proposed development should be considered including relevant views up and down Kennel Lodge Road as well as views from the Ashton Court Estate as identified in the LIVA submitted at outline application stage.

• There is opportunity to improve pedestrian and cyclist access along Kennel Lodge Road, improving access to Ashton Court and the wider cycle network, as well as creating a new route into the campus.

• There is opportunity to concentrate pedestrian and cycle access to the campus via Kennel Lodge Road, creating a better separation of vehicles and pedestrians.

• The existing mature trees to the south of the site should be retained and protected. These provide good visual screening to the campus and proposed site.

• There is opportunity to significantly improve the quality of the landscape frontage to Kennel Lodge Road, thereby enhancing the conservation area as well as providing a better frontage for UWE.

Building 1 Digital Media + Production - UWE - 13

2.2 SITE ANALYSIS

Page 14: Bower Ashton Masterplan, UWE Building 1

2.3 SITE PHOTOGRAPHS

Building 1 Digital Media + Production - UWE - 14

View looking up Kennel Lodge Road towards proposed site on left. Existing mature woodland screens the site on the approach.

View looking up Kennel Lodge Road towards proposed site on left. Existing mature woodland screens the site on the approach

View looking up Kennel Lodge Road. Proposed site with existing G Block is seen on the left. The 5 storey B Block building can be seen behind.

View looking down Kennel Lodge Road with proposed site directly in front and to the side of the 5 storey B Block building. Note lack of footpath along the road.

View looking down Kennel Lodge Road from Ashton Court Estate. The existing campus sits at the bottom of the hill within mature trees. The 5 storey B block building can be seen through the trees.

View from Kennel Lodge Road in front of the proposed site, looking north west across the Ashton Court Estate red deer park.

Page 15: Bower Ashton Masterplan, UWE Building 1

2.3 SITE PHOTOGRAPHS

Building 1 Digital Media + Production - UWE - 15

View of the existing concrete pit to the west of G block. Note the level difference of approximately 2.2m up to the car park behind.

View looking down Kennel Lodge Road with G Block on the right. Note that the proposed site is set down into the sloping ground.

View from Kennel Lodge Road looking south west towards the proposed site. The existing G Block building is in the foreground, with the larger B block in the background. Note the road rises approx. 1.5m from east to west along the proposed site frontage.

View of existing main campus entrance to A Block. The entrance approach is dominated by car parking, presenting an unattrctive frontage. The proposed scheme will improve this important external space, creating a new pedestrian area, cycle parking and reduced car parking.

View of the existing concrete pit area at the north end of B block and adjacent to the gable of G Block. This space is unsightly and under used. The proposed scheme will enhance this area creating new cycle parking and a route to the new building and future courtyard space.

View looking up Kennel Lodge Road. Proposed site with existing G Block is seen on the left. The 5 storey B Block building can be seen behind.

Page 16: Bower Ashton Masterplan, UWE Building 1

2.4 PROPOSED LAYOUTVEHICULAR ROUTE

CYCLE ROUTE

PEDESTRIAN ROUTE

Main Entrance

Cycle Storage

CourtyardSpace

Pull In/DelIverIes

Production Studio

Central Loans Issue Desk

Building 1 Digital Media + Production - UWE - 16

Page 17: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 17

Page 18: Bower Ashton Masterplan, UWE Building 1
Page 19: Bower Ashton Masterplan, UWE Building 1

3.0 SPACE REQUIREMENTS

Page 20: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 20

UWE Bower Ashton 314289Building 1

Room PRIMARY USE OTHER USES OccupancyArea Ratio

Room area (m2)

NumberRequired Area (m2)

Actual Number

Actual Area (m2)

Comments

Academic Staff OfficeAcademic Staff Office Office N/A 4 5 20 3 60 1 41.8Academic Staff Office Office N/A 4 5 20 2 40 1 42.5Academic Staff Office Office N/A 4 5 20 3 60 1 42.4Tea-point Office N/A 6 1 6 1 2.9

166 129.6Technical Staff OfficesPhotographic Tech Office Office N/A 4 5 20 1 20 1 23.7Tech Office/Repairs Animation Office N/A 2 5 10 1 10 1 20.6 Includes Stop Motion storage and repairs

areasCentral Loans Office Office N/A 2 5 10 1 10 1 21.7Tech Office Office (media &

journalism)N/A 12 5 60 1 60 1 60.4

110 126.4General Purpose TeachingTutorial Rooms GPT 1:1; meetings;

applicant interviews; PDRs etc.

5 2 10 5 50 2 30.6 Number reduced from 5 to 2, with increased occupancy from 5 to 8

Workshop Technical workshops (non-computing) / GPT

15 3 45 4 0 3 110.2

50 140.8Computer LabsSoftware learning Software learning

workshopsOpen access computing

15 2.7 40.5 0 0 0

Triple Screen Computer Labs Post-production workshops

Post-production open access; open access computing

15 2.7 40.5 4 162 2 131.5 Post Production Labs

Double Screen Computer Labs Moving image workshops

Moving-image open access; open access computing

15 2.7 40.5 4 162 3 149.3 Animation/moving image lab - large

Digital Darkroom Photographic workshops

Photographic open access; open access computing

18 2.7 48.6 1 48.6 1 52.4

Open Access Digital Darkroom Open access digital darkroom

Open access computing

15 2.7 40.5 1 40.5 1 47.1

413.1 380.3Specialist ResourceProduction Studio TV/Film Production Photographic Studio;

rehearsal space; technical workshops (non-computing)

20 7.5 150 1 150 1 110.2

Loading Bay 20 1 20 1 20.5Scene Dock 20 1 20 1 20.6Store 1 ? 1 10.7Vision gallery Studio vision gallery ? 10 2 20 1 20 1 19.1

Sound gallery Studio sound gallery ? 8 2 16 1 16 1 16.3

Dressing room Dressing room ? 6 2 12 1 12 1 12.7DI Grading suite 2 Production 1 13.6DI Grading suite 1 Teaching DI Grading open

access; open access computing

15 2.7 40.5 1 40.5 1 42.3

Cutting rooms Cutting/editing workshops

Cutting/editing open access; open access computing

4 2 8 6 48 6 45.8

Dubbing Theatre 1 Sound recording ? 15 2.5 37.5 1 37.5 1 36.6

Voice over studio Sound recording ? 2 2.5 5 2 10 2 11.2Dubbing Theatre 2 Sound recording ? 8 2 16 1 16 1 15.9Foley Studio Sound recording ? 15 2 30 1 30 1 27.4Control Room Sound recording ? 3 2.5 7.5 1 7.5 1 6.4 Combined Foley Control Room & Audio

Recording Studio Control Room

Audio Recording Studio Sound recording ? 4 3 12 1 12 1 16.2

Photographic studio Photographic workshops

Photographic open access; technical workshops (non-computing)

12 4.5 54 1 54 1 43.6

Photographic studio Photographic workshops

Photographic open access; technical workshops (non-computing)

5 4.5 22.5 1 22.5 1 44.8

Photographic studio Photographic workshops

Photographic open access; technical workshops (non-computing)

5 4.5 22.5 1 22.5 1 44.3

Copy Camera Copy camera n/a 3 3 9 1 9 1 14.9

Digital Scanning Room Digital scanning n/a 6 2.5 15 1 15 1 12.5Digital Print Room 1 13.2

Stop Motion Production Under camera (stop motion) production studio

1:1 meeting room, storage (if individual rooms); technical workshops (if one large room with curtain booths)

1 10 10 6 60 1 59.5

3 Medium sized studios developed instead of 1 large and 2 small

Schedule of Accommodation - 20/04/15

Staff offices enlarged to 8 person offices and number reduced

SCHEDULE OF ACCOMMODATION

The spatial requirements for Building 1 were established with UWE through a series of meetings with key stakeholders and the building user group.

The site constraints limited the available footprint for the building.

The Bower Ashton campus masterplan sets out the sequence of phased development and the uses of these buildings. It is essential that the new developments follow this phasing as it ensure the continued and uninterupted delivery of programmes.

Building 1 will provide space for film, animation and photography although the facilities will be considered as shared use and available to all students and staff at UWE subject to timetabling.

Through careful and detailed analysis of the space requirements, it was established that approximately 2400m2 of gross internal floor space was needed as a minimum in order for the building to function properly and to allow for the future demolition of D Block and subsequent phased development at the campus.

The adjacent schedule of accommodation illustrates the agreed spatial requirements as at briefing stage. The following stage then developed this into spatial adjacency diagrams, setting out the key room requirements and any critical locations such as those spaces that needed to be on ground floor level.

The spatial analysis was then used to inform the intital concept design and more detailed room data information.

3.1 SPACE REQUIREMENTS

Page 21: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 21

UWE Bower Ashton 314289Building 1

Room PRIMARY USE OTHER USES OccupancyArea Ratio

Room area (m2)

NumberRequired Area (m2)

Actual Number

Actual Area (m2)

Comments

Academic Staff OfficeAcademic Staff Office Office N/A 4 5 20 3 60 1 41.8Academic Staff Office Office N/A 4 5 20 2 40 1 42.5Academic Staff Office Office N/A 4 5 20 3 60 1 42.4Tea-point Office N/A 6 1 6 1 2.9

166 129.6Technical Staff OfficesPhotographic Tech Office Office N/A 4 5 20 1 20 1 23.7Tech Office/Repairs Animation Office N/A 2 5 10 1 10 1 20.6 Includes Stop Motion storage and repairs

areasCentral Loans Office Office N/A 2 5 10 1 10 1 21.7Tech Office Office (media &

journalism)N/A 12 5 60 1 60 1 60.4

110 126.4General Purpose TeachingTutorial Rooms GPT 1:1; meetings;

applicant interviews; PDRs etc.

5 2 10 5 50 2 30.6 Number reduced from 5 to 2, with increased occupancy from 5 to 8

Workshop Technical workshops (non-computing) / GPT

15 3 45 4 0 3 110.2

50 140.8Computer LabsSoftware learning Software learning

workshopsOpen access computing

15 2.7 40.5 0 0 0

Triple Screen Computer Labs Post-production workshops

Post-production open access; open access computing

15 2.7 40.5 4 162 2 131.5 Post Production Labs

Double Screen Computer Labs Moving image workshops

Moving-image open access; open access computing

15 2.7 40.5 4 162 3 149.3 Animation/moving image lab - large

Digital Darkroom Photographic workshops

Photographic open access; open access computing

18 2.7 48.6 1 48.6 1 52.4

Open Access Digital Darkroom Open access digital darkroom

Open access computing

15 2.7 40.5 1 40.5 1 47.1

413.1 380.3Specialist ResourceProduction Studio TV/Film Production Photographic Studio;

rehearsal space; technical workshops (non-computing)

20 7.5 150 1 150 1 110.2

Loading Bay 20 1 20 1 20.5Scene Dock 20 1 20 1 20.6Store 1 ? 1 10.7Vision gallery Studio vision gallery ? 10 2 20 1 20 1 19.1

Sound gallery Studio sound gallery ? 8 2 16 1 16 1 16.3

Dressing room Dressing room ? 6 2 12 1 12 1 12.7DI Grading suite 2 Production 1 13.6DI Grading suite 1 Teaching DI Grading open

access; open access computing

15 2.7 40.5 1 40.5 1 42.3

Cutting rooms Cutting/editing workshops

Cutting/editing open access; open access computing

4 2 8 6 48 6 45.8

Dubbing Theatre 1 Sound recording ? 15 2.5 37.5 1 37.5 1 36.6

Voice over studio Sound recording ? 2 2.5 5 2 10 2 11.2Dubbing Theatre 2 Sound recording ? 8 2 16 1 16 1 15.9Foley Studio Sound recording ? 15 2 30 1 30 1 27.4Control Room Sound recording ? 3 2.5 7.5 1 7.5 1 6.4 Combined Foley Control Room & Audio

Recording Studio Control Room

Audio Recording Studio Sound recording ? 4 3 12 1 12 1 16.2

Photographic studio Photographic workshops

Photographic open access; technical workshops (non-computing)

12 4.5 54 1 54 1 43.6

Photographic studio Photographic workshops

Photographic open access; technical workshops (non-computing)

5 4.5 22.5 1 22.5 1 44.8

Photographic studio Photographic workshops

Photographic open access; technical workshops (non-computing)

5 4.5 22.5 1 22.5 1 44.3

Copy Camera Copy camera n/a 3 3 9 1 9 1 14.9

Digital Scanning Room Digital scanning n/a 6 2.5 15 1 15 1 12.5Digital Print Room 1 13.2

Stop Motion Production Under camera (stop motion) production studio

1:1 meeting room, storage (if individual rooms); technical workshops (if one large room with curtain booths)

1 10 10 6 60 1 59.5

3 Medium sized studios developed instead of 1 large and 2 small

Schedule of Accommodation - 20/04/15

Staff offices enlarged to 8 person offices and number reduced

Stop Motion Training Under camera (stop motion) training workshopg

Fine fabrication? 10 4.5 45 1 45 1 56.4

Line testing Line testing ? 3 2 6 1 6 1 9812.5 723.7

Other SpacesWaiting/Checking Area Central loans issue Tech repairs? 150 41.6 Comprises of waiting area and issue

desk/office area plus storage. External access to loading area.

Loans Store Central loans Storage 111.1

Programme Zones/ Hub areas Programme zone flexi-use 25 2 50 3 150 1 88 reduced to 1 single space300 240.7

Building 1 Net Internal Floor Area 1851.6 1741.5

Non Net AreaCirculation/internal walls (21%) 388.8IT Server Room/hub/switch room inc. Above 47.5Cleaners stores inc. Above 7.3 Only 2 ProvidedWc's inc. Above Dis Wc's inc. Above 11.7

Plant (5%) 92.6 external roof compoundBuilding 1 Gross Internal Floor Area 2333.0 Doesn't include total Non Net Areas

3.1 SPACE REQUIREMENTS

Page 22: Bower Ashton Masterplan, UWE Building 1
Page 23: Bower Ashton Masterplan, UWE Building 1

4.0 DESIGN DEVELOPMENTThe design concept developed from the response to the site context, as well as the project brief and the outline approved masterplan for the campus. This set out certain known parameters including the site, amount of accommodation, spatial adjacencies and functional requirements.

Whilst the site position was largely set by the masterplan, the initial design ideas explored ways in which the form could be organised and articulated to best suit the site context and functional requirements.

This section illustrates the process of design evolution that was undertaken in arriving at the final preferred design solution.

Page 24: Bower Ashton Masterplan, UWE Building 1

The space requirement and the site constraints quickly informed the parameters of the initial sketch design ideas. This included aspects such as the position of entrances, the large production studio space and ‘get-in’, the scale of the building at 3 storeys, and the spatial arrangement.

The sketch designs further explored options for the relationship of the building to the surrounding site and buildings, and investigated options for expressing the prominent facade to Kennel Lodge Road.

The initial concept design was informed by the idea to organise the building with social and group spaces on the Kennel Lodge Road frontage, providing an active facade and enjoying a fine aspect overlooking the deer park. The technical ‘black box’ type spaces could then be arranged on the south facade where the limited amount of windows would aid prevention of unwanted solar gain to the building.

The sketches show some of the initial design ideas that were explored, and that informed the further development of the concept design option.

Building 1 Digital Media + Production - UWE - 24

4.1 INITIAL IDEAS

Page 25: Bower Ashton Masterplan, UWE Building 1

Sketch First Floor Layout Option A

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status INFORMATIONR

Building 1

Bower Ashton Masterplan, UWE

Unnamed

314289 L(SK)007

TE

Feb 2015

L01 Cut away plan2 L02 Cut away plan3

3D View 11

Revision Description By Chkd By Date

We developed two initial options that responded to the site in different ways. Both options were configured around a similar internal plan layout with an orthogonal facade facing into the campus, but with different methods of treating the frontage to Kennel Lodge Road.

The first option looked at reflecting the soft undulating landscape of the deer park with an organic timber form that wrapped around the facade of the building.

The second option took a different approach. This was based on trying to give the programme hub zone more of an identity with a large projecting bay window at first floor overlooking the deer park.

Although visually interesting, it was felt that the first option was somewhat contrived and would result in some complex detailing. The second option provided a more restrained aesthetic that was not trying to compete with the setting, and better reflected the hierachy of internal spaces.

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status INFORMATIONR

Building 1

Bower Ashton Masterplan, UWE

Unnamed

314289 L(SK)007

TE

Feb 2015

L01 Cut away plan2 L02 Cut away plan3

3D View 11

Revision Description By Chkd By Date

Sketch First Floor Layout

Building 1 Digital Media + Production - UWE - 25

4.2 CONCEPT DESIGN

Page 26: Bower Ashton Masterplan, UWE Building 1

UP

UP

9.700

31 2 3 4 5 6 7 8 9 10 11

D

B

C

A

4950.0 6000.0 6000.0 6000.0 6000.0 6000.0 6000.0 6000.0 3500.0 10000.0

7500

.020

00.0

5500

.0

110.32

PRODUCTIONSTUDIO

20.59SCENE DOCK

20.54LOADING BAY

10.69STORE

20.22VISION GALLERY

15.18SOUND GALLERY

43.21

PHOTOGRAPHICSTUDIO 1

10 a10 b

44.45

PHOTOGRAPHICSTUDIO 2

43.95

PHOTOGRAPHICSTUDIO 3

122.42LOANS STORE

9.10

CENTRAL LOANSOFFICE

17.78LOBBY

RIS

ER

4.74LOBBY

9.93ENTRANCE LOBBY

LIFT

REPAIRSAREA

RECEPTION/ISSUE DESK

COURTYARD C BLOCKB BLOCK

KENNEL LODGE ROAD

F BLOCK

DROP OFF/PICK UP

23.04

ACE SERVERROOM

12.74

TECHNICALMANAGERS

OFFICE

42.79WORKSHOP 1

34.79WORKSHOP 3

32.13WORKSHOP 2

41.26

WAITING/CHECKINGAREA

POWEREDDROPDOWN FIRESHUTTER

MIXING DESKMIXING DESK

6.06

SWITCHROOM

2.95

CLEANERSSTORE

RISER

3.98

ACCESSIBLEWC

3.00WC

9.37

DRESSINGROOM

3.00WC

2.97WC

2.08STORE

CHARGINGBAY

CHARGINGBAY

CO

OLI

NG

UN

ITC

OO

LIN

GU

NIT

E

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status PRELIMINARYR

Building 1

@ A1

E

1 : 100

Bower Ashton Masterplan, UWE

Proposed Ground Floor Plan

314289 BA-ASL-0G-00-DR-A-00110

TE

FEB 2015

1 : 100L00 Ground Floor1

Net Area

L00 Ground Floor 713.3 m²L01 First Floor 629.86 m²L02 Second Floor 501.84 m²Total 1845 m²

Gross Internal Area

L00 Ground Floor 894.94 m²L01 First Floor 793.86 m²L02 Second Floor 700.91 m²Total 2389.71 m²

Revision Description By Chkd By DateA Initial concept design TE TY 02.03.15B Updated design TE TY 18.03.15C Updated design TE TY 01.04.15D Updated Design TE TY 24.04.15E Stage 2 plans TE TY 29.04.15

NORTH

PREFERRED DESIGN OPTION

The selected concept option was developed further as the preferred design option.

The internal plan arrangement was reviewed and agreed with the building users to best suit the functional requirements. This included the workshops and heavy duty spaces at ground floor, student spaces and computer suites at first floor, and staff offices and sound sensitive recording and editing spaces on the top floor.

The external appearance was defined as an orthogonal arrangement of 4 parts, which helped to break up the form. This consisted of the 3 storey main building volume with a flat roof, two glass fronted stair and entrance modules and a separate box at the end containing the production studio.

The first floor included an angled projected facade incorporating a large picture window to the hub zone.

The scale and form of the building was being driven by a desire to keep the maximum building height to a minimum level. This resulted in a continous flat roof solution.

Building 1 Digital Media + Production - UWE - 26

4.2 CONCEPT DESIGN

GROUND FLOOR PLAN

Page 27: Bower Ashton Masterplan, UWE Building 1

UPUP

1 2 3 4 5 6 7 8 9 10 11

D

B

C

A

4950.0 6000.0 6000.0 6000.0 6000.0 6000.0 6000.0 6000.0 3500.0 10000.0

7500

.020

00.0

5500

.0

52.48TECH OFFICE

9.00

IT HUBROOM

15.28TUTORIAL ROOM

10 a10 b

LIFT

RIS

ER

56.39

STOP MOTIONTRAINING

20.55

TECH OFFICE/STORE

52.20

DOUBLE SCREENCOMPUTER LAB

RIS

ER

101.12HUB ZONE

65.48

TRIPLE SCREENCOMPUTER LAB

66.44

TRIPLE SCREENCOMPUTER LAB

61.22

STOP MOTIONPRODUCTION

RISER

RISER

3.00WC

2.97WC

3.00WC

55.96

DOUBLE SCREENCOMPUTER LAB

50.42G.P.T 7.41

TEAMLEADER

TEA POINT

2.95

CLEANERSSTORE

3.98

ACCESSIBLEWC

E

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status PRELIMINARYR

Building 1

@ A1

E

1 : 100

Bower Ashton Masterplan, UWE

Proposed First Floor Plan

314289 BA-ASL-0G-01-DR-A-00111

Author

FEB 2015

1 : 100L01 First Floor1

Revision Description By Chkd By DateA Initial concept design TE TY 02.03.15B Updated design TE TY 18.03.15C Updated design TE TY 01.04.15D Updated Design TE TY 24.04.15E Stage 2 plans TE TY 29.04.15

Net Area

L00 Ground Floor 713.3 m²L01 First Floor 629.86 m²L02 Second Floor 501.84 m²Total 1845 m²

Gross Internal Area

L00 Ground Floor 894.94 m²L01 First Floor 793.86 m²L02 Second Floor 700.91 m²Total 2389.71 m²

NORTH

Following a review of the preferred option design with the local planning authority, it was confirmed that they would not support the proposed design for Building 1 in its current guise.

The following items were requested to be considered and have been included in the design:

• A line of tree planting is included along Kennel Lodge Road, to partly screen the building and reinforce the approach to Ashton Court

• The vehicle drop off area has been located at the east of the building, partly screend by existing trees and reducing its impact on Kennel Lodge Road frontage

• The scale of the building and articulation of the roof form have been considered in the following design options study

• A detailed justification for the quantum of floor space has been provided by UWE.

• The use of natural materials is to be considered

• Improved footpath along Kennel Lodge Road is welcomed

• A Public Art Strategy has been proposed by UWE

In response to the local authority’s feedback, an initial exercise was undertaken at first principles to explore a range of different design concept ideas that might be better suited to the site context. Working with the agreed building plan layout, the options considered contrasting ways of articulating the building form and appearance.

The design concept options exercise is illustrated on the following pages.

Building 1 Digital Media + Production - UWE - 27

4.2 CONCEPT DESIGN

FIRST FLOOR PLAN

Page 28: Bower Ashton Masterplan, UWE Building 1

Option 1- Organic wrap

• Timber screen to wrap around the building to soften impact on landscape. Screen breaks down on courtyard side to reflect orthogonal campus context.

• Natural material to blend into existing woodland. Screen of vertical timber members – screen as an interpretation of a forest.

• Hub zone to ‘form a clearing’ in the timber screen/’forest’ to make social spaces visible from street.

• Other windows to remain behind screen – peeking through the timber screen/’forest’ into the deer park.

• Screen unifies top floors on a solid base.

• Dynamic form works well with views when travelling along Kennel Lodge Road.

• Form steps down from high level at west end of building by B Block down to smaller scale at eastern side.

• Entrance to loans store reconfigured and overhang under tech office to form canopy/shelter

• Wrap forms part of screen to roof plant compound

Building 1 Digital Media + Production - UWE - 28

4.3 CONCEPT DESIGN - OPTIONS STUDY

Option 2 – Sculptural form

• Sculptural form, probably timber, to wrap around building. Identity as an art school reflected in bold form. Building to stand out as an object in the landscape, not to hide behind a screen.

• Natural material to blend into existing woodland?

• Sculptural form unifies top floors on a solid base.

• Dynamic form works well with views when travelling along Kennel Lodge Road.

• Form steps down from high level at west end of building by B Block down to smaller scale at eastern side.

• Changes to current plan – plans to match faceted form, treatment of windows in sculptural form?

• Entrance to loans store reconfigured and overhang under tech office to form canopy/shelter

• Forms part of screen to roof plant compound

• Roof could either be flat behind an angular parapet upstand, or folded form wraps over

• Could be perceived as ‘trying too hard’?

• Difficult to detail and to insert window openings

Page 29: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 29

4.3 CONCEPT DESIGN - OPTIONS STUDY

Option 3 – Classical Pavilion

• Building as classical pavilion in the park, as modern interpretation of a ‘gatehouse’ to Ashton Court Estate on Kennel Lodge Road – ‘driveway’ to Grade 1 listed Manor house

• Elegantly proportioned stone fins to unify 1st and 2nd floors. These could also be timber to create a different aesthetic.

• Hub Zone to puncture fins and form an asymmetrical focal point to the elevation.

• Production Studio still to be considered; either as separate element or continuation of classical pavilion in order to maintain a consistent language?

• Could be an interesting contrast between finer honed finish of stone to upper floors over a base of rougher random stone.

Option 4 – Splayed Windows

• Angled windows splayed out to maximise views of deer park.

• Form of building to follow curve of Kennel Lodge Road.

• Hub Zone to puncture fins and form an asymmetrical focal point to the elevation.

• Changes to current plan – plans to match form, could pose a problem matching structural grid. Conflict - the angled windows don’t necessarily relate to the internal spaces

• Dynamic form works well with views when travelling along Kennel Lodge Road.

• Would create a strong visual form for the full 3 storeys – an alternative to other options which proposed a 2 storey volume sitting over a ground story base.

Page 30: Bower Ashton Masterplan, UWE Building 1

Since the geometry and scale of the production studio wing are different to the main form, we’ve elected to treat this differently, contrasting with the main ‘barn’ but tying in through the use of the same metal cladding – it could be interpreted as the ‘silo’ to the barn. With a roof top plant area over the production studio, it would be interesting to carry this same material up as a screen, but potentially perforate the sheet, and introduce matching louvres where needed. Rounded corners are proposed to differntiate and soften the form.

The following pages illustrate the sketch development of Option 5, and a series of sub-option variants that were then explored to consider different aspects of the design and assist in selecting the final preferred design concept.

The concept options were reviewed with the local authority. It was acknowledged that good progress had been made in exploring these options, and that both options 1 and 3 indicated certain aspects of design solutions that might be appropriate to the site.

“The images of the nearby area provide a great reference point and a proposal reflecting a simplicity and textural form replicating the qualities of an agricultural barn would be most conducive in these settings”.

The following key principles were identified;

• The design form should be a simple sculptural form (not too fussy).

• Very few materials need to be used and textural feel of the materials will be of primary importance.

• The detailing of the scheme needs to be minimal and as seamless as possible.

• The height of the building should reflect the preferred design concept and not be constrained to the detriment of the overall design. The strength of the design concept is more important in the site setting.

As a result it was agreed that a 5th option would be developed, drawing on the advice given and the positive aspects of options 1 and 3.

Option 5 has explored this idea further. The main building form has been unified by creating one main block, and introducing a pitched roof. With a limited material pallet and crisp detailing this could provide a modern interpretation of an agricultural barn. Whilst the pitched roof would add to the overall building height, this wouldn’t be perceived from ground level - a design concept that is right for the site is more important than setting an arbitrary maximum height.

A pallet of materials is proposed that includes timber boarding to the main ‘barn’ form with a metal clad pitched roof and part top floor. In treating the top level in this way, it helps to bring down the apparent roof eaves line. The nature of the timber cladding would obviously be explored further, but the intention would be to bring this down almost to ground, sitting over a concrete block base plinth. For the metal, we have in our mind that this could be profiled or seamed aluminium, finished in a dark anthrazite coating,

The traditional form would be seen as being ‘carved’ away or opened up at key points on the façade – for example at the main entrance, feature hub zone window and the corner at the main stair.

Building 1 Digital Media + Production - UWE - 30

4.4 PREFERRED DESIGN CONCEPT - OPTION 5

Page 31: Bower Ashton Masterplan, UWE Building 1

UWE BOWER ASHTON - BUILDING 1Options Development

OPTION 5 - AGRICULTURAL BARN

Building 1 Digital Media + Production - UWE - 31

4.4 PREFERRED DESIGN CONCEPT - OPTION 5

Page 32: Bower Ashton Masterplan, UWE Building 1

VERSION C - BOWED ROOF PROPOSAL WITH FIRST FLOOR PROJECTION.METAL CLADDING AT TOP FLOOR STEPPED BACK FROM THE TIMBER CLADDING ON THE NORTH FACADE.

VERSION A - REGULAR PITCHED ROOF PROPOSAL VERSION B - BOWED ROOF PROPOSAL WITH NORTH FACADE ON UPPER FLOORS OFFSET FROM GROUND LEVEL FACADE TO CREATE AN OVERHANG.

VERSION E - METAL CLADDING WRAPPING DOWN THE NORTH FACADE FROM ROOF TO LEVEL 01. (METAL WOULD BE SET PROUD OF THE TIMBER CLADDING)

FRAMED PICTURE WINDOW TO STUDENT HUB ZONE

VERSION D - AS 5C BUT ILLUSTRATING OPTION TO USE LIGHTER GREY METAL CLADDING.

Maintaining the concept of an agricultural barn typology, the design retains a pitched roof to the main block, with a simple crisp aesthetic comprising a limited pallet of materials including timber, metal cladding and glass.

We have reviewed the concerns regarding light spillage, in particular to the top floor windows, and have reduced these accordingly. With the room use behind changing from computer rooms to staff offices, we have created a ‘grading’ of small to large windows running left to right along the façade.

In considering how the design might incorporate an ‘element of surprise’, we have looked at a number of options for altering the roof profile and/or the façade alignment/ extent of cladding.

The images illustrate what could be a dark finished metal sheet to the roof and walls, in order to reduce reflections and visual impact, whilst achieving an interesting contrast against the timber cladding. Option 5D shows an alternative version using a lighter grey metal sheet.

We have looked at a number of alternative roof profiles, however many of these appeared over dominant or ill-proportioned in the context of the overall design and its surroundings. Either the ‘bowed’ roof form shown on options 5B,C and D or maintaining a constant ridge line seems to be the most successful solution. The bowed roof does create an interesting silhouette as well as a dynamic view along Kennel Lodge Road.

Building 1 Digital Media + Production - UWE - 32

4.4 PREFERRED DESIGN CONCEPT - OPTION 5 VARIANTS

Page 33: Bower Ashton Masterplan, UWE Building 1

PREFERRED OPTION

VERSION C - BOWED ROOF PROPOSAL WITH FIRST FLOOR PROJECTION.METAL CLADDING AT TOP FLOOR STEPPED BACK FROM THE TIMBER CLADDING ON THE NORTH FACADE.

Horizontal Timber cladding

Vertical Timber cladding

Vertical Metalcladding

Option 5C was unanimously selected by the design team, UWE and BCC as the preferred version.

It offers a good balance of simplicity and strength of design concept, whilst offering an articulation to the facade and roof form.

The limited pallet of materials will compliment the surroundings.

The dipped roof profile breaks up the building silouette and provides a dynamic twist to the orthogonal form of the building.

Building 1 Digital Media + Production - UWE - 33

4.5 FINAL PREFERRED DESIGN CONCEPT

Page 34: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 34

4.6 PRECEDENT

The following precedent images show a range of architectural ideas that explore similar themes and concepts to that proposed for Building 1. This includes the use of seamed metal cladding, timber cladding, scale and articulated forms and facade treatments.

Page 35: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 35

4.6 PRECEDENT

Page 36: Bower Ashton Masterplan, UWE Building 1
Page 37: Bower Ashton Masterplan, UWE Building 1

5.0 FINAL DESIGNThe following pages illustrate and explain the final design proposals for Building 1 and the associated landscaping.

This section is set out under the following headings:

• Layout

• Amount

• Scale

• Access and Movement

• Appearance

• Visual Impact

• Landscape

• Environmental Sustainability

• Community Safety

• Ecological Interests

Page 38: Bower Ashton Masterplan, UWE Building 1

UP

9.510

D7

L4

10

356120E

356120E

L3

3

BLOCK B

BLOCK C

1:20 1:20

BUILDING 3

L EV EL REV IEWR EQ UIR ED

9.510

D7

L4

10

356120E

356120E

L3

3

D7

10

BLOCK B BLOCK FBLOCK CBLOCK A

EXISTING BLOCK GBUILDING OUTLINE

EXISTING BLOCK GBUILDING OUTLINE

BLOCK CPHASE 2DEMOLITION

BLOCK CPHASE 2DEMOLITION

INDICATIVE LAYOUT OFFUTURE LANDSCAPEDCOURTYARD

INDICATIVE LAYOUT OFFUTURE LANDSCAPEDCOURTYARD

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

E

1 : 200

Bower Ashton Masterplan, UWE

Proposed Site Plan

314289 BA-ASL-00-00-DR-A-90100

TE

MAY 2015

NORTH

Revision Description By Chkd By DateA Initial concept design TE TY 02.03.15B Updated design TE TY 18.03.15C Stage 2 plans TE TY 29.04.15D Updated Landscape Design TE TY 09.06.15E Issued for PLANNING RH TY 16.10.15

Building 1 is arranged as an orthogonal block reinstating the building frontage line to Kennel Lodge Road and defining the edge of the Bower Ashton campus. The form will also define and enclose the future landscaped courtyard that will form the heart of the redeveloped campus.

The proposed building occupies the position of the existing G Block building which will be demolished.

The ground floor comprises of large functional workshop spaces and studios, including the double height production studio. This space is located at the east end of the building, aiding vehicular access to the loading bay/ scene dock. Adjacent to this is the central loans facility which benefits from the same vehicular access point and pedestrian entrance.

The main entrance is located at the opposite end of the building; in a prime position facing out to what will be the future courtyard space, as well as having close links to the main reception in B Block.

The first floor includes a range of high end IT production spaces, a stop motion animation suite, as well as a large student hub space benefitting from views out over the deer park.

The top floor will be quieter than the lower floors, and comprises of staff offices as well as specialist sound recording spaces and edit suites.

Building 1 Digital Media + Production - UWE - 38

5.1 LAYOUT

PROPOSED SITE PLAN

Page 39: Bower Ashton Masterplan, UWE Building 1

DN

UP

UP

31 2 3 4 5 6 7 8 9 10 11

D

B

C

A

4950 6000 6000 6000 6000 6000 6000 6000 3500 10000

7500

2000

5500

10 a10 b

REPAIRSAREA

RECEPTION/ISSUE DESK

PORTION OF C BLOCKPROPOSED FOR FUTUREDEMOLITION TO FORMNEW CENTRALLANDSCAPED SQUARE

C BLOCKB BLOCK

KENNEL LODGE ROAD

F BLOCK

DROP OFF/PICK UP

POWEREDDROPDOWN FIRESHUTTER

MIXING DESKMIXING DESK

CHARGINGBAY

CHARGINGBAY

CO

OLI

NG

UN

ITC

OO

LIN

GU

NIT

E

0GS002

PHOTOGRAPHICSTUDIO 1

PHOTOGRAPHICSTUDIO 2

PHOTOGRAPHICSTUDIO 3

CORRIDOR

DRESSINGROOM

TECHNICALMANAGERS

OFFICE

SWITCHROOM

WC

WC

WC

RISER

IPS

IPS

IPS

STORE

IPS

ACCESSIBLEWC

CLEANERSSTORE

ENTRANCELOBBY

CORRIDOR

LIFT

WORKSHOP 1 WORKSHOP 2 WORKSHOP 3ACE SERVER

ROOM

LOBBY

SOUNDGALLERY

VISIONGALLERY

CORRIDOR

LOANS STORE

CENTRALLOANS OFFICE

WAITING/CHECKINGAREA

CORRIDOR

STORE SCENE DOCK LOADING BAY

PRODUCTIONSTUDIO

LOBBY

Canopy

CORRIDOR

Circulation

Delivery

Gallery

Office

Store & Maintenance

Teaching Space

WC & Changing

Room key by departments

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

I

1 : 100

Bower Ashton Masterplan, UWE

Proposed Ground Floor Plan

314289 BA-ASL-0G-00-DR-A-00110

TE

MAY 2015

1 : 100L00 Ground Floor1

NORTH

Revision Description By Chkd By DateD Updated Design TE TY 24.04.15E Stage 2 plans TE TY 29.04.15F Updated Design TE TY NYIG Updated Design - Option 5C RH TY 29.09.15H Issued for PLANNING RH TY 16.10.15I Updated for Planning RH TY 21.10.15

The size of the proposed building was established through the development and agreement of the client brief and the space requirements as described earlier in this report.

Building 1 provides approximately 2450sqm of gross internal floorspace split over 3 storeys. A roof area at second floor level provides an external service plant area.

The quantum of space required has been robustly justified by UWE as part of their detailed strategy plans for the wider campus development and their strengthening links with Bristol city centre.

The amount is considered appropriate to the site, with a resulting footprint that retains external spaces and protects the amenity of the local area.

The following pages illustrate the proposed floor plan layouts for the new building.

Building 1 Digital Media + Production - UWE - 39

5.2 AMOUNT

GROUND FLOOR PLAN

Page 40: Bower Ashton Masterplan, UWE Building 1

UPUP DN

DN

1 2 3 4 5 6 7 8 9 10 11

D

B

C

A

4950 6000 6000 6000 6000 6000 6000 6000 3500 10000

7500

2000

5500

TECH OFFICE

IT HUB ROOM

TUTORIALROOM

10 a10 b

STOP MOTIONTRAINING

TECH OFFICE/STORE

DOUBLESCREEN

COMPUTERLABHUB ZONE

TRIPLESCREEN

COMPUTERLAB

TRIPLESCREEN

COMPUTERLAB

STOP MOTIONPRODUCTION

WC

WC

WC DOUBLESCREEN

COMPUTERLAB

G.P.T

TEAM LEADER

CLEANERSSTORE

ACCESSIBLEWC

E

LIFT

RISERRISER

RIS

ER

RIS

ER

1GV009

1GS002

TEA POINT

CORRIDORCORRIDORCORRIDORCORRIDOR

WC LOBBYIPS

IPS

IPS

IPS

Breakout Space

Circulation

Office

Store & Maintenance

Teaching Space

WC & Changing

Room key by departments

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

I

1 : 100

Bower Ashton Masterplan, UWE

Proposed First Floor Plan

314289 BA-ASL-0G-01-DR-A-00111

TE

MAY 2015

1 : 100L01 First Floor1

NORTH

Revision Description By Chkd By DateD Updated Design TE TY 24.04.15E Stage 2 plans TE TY 29.04.15F Updated Design TE TY NYIG Updated Design - Option 5C RH TY 29.09.15H Issued for PLANNING RH TY 16.10.15I Updated for Planning RH TY 21.10.15

1000 1000 10001000 1000 1000 1000 1000 1000 10001000 1000

DN

DN

1 2 3 4 5 6 7 8 9 10 11

D

B

C

A

4950 6000 6000 6000 6000 6000 6000 6000 3500 10000

7500

2000

5500 DUBBING

THEATRE 2FOLEY STUDIODI GRADING

SUITE 2

ACADEMICOFFICE 1

ACADEMICOFFICE 2

ACADEMICOFFICE 3

EDIT SUIT 5EDIT SUITE 4EDIT SUITE 3EDIT SUITE 2EDIT SUITE 1

SOUND LOBBY

VOICE 2

DUBBINGTHEATRE 1

TUTORIALROOM

DI GRADINGSUITE 1

EXTERNAL ROOFPLANT COMPOUND

10 a10 b

VOICE 1CONTROLROOM

SOUND LOBBY

AUDIORECORDING

STUDIO

EDIT SUITE 6

DOUBLESCREEN

COMPUTERLAB

DOUBLESCREEN

COMPUTERLAB

WC

WC

WC

STORE

CLEANERSSTORE

ACCESSIBLEWC

E

CORRIDOR

LIFT

RISERRISER

TEA P

OIN

T

RIS

ER

RIS

ER

CO

PIER

CO

PIER

CORRIDOR

2GSV002

2GSV001

ROOF 01

ROOF 02

CORRIDORCORRIDOR

WC LOBBY

IPS

IPS

IPS

IPS

Breakout Space

Circulation

Office

Store & Maintenance

Teaching Space

WC & Changing

Room key by departments

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

I

1 : 100

Bower Ashton Masterplan, UWE

Proposed Second Floor Plan

314289 BA-ASL-0G-02-DR-A-00112

TE

MAY 2015

1 : 100L02 Second Floor1

NORTH

Revision Description By Chkd By DateD Updated Design TE TY 24.04.15E Stage 2 plans TE TY 29.04.15F Updated Design TE TY NYIG Updated Design - Option 5C RH TY 29.09.15H Issued for PLANNING RH TY 16.10.15I Updated for Planning RH TY 21.10.15

Building 1 Digital Media + Production - UWE - 40

FIRST FLOOR PLAN

SECOND FLOOR PLAN

Page 41: Bower Ashton Masterplan, UWE Building 1

The size and shape of the site has influenced the resulting scale of the proposed development. The proposed development is predominantly 3 stories high, with a lower 2 storey element at the eastern end. This lower element incorporates a roof top plant area that is concealed behind a perforated screen. Refer to the building section drawings for more information.

The flood risk assessment has dictated that the ground floor finished floor level should be no lower than 9.8m AOD.

The principle of developing a 3 storey building on the site was carefully considered during the design development. Computer generated images were used to assess the impact of the building scale on identified key views. The key views were those looking up and down Kennel Lodge Road, as well as long distance views from the surrounding Ashton Court Estate.

On the basis of this work, it was agreed in principle with the local authority that a 3 storey building could be appropriate for the site provided the design quality enhanced the conservation area.

We believe the site can support a building of this proposed scale for the following reasons:

• The proposed footprint is predominantly contained within the existing area of G Block and associated hard standing, and so retains a landscaped buffer to Kennel Lodge Road

• The topography of the site results in the west half of the building being set into the rising slope and so reducing it’s apparent scale when viewed from Kennel Lodge Road

• The proposed building is set within an existing campus setting of other buildings, and is lower than the 5 storey tower of B Block which dominates the surroundings

• The impact of the 3 storey building form on the distant views from the Ashton Court Estate is minimal. The building is seen against the backdrop of the existing campus

• The apparent mass of the building on the street views is reduced by projecting the facade at first floor level and thus appearing to the set the top floor and roof back

• The top floor is designed so as to appear as part of the roof form. The dipping ridge line breaks up the form when viewed across the landscape

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

DB CA

3350

3975

3975

E

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

1 2 3 4 5 6 7 8 9 10 1110 a10 b

Structural zone for steel beams.

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

DB CA E

1

BA-ASL-0G-ZZ-DR-A-00130

2

BA-ASL-0G-ZZ-DR-A-00130

3

BA-ASL-0G-ZZ-DR-A-00130

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

C

As indicated

Bower Ashton Masterplan, UWE

Proposed Sections

314289 BA-ASL-0G-ZZ-DR-A-00130

TE

MAY 2015

1 : 100Section 22

1 : 100Section 11

1 : 100Section 33

Revision Description By Chkd By DateA Initial Input TE TY 18.06.15B Updated Design - Option 5C RH TY 29.09.15C Issued for PLANNING RH TY 16.10.15

BLOCK F

BLOCK CPROPOSED BUILDING 1KENNEL LODGE ROAD

BLOCK A BLOCK B

PROPOSED BUILDING 1BLOCK D KENNEL LODGE ROAD

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

A

1 : 200

Bower Ashton Masterplan, UWE

Proposed Site Sections

314289 BA-ASL-00-ZZ-DR-A-90006

TE

MAY 2015

1 : 200Proposed Site Section 011

1 : 200Proposed Site Section 022

SEC

TIO

N01

SEC

TIO

N02

Key Plan 1:2000 N

Revision Description By Chkd By DateA Issued for PLANNING RH TY 16.10.15

BLOCK F

BLOCK CPROPOSED BUILDING 1KENNEL LODGE ROAD

BLOCK A BLOCK B

PROPOSED BUILDING 1BLOCK D KENNEL LODGE ROAD

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

A

1 : 200

Bower Ashton Masterplan, UWE

Proposed Site Sections

314289 BA-ASL-00-ZZ-DR-A-90006

TE

MAY 2015

1 : 200Proposed Site Section 011

1 : 200Proposed Site Section 022

SEC

TIO

N01

SEC

TIO

N02

Key Plan 1:2000 N

Revision Description By Chkd By DateA Issued for PLANNING RH TY 16.10.15

• A high quality architectural design is proposed in order to enhance the setting

• The layout improves the landscaped spaces around the building

• The site is adequately supported by means of transport to the development

• The existing site already includes support facilities appropriate for the proposed development, including places to purchase food and drink and cyclist changing facilities.

Building 1 Digital Media + Production - UWE - 41

5.3 SCALE

PROPOSED SITE SECTION

PROPOSED SITE SECTION

PROPOSED BUILDING CROSS SECTION

Page 42: Bower Ashton Masterplan, UWE Building 1

The early preparation of this statement is to be considered a positive contribution to identify the philosophy and approach to inclusive design. In preparing this initial statement Austin-Smith:Lord have reviewed all design issues, in order to identify potential access concerns when entering the site and circulating throughout, thereafter evaluating the effectiveness of various solutions which will benefit all users.

The scheme will comply with current legislation. The proposed design and this statement have been developed in reference to Approved Doc M of the Building Regulations and recommendations of BS 8300: 2010 Design of buildings and their approaches to meet the needs of disabled people‘ will also be incorporated wherever possible.

The site can be safely and conveniently accessed via a number of means. Sustainable methods of travel are actively promoted through the University’s Travel Plan, including bus services, cycle groups, walking and car sharing.

In addition to the above, an access consultant has been appointed as part of the project team and have undertaken an RIBA stage 2 access appraisal which will inform the detailed design going forward.

Reference should also be made to the Transport Statement and Travel Plan documents.

PEDESTRIAN ACCESS

The proposed development will improve pedestrian access into the campus by providing a new and improved route via Kennel Lodge Road, thus separating the principle access routes for vehicles from pedestrians and cyclists. The proposed landscaped frontage along Kennel Lodge Road will include a wide pavement which will link to a new ramped footpath leading into the campus. The will connect into a new landscaped courtyard as part of a future phase of work.

The proposed scheme includes improvements to the landscaping of the upper car park area in front A block. This is the approach to the main campus entrance. The revised landscaping will provide a new dedicated pedestrian route through this area connecting from Kennel Lodge Road to the main entrance, and significantly enhancing the visual quality of this space.

From within the campus, pedestrian access will be provided via an external route connecting between C and F blocks and Building 1.

The main entrance to Building 1 is situated on the south west corner of the building, in order to provide frontage onto the future landscaped courtyard and the campus, as well has being identifiable from Kennel Lodge Road. Building 1 will not provide a campus reception point, and as such UWE are keen for the entrance to this building not to be confused as a public/ visitor entrance.

A secondary entrance is provided at the eastern end, facing towards F block. This provides a convenient connection between then buildings which include shared spaces.

CYCLIST APPROACH

The University actively promotes cycling as a sustainable method of travel. Cycle routes connect the campus to the wider area, and this information is distributed to students and staff. Cyclists will arrive at the campus frontage via Kennel Lodge Road.

The proposed masterplan involves a defined strategy for cyclists. A new store is proposed at the north end of B Block, which utilises the existing level change and locates bikes in a convenient position close to the students Union, central services building and C Block. Locating the cycle storage in this area means cyclists use Kennel Lodge Road to access the University; allowing a separation from the main vehicle access along Park Farm Lane, which would enhance safety.

The covered and secure cycle parking store proposed as part of phase 1 will include 136 spaces. A further 106 spaces will be provided as part of phase 2 in order to bring the total provision up to 242 spaces. In the interim period the existing cycle shelters at the southern end of the campus would be retained.

Due to the width of the road and available site, it is not possible to create separate cyclist and pedestrian lanes alongside the road. It is proposed that the pavement alongisde the road will be a shared surface, with cyclists asked to dismount before entering the campus pedestrian area. The path alongisde the road will be extended up towards the entrance to Ashton Court in order to allow possible future connection to a planned cycle route.

Building 1 Digital Media + Production - UWE - 42

5.4 ACCESS AND MOVEMENT

Page 43: Bower Ashton Masterplan, UWE Building 1

VEHICULAR APPROACH

Vehicular approach to the campus is from Clanage Road, leading into Kennel Lodge Road, approaching the campus from the east. The long term aim is to concentrate vehicular approach, including cars, buses and all deliveries/servicing to the main campus access from Park Farm Lane, thus segregating vehicles from pedestrian and cyclist arrival.

There will, however, be a small amount of car parking for disabled, visitors and drop off located in front of A Block, utilising the existing access points from Kennel Lodge Road. It is proposed that this area of car parking is remodelled in order to improve the layout and offer a better pedestrian approach and visual impression of the campus entrance.

The ground floor incorporates a central loans facility for lending of media equipment. This equipment will be picked up and dropped off by students, and thus a dedicated entrance point is required with associated vehicle parking. Along with the production studio, this facility has been located at the eastern end of the building in order to suit the existign site levels. A vehicle pull in and drop off bay has been included alongside the end of the building, with a dedicated access point off Kennel Lodge Road. It’s impact has been reduced by locating the parking bays away fromt he roadside, and screened by the existing mature woodland. This pull-in area has been tracked for relevant vehicle movements including cars and vans.

The masterplan development will ultimately increase the car parking provision on site from 120 to 138 spaces including 5% disabled provision.

ENTRANCES

The building’s main entrance has been located on the corner facing the proposed courtyard, giving maximum prominence in the campus setting. The frontage to the main entrance will be predominantly hard surfaced, and pedestrian routes will be clearly marked and signed. External fittings such as bollards and seating will be coloured to contrast against the background.

The main entrance comprises a automatic bi-parting sliding door each side of a generous draught lobby. The doors will be clearly marked so as to be distinguishable in the façade, and feature a level approach and threshold.

The secondary entrance adjacent Block F, and the central loans access will comprise level thresholds and canopies.

INTERNAL LAYOUT

The building is provided with two main stairs serving all upper floors. All stairs are 1200mm and will be designed in accordance with Approved Document M. A lift will access all floors, located in the Main Entrance area for maximum convenience. All horizontal circulation will be a minimum of 1800mm clear width.

The plan layout is arranged to maximise simplicity and efficiency. Toilet provision for all types of users is located on all floors within the central core area.

SUMMARY

The design is very clearly laid out and facilities are readily visible and legible both from within the building and from the outside with the treatment of the facades. All facilities are accessible. Use of the building will be aided by use of colour contrast and tactile variations in surfaces to distinguish features and aid navigation.

Vehicular access routes around the new building will be clearly marked and separated from pedestrian routes, giving an improvement on the existing site layout. A full access statement for the building will be prepared as part of the building regulations submission at the next stage.

Building 1 Digital Media + Production - UWE - 43

Page 44: Bower Ashton Masterplan, UWE Building 1

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

1234567891011 10 a 10 b

3975

3975

3350 PM1

MS1

TW1 TW2 TW1 MS1OP1 OP1

MS1

BW1

MS1

WIN1

BW1 WIN2

OP1WIN1

WIN2

WIN2

WIN2

WIN1

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

DB CA E

TW2

TW2

TW1

TW2

TW1

MS1BW1

LV2

WIN2

WIN2

WIN1

LV1

MS1:

PM1:

LV1:

LV2:

Metal standing seam cladding

Perforated metal screen

Powder coated steel horizontal brise soleil

Materials Key

OP1: Ceramic backed glass panel

TW1:

TW2:

Vertical timber cladding with irregular timber sections

Horizontal timber cladding

BW1: Concrete facing blockwork

Vertically stacked external shading fins

WIN1: Powder coated aluminium window

WIN2: Powder coated aluminium curtain wall glazing

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

C

1 : 100

Bower Ashton Masterplan, UWE

Proposed Elevations

314289 BA-ASL-0G-ZZ-DR-A-00120

TE

MAY 2015

1 : 100Elevation North1

1 : 100Elevation West2

Revision Description By Chkd By DateA Initial Input TE TY 18.06.15B Issued for PLANNING RH TY 16.10.15C Updated for Planning RH TY 21.10.15

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

1 2 3 4 5 6 7 8 9 10 1110 a10 b

3350

3975

3975

MS1

PM1

TW1BW1TW1BW1TW2

LV1LV2

PA1WIN1 WIN1

LV1

WIN2

MS1:

PM1:

LV1:

LV2:

Metal standing seam cladding

Perforated metal screen

Powder coated steel horizontal brise soleil

Materials Key

OP1: Ceramic backed glass panel

TW1:

TW2:

Vertical timber cladding with irregular timber sections

Horizontal timber cladding

BW1: Concrete facing blockwork

Vertically stacked external shading fins

WIN1: Powder coated aluminium window

WIN2: Powder coated aluminium curtain wall glazing

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

D BC A

3350

3975

3975

E

TW2PM1

MS1

MS1

WIN1

WIN2WIN1

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

B

1 : 100

Bower Ashton Masterplan, UWE

Proposed Elevations

314289 BA-ASL-0G-ZZ-DR-A-00121

TE

MAY 2015

1 : 100Elevation South1

1 : 100Elevation East2

Revision Description By Chkd By DateA Initial Input TE TY 18.06.15B Issued for PLANNING RH TY 16.10.15

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

1234567891011 10 a 10 b

3975

3975

3350 PM1

MS1

TW1 TW2 TW1 MS1OP1 OP1

MS1

BW1

MS1

WIN1

MS1

BW1 WIN2

OP1WIN1

WIN2

WIN2

WIN2

WIN1

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

DB CA E

TW2

TW2

TW1

TW2

TW1

MS1BW1

LV2

WIN2

WIN2

WIN1

LV1

MS1:

PM1:

LV1:

LV2:

Metal standing seam cladding

Perforated metal screen

Powder coated steel horizontal brise soleil

Materials Key

OP1: Ceramic backed glass panel

TW1:

TW2:

Vertical timber cladding with irregular timber sections

Horizontal timber cladding

BW1: Concrete facing blockwork

Vertically stacked external shading fins

WIN1: Powder coated aluminium window

WIN2: Powder coated aluminium curtain wall glazing

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

B

1 : 100

Bower Ashton Masterplan, UWE

Proposed Elevations

314289 BA-ASL-0G-ZZ-DR-A-00120

TE

MAY 2015

1 : 100Elevation North1

1 : 100Elevation West2

Revision Description By Chkd By DateA Initial Input TE TY 18.06.15B Issued for PLANNING RH TY 16.10.15

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

1234567891011 10 a 10 b

3975

3975

3350 PM1

MS1

TW1 TW2 TW1 MS1OP1 OP1

MS1

BW1

MS1

WIN1

MS1

BW1 WIN2

OP1WIN1

WIN2

WIN2

WIN2

WIN1

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

DB CA E

TW2

TW2

TW1

TW2

TW1

MS1BW1

LV2

WIN2

WIN2

WIN1

LV1

MS1:

PM1:

LV1:

LV2:

Metal standing seam cladding

Perforated metal screen

Powder coated steel horizontal brise soleil

Materials Key

OP1: Ceramic backed glass panel

TW1:

TW2:

Vertical timber cladding with irregular timber sections

Horizontal timber cladding

BW1: Concrete facing blockwork

Vertically stacked external shading fins

WIN1: Powder coated aluminium window

WIN2: Powder coated aluminium curtain wall glazing

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

B

1 : 100

Bower Ashton Masterplan, UWE

Proposed Elevations

314289 BA-ASL-0G-ZZ-DR-A-00120

TE

MAY 2015

1 : 100Elevation North1

1 : 100Elevation West2

Revision Description By Chkd By DateA Initial Input TE TY 18.06.15B Issued for PLANNING RH TY 16.10.15

The proposed design for Building 1 draws on the typology of an agricultural barn. This is particularly appropriate to the semi rural context of the conservation area setting, and offers the opportunity to provide a new building on the campus that will preserve and enhance the character of the conservation area.

The building design responds positively to the context of the Ashton Court Estate, whilst also addressing the existing campus with a building befitting of a modern higher education establishment.

The design proposes a strong concept based on a refined simplicity with a limited pallet of materials utilised. Natural timber boarding has been chosen to clad the facade of the main building form, with a dark metal cladding used for the pitched roof and top floor level. The metal cladding drops down at the ends and provides accent details to the building envelope including canopies and soffit panels. The exact type and colour of metal cladding will be agreed on site with the local authority, but at this stage a vertical standing seam profile is preferred, with the roof seams continuing down the face of the building. A dark matt colour is shown in the imagery on the basis that this will reduce reflectivity and blend the building into the surroundings, with the dark tones complimenting those of the mature woodland behind the building.

The timber cladding will be primarily horizontally fixed, with a contrast element of vertically fixed boarding to the ground floor storey facing Kennel Lodge Road. This vertical boarding will run through the entrance lobby and continue in part on the south elevation. The exact timber species and method of fixing will be agreed on site with the local authority, but it will offer a natural material that will weather over time and be sympathetic to the surroundings.

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

1 2 3 4 5 6 7 8 9 10 1110 a10 b

3350

3975

3975

MS1

PM1

TW1BW1TW1BW1TW2

LV1LV2

PA1WIN1 WIN1

LV1

WIN2

MS1:

PM1:

LV1:

LV2:

Metal standing seam cladding

Perforated metal screen

Powder coated steel horizontal brise soleil

Materials Key

OP1: Ceramic backed glass panel

TW1:

TW2:

Vertical timber cladding with irregular timber sections

Horizontal timber cladding

BW1: Concrete facing blockwork

Vertically stacked external shading fins

WIN1: Powder coated aluminium window

WIN2: Powder coated aluminium curtain wall glazing

L00 Ground Floor

9800.0

L01 First Floor

13775.0

L02 Second Floor

17750.0

Roof - Eaves

21100.0

D BC A

3350

3975

3975

E

TW2PM1

MS1

MS1

WIN1

WIN2WIN1

Drawings and models powered byAustin-Smith:Lord LLP BIM using AutoDesk Revit

Austin-Smith:Lord LLPArchitects Designers PlannersLandscape Architectsone Dunleavy DriveCardiff BayCF11 0SNt +44 (0)2920 225208.e [email protected]

DO NOT SCALE. Use figured dimensions only.The contractor is requested to check alldimensions before the work is put in hand.©All copyrights Austin-Smith:Lord LLP

This drawing must only be used for the purposefor which it is supplied and its contents must notbe reproduced for any purpose without writtenpermission.No areas indicated, or areas calculated from thisdrawing should be used for valuation purposesor as the basis for development contracts.Austin-Smith:Lord LLP is a limited liabilitypartnership registered in England & Wales.Number OC315362

Project

Description

Job No. Drawing No. Revision

Date

Drawn

Scale

Status

R

PLANNING

Building 1

@ A1

B

1 : 100

Bower Ashton Masterplan, UWE

Proposed Elevations

314289 BA-ASL-0G-ZZ-DR-A-00121

TE

MAY 2015

1 : 100Elevation South1

1 : 100Elevation East2

Revision Description By Chkd By DateA Initial Input TE TY 18.06.15B Issued for PLANNING RH TY 16.10.15

Building 1 Digital Media + Production - UWE - 44

5.5 CHARACTER - APPEARANCE

PROPOSED ELEVATIONS

Page 45: Bower Ashton Masterplan, UWE Building 1

The production studio is treated as a separate and distinct element at the end of the main ‘barn’ form. Accommodating the primary specialist space and the essential building services, this block is very much the ‘engine’ of the building and is devised as an interpretation of a silo adjoining the barn. Clad in the same metal cladding as used on the barn, it will retain a common language of materiality whilst providing a distinct form with rounded corners and a perforated metal screen to the roof plant. A corner slot window at first floor and the scene dock door will be ‘carved’ out of the metal solid, animating the facade.

Areas of glazing on the facade have been limited to suit the requirements of the internal spaces, and to restrict the potential for light spill to the surroundings. UWE embrace strict targets for energy reduction across their estate and all artificial lighting will be controlled on PIR’s and/ or timer switches where appropriate. Additionally, Building 1 will largely be used only during the core campus operating hours and not through nightime periods.

Building 1 Digital Media + Production - UWE - 45

5.5 CHARACTER - APPEARANCE

Page 46: Bower Ashton Masterplan, UWE Building 1

The visual impact of the proposed development on the surroundings has been assessed in the following series of key views.

The following key views towards the site were agreed with the local authority

It was agreed with the local authority that the following key views would need to be assessed in the context of the new development:

• View up Kennel Lodge Road on the approach to Ashton Court Estate

• View down Kennel Lodge Road on leaving Ashton Court Estate

In addition, the following views based on the Landscape Visual Impact Assessment submitted as part of the outline planning application would need to be assessed:

• KV2 - View northwest at No.s 1&2 Clanage Road

• KV7 - View southwest from PRoW 200A/20 on footbridge

• KV8 - View southeast from bench overlooking Red Deer Park

• KV10 - View southeast from Lambing Pen Field

The following pages show both the existing view and a computer generated photomontage of the same view to show the impact of the proposed development.

Views of the proposed building looking up and down Kennel Lodge Road show how the building is partially screened by existign trees. Additional tree planting along the Kennel Lodge Road frontage is proposed and this will further screen the development. In particular, the existing mature woodland on the approach up Kennel Lodge Road screens the east elevation of the building.

It can be seen that the building is almost invisible in views KV2 and KV7. Views KV8 and KV10 are similar, and both show how the proposed building is minimal impact, being viewed in the context of the existing campus development and blending into the background.

The choice of timber cladding and dark coloured metal helps blend the building into the natural setting.

It is apparent that the views of the building are primarily hidden by the existing trees. What is visible blends into the landscape through the choice of natural materials.

Building 1 Digital Media + Production - UWE - 46

5.6 CHARACTER - VISUAL IMPACT VIEW UP KENNEL LODGE ROAD EXISTING VIEW EXISTING VIEW

PROPOSED VIEW PROPOSED VIEW

VIEW DOWN KENNEL LODGE ROAD

Page 47: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 47

EXISTING VIEW

PROPOSED VIEW

VIEW DOWN KENNEL LODGE ROAD LANDSCAPE AND VISUAL IMPACT ASSESSMENT VIEW KV2Existing View

Proposed View

Existing zoomed in View Proposed zoomed in View

KV8

KV10

KV2

KV7

V2

V1

Key PlanLandscape and Visual Impact Assessment View

View

Site Location

5.6 CHARACTER - VISUAL IMPACT LVIA VIEW KV2

Page 48: Bower Ashton Masterplan, UWE Building 1

The photographs show that the proposed development is obscured by existing trees and hedges in this key view.

Building 1 Digital Media + Production - UWE - 48

LANDSCAPE AND VISUAL IMPACT ASSESSMENT VIEW KV7

Existing View

Proposed View

Existing Block B Outline: Proposed Building 1 Outline:

KV8

KV10

KV2

KV7

V2

V1

Key PlanLandscape and Visual Impact Assessment View

View

Site Location

5.6 CHARACTER - VISUAL IMPACTLVIA VIEW KV7

Page 49: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 49

Existing View

Proposed View

Existing zoomed in View Proposed zoomed in View

LANDSCAPE AND VISUAL IMPACT ASSESSMENT VIEW KV8

KV8

KV10

KV2

KV7

V2

V1

Key PlanLandscape and Visual Impact Assessment View

View

Site Location

5.6 CHARACTER - VISUAL IMPACT LVIA VIEW KV8

PROPOSED VIEW

EXISTING VIEW

PROPOSED ZOOMED IN VIEWEXISTING ZOOMED IN VIEW

Page 50: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 50

Existing View

Proposed View

Existing zoomed in View Proposed zoomed in View

LANDSCAPE AND VISUAL IMPACT ASSESSMENT VIEW KV10

KV8

KV10

KV2

KV7

V2

V1

Key PlanLandscape and Visual Impact Assessment View

View

Site Location

5.6 CHARACTER - VISUAL IMPACTLVIA VIEW KV10

PROPOSED VIEW

EXISTING VIEW

PROPOSED ZOOMED IN VIEWEXISTING ZOOMED IN VIEW

Page 51: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 51

5.7 LANDSCAPE

Building 1 forms the first phase of the masterplan redevelopment for the Bower Ashton campus, as per the outline planning approved scheme. The quality of the landscaped space between the buildings and addressing the site boundaries will be critical to the success of the redevelopment, knitting the campus together and improving its appearance within the surrounding context.

The red line boundary for Building 1 includes the land along the boundary with Kennel Lodge Road, extending up to include the existing upper car park in front of the main campus entrance.

The frontage to Kennel Lodge Road will be significantly improved to better suit the conservation area setting and to provide a safe and accessible pedestrian and cyclist route alongside the road. This will give access to a new pedestrian and cyclist entry point into the campus. New hard surfaces and soft landscaping will enhance the street frontage.

The new path alongside the road will continue up as far as the edge of UWE’s site boundary at the gates to the Ashton Court Road. This is at the request of the local authority and will facilitate the eventual future connection of a linking cycle route, as well as improving access to the Estate.

The proposed landscape design has been extended to incorporate the upper car park area in front of A Block. This forms the approach to the campus main entrance. The revised landscape scheme will significantly improve this frontage and provide enhanced pedestrian access, cycle parking and a revised car park layout. In order to improve this external space in terms of appearance, accessibility and safety, it has been necessary to remodel the car park layout with a consequential reduction in the number of spaces.

A new cycle parking shelter is proposed to be located immediately adjacent to the new campus entrance path, utilising the existing unsightly ‘pit’ adjacent to B block. As a result the cycle shelter will be set down into the slope of the site, thus reducing its visual impact on the surroundings.

Existing trees have been retained wherever possible. However, a small number of trees will need to be removed to facilitate the development, including the new wider footpath alongside the road. All trees that are to be removed will be replaced with new tree planting in line with the local authority standards, and as shown on the proposed landscape drawings.

The building use includes a production studio and a central loans facility. Both of these require a vehicle drop off and pick up area to be located nearby, and this

is shown at the end of the building, screened behind the existing trees. The access point on Kennel Lodge Road has been configured so as to minimise its impact on the street frontage and to recreate the impression of a driveway entrance.

The proposed planting has been informed by the consultant ecologist and will include native species appropriate to the conservation area.

External lighting will be designed to provide low level illumination directed to the ground and to avoid light spill to the surroundings. The lighting will improve legibility and public safety.

The following precedent images give an indication of the type of proposed finishes and details being considered for the various key elements of the landscaping. These include examples of proposed hard surfaces, methods of dealing with level changes, street furniture, cycle parking, lighting and projection, and the future courtyard with potential bio-swale.

Page 52: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 52

5.7 LANDSCAPE - SITE PLAN

Page 53: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 53

5.7 LANDSCAPE - PRECEDENT

Page 54: Bower Ashton Masterplan, UWE Building 1

5.7 LANDSCAPE CONCEPT

COURTYARD

The masterplan for the campus redevelopment includes for the demolition of parts of C Block in order to form a new central landscaped courtyard within the campus. A concept design has been produced in order to inform the design of the phase 1 landscape works, but the detailed design for this space will be carried out under a future phase of works. The courtyard will offer opportunities to create a much needed heart to the campus, improving connectivity between buildings and permeability from Kennel Lodge Road.

A key part of the overall campus landscape realm, the courtyard will provide soft and hard landscaping, new trees and paved areas. The courtyard represents a significant increase in green space and permeable surfaces at the heart of the campus. The arrangement of the buildings around the courtyard with entrances and active frontages orientated towards each other would ensure the space is a lively and widely use by staff and students.

Until the courtyard phase is realised, the south elevation and entrance to Building 1 will face onto the existing C Block elevation. The narrow external space between these two buildings will be temporarily landscaped to suit the existing entrances and levels until the courtyard work commences.

UWE have developed a Public Art Strategy for the campus which proposes a series of annual temporary commissions of external art projects within the courtyard space. These projects will cross the full range of mediums including sculpture, film, drama etc.

UWE are also interested in incorporating systems to allow for the projection of visuals/ artwork onto the south façade of Building 1, overlooking the new courtyard.

The concept design illustrate the potential to incorporate a landscaped swale running the length of the courtyard providing a pleasing visual whilst simultaneously providing a sustainable drainage strategy and increasing biodiversity in the area.

Building 1 Digital Media + Production - UWE - 54

Page 55: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 55

5.8 ENVIRONMENTAL SUSTAINABILITY

THE SETTING

The development sits within the existing university campus, surrounded by buildings of similar scale and type, and sitting on the footprint of an existing building.

ENHANCING BIODIVERSITY

The proposed building will be located on a part of the site that is considered to have no biodiversity value, featuring an existing building and areas of hardstanding. Some trees and scrub will be lost as a result of the development, primarily in the area of the new car park. To mitigate this, new tree and scrub planting will be introduced alongside the site in order to enhance biodiversity and to provide natural screening. Details for this will be developed with the ecologist and landscape architect, to the approval of the authority.

ENERGY EFFICIENCY

A sustainable design approach has been taken on each element of the Building 1 design. The building fabric and room layouts have been optimised. Dynamic energy modelling software has been used to inform the building’s energy demands, requirements for cooling, and the carbon reduction figure required to satisfy the Bristol City Council planning requirements for LZC technologies.

The building services design has been carefully considered in order to offer optimum energy usage, flexibility, and the ability achieve planning conditions. Through a LZC technology appraisal photovoltaic panels have been selected to provide the specific planning requirements.

The external envelope will be designed to achieve an excellent thermal performance, reducing heat loss and air leakage, thus ensuring energy efficiency.

An LZC report has been carried out and has recommended the use of air source heat pumps and PV panels. Approxmiately 150m2 of PV will be required. Through consultation with the local authority, it has been agreed that the PV panels should not be located on the roof of Building 1 due to visibility from the surrounding area. The preferred and agreed strategy is to place these on the roof of Building 2 which will be developed in the next phase. Alternatively, the PV could be located on the existing roof of C Block, within the campus. Air source heat pumps will be loated within the roof top plant compound.

LIGHTING

All luminaries where possible will be LED. The controls will be selected to optimise the use of electric lighting in each area according to its use. Where daylight savings can be made separate modulating photo-electric controls will maximise daylight by switching off rows of unwanted illuminated luminaires. In offices and toilets PIR absence control will also be used to prevent occurrences of lights being left on while the space is unoccupied.

SUSTAINABLE MATERIALS

Building and landscape materials will be selected in accordance with the BRE Green Guide in order to achieve A/ A+ ratings where possible.

All timber will be responsibly sourced. The contractor will be registered with the Considerate Contractors Scheme.

It is intended that rubble from the demolished building will be re-used on site for forming sub-bases.

WATER

The boosted mains cold water service to the building will be metered and monitored by the building management system. Sub metering will be used in areas or for equipment using ten percent or more of the buildings total water demand.

A leak detection system is proposed for the building and for the mains pipework coming to the building from the campus.Flow control devices regulating the supply of water to each WC are to be installed. Low flow water saving fittings will be specified.

Rainwater harvesting was considered at an early stage but the low demand within the building made it unfeasible. It will be considered again as part of future building phases.

BREEAM UK New Construction 2014 Assessment Report: Rating & Key Performance Indicators

Overall Building Performance

Building name UWE Arts & Media Building

BREEAM rating Very Good

Total Score 69.07%

Min. standards level achieved Excellent level

Building Performance by Environment Section

Environmental SectionNo. credits available

No. credits Achieved

% credits achieved

Section Weighting Section Score

Management 21 14 66.67% 12.0% 8.00%

Health & Wellbeing 18 12 66.67% 15.0% 10.00%

Energy 23 14 60.87% 15.0% 9.13%

Transport 11 8 72.73% 9.0% 6.55%

Water 9 7 77.78% 7.0% 5.44%

Materials 14 8 57.14% 13.5% 7.71%

Waste 8 5 62.50% 8.5% 5.31%

Land Use & Ecology 10 9 90.00% 10.0% 9.00%

Pollution 13 9 69.23% 10.0% 6.92%

Innovation 10 1 10.00% 10.0% 1.00%

0%

2%

4%

6%

8%

10%

12%

14%

16%

Management Health &Wellbeing

Energy Transport Water Materials Waste Land Use &Ecology

Pollution Innovation

Section score available Section score achieved

Assessment Rating KPIs 18/03/2015 Section 2 - Page 2

Page 56: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 56

WASTE MANAGEMENT

The building has been designed to be simple in form and thus maximise efficiency in use of materials and the minimisation of waste. During construction, a site waste management plan will be used and diversion from landfill will be monitored.

Dedicated facilities will be included for the storage, sorting and recycling of operational waste in the building’s use. The existing campus refuse storage facilities will be used in the short term, though a new storage compound is propsoed as part of a later phase of the masterplan development.

SUSTAINABLE BUILDING STANDARDS

The development is being assessed using BREEAM New Construction 2014, and will achieve a minimum BREEAM Very Good rating, in accordance with planning policy.

The current pre-assessment indicates a target potential score of 69%. A copy of the pre-assessment summary estimate has been included in this report for reference.

ADAPTABILITY FOR FUTURE CHANGE

The nature of educational buildings change over time, so the requirement for future flexibility was a part of the project brief. The building has been designed to be as simple as possible, therefore aiding future adaptation. The structure will be an in-situ concrete column and flat slab frame with a generous floor to soffit height. Spaces are designed to be functional and robust. Internal partitioning will comprise stud and plasterboard which will aid future adaptation.

Page 57: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 57

The proposed development will improve the security and safety of the site and surrounding area for the benefit of the building users and wider public.

Consultation has taken place with Avon & Somerset Police’s Crime Prevention Design Officer.

The crime risk for the premises has been identified as; theft of cycles, criminal damage, burglary and arson.

The following design advice has been provided and has informed the proposed design, offering security and safety imrpovements to the campus site:

• An intruder alarm system will be fitted to the building

• The design avoids the creation of hidden recesses or recessed doorways that cannot be overlooked

• Secure cycle storage facilities will be provided for staff and student use. These will feature locked gate access and CCTV coverage

• Fire exit doors will be metal with no outer door furniture, fitted with hinge bolts and be linked to the alarm system within the building. As a minimum they will be fitted with an unmonitored screech alarm to reduce opportunity for the doors to be propped open.

• All external glazing at ground floor level will incorporate laminated glass as one of its double glazed panes and should reach BS7950 or similar standard.

• Entrance doors into the building should be PAS 24 standard or LPS 1175 SR1.

• CCTV cameras will be positioned to cover all building access points. External lighting levels should be compatible with the CCTV system installed.

• External lighting will be provided to highlight pedestrian routes and entrances, to enhance personal safety. However, the type and level of lighting will need to also balance the requirements of the conservation area setting.

5.9 COMMUNITY SAFETY

• Good signage to inform and instruct visitors to the facility and to define the building entrance points.

• Any planting design should not inhibit natural surveillance and plant growth should not be above 1 metre mature growth height and trees should not obstruct CCTV and lighting systems installed.

• Areas inside the building will be fitted with zoned access control restricting access to only those authorised to reduce possibilities of theft.

• The building will have adequate fire warning, evacuation and prevention systems in place to protect life.

• Waste storage bins will be securely located within a dedicated compound at a central collection point on the campus, remote from surrounding buildings.

In addition to the above, the campus benefits from a 24 hour security presence.

Page 58: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 58

5.10 ECOLOGICAL INTERESTS

An extended phase 1 habitat survey of the Bower Ashton campus has been completed by Ecosulis and was submitted as part of the masterplan outline planning application.

The technical summary noted the following:

The site comprises amenity grassland, hard-standing, standard trees, woodlands, buildings and semi-improved grassland. The site is immediately adjacent to Ashton Court SSSI. No evidence of protected or notable species was recorded during the surveys; however the site provides opportunities for roosting and foraging bats and nesting birds and reptiles.

Further bat survey works have been carried out on site in accordance with the recommendations of the report.

Further input is being sought from the ecologist in respect of achieving the relevant BREEAM credits. Their ongoing advice and recommendations will be considered by the project team and acted upon where agreed.

Page 59: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 59

Page 60: Bower Ashton Masterplan, UWE Building 1
Page 61: Bower Ashton Masterplan, UWE Building 1

6.0 CONCLUSION

Page 62: Bower Ashton Masterplan, UWE Building 1

Building 1 Digital Media + Production - UWE - 62

This Design and Access Statement accompanies theReserved Matters planning application for the development of a new 3 storey Digital Media building (known as Building 1) and associated landscaping for UWE, to be located at their Bower Ashton campus, Kennel Lodge Road, Bristol. The proposed development is in line with the outline approved masterplan development.

The proposed higher education use is considered entirely appropriate for the location, forming part of the existing campus site. The redevelopment of the campus will ensure the long term retention and enhancement of the site for the benefit of the local community and economy.

The site is a sustainable location for the proposed development, utilising the footprint of an existing out-dated building and associated areas of hardstanding.

The site benefits from good sustainable transport options including public transport and cycling.These options will be promoted through the University Travel Plan.

The proposed development will preserve and enhance the conservation area setting. The design development and supporting information has justified the proposed scale and position of the building, and provides a high quality facility that improves the frontage along Kennel Lodge Road.

The proposed amount and layout of Building 1 have been developed in close consultation with UWE, and justification has been provided to demonstrate this.

The scale and appearance have been developed in close collaboration with the local authority and UWE. The final scheme offers a proposed design that responds to the setting. The articulation of the facade and roof, and the use of natural materials within a simple and strong design concept will enhance the conservation area context.

The associated landscape works along the Kennel Lodge Road frontage will offer significant improvements to the visual appearance and quality of this important approach route to the Ashton Court Estate.

Overall, it is considered that the proposed development is appropriate to the site context, offers significant improvements in landscape and visual appearance, and will provide a high quality new facility as the first phase of the Bower Ashton campus masterplan.

8.0 CONCLUSION

Page 63: Bower Ashton Masterplan, UWE Building 1

Cardiffone Dunleavy Drive

Cardiff CF11 0SN

+44 (0)2920 225 [email protected]

Glasgow296 St Vincent Street

Glasgow G2 5RU

+44 (0)141 223 [email protected]

LiverpoolPort of Liverpool Building

Pier Head L3 1BY

+44 (0)151 227 [email protected]

www.austinsmithlord.com

Austin-Smith:Lord LLP is a limited liability partnership registered in England & Wales with registered number OC315362